Pavlo Villhauer—SUPERINTENDENT Claire McNally—ASSISTANT PROJECT MANAGER Mark Rolfs —PROJECT EXECUTIVE Kara McDade—PROJECT COORDINATOR Corpus Christi Church CONSTRUCTION UPDATE | May 22, 2020 REPORT NO.: 18 Completed Activities Began precast erection at West Entrance Continued plumbing rough in, steel deck installation, and framing Fleche steel delivered to site Concrete placed at elevated slabs and slab on deck at Choir Loft Energized transformer Critical Issues and Pending Approvals Sprocket Detail at Roof Look Ahead Schedule Continue wall framing Continue plumbing rough in Commence sprinkler rough in Continue installation of pre-cast Installation of high ductwork in Nave Installation of stair to Choir Loft VIEW FROM CHOIR LOFT SUBSTANTIAL COMPLETION | March 2021 BUILDING WEST ENTRANCE FACADE STEEL AT ALTAR AND CROSSING

Upload: others

Post on 06-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Corpus Christi Churchcorpuschristisr.org/images/18_-_Newsletter_Update_05-22-2020_1.pdf · 22/05/2020  · Corpus Christi Church CONSTRUCTION UPDATE | May 22, 2020 REPORT NO.: 18

Pavlo Villhauer—SUPERINTENDENT

Claire McNally—ASSISTANT PROJECT MANAGER

Mark Rolfs —PROJECT EXECUTIVE

Kara McDade—PROJECT COORDINATOR

Corpus Christi Church CONSTRUCTION UPDATE | May 22, 2020

REPORT NO.: 18

Completed Activities

� Began precast erection at West Entrance

� Continued plumbing rough in, steel deck installation,

and framing

� Fleche steel delivered to site

� Concrete placed at elevated slabs and slab on deck

at Choir Loft

� Energized transformer

Critical Issues and Pending Approvals

� Sprocket Detail at Roof

Look Ahead Schedule

� Continue wall framing

� Continue plumbing rough in

� Commence sprinkler rough in

� Continue installation of pre-cast

� Installation of high ductwork in Nave

� Installation of stair to Choir Loft

VIEW FROM CHOIR LOFT

SUBSTANTIAL COMPLETION | March 2021

BUILDING WEST ENTRANCE FACADE

STEEL AT ALTAR AND CROSSING

Page 2: Corpus Christi Churchcorpuschristisr.org/images/18_-_Newsletter_Update_05-22-2020_1.pdf · 22/05/2020  · Corpus Christi Church CONSTRUCTION UPDATE | May 22, 2020 REPORT NO.: 18

HAVE A QUESTION ABOUT THE PROJECT? CALL OR EMAIL US!

240.375.6593| [email protected]

Corpus Christi Church CONSTRUCTION UPDATE | MAY 2020

VIEW STANDING AT THE ALTAR

FLECHE STEEL PRELIMINARY FITTING