![Page 1: CORRIDOR STUDY PARSONS BRINCKERHOFF...To Remain in Place Concrete Median Existing Raised Panel (W7-1) Warning Sign Replace Truck Existing Guardrail Repair or Replace with Post STOP](https://reader034.vdocument.in/reader034/viewer/2022050120/5f5060455ddc2013c64cb789/html5/thumbnails/1.jpg)
Mini-Skip LineReplace
(YIELD sign)Replace Sign Panel
RampGore and alongEdge Lines inReplace Existing
Turn LaneShared Thru/Left Remove Existing
and Adjust MarkingsTraffic Signal EquipmentRemove Existing
with postsign (R1-1) Install STOP
and Stop BarInstall Crosswalk
Install Sidewalk
Close Driveways
Street to Lendall Lane- Install sidewalk along south side of Route 17 from Short
and Route 17 eastbound right lane drop at Olde Forge Drive- Add pavement for extending the I-95 Off-Ramp merge lane
Forge Drive- Install Raised Median between Short Street and Olde
and to allow the Short Street Northbound Right Turns only to prohibit the Route 17 Eastbound and Westbound Left Turns - Install Raised Median at the Short Street intersection
Final Conceptual Layout:
0
SCALE
100' 200'
MA
TC
HLIN
E
SH
EE
T 2
Short Street
(Warrenton Road)
US 17 Business
Horn
ets N
est Lane
Off-R
amp
I-95 N
orth
On-R
am
p
I-95 N
orth
SHEET 1 OF 5
FINAL CONCEPTUAL LAYOUT
N
Legend:
New Signal
Existing Signal
MedianProposed Raised
Proposed Pavement
Pavement Demo
11:2
6
BRINCKERHOFFPARSONS
CORRIDOR STUDYUS 17 BUSINESS (WARRENTON RD)
MARCH 2017
![Page 2: CORRIDOR STUDY PARSONS BRINCKERHOFF...To Remain in Place Concrete Median Existing Raised Panel (W7-1) Warning Sign Replace Truck Existing Guardrail Repair or Replace with Post STOP](https://reader034.vdocument.in/reader034/viewer/2022050120/5f5060455ddc2013c64cb789/html5/thumbnails/2.jpg)
end Existing DrivewayInstall Cul-de-sac to
Close Driveway
Close Driveway
Close Driveway
Drivewayto end Existing Install Cul-de-sac
Signalized Intersection(RV Parkway) with new Realign existing Route 698
Street to Lendall Lane- Install sidewalk along south side of Route 17 from Short
traffic signal and pavement markings- Realign RV Parkway across Olde Forge Drive; add new
drop at Olde Forge Drive- Add pavement for new Route 17 eastbound right lane
Forge Drive- Install Raised Median between Short Street and Olde
Final Conceptual Layout:
along US 17 an Eastbound to Westbound U-Turn movementPedestrian Signal Equipment; AccommodateInstall Traffic Signal with Crosswalks and
Legend:
New Signal
Existing Signal
MedianProposed Raised
Proposed Pavement
Pavement Demo
0
SCALE
100' 200'
N
MA
TC
HLIN
E
SH
EE
T 1
MA
TC
HLIN
E
SH
EE
T 3
(Warrenton Road)
US 17 Business
Olde F
org
e Drive
Gle
n Alice L
ane
FINAL CONCEPTUAL LAYOUT
SHEET 2 OF 5
Road
Quarles
RV P
ark
way
11:2
6
BRINCKERHOFFPARSONS
CORRIDOR STUDYUS 17 BUSINESS (WARRENTON RD)
MARCH 2017
![Page 3: CORRIDOR STUDY PARSONS BRINCKERHOFF...To Remain in Place Concrete Median Existing Raised Panel (W7-1) Warning Sign Replace Truck Existing Guardrail Repair or Replace with Post STOP](https://reader034.vdocument.in/reader034/viewer/2022050120/5f5060455ddc2013c64cb789/html5/thumbnails/3.jpg)
Close 2 Entrances
and Stop BarInstall Crosswalk
Shared Thru/LeftConvert Center Lane to
TimeAdjust Pedestrian Clearance Signals to New Crosswalks; Markings; Add Pedestrian Refresh Existing Crosswalk
signal equipment and adjust pedestrian clearance timing shared Thru / Left andAdjust signal heads; Add pedestrian- Convert Solomon Drive southbound center lane to a
Lane east to existing median- Install Raised Median between Solomon Drive / Lendall
Forge Drive to Lendall Lane- Install sidewalk along south side of Route 17 from Olde
Final Conceptual Layout:
Close Driveway
ConnectionInstall Sidwalk
Legend:
New Signal
Existing Signal
MedianProposed Raised
Proposed Pavement
Pavement Demo
0
SCALE
100' 200'
N
MA
TC
HLIN
E
SH
EE
T 2
MA
TC
HLIN
E
SH
EE
T 4
(Warrenton Road)US 17 Business
Lendall L
ane
Solo
mon Drive
Sa
mson Street
SHEET 3 OF 5
FINAL CONCEPTUAL LAYOUT
11:2
6
BRINCKERHOFFPARSONS
CORRIDOR STUDYUS 17 BUSINESS (WARRENTON RD)
MARCH 2017
![Page 4: CORRIDOR STUDY PARSONS BRINCKERHOFF...To Remain in Place Concrete Median Existing Raised Panel (W7-1) Warning Sign Replace Truck Existing Guardrail Repair or Replace with Post STOP](https://reader034.vdocument.in/reader034/viewer/2022050120/5f5060455ddc2013c64cb789/html5/thumbnails/4.jpg)
Install Stop Bar
with PostSTOP sign (R1-1) Install Stop Bar and
Sign and PostDamaged Route DesignationReplace and Relocate
TaperInstall Right Turn
Wyne Drive- Add right turn lane taper on Route 17 westbound at
- Install Raised Median at Wyne Drive intersection
industrial site truck traffic Lane east to existing median, with a median break for the- Install Raised Median between Solomon Drive / Lendall
Final Conceptual Layout:
for Industrial Site trafficInstall Median Break
0
SCALE
100' 200'
N
MA
TC
HLIN
E
SH
EE
T 5
MA
TC
HLIN
E
SH
EE
T 3
(Warrenton Road)
US 17 Business
Wyne Drive
FINAL CONCEPTUAL LAYOUT
SHEET 4 OF 511:2
7
BRINCKERHOFFPARSONS
CORRIDOR STUDYUS 17 BUSINESS (WARRENTON RD)
MARCH 2017
![Page 5: CORRIDOR STUDY PARSONS BRINCKERHOFF...To Remain in Place Concrete Median Existing Raised Panel (W7-1) Warning Sign Replace Truck Existing Guardrail Repair or Replace with Post STOP](https://reader034.vdocument.in/reader034/viewer/2022050120/5f5060455ddc2013c64cb789/html5/thumbnails/5.jpg)
To Remain in PlaceConcrete MedianExisting Raised
Panel (W7-1)Warning Sign Replace Truck
Existing GuardrailRepair or Replace
with PostSTOP sign (R1-1) Install Stop Bar and
Storage)Lane (100 FT. Install Right Turn
Legend:
New Signal
Existing Signal
MedianProposed Raised
Proposed Pavement
Pavement Demo
0
SCALE
100' 200'
N
MA
TC
HLIN
E
SH
EE
T 4
(Warrenton Road)
US 17 Business
Heartfie
lds Lane
Washingto
n Stre
et
Melch
ers D
rive
FINAL CONCEPTUAL LAYOUT
SHEET 5 OF 511:2
7
BRINCKERHOFFPARSONS
CORRIDOR STUDYUS 17 BUSINESS (WARRENTON RD)