corporate resume -...

4
We Are Sustineo is a visionary company, dedicated to global sustainability. We are responsive, agile, and collaborative. We are committed to excellence in environmental stewardship through energy and water efficiency, renewable energy, and green building. Corporate Resume ph. 858-270-9333 [email protected] www.SustineoPlanet.com COMPANIES: CORPORATE HEADQUARTERS: SUSTINEO CORPORATION SUSTINEO SOLAR SYSTEMS, INC SUSTINEO CONSTRUCTION CORPORATION 6977 Navajo Road, Suite 139 San Diego, California 92119 Toll Free 1-866-SUSTINEO (787-8463)

Upload: others

Post on 24-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Corporate Resume - sustineocorporation.netsustineocorporation.net/downloads/Sustineo-Corporate-Resume.pdf · Corporate Resume Info@SustineoPlanet.com ph. 858-270-9333 COMPANIES: CORPORATE

We AreSustineo is a visionary company, dedicated to global sustainability. We are responsive,

agile, and collaborative. We are committed to excellence in environmental stewardship

through energy and water efficiency, renewable energy, and green building.

Corporate Resume

ph. 858-270-9333 [email protected]

C O M P A N I E S : C O R P O R A T E H E A D Q U A R T E R S :

SUSTINEO CORPORATION

SUSTINEO SOLAR SYSTEMS, INC

SUSTINEO CONSTRUCTION CORPORATION

6977 Navajo Road, Suite 139

San Diego, California 92119

Toll Free 1-866-SUSTINEO (787-8463)

Page 2: Corporate Resume - sustineocorporation.netsustineocorporation.net/downloads/Sustineo-Corporate-Resume.pdf · Corporate Resume Info@SustineoPlanet.com ph. 858-270-9333 COMPANIES: CORPORATE

Sustineo Corporation is a Design + Build + Operate engineering, procurement, and construction firm specializing in

sustainability and renewable energy power projects. Based in San Diego, California, we provide feasibility studies,

engineering design, procurement, construction, commissioning, and maintenance services to clients throughout the U.S.

market. Our core expertise is solar PV projects for commercial, government, military, and utility scale clients. Our

strengths are providing flexible and comprehensive approaches to system designs, with unparalleled speed and accuracy.

ProfileO P E R A T I O N A L Q U A L I F I C A T I O N S & E X P E R I E N C E

COMPANY PROFILE

Target Customers

Business Sectors

Type of Business Organization

Incorporation

Registered Small Business

Ownership Status

Subsidiaries

Bonding Capability

Dun & Bradstreet #

Licenses

Certifications

Number of Employees

NABCEP Installers

Loss Time Incidents

Financial Status

Arbitration/Litigation

Equipment Owned

Engineering Design, Construction, O&M, Asset Management, & Consulting

Agricultural, Utility, Military, Commercial, & School Districts

Renewable Energy, Solar PV, Energy Efficiency, & Green Building

2008, State of California; Founded 2007

Yes, State of California #1011839

Privately Held Corporation

Sustineo Solar Systems, Inc.,

Sustineo Construction Corporation

Yes

00-529-3889

C-46, C-10; Electrical Engineering; Civil Engineering

Multi-State/North America; Electrical, Civil, Mechanical, Structural Engineers; Certified

Energy Managers; Certified Plans Examiners; OSHA-30

9, Exclusive to Solar PV Business

Yes, On Staff

None Over Past 5 Years

No bankruptcies or credit issues over company history

None in company history

All necessary equipment to self-perform feasibility & solar shading studies, AutoCAD,

electrical & structural engineering plotting, mechanical & electrical installation, system

commissioning, IV curve tracing, & troubleshooting of electrical systems; O&M test equip.

Page 3: Corporate Resume - sustineocorporation.netsustineocorporation.net/downloads/Sustineo-Corporate-Resume.pdf · Corporate Resume Info@SustineoPlanet.com ph. 858-270-9333 COMPANIES: CORPORATE

PortfolioO P E R A T I O N A L Q U A L I F I C A T I O N S & E X P E R I E N C E

We PromiseWe pride ourselves on providing the highest quality work, and will continue exceeding our clients’

expectations while simplifying the pursuit of sustainability. We commit to creating customers for

life through innovative sustainability, excellence in workmanship, and impeccable service.

Sustineo acted as the lead engineering team during construc-

tion permitting. Scope of work included: site visits, transmis-

sion system review, coordination with Imperial Irrigation

District, the City of El Centro, system layout and sizing,

grading plans, structural foundation designs, electrical design

and full permitting support.

Sol Orchard - Imperial I, El Centro, CA | Largest Project Completed

Sustineo Solar Systems, Inc. provided preliminary feasibility and

structural studies in order to determine the amount of weight

that each roof could accept along with the corresponding

requirement imposed by the local utility. Turn‐key construction

services were offered by our team. The system was commis-

sioned and tested in order to determine proper installation, as

well as create a baseline for long‐term performance.

DiMare Company, Indio, CA | Latest Project Completed

Sustineo provided engineering design services, product procurement,

equipment staging, labor for crane lifts, electrical interconnection

designs, permitting, QA/QC on the carport layouts and connection to

the structures. Sustineo is acting as the engineer of record for, electrical

single-lines, as well as coordinated with the Authority Having Jurisdic-

tion on permitting review and approval. Site walks were conducted

regularly with a multi-disciplinary engineering team advising on

structural, electrical, and environmental issues. Sustineo will also

manage all aspects of the construction to ensure project goals are met.

Fox Studios, Burbank, CA | Ongoing Project

Page 4: Corporate Resume - sustineocorporation.netsustineocorporation.net/downloads/Sustineo-Corporate-Resume.pdf · Corporate Resume Info@SustineoPlanet.com ph. 858-270-9333 COMPANIES: CORPORATE

Project HighlightsO P E R A T I O N A L Q U A L I F I C A T I O N S & E X P E R I E N C E

We BelieveOur actions today will ensure a healthier planet for our children tomorrow.

PROJECT HIGHLIGHTS TIMELINE

SOUTHERN CALIFORNIA GAS COMPANY | Palm Desert, CA | 59kWp | February 2015

DIMARE COMPANY | Indio, CA | 331kWp | November 2014

NEW JERSEY PPA PORTFOLIO | Various Locations in NJ | 3,000kWp | May 2014

UNIVERSITY OF CALIFORNIA RIVERSIDE | Riverside, CA | 500kWp | January 2014

SOUTHERN CALIFORNIA GAS COMPANY | Redlands, CA | 303kWp | June 2013

SOL ORCHARD - IMPERIAL I | El Centro, CA | 25,000kWp | September 2013

MC BRIDE RV | Chino, CA | 1,500kWp | April 2012

BLUE BEETLE SOLAR FARM | Barceloneta, Puerto Rico | 28,000kWp | March 2012

BEE SAFE STORAGE UNIT | Temecula, CA | 1,200kWp | March 2012

SAN VINCENTE HABITAT 4 HUMANITY | South Gate, CA | Portfolio | January 2012

CITY OF MURRIETA POLICE STATION | Murrieta, CA | 302kWp | June 2011

KINGMAN SOLAR FARM | Kingman, AZ | 360,000kWp | August 2011

EXCELSIOR SOLAR FARM | Five Points, CA | 14,000kWp | June 2011

ADERA SOLAR FARM | Chowchilla, CA | 20,000kWp | April 2011

RAVENSWOOD WINERY | Sonoma, CA | 580kWp | November 2010

TEMECULA VALLEY RV | Temecula, CA | 1,500kWp | October 2010

ESTANCIA WINERY | Soledad, CA | 1,125kWp | October 2010

CLOS DU BOIS WINERY | Geyserville, CA | 1,125kWp | September 2010

LOS ANGELES VALLEY PERFORMING ARTS (LEED) | Palm Desert, CA | 150kWp | June 2010

CHINA LAKE HANGAR BUILDING | Ridgecrest, CA | 450kWp | April 2010

VENTURA NAVAL BASE | Ventura, CA | 500kWp | March 2010

EL CENTRO NAVAL AIR STATION | El Centro, CA | 210kWp | Janury 2010

POST GRADUATE NAVAL ACADEMY | Monterey, CA | 250kWp | September 2009

SAN DIEGO NAVAL BASE | San Diego, CA | 215kWp | December 2009

CARMEL VALLEY COMMUNITY CENTER (LEED) | San Diego, CA | 30kWp | March 2009

VALLEY VIEW CASINO & HOTEL | Valley Center, CA | 1,000kWp | July 2008

CHINA LAKE MICHELSON LABS | Ridgecrest, CA | 200kWp | April 2008

BIG PARK SCHOOL DISTRICT (LEED) | Sedona, AZ | 150kWp | November 2008

CHINA LAKE BARRACKS | Ridgecrest, CA | 121kWp | June 2007