cosapi int class 2
DESCRIPTION
COSAPI ETP . INTERMEDIATE CLASS 2TRANSCRIPT
![Page 1: Cosapi int class 2](https://reader033.vdocument.in/reader033/viewer/2022052323/55938ef31a28abd54e8b461e/html5/thumbnails/1.jpg)
COSAPI ENGLISH
TRAINING PROGRAM
Conducted by:
Marco Loyola Florián
Class 2Intermediate level
www.cosapi.pbworks.com
![Page 2: Cosapi int class 2](https://reader033.vdocument.in/reader033/viewer/2022052323/55938ef31a28abd54e8b461e/html5/thumbnails/2.jpg)
COSAPI: The Trujillo Temple
ProjectOFFICES
The Technical Office
The Production Office
The Project Management Office
The OSH Office (Occupational Safety and Health)
The Administrative Office
The Quality Management Office
The Procurement Office
The Warehouse
The Management Office
The Contract Management Office
The Topography Office
The Equipment and Service Office
![Page 3: Cosapi int class 2](https://reader033.vdocument.in/reader033/viewer/2022052323/55938ef31a28abd54e8b461e/html5/thumbnails/3.jpg)
COSAPI: The Trujillo Temple
Project SCOPE OF WORK
The project includes the development of
two main constructions, the Temple, the
Patron Housing, as well as auxiliary
constructions. These constructions will
be characterized by their architectonic
integration with the place and its
landscaping.
![Page 4: Cosapi int class 2](https://reader033.vdocument.in/reader033/viewer/2022052323/55938ef31a28abd54e8b461e/html5/thumbnails/4.jpg)
The Nature of Civil Engineering work
![Page 5: Cosapi int class 2](https://reader033.vdocument.in/reader033/viewer/2022052323/55938ef31a28abd54e8b461e/html5/thumbnails/5.jpg)
The Nature of Civil Engineering work
![Page 6: Cosapi int class 2](https://reader033.vdocument.in/reader033/viewer/2022052323/55938ef31a28abd54e8b461e/html5/thumbnails/6.jpg)
True or False?
1. There is no identical set of identical civil engineering structures
2. The first step of a project consists on getting the necessaryconstruction licenses.
3. The initial estimated construction budget is likely to change.4. Initial drawings are always followed exactly.
5. The promoter of the project very often undertakes theconstruction works by himself.
6. The extra cost always has to be assumed by the contractor.
![Page 7: Cosapi int class 2](https://reader033.vdocument.in/reader033/viewer/2022052323/55938ef31a28abd54e8b461e/html5/thumbnails/7.jpg)
Discussion questions:
1. Who are the parties in this project? (Promoter, Project Designer,contractor)
2. Which party is in charge of each of the five steps?
3. Which factors have affected the proposed cost for this project so far?
4. Which party has to bear the cost of extra expenditure?
5. Which difficulties have emerged?
6. How has COSAPI overcome these obstacles?
![Page 8: Cosapi int class 2](https://reader033.vdocument.in/reader033/viewer/2022052323/55938ef31a28abd54e8b461e/html5/thumbnails/8.jpg)
Book: Page 6 –GPS Technology
![Page 9: Cosapi int class 2](https://reader033.vdocument.in/reader033/viewer/2022052323/55938ef31a28abd54e8b461e/html5/thumbnails/9.jpg)
Crane Tower Backhoe loader
Road Roller
![Page 10: Cosapi int class 2](https://reader033.vdocument.in/reader033/viewer/2022052323/55938ef31a28abd54e8b461e/html5/thumbnails/10.jpg)
Book: Page 6 –GPS Technology
![Page 11: Cosapi int class 2](https://reader033.vdocument.in/reader033/viewer/2022052323/55938ef31a28abd54e8b461e/html5/thumbnails/11.jpg)
Book: Page 7 –GPS Technology
![Page 12: Cosapi int class 2](https://reader033.vdocument.in/reader033/viewer/2022052323/55938ef31a28abd54e8b461e/html5/thumbnails/12.jpg)
Book: Page 7 –GPS Technology