correspondence from a resident relating to agenda item 8 · 2020. 6. 16. · correspondence from a...
TRANSCRIPT
Correspondence from a resident relating to agenda item 8.5
I believe the time may be right to advise the HPC that the long awaited Hardwick Footpath
Upgrade from Cambridge County Council should commence in September 2020 following
the current Hill Contractors work on the short stretch from Blue Lion to St Marys. The
advice from Hills Contractors is that their work is scheduled for 8 to 10 weeks. This is the
reason for the Traffic Order and temporary road signs for Main Street – unfortunately it is not
for CCC work yet. I attach emails that provide communications if required. The mention of
costs is applicable to CCC not Hardwick Village as the funds are already allocated.
Highways have confirmed that they will join the full upgrade onto Hills work up to St Marys
bend then heading down Main Street to Cahills corner initially. Their first task is to “move
the road across” so that sufficient space can be created for a 2m footpath.
We were sent outline drawings back in December 2019 but at that time, several tests and
audits were awaited hence drawings were not considered final. The Final Road Safety Audit
on the church bend and the pedestrian safety solution at the junction Cambridge Road and St
Neots Road appear imminent and so the drawings and work details are attached for
information and discussion.
Just to let you know that the original Highways Program Manager, Mike Davies, who
championed my proposal for the Transport Investment Plan and conducted the walk through
with Tony, has left CCC and we are now dealing with Stuart Rushby and primarily his
Engineer, John Stanley.
I have had no enquiries or interest on this from any other councillor except a conversation
with one who thought the upgrade was not firm.
Background
You are aware that Hardwick were granted £400,000 from Cambridge County Council for the
upgrade of the footpath through Main Street and Cambridge Road. I put a situation report in
March 2019 HH and then an update in February HH and now the plans are now almost
complete. It seems a good time to share with the Village again. Highways have of course
been keeping us updated with their progress though with Covid-19, this has been limited.
John Stanley CCC to Resident
In terms of updates:
- Road Safety Audit Stage 1 has now been completed.
- Road Safety Audit Stage 2 comments are expected to be returned next week.
- Once the Road Safety Audit tasks are completed and any additional requirements are
incorporated within the design, we can look to obtain a Target Cost.
- Hills Contractors have confirmed that all being well they are looking to commence works
the w/b 15th June.
- I'll look to follow up with them next week to determine some additional details, in
particular the planned duration of their programme.
And
Hills Contractors have indeed confirmed that they’re looking at an 8 – 10 week programme
of works.
As they have the road space booked – our works on Cambridge Road/Main Street will have
to follow completion of the Hills works. On that basis, realistically, we’re looking at
September at the earliest.
I’ve already been chasing Hills this week for a copy of their confirmed design, mainly to
discuss the tie in with our works on the bend near the Church, but now to ascertain the exact
locations for the columns too.
I’m yet to receive a response, but I’ll of course keep on the case.
6
1
.
2
6
G
G
6
1
.
3
2
G
G
6
0
.
9
8
G
G
K
O
C
L
6
0
.
8
5
M
H
C
L
6
0
.
6
0
U
C
M
H
C
L
6
1
.
1
4
M
H
L
P
L
P
S
I
C
L
6
1
.
0
6
I
C
S
I
S
I
S
I
P
B
S
T
0
6
S
T
0
5
W
M
A
s
p
h
a
l
t
W
all
G
r
a
s
s
W
BG
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
T
P
E
P
OH
L
A
sphalt - 30m
ph
M
ain
S
treet
Asphalt - 30mph
Main Street
OH
L
I
/
R
1
.
5
h
P
/R
1
.5
h
D
u
e
t
o
D
e
n
s
e
V
e
g
e
t
a
t
i
o
n
3
.
0
h
U
n
a
b
l
e
t
o
S
u
r
v
e
y
D
u
e
t
o
D
e
n
s
e
V
e
g
e
t
a
t
i
o
n
3
.
0
h
U
n
a
b
l
e
t
o
S
u
r
v
e
y
P
/R
1
.5
h
P
/R
1
.5
h
D
u
e
t
o
D
e
n
s
e
V
e
g
e
t
a
t
i
o
n
3
.
0
h
U
n
a
b
l
e
t
o
S
u
r
v
e
y
P
r
i
v
a
t
e
L
a
n
d
P
r
i
v
a
t
e
T
r
a
c
k
C
o
n
c
r
e
t
e
P
r
i
v
a
t
e
T
r
a
c
k
T
P
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
S
I
Concrete
U
K
9
h
Footway - Asphalt
Footway - Asphalt
Footw
ay -
Asphalt
Bench
T
o
W
OHL
OHL
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
Asphalt - 30mph
Main Street
A
s
p
h
a
l
t
-
3
0
m
p
h
M
a
i
n
S
t
r
e
e
t
E
F
H
B
2
H
B
2
HB
2
H
B
2
H
B
2H
B
2
H
B2
H
B2
H
B
2
H
B
2
H
B
2
E
F
EF
EF
E
F
EF
EF
E
F
B
N
B
N
B
N
L
P
0
3E
K
L
EK
L
EK
L
E
K
L
E
K
L
E
K
L
E
K
LE
K
L
EK
L
EK
L
E
K
L
E
K
L
E
K
L
E
K
L
E
K
L
EK
L
EK
L
E
K
L
E
K
L
E
K
L
E
K
LE
K
L
EK
L
EK
L
E
K
L
E
K
L
E
K
L
E
K
L
1004 100 4 2
1010 100 1 1
M
AIN
ST
R
EE
T
MAIN STREET
CU
T LIN
E
CU
T LIN
E
CU
T LIN
E
CU
T LIN
E
CO
NT
IN
UE
D O
N S
HE
ET
1
NKO1
NMH1
N
M
H
2
K
O
C
L
6
0
.
8
5
M
H
C
L
6
0
.
5
5
M
H
C
L
6
0
.
6
0
U
C
L
P
W
M
6
0
.
3
0
G
G
5
9
.
4
8
G
G
M
H
T
P
U
K
1
0
h
Hedge 1.5h
H
edge 2.5h
Hedge 2.5h
OH
L
OHL
G
r
a
s
s
T
P
P
/
R
1
.
5
h
P
/
R
1
.
5
h
D
u
e
t
o
D
e
n
s
e
V
e
g
e
t
a
t
i
o
n
3
.
0
h
U
n
a
b
l
e
t
o
S
u
r
v
e
y
P
r
i
v
a
t
e
L
a
n
d
Hedge 2.5h
Hedge 2
.5h
C
o
n
c
r
e
t
e
P
r
i
v
a
t
e
T
r
a
c
k
T
P
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
F
o
o
t
w
a
y
-
A
s
p
h
a
l
t
G
r
a
s
s
Hedge 2.5h
H
e
d
g
e
2
.5
h
F
o
o
tw
a
y - A
sp
h
a
lt
Footway -
Asphalt
Footway -
Asphalt
Hedge 1.5h
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
P
r
i
v
a
t
e
L
a
n
d
P
r
i
v
a
t
e
L
a
n
d
P
r
i
v
a
t
e
L
a
n
d
P
r
i
v
a
t
e
L
a
n
d
P
r
i
v
a
t
e
L
a
n
d
P
r
i
v
a
t
e
L
a
n
d
P
r
i
v
a
t
e
L
a
n
d
P
r
i
v
a
t
e
L
a
n
d
P
r
i
v
a
t
e
L
a
n
d
A
s
p
h
a
lt - 3
0
m
p
h
M
a
in
S
tre
e
t
Asphalt - 30mph
Main Street
EF
H
B
2
H
B
2
H
B
2
H
B
2
H
B
2
H
B
2
H
B
2
H
B
2
HB
2
HB
2
HB
2
HB2
HB2
HB2
HB2
E
F
E
F
E
F
E
F
EF
EF
EF
EF
EF
HB
2
HB2
HB2
HB2
BN
HB2
EF
EFEF
EF
EFEF
EFEF
EF
EF
EF
EF
EF
EF
EF
B
N
B
N
B
N
LP05
LP04
LP03
RS02
BTC02
BTC03
PP06
E
K
L
E
K
L
E
K
L
E
K
L
E
K
L
E
K
L
EK
L
EK
L
EK
L
EKL
EKL
EKL
EKL
E
K
L
E
K
L
E
K
L
E
K
L
E
K
L
E
K
L
EK
L
EKL
EKL
EKL EKL
EKL
E
K
L
E
K
L
E
K
L
E
K
L
E
K
L
E
K
L
EK
L
EK
L
EK
L
EKL
EKL
EKL
EKL
E
K
L
E
K
L
E
K
L
E
K
L
E
K
L
E
K
L
EK
L
EKL
EKL
EKL EKL
EKL
1004100
4
2
MAIN STREET
M
A
IN
S
TR
E
E
T
K
I
N
G
S
R
O
A
D
CU
T L
IN
E
CU
T L
IN
E
C
U
T
L
I
N
E
C
U
T
L
I
N
E
N
K
O
1
N
M
H
1
NMH2
NG1
EF
EF
EF
EF
EF
EF
EF
EF
EF EFEF
EF
EF
EF
E
F
RS03
BTC04
BTC05
M
A
I
N
S
T
R
E
E
T
MAIN STREET
C
U
T
L
I
N
E
C
U
T
L
I
N
E
C
O
N
T
I
N
U
E
D
O
N
S
H
E
E
T
3
CU
T L
IN
E
CU
T L
IN
E
Drawing Originator
© Crown copyright and database rights XXXX Ordnance Survey xxxxxxxxx. You are permitted to use this
data solely to enable you to respond to, or interact with, the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
D
R
A
F
T
5020296-SKA-HGN-ZZ-DR-CH-0002 P1.0
1:250 HW
02/09/19
GENERAL ARRANGEMENT(SHEET 2 OF 4)
HARDWICK FOOTWAY WIDENING
PRELIMINARY DESIGN
Scale
Checked Date
Checked by
Drawn Date Approved Date
Approved by
Project Name
Drawing Status
Title Original drawing sheet is A1
Drawn by
RevDrawing Number
Chk'dDrnDescriptionDateRev
Revisions
File location: P:\GBCBA\HandT\Cambridgeshire Highways\Projects\5020296-Hardwick\900 CAD & BIM\910 Drawings\HGN\5020296-SKA-HGN-ZZ-DR-CH-0001.dwg Printed by: Thompson, Neil (IS)
Unit 1A, Vantage HouseWashingley RoadHuntingdon, PE29 6SR
Tel: +44 (0)1223 785165Email: [email protected]
© Crown copyright and database rights 2018 Ordnance Survey 100023205. You are permitted to use this
data solely to enable you to respond to, or interact with, the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
- - - - -
SECTION BEING DESIGNED
BY DEVELOPER
SECTION PREVIOUSLY UPGRADED
BT COVER- TO BE
LOWERED
LP04 TO REMAIN
BT COVER- TO BE
LOWERED
BT COVER- TO BE
LOWERED
EXISTING
HEADWALL
!
SIGNIFICANT CDM HEALTH & SAFETY RISKS
1. ..........
NOTES:
1. DO NOT SCALE FROM THIS DRAWING.
2. SITE VERIFY ALL DIMENSIONS PRIOR TO
CONSTRUCTION
3. ALL KERBS TO BE LAID IN ACCORDANCE TO BS EN
1340:2003 AND HOUSING ESTATE ROAD CONSTRUCTI0N
SPECIFICATION (HERCS)
4. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL RELEVANT DOCUMENTS AND DRAWINGS
5. CHAINAGE 0 IS LOCATED AT THE START OF THE
FOOTWAY ON MAIN STREET
!
1
Residual Risk Assessment
Wherever possible, risk is designed-out of this
proposal during the design process. Where this is
not possible, the risk will be minimised and any
residual significant risk will be noted and indicated
by the symbol.
KEY
EXISTING POWER POLE
EXISTING LAMP COLUMN
EXISTING INFORMATION BOARD
BUS SHELTER
EXISTING BUS SHELTER TO BE
DISMANTLED AND REPLACED WITH 3-BAY
CANTILEVER BUS SHELTER WITH HALF
END PANELS
PROPOSED HB2 KERB
LPxx
PPxx
IBxx
EXISTING SIGNSRSxx
VERGE
EXISTING FOOTWAY PREVIOUSLY IMPROVED
PROPOSED REFUGE ISLAND
EXISTING FOOTWAY TO BE PLANED 25mm
AND REINSTATED
EXISTING BT POLE
BTPxx
BTCxx EXISTING BT COVER
HB2
EF
BN
PROPOSED CONCRETE EDGING KERB
PROPOSED BULL NOSED KERB
NGx
NKOx
PROPOSED GULLY, POT AND FRAME AND
CONNECTION TO EXISTING CARRIER DRAIN
PROPOSED KERB OFFLET AND
CONNECTION TO EXISTING CARRIER DRAIN
PROPOSED TACTILE PAVING SLABS WITH
BALLOTINI BLOCKS
1004.1 100 6 3
GAP (m)
WIDTH (mm) LENGTH (m)
DIAG. NO.
PROPOSED FOOTWAY WIDENING
PROPOSED CARRIAGEWAY WIDENING
PROPOSED CARRIAGEWAY RE-PROFILING
EKLEXISTING KERB TO BE REMOVED
NMHxPROPOSED MANHOLE COVER AT NEW
CARRIAGEWAY LEVEL
EF EF
BTC12
BTC13
IB02
CAMBRIDGE ROAD
CAMBRIDGE ROAD
LIM
ES
R
OA
D
CU
T L
IN
E
CU
T L
IN
E
CO
NT
IN
UE
D O
N S
HE
ET
3
CU
T L
IN
E
CU
T L
IN
E
6
4
.
0
0
5
3
7
6
4
0
.
0
0
0
m
E
5
3
7
6
6
0
.
0
0
0
m
E
Footway - Asphalt
U
n
a
b
le
t
o
S
u
r
v
e
y
D
u
e
t
o
D
e
n
s
e
V
e
g
e
t
a
t
io
n
3
.
0
h
Ditch
Grass Bank
Grass Bank
G
r
a
s
s
P
r
iv
a
t
e
L
a
n
d
Asphalt - 30mph
Cambridge Road
CAMBRIDGE ROAD
CAMBRIDGE ROAD
CU
T L
IN
E
CU
T L
IN
E
CU
T L
IN
E
CU
T L
IN
E
S
T
0
4
6
4
.0
0
G
G
6
3
.9
9
G
G
6
4
.2
3
U
C
K
O
K
O
K
O
K
O
K
O
K
O
K
O
M
P
T
C
T
a
c
T
C
S
V
F
H
C
L
6
4
.2
5
IC
T
C
T
a
c
.
U
K
1
0
h
L
P
L
P
R
S
R
S
R
S
R
S
S
T
0
3
H
e
d
g
e
2
.0
h
Hedge 2
.0h
Concrete
W
a
ll
Footway - Asphalt
Footway - Asphalt
G
ra
s
s
N
B
N
B
NB
Concrete
G
ra
s
s G
ra
s
s
R
S
G
ra
s
s
G
ra
s
s
G
ra
s
s
Footway - Asphalt
F
o
o
t
w
a
y
-
A
s
p
h
a
l
t
F
ootw
ay - A
sphalt
B
x
U
n
a
b
le
to
S
u
rv
e
y
D
u
e
to
D
e
n
s
e
V
e
g
e
ta
tio
n
3
.0
h
U
n
a
b
le
to
S
u
rv
e
y
D
u
e
to
D
e
n
s
e
V
e
g
e
ta
tio
n
3
.0
h
U
n
a
b
le
to
S
u
rv
e
y
D
u
e
to
D
e
n
s
e
V
e
g
e
ta
tio
n
3
.0
h
U
n
a
b
le
to
S
u
rv
e
y
D
u
e
to
D
e
n
s
e
V
e
g
e
ta
tio
n
3
.0
h
B
x
U
n
a
b
le
to
S
u
rv
e
y
D
u
e
to
D
e
n
s
e
V
e
g
e
ta
tio
n
3
-8
h
U
n
a
b
le
to
S
u
rv
e
y
D
u
e
to
D
e
n
s
e
V
e
g
e
ta
tio
n
3
-8
h
U
n
a
b
le
to
S
u
rv
e
y
D
u
e
to
D
e
n
s
e
V
e
g
e
ta
tio
n
3
-8
h
G
ra
s
s
G
ra
s
s
G
ra
s
s
G
ra
s
s
G
ra
s
s
H
edge 2.0h
Hedge 2
.0h
D
itc
h
G
ra
s
s
B
a
n
k
G
r
a
s
s
B
a
n
k
D
itch
G
rass B
ank
G
rass B
ank
G
ra
s
s
G
ra
s
s
G
ra
s
s
G
ra
s
s
G
ra
s
s
G
ra
s
s
G
ra
s
s
G
ra
s
s
P
riv
a
te
L
a
n
d
P
riv
a
te
L
a
n
d
P
riv
a
te
L
a
n
d
Asphalt - 40mph
St Neots RoadAsphalt - 40mph
St Neots Road
Asphalt - 40mph
St Neots Road
Asphalt - 30m
ph
Cam
bridge R
oad
A
sphalt - 30m
ph
C
am
bridge R
oad
5
3
7
6
4
0
.0
0
0
m
E
5
3
7
6
6
0
.0
0
0
m
E
2
5
9
5
6
0
.0
0
0
m
N
2
5
9
5
8
0
.0
0
0
m
N
2
5
9
5
8
0
.0
0
0
m
N
2
5
9
6
0
0
.0
0
0
m
N
H
B
2
H
B
2
B
N
H
B
2
B
N
H
B
2
BN
BN
HB2
HB2
E
K
L
E
K
L
E
K
L
E
K
L
TACTILE PAVING
TO BE REMOVED
TOTALING 3.71m²
ST NEOTS RO
AD
ST NEOTS ROAD
CA
MB
RID
GE
R
OA
D
C
U
T
LIN
E
C
U
T
LIN
E
Drawing Originator
© Crown copyright and database rights XXXX Ordnance Survey xxxxxxxxx. You are permitted to use this
data solely to enable you to respond to, or interact with, the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
D
R
A
F
T
5020296-SKA-HGN-ZZ-DR-CH-0004 P1.0
1:250 HW
02/09/19
GENERAL ARRANGEMENT(SHEET 4 OF 4)
HARDWICK FOOTWAY WIDENING
PRELIMINARY DESIGN
Scale
Checked Date
Checked by
Drawn Date Approved Date
Approved by
Project Name
Drawing Status
Title Original drawing sheet is A1
Drawn by
RevDrawing Number
Chk'dDrnDescriptionDateRev
Revisions
File location: P:\GBCBA\HandT\Cambridgeshire Highways\Projects\5020296-Hardwick\900 CAD & BIM\910 Drawings\HGN\5020296-SKA-HGN-ZZ-DR-CH-0001.dwg Printed by: Thompson, Neil (IS)
Unit 1A, Vantage HouseWashingley RoadHuntingdon, PE29 6SR
Tel: +44 (0)1223 785165Email: [email protected]
© Crown copyright and database rights 2018 Ordnance Survey 100023205. You are permitted to use this
data solely to enable you to respond to, or interact with, the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
- - - - -
EXISTING PATH
RESURFACE ONLY
!
SIGNIFICANT CDM HEALTH & SAFETY RISKS
1. ..........
NOTES:
1. DO NOT SCALE FROM THIS DRAWING.
2. SITE VERIFY ALL DIMENSIONS PRIOR TO
CONSTRUCTION
3. ALL KERBS TO BE LAID IN ACCORDANCE TO BS EN
1340:2003 AND HOUSING ESTATE ROAD CONSTRUCTI0N
SPECIFICATION (HERCS)
4. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL RELEVANT DOCUMENTS AND DRAWINGS
5. CHAINAGE 0 IS LOCATED AT THE START OF THE
FOOTWAY ON MAIN STREET
!
1
Residual Risk Assessment
Wherever possible, risk is designed-out of this
proposal during the design process. Where this is
not possible, the risk will be minimised and any
residual significant risk will be noted and indicated
by the symbol.
KEY
EXISTING POWER POLE
EXISTING LAMP COLUMN
EXISTING INFORMATION BOARD
BUS SHELTER
EXISTING BUS SHELTER TO BE
DISMANTLED AND REPLACED WITH 3-BAY
CANTILEVER BUS SHELTER WITH HALF
END PANELS
PROPOSED HB2 KERB
LPxx
PPxx
IBxx
EXISTING SIGNSRSxx
VERGE
EXISTING FOOTWAY PREVIOUSLY IMPROVED
PROPOSED REFUGE ISLAND
EXISTING FOOTWAY TO BE PLANED 25mm
AND REINSTATED
EXISTING BT POLE
BTPxx
BTCxx EXISTING BT COVER
HB2
EF
BN
PROPOSED CONCRETE EDGING KERB
PROPOSED BULL NOSED KERB
NGx
NKOx
PROPOSED GULLY, POT AND FRAME AND
CONNECTION TO EXISTING CARRIER DRAIN
PROPOSED KERB OFFLET AND
CONNECTION TO EXISTING CARRIER DRAIN
PROPOSED TACTILE PAVING SLABS WITH
BALLOTINI BLOCKS
1004.1 100 6 3
GAP (m)
WIDTH (mm) LENGTH (m)
DIAG. NO.
PROPOSED FOOTWAY WIDENING
PROPOSED CARRIAGEWAY WIDENING
PROPOSED CARRIAGEWAY RE-PROFILING
EKLEXISTING KERB TO BE REMOVED
NMHxPROPOSED MANHOLE COVER AT NEW
CARRIAGEWAY LEVEL
S
T
0
1
S
T
0
2
6
6
.
1
1
G
G
6
6
.
1
8
G
G
F
H
S
V
M
H
C
L
6
6
.
2
4
6
5
.
7
3
6
5
.
7
6
S
I
L
P
E
P
6
6
.
3
5
T
o
W
6
6
.
3
5
T
o
W
6
6
.
4
0
T
o
W
6
6
.
4
0
T
o
W
M
P
6
5
.
7
3
6
5
.
7
6
F
o
o
tw
a
y
- A
s
p
h
a
lt
F
o
o
tw
a
y - A
sp
h
a
lt
C
/B
2.0h
W
a
l
l
G
r
a
s
s
B
a
n
k
W
a
l
l
W
a
ll
C
/
L
1
.
2
h
W
a
ll
W
a
ll
O
H
L
O
H
L
D
i
t
c
h
F
o
o
t
w
a
y
-
A
s
p
h
a
lt
F
o
o
t
w
a
y
-
A
s
p
h
a
lt
F
o
o
t
w
a
y
-
A
s
p
h
a
lt
B
u
s
S
t
o
p
H
e
d
g
e
1
.
8
h
H
e
d
g
e
1
.8
h
H
e
d
g
e
1
.8
h
H
e
d
g
e
1
.
5
h
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
A
s
p
h
a
lt
-
3
0
m
p
h
P
o
r
t
w
a
y
R
o
a
d
A
s
p
h
a
lt
-
3
0
m
p
h
P
o
r
t
w
a
y
R
o
a
d
M
H
C
L
6
6
.
1
6
O
H
L
O
H
L
O
H
L
E
F
E
F
EF
E
F
E
F
E
F
E
F
E
F
E
F
E
F
E
F
E
F
E
F
E
F
E
F
EF
EF
EF
EF
EF
EF
LP01
P
P
0
1
IB01
B
U
S
S
H
E
L
T
E
R
M
A
I
N
S
T
R
E
E
T
MAIN STREET
P
O
R
T
W
A
Y
R
O
A
D
C
U
T
L
I
N
E
C
U
T
L
I
N
E
P
U
B
L
I
C
B
R
I
D
L
E
W
A
Y
S
T
0
2
6
6
.1
1
G
G
65.7
3
6
5
.7
6
6
6
.3
5
T
o
W
6
6
.3
5
T
o
W
65.73
6
5
.7
6
Wall
Gra
ss B
ank
C
/L
1
.2
h
Wall
Wall
Ditch
Footway - Asphalt
Hedge 1.8h
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
OHL
OHL
EF
EF
EF
EF
EF
EF
EF
EF
EFEF
EF
EF
EF
EF
EF
EF
EF
EF
EF
EF
EF
PP01
PP02
RS01
BTC01
LP02
PP03
MAIN STREET
MAIN STREET
CU
T LIN
E
CU
T LIN
E
CU
T LIN
E
CU
T LIN
E
TH
E P
AS
TU
RE
S
EF
EF
EF
E
F
EF
EFEF EF EF EF
EF
EF
EF
E
F
EF
E
F
E
F
EF
PP04
PP05
M
A
IN
S
T
R
E
E
T
M
A
IN
S
T
R
E
E
T
MAIN STREET
S
A
D
L
E
R
S
C
L
O
S
E
C
U
T
L
IN
E
C
U
T
L
IN
E
C
O
N
T
IN
U
E
D
O
N
S
H
E
E
T
2
CU
T LIN
E
CU
T LIN
E
THE BLUE LION
PUBLIC HOUSE
Drawing Originator
© Crown copyright and database rights XXXX Ordnance Survey xxxxxxxxx. You are permitted to use this
data solely to enable you to respond to, or interact with, the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
D
R
A
F
T
5020296-SKA-HGN-ZZ-DR-CH-0001 P1.0
1:250 HW
02/09/19
GENERAL ARRANGEMENT(SHEET 1 OF 4)
HARDWICK FOOTWAY WIDENING
PRELIMINARY DESIGN
Scale
Checked Date
Checked by
Drawn Date Approved Date
Approved by
Project Name
Drawing Status
Title Original drawing sheet is A1
Drawn by
RevDrawing Number
Chk'dDrnDescriptionDateRev
Revisions
File location: P:\GBCBA\HandT\Cambridgeshire Highways\Projects\5020296-Hardwick\900 CAD & BIM\910 Drawings\HGN\5020296-SKA-HGN-ZZ-DR-CH-0001.dwg Printed by: Thompson, Neil (IS)
Unit 1A, Vantage HouseWashingley RoadHuntingdon, PE29 6SR
Tel: +44 (0)1223 785165Email: [email protected]
© Crown copyright and database rights 2018 Ordnance Survey 100023205. You are permitted to use this
data solely to enable you to respond to, or interact with, the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
- - - - -
EXISTING BUS SHELTER TO BE
DISMANTLED AND REMOVED
TO TIP OFF SITE AND
REPLACED WITH 3-BAY
CANTILEVER BUS SHELTER
WITH HALF END PANELS ON
NEW CONCRETE PAD
EXISTING INFORMATION BOARD TO
BE REMOVED TO TIP OFF SITE AND
REPLACED WITH NEW, AT BACK OF
PROPOSED FOOTWAY
!
SIGNIFICANT CDM HEALTH & SAFETY RISKS
1. ..........
NOTES:
1. DO NOT SCALE FROM THIS DRAWING.
2. SITE VERIFY ALL DIMENSIONS PRIOR TO
CONSTRUCTION
3. ALL KERBS TO BE LAID IN ACCORDANCE TO BS EN
1340:2003 AND HOUSING ESTATE ROAD CONSTRUCTI0N
SPECIFICATION (HERCS)
4. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL RELEVANT DOCUMENTS AND DRAWINGS
5. CHAINAGE 0 IS LOCATED AT THE START OF THE
FOOTWAY ON MAIN STREET
!
1
Residual Risk Assessment
Wherever possible, risk is designed-out of this
proposal during the design process. Where this is
not possible, the risk will be minimised and any
residual significant risk will be noted and indicated
by the symbol.
KEY
EXISTING POWER POLE
EXISTING LAMP COLUMN
EXISTING INFORMATION BOARD
BUS SHELTER
EXISTING BUS SHELTER TO BE
DISMANTLED AND REPLACED WITH 3-BAY
CANTILEVER BUS SHELTER WITH HALF
END PANELS
PROPOSED HB2 KERB
LPxx
PPxx
IBxx
EXISTING SIGNSRSxx
VERGE
EXISTING FOOTWAY PREVIOUSLY IMPROVED
PROPOSED REFUGE ISLAND
EXISTING FOOTWAY TO BE PLANED 25mm
AND REINSTATED
EXISTING BT POLE
BTPxx
BTCxx EXISTING BT COVER
HB2
EF
BN
PROPOSED CONCRETE EDGING KERB
PROPOSED BULL NOSED KERB
NGx
NKOx
PROPOSED GULLY, POT AND FRAME AND
CONNECTION TO EXISTING CARRIER DRAIN
PROPOSED KERB OFFLET AND
CONNECTION TO EXISTING CARRIER DRAIN
PROPOSED TACTILE PAVING SLABS WITH
BALLOTINI BLOCKS
1004.1 100 6 3
GAP (m)
WIDTH (mm) LENGTH (m)
DIAG. NO.
PROPOSED FOOTWAY WIDENING
PROPOSED CARRIAGEWAY WIDENING
PROPOSED CARRIAGEWAY RE-PROFILING
EKLEXISTING KERB TO BE REMOVED
NMHxPROPOSED MANHOLE COVER AT NEW
CARRIAGEWAY LEVEL
LAMP COLUMN TO
BE RELOCATED
ST
07
Hedge 2
.0h
58.84
GG
EP
LP
59.69
ToW
Footway - Asphalt
Wall
Brick S
etts
G
ra
s
s
Asphalt
Brick S
etts
P
a
n
1
.5
h
Hedge 2
.0h
Hedge 2.0hH
edge 2
.0h
Grass
G
rass
Footway - Asphalt
Footway - Asphalt
OHL
OHL
P
a
n
1
.5
h
30mph - Asphalt
Cambridge Road
30mph - Asphalt
Cambridge Road
Grass
Grass
Grass
Grass
ST
07
Hedge 2
.0h
58.84
GG
EP
LP
59.69
ToW
Footway - Asphalt
Wall
Brick S
etts
G
ra
s
s
Asphalt
Brick S
etts
P
a
n
1
.5
h
Hedge 2
.0h
Hedge 2.0hH
edge 2
.0h
Grass
G
rass
Footway - Asphalt
Footway - Asphalt
OHL
OHL
P
a
n
1
.5
h
30mph - Asphalt
Cambridge Road
30mph - Asphalt
Cambridge Road
Grass
Grass
Grass
Grass
EF
EF
EF
EF
EF
EF
HB2
HB2
HB2
LP07
BTP01
BTC06
LP06
BTP02
E
K
L
EKL
E
K
L
CAM
BRID
GE R
OAD
CAMBRIDG
E ROAD
M
A
I
N
S
T
R
E
E
T
CU
T L
IN
EC
UT
L
IN
E
C
U
T
L
I
N
E
C
U
T
L
I
N
E
C
O
N
T
I
N
U
E
D
O
N
S
H
E
E
T
2
KE
ST
ER
S C
LO
SE
F
o
o
t
w
a
y
-
A
s
p
h
a
l
t
ST
08
Hedge 1.6h
TC
60.61
MH
60.58
GG
LP
TP
61.28
ToW
Footway - Asphalt
C
/B
1.4h
G
ravel
W
a
ll
O
H
L
O
HL
O
H
L
H
e
d
g
e
1
.6
h
W
a
ll
C
/B 1
.4h
Grass
Grass
O
H
L
Grass
30mph - Asphalt
Cambridge Road
30mph - Asphalt
Cambridge Road
Grass
Grass
Grass
Gravel
F
o
o
t
w
a
y
-
A
s
p
h
a
l
t
F
o
o
t
w
a
y
-
A
s
p
h
a
l
t
ST
08
Hedge 1.6h
TC
60.61
MH
60.58
GG
LP
TP
61.28
ToW
Footway - Asphalt
C
/B
1.4h
G
ravel
W
a
ll
O
H
L
O
HL
O
H
L
H
e
d
g
e
1
.6
h
W
a
ll
C
/B 1
.4h
Grass
Grass
O
H
L
Grass
30mph - Asphalt
Cambridge Road
30mph - Asphalt
Cambridge Road
Grass
Grass
Grass
Gravel
F
o
o
t
w
a
y
-
A
s
p
h
a
l
t
F
o
o
t
w
a
y
-
A
s
p
h
a
l
t
Footway - Asphalt
Brick S
etts
Hedge 2.0h
Grass
G
rass
30mph - Asphalt
Cambridge Road
Grass
Footway - Asphalt
Brick S
etts
Hedge 2.0h
Grass
G
rass
30mph - Asphalt
Cambridge Road
Grass
BN
EF
EF EF EFEF
EF
EF
EF
EF
EF
EF
HB2
BN
HB2
HB2
LP08
LP09
BTC07
BTC08
BTC09
BTC10
BTP03
BTP04
RS04
LP10
E
K
L
E
K
L
EK
L
E
K
L
CAMBRIDGE ROAD
CAMBRIDGE ROAD
CU
T LIN
E
CU
T LIN
E
CU
T LIN
EC
UT
L
IN
E
SV
62.47
GG
TC
62.41
GG
N
B
N
B
Fo
otw
ay - A
sp
ha
lt
F
o
o
t
w
a
y
-
A
s
p
h
a
l
t
Footw
ay - A
sphalt
F
o
o
t
w
a
y
-
A
s
p
h
a
l
t
Egrem
ont R
oad
EF
LP11
BTC09
BTC10
B
T
C
1
2
B
T
C
1
3
BTC11
E
K
L
E
K
L
C
A
M
B
R
I
D
G
E
R
O
A
D
CAMBRIDGE ROAD
L
I
M
E
S
R
O
A
D
EG
RE
MO
NT
R
OA
D
CU
T LIN
E
CU
T LIN
E
C
U
T
L
I
N
E
C
U
T
L
I
N
E
C
O
N
T
I
N
U
E
D
O
N
S
H
E
E
T
4
Drawing Originator
© Crown copyright and database rights XXXX Ordnance Survey xxxxxxxxx. You are permitted to use this
data solely to enable you to respond to, or interact with, the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
D
R
A
F
T
5020296-SKA-HGN-ZZ-DR-CH-0003 P1.0
1:250 HW
02/09/19
GENERAL ARRANGEMENT(SHEET 3 OF 4)
HARDWICK FOOTWAY WIDENING
PRELIMINARY DESIGN
Scale
Checked Date
Checked by
Drawn Date Approved Date
Approved by
Project Name
Drawing Status
Title Original drawing sheet is A1
Drawn by
RevDrawing Number
Chk'dDrnDescriptionDateRev
Revisions
File location: P:\GBCBA\HandT\Cambridgeshire Highways\Projects\5020296-Hardwick\900 CAD & BIM\910 Drawings\HGN\5020296-SKA-HGN-ZZ-DR-CH-0001.dwg Printed by: Thompson, Neil (IS)
Unit 1A, Vantage HouseWashingley RoadHuntingdon, PE29 6SR
Tel: +44 (0)1223 785165Email: [email protected]
© Crown copyright and database rights 2018 Ordnance Survey 100023205. You are permitted to use this
data solely to enable you to respond to, or interact with, the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
- - - - -
SECTION PREVIOUSLY UPGRADED
HIGHWAY BOUNDARY NEEDS TO BE MARKED ON SITE WITH TIMBER PEGS TO
DETERMINE HIGHWAY BOUNDARY. RESIDENTS TO BE INFORMED
PROPOSED
CROSSING POINT
HIGHWAY BOUNDARY
NEEDS TO BE CHECKED !
LAMP COLUMN TO
BE RELOCATED
EXISTING SIGN TO
BE RELOCATED
!
SIGNIFICANT CDM HEALTH & SAFETY RISKS
1. ..........
NOTES:
1. DO NOT SCALE FROM THIS DRAWING.
2. SITE VERIFY ALL DIMENSIONS PRIOR TO
CONSTRUCTION
3. ALL KERBS TO BE LAID IN ACCORDANCE TO BS EN
1340:2003 AND HOUSING ESTATE ROAD CONSTRUCTI0N
SPECIFICATION (HERCS)
4. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL RELEVANT DOCUMENTS AND DRAWINGS
5. CHAINAGE 0 IS LOCATED AT THE START OF THE
FOOTWAY ON MAIN STREET
!
1
Residual Risk Assessment
Wherever possible, risk is designed-out of this
proposal during the design process. Where this is
not possible, the risk will be minimised and any
residual significant risk will be noted and indicated
by the symbol.
KEY
EXISTING POWER POLE
EXISTING LAMP COLUMN
EXISTING INFORMATION BOARD
BUS SHELTER
EXISTING BUS SHELTER TO BE
DISMANTLED AND REPLACED WITH 3-BAY
CANTILEVER BUS SHELTER WITH HALF
END PANELS
PROPOSED HB2 KERB
LPxx
PPxx
IBxx
EXISTING SIGNSRSxx
VERGE
EXISTING FOOTWAY PREVIOUSLY IMPROVED
PROPOSED REFUGE ISLAND
EXISTING FOOTWAY TO BE PLANED 25mm
AND REINSTATED
EXISTING BT POLE
BTPxx
BTCxx EXISTING BT COVER
HB2
EF
BN
PROPOSED CONCRETE EDGING KERB
PROPOSED BULL NOSED KERB
NGx
NKOx
PROPOSED GULLY, POT AND FRAME AND
CONNECTION TO EXISTING CARRIER DRAIN
PROPOSED KERB OFFLET AND
CONNECTION TO EXISTING CARRIER DRAIN
PROPOSED TACTILE PAVING SLABS WITH
BALLOTINI BLOCKS
1004.1 100 6 3
GAP (m)
WIDTH (mm) LENGTH (m)
DIAG. NO.
PROPOSED FOOTWAY WIDENING
PROPOSED CARRIAGEWAY WIDENING
PROPOSED CARRIAGEWAY RE-PROFILING
EKLEXISTING KERB TO BE REMOVED
NMHxPROPOSED MANHOLE COVER AT NEW
CARRIAGEWAY LEVEL