Agenda• Presentation
– Project purpose– Introduction– COTS-Based System Types– COTS-Based System Development Process
– Examples of COTS-Based System
– Examples of CBS Management– Benefits of COTS-Based System– Weakness of COTS-Based System– Conclusion
• Question• Exercise• Discussion
Project Purpose– To define COTS Products, COTS-Based
system – To show benefits and weakness of COTS-
Based system – To explain COTS-Based system
Development Process– To guide preparation and management of
COTS-Based system particularly in Evaluation and Maintenance Management.
Introduction
• COTS (Commercial Off The Shelf)• COTS Product <by Mutual Agreement Of SEI>
– is a software product that has been sold, leased, or licensed to the general public by a commercial entity in a business of making a profit from product with multiple identical copies available
– where integrators use the product without modification of its internals
– and the commercial entity provide product support and evolution.
• COTS-Based System (CBS) – Contains components of COTS-Products – Non-Developmental Items <NDI>– Multiple components and vendors
COTS-Based System Types
• Turnkey systems are built around a suite of commercial products, such as Microsoft Office or Netscape Navigator. Only one COTS is used, and customization does not change the nature of the initial COTS.
• Intermediate systems are built around one COTS (e.g. Oracle) but integrate other components, commercially or produced or developed in-house.
• Intensive systems are built by integrating several COTS, all on the same level of importance.
A New Look at COTS-Based Systems
Qualify Adapt Assemble Upgrade COTS Market
Selected products are qualified to be “fit for use” as
components
Qualified products are adapted to be components that can be integrated
Adapted components are assembled by using architecture, infrastructure, or middleware
Upgrades to the system occur as needed and are facilitated by proceeding steps
The market supplies products
Copyright 1997 Software Engineering Institute
Qualification
• A process of evaluation and selection.
• Not only product but also vendor and technology must be qualified
Qualification (Cont’d.)
Product Considerations• Wide customer base• Continual improvement to stay in market• Usability and reliability • Open Interface • Supporting TOOLS• Useful documentations
Qualification (Cont’d.)
Vendor considerations• Relationship• Maintenance ability• Training ability• Development Certification• Product release plan
Qualification (Cont.)
System Context considerations• Requirements • Constraints• Previous products <COTS-Based or Non-
COTS-Base>
Adaptation
• Adaptation in CBS is not modification • Process of adapting the COTS Products to fit
the requirements• Sometimes the legacy system must be
adapted to fit the products. • COTS Products are black-boxes that have no
source code, so some functions are written using “glueware” or “wrappers,” passing by API or SQL standards to make them compatible.
Assembly
• Process of integration among the products by using “wrappers” or “gluewares”
• Component combined to other components might be COTS Product or Non-COTS Product
Upgrade
• Involves upgrade product versions• Involves upgrade technology• The longest life phase• Repeatable• The most expensive phase • Driven by external environment such as
vendor and Technology change.
Development Process Outlines
• System analysis
• Product selection
• Product evaluation
• System Design
• Integration
• Testing
• Maintenance
Example of CBS Development Process
information flow – bidirectionalsequence
hard requirements
processprocess check or review
traditional waterfall development separate entity
ExternalInformation Vendor
RequirementsAnalysis
SystemRequirements
Review
PackageIdentificationEvaluation/Selection
IdentifyGlueware and
IntegrationRequirements
SystemDesignReview
WriteGlueware
andInterfaces
IntegrationandTest
Non-COTSDevelopmentSystem
Architecture
Discrepancy
Resolution
TargetSystem
Installation andAcceptance
Test
SustainingEngineering
Key:
Publication of investigating and improving CBS Development Process
CBS Roles & Responsibilities
Qualify Adapt Assemble Update COTS Market
Copyright 1997 Software Engineering Institute
Roles & ResponsibilitiesRole Responsibilities
Project leader -Project Management
Marketing -Market research of COTS Products-Licenses negotiation-Vendor relationship
System Analyst -System analysis-Product selection and evaluation-Impact analysis
System Design -Design a system and integrated parts
Developer -Programming
-System test
Logistic support -Install system
-Backup, and Recovery system
Process Engineer -CBS Techniques and management tools-Development Process -System Configuration
Key Activity Area
• Engineering
• Business
• Contract
• Program-wide
<Software Engineering Institute, Carnegie Mellon University>
Key Activity Area
Engineering Activities• System context• Marketplace• Architecture and Design• Construction• Configuration• Sustainment• Evaluation
Key Activity Area
Contract Activities• Contract requirement
• Solicitation
• Contract tracking and oversight
• License negotiation
Key Activity Area
Program-wide Activities• CBS Strategy
• Risk Management
• Tradeoffs
• Cultural transition
• Information Sharing
COTS Intensive System Evaluation
• Formative Evaluation
• Ensemble Evaluation
• Continuous Evaluation
• Business Evaluation
• Exploratory Evaluation
Risks in Maintenance phase
• Risk from upgrading product version
• Risk from product modification
• Risk from Technology change
• Multiple-COTS Products
• Quality viewed by supplier
Market ResearchGuidance:• How often are new versions released?• How long are the products in market and how
stable are they?• How will new versions impact the other sites?• What are the responses from other sites using
the same products?• What are the responses of the products and
the services from other purchaser using products developed from same vendor as ours?
• What is the direction of development of hardware and software?
Impact Analysis
The results from a market research are analyzed what the impact might happen and finally the impact protection activities must be defined.
Configuration
• Keep track all versions or releases of the products and product information and always having copy of every released.
• Vendor information.• Referenced site information.• Activity information• What activities have been done, when, and by
whom?• What are the results of each release?
Logistic Support
• This activities include the acquisition, distribution, and installation of copies of upgraded COTS-Products. It also includes the re-installation when the upgraded version corrupts.
Example of COTS-Based System
Developer CBS System
EDO Cooperation Combat System
U.S. Navy Radar Tracking System
NASA •EPOCH2000 Satellite Ground System•LABVIEW•Advanced Orbiting System
URL: http://joy.gsfc.nasa.gov/MSEE/tooleval.htm
CURE <COTS Usage Risk Evaluation>
• Offered by Software Engineering Institute• Focused on evaluation of CBS
development project. • Given during the early stages of a
program and can even before a specific vendor has been chosen.
• Evaluated risk reports are delivered 2 weeks after onsite visit
Benefits of COTS-Based System
• To Improve software development process
• To reduce coding, debugging, unit testing, code inspection
• To reduce software life-cycle
• To reduce development cost
The moral of the story is…
• Integration is not a one time event.
• The COTS marketplace drives continuous system upgrade.
• Systems must be engineered to accommodate marketplace imperatives.
Copyright 1997 Software Engineering Institute
Conclusion• CBS – A new technology to improve software
development process by integrating the previous Off-the-shelf products into a larger system.
• CBS benefit to improve software development process, reduce time and cost.
• CBS differs from Custom-Based Design System in many terms- Life cycle, Process, Activities, Role, Management, and Risk.
• To approach CBS all activities in the areas of system context, architecture & design, and marketplace are considered simultaneously
• New engineering activities, managing activities , methodologies, supporting tools, today, are researched for a CBS Success.
References1. COTS Base System Initiative
By Carnegie Mellon University URL: http://www.sei.cmu.edu/cbs/index.html
2. SEI MONOGRAPHS ON THE Use of Commercial Software in Government Systems.Case Study: Evaluating COTS Products for DoD Information Systems. By Carol Sledge and David Carney <Carnegie Mellon University> URL: http://www.sei.cmu.edu/cbs/index.html
3. The Basic for COTS Software Evaluation: Foundation for the design of CISBy Kurt C. Wallnau <Carnegie Mellon University>URL: http://www.sei.cmu.edu/cbs/index.html
4. A Management Guide to Software Maintenance in COTS-Bases system By: Judith A. Clapp and Audrey E. Taub<Electronic Systems Center> URL:http//www.mitre.org/resources/conters/sepo/sustainment/manage_guide_cotsbase.html
5. An Activity Framework for COTS-Based Systems. By: Lisa Brownsword, Patricia Oberndorf, and Carol A.Sledge <Software Engineering Institute, Carnegie Mellon University>URL: http://www.stsc.hill.af.mil/CrossTalk/2000/sep/brownsword.asp
References (Cont’d)6. Investigating and Improving a CBS Development Process
By M. Morisio1, C.B. Seaman3,4, A. T. Parra2, V.R. Basili1,4, S.E. Kraft5, S.E. Condon2
1 University of Maryland
College Park, MD 20742, USA, {morisio, basili}@ cs.umd.edu 2 Computer Sciences Corporation,
Greenbelt, MD 20771, USA, {aparra, scondon} @ csc.com3 University of Maryland Baltimore County,
Baltimore, MD 21250, USA, [email protected] Center Maryland,
College Park, MD 20742, USA, basili@ fc-md.umd.edu5 NASA/Goddard Space Flight Center,
Greenbelt, MD 20771, USA, stkraft@ gsfc.nasa.gov
http://www.research.umbc.edu/~cseaman/papers/icse00.doc
Exercise
CBS Case Study: Military Information System
•System Requirements
•Constraints
•Product Evaluations activities
•Results of evaluations
•Problems