1Future full of energy
Presentation on
Disaster Management in LPG & Petroleum product pipeline
transportation
31st January 2014
By
J S Prasad
GM-Pipelines, HPCL
Hindustan Petroleum Corporation Limited
2
Vijayawada
Mangalore
Bahadurgarh
Awa
Salawas
Raman Mandi
Bhatinda
PRODUCT PIPELINE NETWORK
INDIA (PSU)
2012-13
Mundra
Barauni
GuwahatiSiliguri
HaldiaKoyali
Ratlam
Mathura
TinsukiaDigboi
Numaligarh
Bina
Kota
IOCL
HPCL
BPCL
OIL
Total Network Length : 14,034 Kms
Total Capacity : 85 MMTPA
GAIL
11-02-2014
2
3
Product Pipeline Network (PSU)
Company Total Product Pipeline network length in Kms
Total Capacity in MMTPA
IOC 6,632 41.56
HPCL 2,769 22.60
GAIL 2,038 3.24
BPCL 1,941 15.50
OIL 654 1.72
TOTAL 14,034 85
47%
20%
14%
14%5%
Network Share
IOCL HPCL BPCL GAIL OIL
49%
27%
4%18%
2%
Capacity Share
IOC HPCL GAIL BPCL OIL
LPG Pipelines of 2312 Km and 3.94 MMTPA in India
Future Full Of Energy 4
DescriptionLength (KMs)
Capacity (MMTPA)
Year of Comm
Mumbai-Pune-Solapur P/L & Other P/L 544 6.8 1985 /2006
Visakh-Vijayawada-Secunderabad P/L 572 5.38 1998 /2002
Mundra-Delhi P/L & BTPL 1068 6.06 2007
Ramanmandi-Bahadurgarh and Ramanmandi-Bathinda P/L
273 5.86 2012
Mangalore Hassan Bengaluru P/L (JV) 364 2.14 2002
Total 2823 26.22
HPCL Pipelines
Operating Pipelines
DescriptionLength
(KMs)
Capacity
(MMTPA)
Scheduled
Completion
Rewari - Kanpur 442 7.9 Nov, 2015
Awa - Salawas 93 2.3 Nov, 2015
Mangalore Hassan Mysore Solur (LPG) 397 3.1 Nov, 2015
Total 932 13.3
Under Construction Pipelines
Future Full Of Energy
11-02-2014
3
5
Salient Points to be discussed
ONSITE DISASTER MANAGEMENT
RISKS
OPERATION PRACTICES TO MITIGATE RISKS
EMERGENCY PREPRAREDNESS – SYSTEMS
AND PROCEDURES
OFFSITE DISASTER MANAGEMENT
RISKS
MAJOR STAKE HOLDERS
EMERGENCY PRERPAREDNESS – SYSTEMS
& PROCEDURES
SYSTEM DESIGN
INNOVATIONS
CASE STUDIES 6
DESIGN FEATURES
OF PIPELINES
DESIGN FEATURES
OF PIPELINES
Future Full Of Energy
11-02-2014
4
7
Safety Features – Design/ Construction Stage
Future Full Of Energy
De
sig
n Various National and International codes like ASME B31.4, API 1104, API 1102, API 5L,
Petroleum Rules 2002, OISD 141, 117, 214
Corrosion Allowance of 0.5 MM
Safety Factor of 0.72 as per ASME B31.4
Str
ength
Selection of line pipe based on API 5L standard spec
Automatic / Semi-Automatic welding ensuring strength of weld area greater than parent material
100% Radiography is ensured for the weld joints as per API 1104
Pipeline is shop floor tested at 95% of SMYS
Pipeline is site tested at either 1.25 times the design pressure or 95% of SMYS
Concrete coating of Pipes as anti-buoyancy measure
Sa
fety
The pipeline routes are selected based on urbanization and population
Laid at the minimum depth of 1.2 Meters
Environmental Impact assessment (EIA) and Quantitative risk analysis (QRA) studies
Higher wall thickness in Highway and Rail Crossings with casings ref. API 1102
Pipeline Laid 2 Meters below the Scour Depth using HDD while crossing Perennial rivers
Adequate safety margins considered for withstanding longitudinal stresses because of earthquakes / Tectonic Plate Movement
Mobile Cold Flare Systems for LPG Pipelines at Remote SVs
8
Integrity of Pipelines
Future Full Of Energy
Corrosion Protection
Process Control
Safety/Security
Emergency preparedness
Internal corrosion:
� Dosing by Corrosion Inhibitor� Online Corrosion
Monitoring using Corrosion Probes
External corrosion:
� Anti corrosive coating using Denso/ 3 LPE coating.
� Corrosion protection thru Impressed Current Cathodic Protection
system
� PLC based onsite
control of various process and equipment parameters
� OFC Based dedicated telecommunication system for effective and
quick communication between stations.
� SCADA based control
of entire pipeline for control of Process and equipment
� Dynamic and Steady state leak detection system based on
mathematical model of Pressure, temperature, volume and flow.
� Day and Night Patrolling of Line walkers
� CCTV Cameras in all stations and SV stations
� Security Tracking System to monitor the movement of line
walkers on a daily basis
� Pipeline Intrusion
Detection System to detect third party intrusion on our
pipeline ROU
� Offsite and On Site mock drill
� Village awareness and
Village coordination meet
� Security Coordination
meets
11-02-2014
5
9
Periodic Checks
CAT: Current Attenuation Test
CIPL: Closed Interval Potential Logging
TLP : Test Lead Points
IP : Intelligent Pigging
Pipeline Checks Periodicity as per OISD 188 and 138
CAT survey Once in 5 years
CIPL survey Once in 5 years
On/off TLP survey Once in a year.
IP survey Once in 10 years CIPL Survey
Intelligent PIG
10
ONSITE DISASTER
MANAGEMENT
ONSITE DISASTER
MANAGEMENT