county of fairfax, virginia - fairfax federation home … of public works and environmental services...
TRANSCRIPT
Department of Public Works and Environmental ServicesPlanning & Design Division
12000 Government Center Parkway, Suite 449Fairfax, VA 22035-0052
Phone: 703-324-5800, TTY: 1-800-828-1120, Fax: 703-324-4365www.fairfaxcounty.gov/dpwes
C o u n t y o f F a i r f a x , V i r g i n i a
M E M O R A N D U M
DATE: November 23, 2009 TO: Jimmie D. Jenkins, Director
Department of Public Works and Environmental Services
FROM: Ronald N. Kirkpatrick Planning and Design Division SUBJECT: Planning and Design Division Monthly Projects Status Report Attached is a copy of the October 2009 Monthly Projects Status Report. This report provides a status summary for capital projects managed within the Planning and Design Division (P&DD). A separate report will be issued by the Stormwater Planning Division for drainage related capital projects. If you have any questions, please call at 703-324-5800. RNK/ml/1257m Attachment: As Stated PUBLIC WORKS AND ENVIRONMENTAL SERVICES DISTRIBUTION Howard J. Guba, Deputy Director, Department of Public Works and Environmental Services Shahram Mohsenin, Director, Wastewater Planning and Monitoring Division Gilbert Osei-Kwadwo, Branch Chief, Wastewater Planning and Monitoring Division Edgar R. Jones, Chief, Financial Management & Financial Planning Branch, Wastewater Planning & Monitoring Division Mark M. Leonard, Wastewater Planning & Monitoring Division Randy Bartlett, Deputy Director, DPWES Steve Aitcheson, Director, Maintenance and Stormwater Management Division Craig Carinci, Director, Stormwater Planning Division (SWPD) Don Demetrius, Chief, Watershed Projects Evaluation Branch (WPEB), SWPD Chad Crawford, Chief, Watershed Projects Implementation Branch (WPIB), SWPD Scott Ramsey, MA III, SWPD, DPWES Dale Glines, Engineering Technician III, MSMD, DPWES Nat Atapoor, Director, Construction Management Division Vickie McEntire, County Surveyor, CMD Bruce Goudarzi, Chief, Utilities Construction Branch, CMD Robin W. Patton, Director, Land Acquisition Division James Ratliff, Project Manager, Land Acquisition Division John Honnick, Senior Right-of-Way Agent, Land Acquisition Division Keith Wilson, Senior Right-of-Way Agent, Land Acquisition Division Walter T. Wozniak, Chief, Planning Support Branch, P&DD Larry Ichter, Deputy Director, Transportation Design, P&DD Carey F. Needham, Deputy Director, Building Design, P&DD Ahmed Rayyan, Chief, Wastewater Design Branch, P&DD Jeff Kent, Chief, Administrative Support Branch, CAP Randall Flowers, Engineer, Wastewater Design Branch, P&DD Michael Guarino, Engineer, TDB, P&DD Shahla Zahirieh, Engineer, TDB, P&DD Jennifer Gilbert, Consultant, TDB, P&DD Erik Shively, Consultant, TDB, P&DD Brian Utterback, Consultant, TDB, P&DD Natalie Colley, Engineering Technician III, TDB, P&DD Anna Carlen, Administrative Support Branch, CAP Richard Aamodt, Electoral Board, REG Rona Courtney, Admin V, Directors Office
Jimmie D. Jenkins Planning and Design Division Monthly Projects Status Report Page 2 of 2
OUTSIDE AGENCY DISTRIBUTION Carol Bondurant, VDOT, 14685 Avion Parkway, Chantilly, VA 20151 w/attachment Fund 304, 314, 315, HCD, & Misc.; [email protected] Dorothy Purvis, VDOT, 14685 Avion Parkway, Chantilly, VA 20151; [email protected] Rick A. Miller, VDOT, [email protected] Jan Vaughan, VDOT, [email protected] Charlene Whitfield, DVP, Manager Regional Projects, 171 Elden St., Herndon, Va. 20170; [email protected] John W. Dargle, Director, Fairfax County Park Authority Mike Lake, Department of Transportation w/attachment Fund 304, 305, & Misc. Katharine Ichter, Director, Department of Transportation James Chandler, Department of Transportation Charlie Strunk, Department of Transportation Ellen Gallagher, Department of Transportation Karyn Moreland, Department of Transportation Chris Wells, Department of Transportation Tom Biesiadny, Department of Transportation Paul Mounier, Bus Stop Coordinator, Department of Transportation Jeffrey Hermann, Department of Transportation Otto Clemente, Department of Transportation Dranesville District Supervisors Office David B. Marshall, Assistant Director, Planning Division, Department of Planning and Zoning Paula C. Sampson, Director, Housing and Community Development (HCD), w/attachment 314 and 315 Barbara Byron, Director, Zoning Evaluation Division, Department of Planning and Zoning Sheng-Jieh Leu, Department of Planning and Zoning Dave Guerra, Fairfax County Water Authority; [email protected] Jeannie Swim, Fairfax County Water Authority; [email protected] Jerry Scott, Fairfax County Water Authority; [email protected] John Milgrim, Environmental Health Supervisor, Fairfax County Health Department Mark Canale, Department of Transportation Bill Harrell, Department of Transportation, [email protected] Todd Lawson, Verizon, 2980 Fairview Park Dr., 7th Floor, Falls Church, VA. 22042; [email protected] David A. Guillaudeu, Engineering Assistant, Verizon Communications, david.a.guillaudeu@verizon,com [email protected] Jo Anne Sorenson, VDOT, 14685 Avion Parkway, Chantilly VA 20151, w/attachment Fund 308, 304, 305, 314, 315, HCD & Misc.; [email protected] Mark Comer, VDOT, [email protected] Peter Gerner, VDOT, [email protected] Richard Burke, VDOT, [email protected] Charlotte E. Miller, VDOT, [email protected] Donald Ostrander, Traffic Engineering Section, VDOT Northern Va. District, [email protected] Allan Melliza, Washington Gas; [email protected] Ronald Seale, VDOT, [email protected] Javier Baldivieso, [email protected] Verna Love, [email protected]
PD 1 of 1CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPre-Design
PROJECT: Noman M. Cole Pollution Control Plant RenovationsProject Number X00911 408/
PROJECT MANAGER: Roberts, Frank
LAND ACQ. AGENT:PROJECT ENGINEER:
USER AGENCY: Capital FacilitiesSarah Motsch
DistrictMount Vernon
Study of the existing condition and future rehabilitation/replacement options of the solids incinerator and related processes.
Parsons has been selected to provide engineering services for this project. Negotiations are in progress with Parsons and are expected to be concluded by the end of the Winter 2010.
PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Parsons
Phase
Kailash GuptaMike McGrath
CURRENT FISCAL YEAR APPROPRIATION:CURRENT TOTAL PROJECT ESTIMATE:APPROVED TOTAL PROJECT ESTIMATE:
FUNDING INFORMATION:
Solids Stabilization and Disposal System Study
developed by, Robert Hockersmith
D 1 of 12CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPlanning and Design
PROJECT: Extension ProjectProject Number X00828 402/
PROJECT MANAGER: Schmidt, Natasha
LAND ACQ. AGENT: Preston, ClintonPROJECT ENGINEER: Steele, Terrence
USER AGENCY: Wastewater Management
DistrictSully
115 LF 8" sanitary sewer, 10 grinder pumps, & 1,565 LF and 1-1/2" force main.
LAD authorized 2/9/09 to acquire easements (acquisition complete for 5 of 16 properties); citizens meeting conducted 10/28/09 to present the new DPWES guidelines for grinder pump lots; since three out of ten property owners attended, a letter was sent to all ten property owners summarizing the meeting and the new guidelines; property owners who have not signed and returned their easement agreements by 12/15/09 will be issued revised plats and easement documents per the new guidelines.
PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Natasha Schmidt (in-house)
Phase
CURRENT FISCAL YEAR APPROPRIATION $250,000
APPROVED TOTAL PROJECT ESTIMATE: $250,000
SCHEDULE APPROVED CURRENT
DESIGN:
CONSTRUCTION:
Schematics: NADesign Dev: NA
Const.Drawings: 03/09Site Permit: NA
Bldg. Permit: NA
Bid Advertisement: 11/09Contract Award: 02/10
Substantial Completion: 04/10
NANA
03/09NANA
01/10 04/10 09/10
A
EEE
ESTIMATED /ACTUAL
CURRENT TOTAL PROJECT ESTIMATE: $250,000
FUNDING INFORMATION:
Occupancy: NA NA
Colewood Street
developed by, Robert Hockersmith
D 2 of 12CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPlanning and Design
PROJECT: Extension ProjectProject Number X00826 402/
PROJECT MANAGER: Royse, Andy
LAND ACQ. AGENT: Finnell, RichardPROJECT ENGINEER: TBD, To be Determined
USER AGENCY: Wastewater Management
DistrictDranesville
3,600 LF 8" gravity sanitary sewer and 200 LF 1.5" force main; 25 lots served by gravity, 4 lots served by grinder pumps.
Gravity only outfall alternative rejected because of property owner objection over amount of tree loss; directed by Supervisor Foust's office to consider other outfall alternatives; agreement in principal arrived at with 1322 Darnall Drive for alternative outfall easement; 2nd citizen's meeting held 8/19/09; additional survey and utility designation received 9/17/09, and 9/24/09 respectively; 3rd citizen's meeting with preliminary design held October 21, 2009. Preliminary design in progress.
PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Andy Royse (in-house)
Phase
CURRENT FISCAL YEAR APPROPRIATION $2,000,000
APPROVED TOTAL PROJECT ESTIMATE: $2,000,000
SCHEDULE APPROVED CURRENT
DESIGN:
CONSTRUCTION:
Schematics: NADesign Dev: 11/09
Const.Drawings: 04/10Site Permit: NA
Bldg. Permit: NA
Bid Advertisement: 12/10Contract Award: 02/11
Substantial Completion: 10/11
NA 11/09 04/10
NANA
12/10 02/11 10/11
EE
EEE
ESTIMATED /ACTUAL
CURRENT TOTAL PROJECT ESTIMATE: $2,000,000
FUNDING INFORMATION:
Occupancy: NA NA
Salona Village E&I
developed by, Robert Hockersmith
D 3 of 12CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPlanning and Design
PROJECT: Extension ProjectProject Number X00828 402/
PROJECT MANAGER: Royse, Andy
LAND ACQ. AGENT: Barnes, DiannePROJECT ENGINEER: Steele, Terrence
USER AGENCY: Wastewater Management
DistrictProvidence
950 LF 8-inch sanitary sewer.
Project was on hold for approximately 5-years pending the receipt of an additional prepayment of availability fee which was received 8/07 (5 properties with 3 payments received from locations with non-failing systems); major design update required; site survey complete and FCPA concurrence received on proposed sewer alignment; design in progress; LAD authorized December 2008 to proceed with the acquisition of the required easements; final easement (FCPA) recorded 8/26/09; Received letter from FCPA requesting/stating that no construction on their property be done 2/15/10-07/01/10 to allow for bird breeding. RNK approved start date of 7/2/10.
PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Andy Royse (in-house)
Phase
CURRENT FISCAL YEAR APPROPRIATION $375,000
APPROVED TOTAL PROJECT ESTIMATE: $375,000
SCHEDULE APPROVED CURRENT
DESIGN:
CONSTRUCTION:
Schematics: NADesign Dev: NA
Const.Drawings: 11/08Site Permit: NA
Bldg. Permit: NA
Bid Advertisement: 03/10Contract Award: 05/10
Substantial Completion: 11/10
NANA
11/08NANA
03/10 05/10 11/10
A
EEE
ESTIMATED /ACTUAL
CURRENT TOTAL PROJECT ESTIMATE: $375,000
FUNDING INFORMATION:
Occupancy: NA NA
Pine Ridge E&I
developed by, Robert Hockersmith
D 4 of 12CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPlanning and Design
PROJECT: Extension ProjectProject Number X00826 402/
PROJECT MANAGER: Gallo, Michael
LAND ACQ. AGENT: Barnes, DiannePROJECT ENGINEER: Knizner, Anthony
USER AGENCY: Wastewater Management
DistrictHunter Mill
550 LF of 8-inch sanitary sewer to serve 6 dwellings.
Project scope and alignment issues resolved; site survey and design complete, including alignment changes requested by the property owners during easement acquisition; initial land acquisition complete (4 of 7 easements and 0 of 1 letters of permission acquired); partial LAD completion memorandum sent 7/27/09 (LAD has obtained an updated compensation estimate and is continuing to pursue the negotiations (difficult) to acquire the remaining land rights at a crossing of a pipe stem driveway concurrently with the remaining project being prepared for construction bid advertisement).
PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Michael Gallo (in-house)
Phase
CURRENT FISCAL YEAR APPROPRIATION $175,000
APPROVED TOTAL PROJECT ESTIMATE: $175,000
SCHEDULE APPROVED CURRENT
DESIGN:
CONSTRUCTION:
Schematics: NADesign Dev: NA
Const.Drawings: 06/08Site Permit: NA
Bldg. Permit: NA
Bid Advertisement: 02/10Contract Award: 10/09
Substantial Completion: 04/10
NANA
08/08NANA
02/10 03/10 09/10
A
EEE
ESTIMATED /ACTUAL
CURRENT TOTAL PROJECT ESTIMATE: $175,000
FUNDING INFORMATION:
Occupancy: NA NA
Old Courthouse/Besley Road
developed by, Robert Hockersmith
D 5 of 12CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPlanning and Design
PROJECT: Extension ProjectProject Number X00826 402/
PROJECT MANAGER: Gallo, Michael
LAND ACQ. AGENT: Barnes, DiannePROJECT ENGINEER: TBD, To be Determined
USER AGENCY: Wastewater Management
DistrictDranesville
1,000 LF 8-inch sanitary sewer and 6 grinder pumps.
BOS approved expansion of Sewer Service Area on February 27, 2006, to include additional properties with potentially failing septic systems; Phase I serves properties with potentially failing systems (including those in expansion area); scope of work revised to include the use of grinder pumps to address constructability issues associated with deep excavations (grinder pump easements will be required); design by A/E (Dewberry) 60% complete; preliminary plans submitted and under review; geotechnical report and boring complete; coordination on-going with property owners on proposed grinder pump locations; LAD authorized 11/9/09 to review easement plats and obtain title reports; project schedule adjustment approved 9/14/09).
PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Dewberry & Davis LLC
Phase
CURRENT FISCAL YEAR APPROPRIATION $350,000
APPROVED TOTAL PROJECT ESTIMATE: $350,000
SCHEDULE APPROVED CURRENT
DESIGN:
CONSTRUCTION:
Schematics: NADesign Dev: NA
Const.Drawings: 10/08Site Permit: NA
Bldg. Permit: NA
Bid Advertisement: 04/10Contract Award: 05/10
Substantial Completion: 06/10
NANA
11/09NANA
04/10 05/10 12/10
E
EEE
ESTIMATED /ACTUAL
CURRENT TOTAL PROJECT ESTIMATE: $350,000
FUNDING INFORMATION:
Occupancy: NA NA
Portland Place E & I, Phase I
developed by, Robert Hockersmith
D 6 of 12CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPlanning and Design
PROJECT: Extension ProjectProject Number X00828 402/
PROJECT MANAGER: Royse, Andy
LAND ACQ. AGENT: Buckley, BethPROJECT ENGINEER: Knizner, Anthony
USER AGENCY: Wastewater Management
DistrictDranesville
3,100 LF 8-inch sanitary sewer, 20 grinder pumps, and 1,800 LF force main; 38 properties in project.
LAD authorized 6/21/06 to proceed with acquisition of easements (34 total plats including 20 grinder pump easements and 4 offsite easements); 1 critical easement remains outstanding; land acquisition negotiations continuing concurrently with attempts to get 7 more pre-payments. Will need to go to BOS for one "owner unknown" easement. Supervisor Foust and Cheryl Patten to meet with key homeowner, Mr. Gregg, the first week of December 2009 regarding granting critical easement.
PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Patton Harris Rust & Associates
Phase
CURRENT FISCAL YEAR APPROPRIATION $2,530,000
APPROVED TOTAL PROJECT ESTIMATE: $2,530,000
SCHEDULE APPROVED CURRENT
DESIGN:
CONSTRUCTION:
Schematics: NADesign Dev: NA
Const.Drawings: 05/06Site Permit: NA
Bldg. Permit: NA
Bid Advertisement: 11/07Contract Award: NA
Substantial Completion: 12/08
NANA
05/07NANA
05/10 07/10 10/11
A
EEE
ESTIMATED /ACTUAL
CURRENT TOTAL PROJECT ESTIMATE: $2,530,000
FUNDING INFORMATION:
Occupancy: NA NA
Saigon Subdivision E & I
developed by, Robert Hockersmith
D 7 of 12CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPlanning and Design
PROJECT: Extension ProjectProject Number X00826 402/
PROJECT MANAGER: Roberts, Frank
LAND ACQ. AGENT: TBD, To be DeterminedPROJECT ENGINEER: TBD, To be Determined
USER AGENCY: Wastewater Management
DistrictLee
1,450 LF of 8'' sanitary sewer.
Project to provide sanitary sewer service to 11 houses; coordination with DPZ completed to require an adjacent land development project to provide an alternate sanitary sewer outfall (possibly in late 2009) via a proffered development condition; project schedule to be prepared once adjacent development begins construction; looking into alternate routings/alignments to provide service.
PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Frank Roberts (in-house)
Phase
CURRENT FISCAL YEAR APPROPRIATION $381,000
APPROVED TOTAL PROJECT ESTIMATE: $381,000
SCHEDULE APPROVED CURRENT
DESIGN:
CONSTRUCTION:
Schematics: NADesign Dev: NA
Const.Drawings: NASite Permit: NA
Bldg. Permit: NA
Bid Advertisement: NAContract Award: NA
Substantial Completion: NA
NANANANANA
NANANA
TBDTBDTBDNANA
TBDTBDTBD
ESTIMATED /ACTUAL
CURRENT TOTAL PROJECT ESTIMATE: $381,000
FUNDING INFORMATION:
Occupancy: NA NA NA
Piney Run Drive
developed by, Robert Hockersmith
D 8 of 12CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPlanning and Design
PROJECT: Extension ProjectProject Number X00826 402/
PROJECT MANAGER: Gallo, Michael
LAND ACQ. AGENT: Kresge, CarolPROJECT ENGINEER: Knizner, Anthony
USER AGENCY: Wastewater Management
DistrictProvidence
1,000 LF of 8-inch sanitary sewer.
Survey and utility designation complete; LAD coordinated with County Attorney on the use of a combined sanitary sewer/storm sewer easement as requested by property owners; sanitary and storm drainage design to be completed by Dewberry via a task order; first submission design plans for sanitary sewer (includes directional drilling) have been reviewed (revised preliminary design submission scheduled for mid-November 2009); addressing property owner concerns with the impact of construction; wetlands delineation complete; updated project completion schedule to be prepared after property owner concerns addressed.
PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Dewberry & Davis
Phase
CURRENT FISCAL YEAR APPROPRIATION $315,000
APPROVED TOTAL PROJECT ESTIMATE: $315,000
SCHEDULE APPROVED CURRENT
DESIGN:
CONSTRUCTION:
Schematics: NADesign Dev: NA
Const.Drawings: 03/09Site Permit: NA
Bldg. Permit: NA
Bid Advertisement: 03/10Contract Award: 04/10
Substantial Completion: 02/11
NANA
01/10NANA
03/10 04/10 02/11
E
EEE
ESTIMATED /ACTUAL
CURRENT TOTAL PROJECT ESTIMATE: $315,000
FUNDING INFORMATION:
Occupancy: NA NA
Glenbrook Road E & I
developed by, Robert Hockersmith
D 9 of 12CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPlanning and Design
PROJECT: Extension ProjectProject Number X00826 402/
PROJECT MANAGER: Royse, Andy
LAND ACQ. AGENT: Buckley, BethPROJECT ENGINEER: TBD, To be Determined
USER AGENCY: Wastewater Management
DistrictDranesville
2,700 LF 1.5" force main sanitary sewer with grinder pumps serving 16 lots.
Project will serve 16 lots with pressure sewer; citizens opposed gravity solution presented because of tree loss; feasibility study done in July 2009 in response to Supervisor Foust's 2/9/09 Board Matter requesting staff look into alternative approaches which would save trees. Presented force main with grinder pump solution at 7/30/09 citizens' meeting. NIP item authorizing grinder pump alternative signed in August 2009. Additional survey obtained 11/04/09. Design in progress.
PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Andy Royse (in-house)
Phase
CURRENT FISCAL YEAR APPROPRIATION $650,000
APPROVED TOTAL PROJECT ESTIMATE: $650,000
SCHEDULE APPROVED CURRENT
DESIGN:
CONSTRUCTION:
Schematics: NADesign Dev: NA
Const.Drawings: 06/10Site Permit: NA
Bldg. Permit: NA
Bid Advertisement: 01/11Contract Award: 03/11
Substantial Completion: 11/11
NANA
06/10NANA
01/11 03/11 11/11
E
EEE
ESTIMATED /ACTUAL
CURRENT TOTAL PROJECT ESTIMATE: $650,000
FUNDING INFORMATION:
Occupancy: NA NA
Turkey Run Road Sewer E&I
developed by, Robert Hockersmith
D 10 of 12CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPlanning and Design
PROJECT: Extension ProjectProject Number X00828 402/
PROJECT MANAGER: Roberts, Frank
LAND ACQ. AGENT: Finnell, RichardPROJECT ENGINEER: Knizner, Anthony
USER AGENCY: Wastewater Management
DistrictProvidence
6,450 LF of 8-inch sanitary sewer.
Three (3) pre-payments of availability fees outstanding to satisfy 50% requirement (30 of 33 payments received); project on-hold pending receipt of the required pre-payments at which time an updated completion schedule will be presented; VDOT comments received 6/8/09, partial redesign in progress to address VDOT comments. Anticipate resubmission to VDOT by December 2009.
PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Frank Roberts (in-house)
Phase
CURRENT FISCAL YEAR APPROPRIATION $2,500,000
APPROVED TOTAL PROJECT ESTIMATE: $2,500,000
SCHEDULE APPROVED CURRENT
DESIGN:
CONSTRUCTION:
Schematics: NADesign Dev: NA
Const.Drawings: 12/07Site Permit: NA
Bldg. Permit: NA
Bid Advertisement: NAContract Award: NA
Substantial Completion: 04/10
NANA
03/08NANA
02/10 04/10 04/11
A
EEE
ESTIMATED /ACTUAL
CURRENT TOTAL PROJECT ESTIMATE: $2,500,000
FUNDING INFORMATION:
Occupancy: NA NA
Fairfax Acres Subivision
developed by, Robert Hockersmith
D 11 of 12CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPlanning and Design
PROJECT: Extension ProjectProject Number X00826 402/
PROJECT MANAGER: Zahirieh, Shahla
LAND ACQ. AGENT: Finnell, RichardPROJECT ENGINEER: TBD, To be Determined
USER AGENCY: Wastewater Management
DistrictDranesville
700 LF 8-inch sanitary sewer.
Survey and utility designation complete; LAD has acquired all easements; stream crossing permits (Army Corps of Engineers and Virginia DEQ) obtained; letter to property owners 12/22/08 requesting the prepayment of the availability fee (3 of 4 required payments received); geotechnical proposal approved; updating VSMP permit application and preparing to submit; finalizing plans and preparing construction package.
PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Shahla Zahirieh (in-house)
Phase
CURRENT FISCAL YEAR APPROPRIATION $200,000
APPROVED TOTAL PROJECT ESTIMATE: $200,000
SCHEDULE APPROVED CURRENT
DESIGN:
CONSTRUCTION:
Schematics: NADesign Dev: NA
Const.Drawings: 10/06Site Permit: NA
Bldg. Permit: NA
Bid Advertisement: NAContract Award: NA
Substantial Completion: 04/08
NANA
12/07NANA
12/09 03/10 06/10
A
EEE
ESTIMATED /ACTUAL
CURRENT TOTAL PROJECT ESTIMATE: $200,000
FUNDING INFORMATION:
Occupancy: NA NA
Langley Forest E&I Phase II
developed by, Robert Hockersmith
D 12 of 12CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPlanning and Design
PROJECT: Extension ProjectProject Number X00826 402/
PROJECT MANAGER: Gallo, Michael
LAND ACQ. AGENT: Barnes, DiannePROJECT ENGINEER: TBD, To be Determined
USER AGENCY: Wastewater Management
DistrictDranesville
525 LF 8-inch sanitary sewer.
Phase II serves section of neighborhood south of Portland Place and requires easements; survey complete; design by A/E (Dewberry) 50% complete; preliminary plans submitted and under review; geotechnical report and boring complete; follow up citizen's meeting with critical property owners conducted 8/24/09 to discuss alignment and construction methods; evaluation of possible directional drilling alternative being pursued to minimimize impact to an existing property; completion schedule to be adjusted upon a final determination of the overall project scope. .
PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Dewberry & Davis
Phase
CURRENT FISCAL YEAR APPROPRIATION $200,000
APPROVED TOTAL PROJECT ESTIMATE: $200,000
SCHEDULE APPROVED CURRENT
DESIGN:
CONSTRUCTION:
Schematics: NADesign Dev: NA
Const.Drawings: 10/08Site Permit: NA
Bldg. Permit: NA
Bid Advertisement: 04/10Contract Award: 05/10
Substantial Completion: 06/10
NANA
12/09NANA
04/10 05/10 12/10
E
EEE
ESTIMATED /ACTUAL
CURRENT TOTAL PROJECT ESTIMATE: $200,000
FUNDING INFORMATION:
Occupancy: NA NA
Portland Place - Phase II
developed by, Robert Hockersmith
PC 1 of 2CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPost-Construction
PROJECT: Extension ProjectProject Number X00826 402/
PROJECT MANAGER: Royse, Andy
LAND ACQ. AGENT: Buckley, BethPROJECT ENGINEER: Knizner, Anthony
USER AGENCY: Capital Facilities
DistrictDranesville
Installation of 3,266 LF 8-inch sanitary sewer, 69 grinder pumps, and 18,570 LF force main.
Project substantially complete (VDOT permit release obtained 8/28/08); LAD completed vacation/ abandonment of grinder pump easements on 10/28/09.
PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Dewberry & Davis (consultant)
Phase
CURRENT FISCAL YEAR APPROPRIATION: $7,300,000CURRENT TOTAL PROJECT ESTIMATE: $7,300,000APPROVED TOTAL PROJECT ESTIMATE: $7,300,000
PROJECT LOCATION: 729 Lawton Street, McLean, VA, 22101-
PROJECT COMPLETE: 100
Contractor: Anchor
Project Substantial Complete Date: 8/31/2008
FUNDING INFORMATION:
%
River Oaks
developed by, Robert Hockersmith
PC 2 of 2CAP WDB - Monthly Status Report10/31/2009
MONTHLY STATUS REPORTPost-Construction
PROJECT: Extension ProjectProject Number X00826 402/
PROJECT MANAGER: Royse, Andy
LAND ACQ. AGENT: Barnes, DiannePROJECT ENGINEER: Steele, Terrence
USER AGENCY: Wastewater ManagementJonathan Okafor
DistrictDranesville
2,400 LF 8-inch sanitary sewer.
Construction NTP given 2/20/09. Construction substantially complete 10/29/2009.PROJECT STATUS
PROJECT DESCRIPTION
Engineer: Andy Royse (in-house)
Phase
Sam Shaikh
CURRENT FISCAL YEAR APPROPRIATION: $914,000CURRENT TOTAL PROJECT ESTIMATE: $914,000APPROVED TOTAL PROJECT ESTIMATE: $914,000
PROJECT LOCATION: 9247 Vernon Drive, Great Falls, VA,
PROJECT COMPLETE: 100
Contractor: Willam A Hazel
Project Substantial Complete Date: 10/29/2009
FUNDING INFORMATION:
%
Kenmore Subdivision
developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
26002G
Bus Shelters-CMAQ02407
South Van Dorn St @Crown Royal Dr NB
$19,000$0
Installation of bus shelter Shelter installed by developer. County project has been cancelled.
Lee Guarino, MichaelGlass, Lisa
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 04/04102Fund
26002G
Bus Shelters-CMAQ02409
Franconia Rd @ Westchester St EB
$15,000$0
Installation of bench Land acquisition required. Property owner refused to grant easements. Memo to DOT 9/26/06, recommending deletion of project. DOT coordinating with Supervisor's office (email sent 11/3/09, recommending deletion).
Lee Guarino, MichaelKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
NANA NA TBD TBD TBD
Project Description Monthly Remarks
NA01/06
TBD TBD TBDTBD 04/06102Fund
26002G
Bus Shelters-CMAQ02501
Rt 7 @ South George Mason Dr EB
$19,000$0
Installation of bus shelter Construction package being prepared. State building permit application submitted and comments received. County building permit obtained. Application for construction stage environmental clearance submitted 7/14/09.
Mason Moreland, KenBarnes, Dianne
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/09 09/08NA NA NA NA
Project Description Monthly Remarks
08/09 11/09 11/09 01/1011/0911/09102Fund
26002G
Bus Shelters-CMAQ02602
Ft Hunt Rd @ Belle View Blvd WB (N Side)
$19,000$0
Installation of bus shelter Construction package being prepared. State building permit application submitted and comments received. County building permit obtained. Application for construction stage environmental clearance submitted 7/14/09.
Mount Vernon Moreland, KenHonnick, John
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/09 11/03 05/09NA NA NA
Project Description Monthly Remarks
08/09 11/09 11/09 01/1011/1011/09102Fund
Friday, November 20, 2009 Page 1 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
26002G
Bus Shelter-CMAQ07001
BS#01730 Alban Road EB @ Springfield Oaks Drive
$30,000$0
Installation of bus shelter and storm drainage improvements
Project funded with federal (CMAQ) dollars. Intermediate design is in progress. Scope increased to include drainage improvements. NEPA environmental clearance work is in progress by consultant.
Lee Zahirieh, Shahla
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/1001/10 03/10 08/10TBD TBD
Project Description Monthly Remarks
01/10 11/10 11/10 02/1105/1011/10102Fund
26002G
Bus Shelter-CMAQ07002
BS#01248 Hinson Farm WB @ Tiswell Drivel
$30,000$0
Installation of bus shelter Project funded with federal (CMAQ) dollars. Intermediate design in progress. NEPA environmental clearance work in progress by consultant.
Mount Vernon Zahirieh, ShahlaPM PDD:PM LAD:PM CMDE:PM CMDS:
09/1001/10 03/10 08/10NA TBD
Project Description Monthly Remarks
01/10 11/10 11/10 02/1105/1011/10102Fund
26002G
Bus Shelter-CMAQ07003
BS#03020 Leesburg Pike EB @ Nevius Street
$35,000$0
Installation of bus shelter Project funded with federal (CMAQ) dollars. Intermediate design in progress. NEPA environmental clearance work in progress by consultant.
Mason Zahirieh, ShahlaPM PDD:PM LAD:PM CMDE:PM CMDS:
09/1001/10 03/10 08/10NA TBD
Project Description Monthly Remarks
01/10 11/10 11/10 02/1105/1011/10102Fund
26002G
Bus Shelter-CMAQ07004
BS#03129 Old Keene Mill EB @ Ainsworth Avenue
$30,000$0
Installation of bus shelter Project funded with federal (CMAQ) dollars. Coordinating with DOT on overall project scope and location - project on-hold until resolved.
Springfield Zahirieh, Shahla
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 08/08102Fund
Friday, November 20, 2009 Page 2 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
26002G
Bus Shelter-CMAQ07005
BS#04042 Braddock Road EB @ Carriagepark Drive
$35,000$0
Installation of bus shelter Project funded with federal (CMAQ) dollars. Intermediate design in progress. NEPA environmental clearance work in progress by consultant.
Braddock Zahirieh, Shahla
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/1001/10 03/10 08/10NA TBD
Project Description Monthly Remarks
01/10 11/10 11/10 02/1105/1011/10102Fund
26002G
Bus Shelter-CMAQ07006
BS#04050 Braddock Road EB @ Nash Drive
$35,000$0
Installation of bus shelter Project funded with federal (CMAQ) dollars. Intermediate design in progress. NEPA environmental clearance work in progress by consultant.
Braddock Zahirieh, Shahla
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/1001/10 03/10 08/10NA TBD
Project Description Monthly Remarks
01/10 11/10 11/10 02/1105/1011/10102Fund
26002G
Bus Shelter-CMAQ07007
BS#05343 McClearen Road EB @ Towerview Road
$30,000$0
Installation of bus shelter Project funded with federal (CMAQ) dollars. Intermediate design in progress. NEPA environmental clearance work in progress by consultant.
Sully Zahirieh, ShahlaPM PDD:PM LAD:PM CMDE:PM CMDS:
09/1001/10 03/10 08/10NA TBD
Project Description Monthly Remarks
01/10 11/10 11/10 02/1105/1011/10102Fund
26006G
Richmond Highway Intersection Improvement Phase 4D
06001
Intersection Design - Sacramento Drive, Southgate Drive, Lockheed Boulevard and Arlington Drive
$1,200,000$1,200,000
Engineering and construction of intersection improvements for express bus service stops at Sacremento Dr., Southgate Dr., Lockheed Blvd. and Arlington Dr.
Project is part of the Four-Year Transportation Program endorsed by the Board on 2/9/04. This project will be completed in phases. Schedule for this phase will be determined following completion of other phases.
Mount Vernon Madhusudhan, GPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 07/06Lee102Fund
Friday, November 20, 2009 Page 3 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
26006G
Richmond Highway Intersection Improvement Phase 4B2
06002
Intersection Design - Lukens Lane and Frye Road (Phase2)
$600,000$600,000
Engineering and construction of intersection improvements for express bus service stops at Lukens Lane and Frye Road.
Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. This project will be completed in phases. Design waiver package submitted to VDOT 8/31/09. Intermediate design in progress.
Mount Vernon Madhusudhan, GBarnes, DianneFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/1102/10 07/10 07/11NA TBD
Project Description Monthly Remarks
05/11 10/11 11/11 06/1206/1209/11
Lee102Fund
26006G
Richmond Highway Intersection Improvement Phase 4C
06002
Intersection Design - Ladson Lane
$400,000$400,000
Engineering and construction of intersection improvements for an express bus service stop at Ladson Ln.
Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. This project will be completed in phases. Intermediate design in progress. Design waiver package submitted to VDOT 8/31/09. Consultant is coordinating with VDOT on revised scope of work.
Mount Vernon Madhusudhan, G
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/1102/10 05/10 05/11NA TBD
Project Description Monthly Remarks
03/11 08/11 09/11 12/1112/1107/11
Lee102Fund
26006G
Richmond Highway Intersection Improvement Phase 4B1
06002
Intersection Design Frye Road (Phase I)
$200,000$0
Engineering and construction of intersection improvements for express bus service stop at Frye Road.
Project is part of the Four-Year Transportation Program endorsed by the Board on 2/9/04. This project will be completed in phases. Fairfax Water utility relocation plans were received and are under review.
Mount Vernon Madhusudhan, GBarnes, DianneFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0905/06NA NA NA NA
Project Description Monthly Remarks
07/06 02/10 03/10 07/1007/1001/10
Lee102Fund
26006G
Richmond Highway Intersection Improvement Phase 4C1
06002
Intersection Design Kings Highway
$400,000$0
Engineering and construction of intersection improvements for express bus service stop at Kings Highway.
Project is part of the Four-Year Transportation Program endorsed by the Board on 2/9/04. This project will be completed in phases. Draft construction package being prepared. VDOT permit application submitted 9/30/09.
Mount Vernon Madhusudhan, G
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/0905/06NA NA NA NA
Project Description Monthly Remarks
07/06 01/10 02/10 06/1004/1012/09
Lee102Fund
Friday, November 20, 2009 Page 4 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
26006G
Richmond Hwy Public Transport Initiative: Intersections Phase 4
06004
Route 1 SB: Sacramento Drive: Southbound REX Bus Stop
$65,000$65,000
Installation of REX Bus Shelter and Bus Stop Improvements
Part of a multi-phased project along the Route 1 Corridor (Fort Belvoir to Huntington Metro) with an overall TPE of $55 million; construction 100% complete except for solar lighted sign pole installation. CMD authorized to install lighted sign poles 5/17/09.
Mount Vernon Zahirieh, Shahla
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/06NA NA NA NA NA
Project Description Monthly Remarks
12/06 12/06 12/06 01/0702/0712/06102Fund
26007G
Seven Corners Transit Center06000
$1,000,000$0
Design and construction of a transit center on the Seven Corners Shopping Center parking lot site
Project is part of the Second Four-Year Transportation Program; CMAQ funds approved for project. Final plans to be submitted to LDS once VDOT approves new entrance layout. A public hearing is scheduled for 11/18/09.
Mason Hojatzadeh, Max
Farsad, NahidHousley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/08NA NA TBD TBD TBD
Project Description Monthly Remarks
05/08 02/10 03/10 11/1006/0901/10102Fund
26008G
Countywide Trails07001
Soapstone Drive Walkway
$1,500,000$0
3,300 LF of walkway, curb and gutter, drainage improvements along east side of Soapstone Drive, 4 bus pad sites
Contract addendum for design services is being revised by consultant based on comments received from the County. A citizen's meeting was held 10/27/09 to go over selected alignment for the project. Fee proposal for addendum one is being processed.
Hunter Mill El Kaissi, Moham
Gharavi, MoMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD102Fund
26008G
Countywide Trails07002
Columbia Pike Phase II Walkway
$500,000$0
600 LF of 8-foot wide walkway, retaining wall and installation of a bus shelter, eastbound lane Columbia Pike at Powell Lane
Project is part of the Second Four-Year Transportation Program Project will include the construction of the proposed bus shelter. Additional CMAQ funds approved for construction of Phase II section. Pre-final plans have been submitted and are under review. Comments due back from MSMD and CMD by 11/25/09. County is pursuing necessary environmental approvals.
Mason Schmidt, NatashaBuckley, Beth
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/09 11/06
Project Description Monthly Remarks
09/09 03/10 05/10 09/1004/1002/10102Fund
Friday, November 20, 2009 Page 5 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
PPTF01
Pedestrian Task Force Recommendations
00400
Leesburg Pike / Glen Carlyn Road
$150,000$0
Pedestrian improvements at the intersection of Leesburg Pike and Glen Carlyn Road.
Notice to proceed issued 10/12/09. Construction is 60% complete.
Mason Hojatzadeh, Max
Lim, SamJensen, Chris
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0906/07NA NA NA NA
Project Description Monthly Remarks
09/07 10/09 10/09 02/1012/0910/09124Fund
PPTF01
Pedestrian Task Force Recommendations
00500
Leesburg Pike / Magarity Road
$150,000$0
Pedestrian improvements at the intersection of Leesburg Pike and Magarity Road.
Notice to proceed issued 10/12/09. Construction is 60% complete.
Dranesville Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0909/07NA NA NA NA
Project Description Monthly Remarks
04/08 10/09 10/09 02/1012/0910/09
Providence124Fund
PPTF01
Pedestrian Task Force Recommendations
00600
Leesburg Pike / Dranesville Road
$150,000$0
Pedestrian improvements at the intersection of Leesburg Pike and Dranesville Road.
Construction is 60% complete.
Dranesville Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0909/07NA NA NA NA
Project Description Monthly Remarks
04/08 11/09 11/09 02/1012/0911/09124Fund
PPTF01
Pedestrian Task Force Recommendations
00700
Dolley Madison Boulevard / Great Falls Street - Lewinsville Road
$150,000$0
Pedestrian improvements at the intersection of Dolley Madison Boulevard/Great Falls Street and Lewinsville Road.
Construction is 60% complete.
Dranesville Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0909/07NA NA NA NA
Project Description Monthly Remarks
04/08 11/09 11/09 02/1012/0911/09124Fund
Friday, November 20, 2009 Page 6 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
PPTF01
Pedestrian Task Force Recommendations
00800
Lewinsville Road / Balls Hill Road
$150,000$0
Pedestrian improvements at the intersection of Lewinsville Road and Balls Hill Road.
Construction is 60% complete.
Dranesville Hojatzadeh, MaxZore, TasneemLim, SamMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0909/07 02/08 04/08NA NA
Project Description Monthly Remarks
04/08 11/09 11/09 02/1012/0911/09124Fund
PPTF01
Pedestrian Task Force Recommendations
00900
Little River Turnpike / Backlick Road
$150,000$0
Pedestrian improvements at the intersection of Little River Turnpike and Backlick Road.
Construction package submitted 10/1/09. Notice to proceed issued 10/12/09. Construction is 0% complete.
Mason Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0909/07NA NA NA NA
Project Description Monthly Remarks
04/08 10/09 10/09 02/1012/0910/09124Fund
PPTF01
Pedestrian Task Force Recommendations
01000
Arlington Blvd - Olin Drive
$150,000$0
Pedestrian improvements on Arlington Boulevard near Olin Drive.
Construction package submitted to 10/1/09. Notice to proceed issued 10/12/09. Construction is 0% complete.
Mason Hojatzadeh, Max
Lim, SamMurdoch, Guy
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0908/08NA NA NA NA
Project Description Monthly Remarks
09/08 10/09 10/09 02/1012/0910/09124Fund
PPTF01
Pedestrian Task Force Recommendations
01200
Vale Rd and Flint Hill Rd Pedestrian Concrete Projects
$20,000$0
Three new crosswalks, sidewalk, curb and gutter, curb ramps, and concrete island
Notice to proceed with survey and design issued 10/8/09. Survey notification letters sent 10/8/09.
Hunter Mill Ayodeji, OlawalePM PDD:PM LAD:PM CMDE:PM CMDS:
12/1001/10 07/10 02/11NA TBD
Project Description Monthly Remarks
12/10 04/11 04/11 07/1107/1104/11124Fund
Friday, November 20, 2009 Page 7 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
PPTF01
Pedestrian Task Force Recommendations
01300
Arlington Boulevard / Graham Road
$200,000$0
Pedestrian improvements at the intersection of Arlington Boulevard and Graham Road.
Final design is in progress. Preparing VDOT permit package. Plat being revised.
Providence Hojatzadeh, MaxFinnell, RichardLim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/1008/08 08/09 03/10NA NA
Project Description Monthly Remarks
02/09 07/10 08/10 11/1011/1006/10124Fund
PPTF01
Pedestrian Task Force Recommendations
01400
Braddock Road / Guinea Road
$150,000$0
Pedestrian improvements at the intersection of Braddock Road and Guinea Road.
Pre-final plans submitted to VDOT for review 5/5/09. Final comments received. Preparing VDOT permit application. Plat being revised.
Braddock Hojatzadeh, MaxFinnell, RichardLim, SamMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/1012/08 10/09 04/10NA NA
Project Description Monthly Remarks
05/09 06/10 06/10 12/1004/1106/10124Fund
PPTF01
Pedestrian Task Force Recommendations
01500
Braddock Road / Wakefield Chapel Road
$150,000$0
Pedestrian improvements at the intersection of Braddock Road and Wakefield Chapel Road.
Final plans submitted to VDOT for review on 8/26/09.
Braddock Hojatzadeh, MaxFinnell, RichardLim, SamJensen, Chris
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/1003/08 10/09 04/10NA NA
Project Description Monthly Remarks
08/08 06/10 06/10 12/1003/1106/10124Fund
PPTF01
Pedestrian Task Force Recommendations
01600
Leesburg Pike / Baron Cameron Avenue - Springvale Road
$200,000$0
Pedestrian improvements at the intersection of Leesburg Pike/Baron Cameron Avenue and Springvale Road.
Pre-final plans submitted to VDOT for review 9/16/09. Request for plat made 9/28/09. Plat being revised.
Dranesville Hojatzadeh, MaxKresge, CarolLim, SamMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/0901/09 10/09 04/10NA NA
Project Description Monthly Remarks
05/09 06/10 06/10 12/1004/1106/10
Hunter Mill124Fund
Friday, November 20, 2009 Page 8 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
PPTF01
Pedestrian Task Force Recommendations
01700
Leesburg Pike / Patrick Henry Drive
$500,000$0
Pedestrian improvements at the intersection of Leesburg Pike and Patrick Henry Drive.
Second final design submitted to VDOT for review 6/23/09. Awaiting final comments. Request for plats submitted 10/7/09. Preparing VDOT permit package.
Mason Hojatzadeh, MaxZore, TasneemLim, SamMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/1006/08 11/09 06/10NA NA
Project Description Monthly Remarks
05/09 10/10 11/10 02/1102/1109/10124Fund
R19301
Georgetown Pike/Walker Road RTL00009
Georgetown Pike/Walker Road RTL
$500,000$0
Construction of right turn lane and sidewalk from southbound Walker Rd. to westbound Georgetown Pk. and signal modifications.
Construction package submitted 10/1/09. Notice to proceed issued 10/26/09.
Dranesville Hojatzadeh, MaxFinnell, RichardFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0910/08 12/08 04/09NA NA
Project Description Monthly Remarks
08/09 10/09 10/09 03/1003/1010/09124Fund
007701
Route 50 Interchange/Waples Mill Road
00000
$4,584,000$0
Design and construction of at-grade improvements.
Project is part of the Four-Year Transportation Program endorsed by the Board on 2/9/04. Construction substantially complete 12/18/06. Punch list items for overhead sign completed. Awaiting permit release.
Springfield Gharavi, MoFinnell, RichardMinnix, W. ToddHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/0410/02 07/03 04/04 10/04NA
Project Description Monthly Remarks
10/04 05/05 06/05 12/0610/0604/05
Providence301Fund
007702
Tall Timbers Drive00000
$1,450,000$0
Construction of 700 linear feet of roadway connecting existing portions of Tall Timbers Drive.
Construction substantially complete 10/10/07. Post-construction street acceptance package submitted to VDOT 7/21/09.
Springfield McCorkle, LisaBuckley, BethMinnix, W. ToddHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/0706/06 12/05 02/07NA NA
Project Description Monthly Remarks
08/06 02/07 03/07 10/0701/0801/07301Fund
Friday, November 20, 2009 Page 9 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
008803
Route 29 Widening00000
$4,400,000$985,000
Phase II: Trail improvements from Stevenson Street to Holly Avenue.
VDOT completed widening of westbound lane between Dixie Hill Road and Holly Avenue. TPE includes future phases to be identified. Phase II final design comments are being addressed. Design approval package submitted to VDOT for review 8/24/09. Preparing right of way authorization package for VDOT approval.
Springfield Madhusudhan, GFinnell, RichardMinnix, Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/06 04/07TBD TBD TBD TBD
Project Description Monthly Remarks
11/07TBD TBD TBDTBDTBD
301Fund
009906
Signal Installation00100
Pedestrian Signals at Prosperity and Hilltop
$80,000$0
Pedestrian improvements at the intersection of Prosperity Avenue and Hilltop Road.
Pre-final design in progress. Project plats are in progress.
Providence Ayodeji, OlawaleFinnell, RichardMinnix, W. Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1005/09 01/10 07/10NA TBD
Project Description Monthly Remarks
11/09 08/10 08/10 12/1009/1008/10301Fund
009913
Dolley Madison Blvd. (Rt. 123)00000
$8,946,000$0
Widening Dolley Madison Blvd. to six lanes from I-495 to Dulles Toll Road.
Construction is complete. Initial street acceptance package approved by VDOT on 10/2/09.
Providence
Goudarzi, BehrooStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0002/00 11/00 11/00 03/01NA
Project Description Monthly Remarks
11/00 03/01 04/01 07/0207/0212/00301Fund
009471
Lee District Capital ProjectsWT002
Governor's Hill Drive Walkway
$240,000$126,000
750 LF of 5-foot wide concrete walkway along the south side of Franconia Road between Governor's Hill Road and Telegraph Road
Fairfax Water submitted updated waterline relocation proposal 11/10/09. Construction schedule being developed.
Lee Royse, AndyBarnes, Dianne
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/07 08/08 01/09NA
Project Description Monthly Remarks
06/07 04/10 05/10 11/1008/0903/10303Fund
Friday, November 20, 2009 Page 10 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
009472
Mason District Capital ProjectsWT002
Columbia Pike: Govnmnt Ctr to Downing St
$570,000$0
500 LF of 5-foot wide concrete sidewalk
Project is part of the Second Four-Year Transportation Program Construction substantially complete 5/18/09. VDOT permit release 6/30/09.
Mason Schmidt, NatashaBuckley, BethMinnix, W. ToddHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/07 11/06NA NA
Project Description Monthly Remarks
02/07 09/08 05/0912/08NA
303Fund
009473
Mt. Vernon District Capital ProjectsWT002
David Site Wayside Signage
$10,000$0
Installation of signage at historic site along Mason Neck Trail, segment 3
FCPA to follow up with consultant on 11/10/09 to finalize graphics design for historic signage panels. Construction schedule to be developed after panel design is complete.
Mount Vernon Royse, AndyPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD NA NA NA
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD303Fund
009475
Springfield District Capital ProjectsWT002
Tuttle Road
$441,200$0
2,935 LF of 8-foot wide asphalt walkway.
Construction notice to proceed issued 6/29/09. Construction is 90% complete.
Springfield Roberts, FrankZore, TasneemMinnix, W. Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/06 02/07NA NA
Project Description Monthly Remarks
03/06 05/09 05/09 12/0909/0905/09303Fund
V00003
Road Viewer ProjectsRVP34
I-Street
$36,000$36,000
180 LF road improvements Preliminary punch list developed with VDOT. Updated property line and topographic survey requested 11/18/09. Coordination meeting with VDOT to be scheduled 11/2009 to discuss the outstanding scope of work. Project completion schedule to be prepared after updated site survey is completed.
Mount Vernon Gallo, MichaelPM PDD:PM LAD:PM CMDE:PM CMDS:
01/10NA NA NA
Project Description Monthly Remarks
12/06TBD TBD TBDTBDTBD
303Fund
Friday, November 20, 2009 Page 11 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
V00003
Road Viewer ProjectsRVP35
Woodburn Access Rd
$250,300$250,300
850 LF road improvements Negotiations between County and INOVA in progress on Woodburn Center for Community Mental Health site which may delete the need to proceed with the access road project; Building Design Branch included access road issue with briefing of County Executive (deletion of road improvements deferred ~ project to remain on hold unitl possible BOS action currently scheduled for the spring 2010).
Providence Wozniak, WalterColeman, MichaelFarsad, NahidMcMillen, Barry
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDNA NA NA NA NA
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 04/03303Fund
V00004
Road Maintenance ProgramRM188
Abbott Lane
$65,000$0
380 LF road improvements Design in progress. Updated survey in progress. Coordination with VDOT in progress to conduct a joint site inspection to define scope. Construction contingent upon availability of possible BORV funds that may be approved during FY 2010. Project completion schedule to be approved after a funding source for construction is identified.
Providence Gallo, MichaelPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDNA NA NA NA NA
Project Description Monthly Remarks
02/06TBD TBD TBDTBDTBD
303Fund
V00004
Road Maintenance ProgramRM190
Silverleaf Drive
$75,000$0
700 LF road improvements Coordinatng with VDOT in progress to conduct a joint site inspection to re-define scope of corrective work. Land acquisition may be required. Construction contingent upon availability of possible BORV funds that may be approved during FY 2010. Project completion schedule to be approved after a funding source for construction is identified.
Springfield Wozniak, WalterPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDNA NA TBD TBD TBD
Project Description Monthly Remarks
04/06TBD TBD TBDTBDTBD
303Fund
Z00032
Safety Improvements at Bus Shelters/Stops
05120
NB Soapstone & Hearthstone Ct
$20,200$0
20' concrete sidewalk, loading pad, and drainage culvert
Group 1: Project to be completed with Soapstone Drive Walkway, Project No. 26008G (07001).
Hunter Mill Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
NANA NA NA NA NA
Project Description Monthly Remarks
TBD NA NA NANANA303Fund
Friday, November 20, 2009 Page 12 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
Z00032
Safety Improvements at Bus Shelters/Stops
05144
WB Glade Drive & Breton Court
$15,000$0
Loading pad Group 3: Bus stop improvements to be completed with walkway project - see Glade Drive Walkway, Project No. 4YP201 (PB012).
Hunter Mill Lauretti, FrancescFinnell, Richard
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
NANA NA NA NA NA
Project Description Monthly Remarks
NA NA NA NANANA303Fund
006495
Wiehle Avenue Phase III00000
$7,399,000$0
Four lane road from Dranesville Road to Fairfax County Parkway.
Construction is complete. AT&T quitclaim has been received. As-built package re-submitted to VDOT 8/13/09. A follow up email was sent to VDOT 11/9/09.
Dranesville Gharavi, Mo
Farsad, NahidStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0003/89 07/90 11/99 11/99 06/00
Project Description Monthly Remarks
08/00 03/01 04/01 08/0208/0202/01304Fund
006495
Wiehle Avenue, Phase II00000
$7,933,000$0
Four lane road from Fairfax County Parkway to Reston Avenue.
Construction is complete. Colonial Pipeline quitclaim has been received. As-built package re-submitted to VDOT 7/16/09. A follow up email was sent to VDOT 11/9/09.
Hunter Mill Gharavi, Mo
Farsad, NahidStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/9803/89 01/90 03/98 03/98 10/98
Project Description Monthly Remarks
10/98 05/99 06/99 04/0004/0001/99
Dranesville304Fund
064103
South Van Dorn/I-95, Phase II00000
$11,300,000$0
Design and construct a ramp from northbound South Van Dorn Street to eastbound I-95.
Construction is complete. Street Acceptance Package being prepared for submission to VDOT. Vacation of a Portion of Oakwood Road and a Dedication of a Temporary Drainage Easement and a Sanitary Sewer Easement was forwarded to DOT at the end of August 2006. PDD is working to secure the easements with the property owners.
Lee Gharavi, Mo
Strecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/9707/94 01/96NA NA NA
Project Description Monthly Remarks
09/97 01/98 02/98 01/9901/9901/98304Fund
Friday, November 20, 2009 Page 13 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
064233
Spring Hill Road00000
$10,900,000$0
Widening Spring Hill Road between Route 7 and International Drive.
Funding provided by VDOT in accordance with its 6-year plan. Construction is 50% complete.
Providence Gharavi, MoKresge, CarolGharavi, MoHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/0307/02 12/03 05/05 10/05NA
Project Description Monthly Remarks
09/03 02/09 03/09 10/1006/0812/08304Fund
064246
South Van Dorn/Franconia Interchange
00000
$7,574,399$0
Design of grade-separated interchange.
Project is funded for design only in the VDOT Six-Year Improvement Program. Preliminary design in progress. VDOT approved the VE recommendations on 10/26/09. Meeting with consultant, DOT and PDD scheduled on 11/6/09.
Lee Salahuddin, KhaliFinnell, Richard
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/1001/10 03/10TBD TBD TBD
Project Description Monthly Remarks
10/07TBD TBD TBDTBDTBD
304Fund
064248
Fairfax County Parkway Widening00000
$3,325,000$0
Widening of Fairfax County Parkway to six lanes from Rugby Road to Dulles Toll Road for a total of 6.5 miles. Additional lane to be HOV lane.
Funding for preliminary engineering and environmental studies only. Further evaluation is necessary to determine any operational issues that may arise due to HOV designation of the additional through lane. Revised draft report summarizing VISSIM results submitted for review 8/17/09. Project is on hold.
Sully Salahuddin, KhaliPreston, ClintonMinnix, ToddHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 02/09Hunter Mill304Fund
064251
Guinea Road/Falmead Road00000
$150,000$0
Extend sidewalk, drop inlet, drainage improvements, and install a crosswalk at Guinea Road and Falmead Road.
Construction to be completed by annual contractor. VDOT permit application package submitted 9/29/09. Draft construction package is being prepared.
Braddock Madhusudhan, GPreston, ClintonGharavi, Mo
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/0906/05NA NA NA NA
Project Description Monthly Remarks
02/06 01/10 02/10 04/1007/0712/09304Fund
Friday, November 20, 2009 Page 14 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
064257
Centreville Road Trail at Dulles Toll Road Phase II
00000
$290,000$0
Provide pedestrian improvements and traffic signal modifications to cross Centreville Rd. @ Dulles Toll Rd. Interchange.
Final design is in progress. Traffic Management Plan is being prepared.
Hunter Mill Madhusudhan, G
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0905/09NA NA NA NA
Project Description Monthly Remarks
01/09 03/10 03/10 07/1008/0903/10304Fund
064258
Colts Neck Road Trail/Sidewalk00000
$366,000$0
Construct trail/sidewalk on Colts Neck Road/South Lakes Drive to Hunter Wood Shopping Center (west side).
A field meeting with CMD was held 4/15/09 to resolve utility conflicts. Design options are being evaluated.
Hunter Mill Madhusudhan, GZore, TasneemMinnix, W. Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1007/05 06/06 09/06NA NA
Project Description Monthly Remarks
03/06 03/10 03/10 07/1009/0703/10
Mason304Fund
064267
Pedestrian Improvements - VDOT Funded
PI005
Chain Bridge Road / International Drive
$0$0
Pedestrian improvements at the intersection of Chain Bridge Road and International Drive.
Project on hold due to potential conflict with Metro Project.
Providence Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 08/07304Fund
064267
Pedestrian Improvements - VDOT Funded
PI026
Fairfax County Parkway / Hooes Road - Seabrook Lane
$500,000$350,000
Pedestrian improvements at the intersection of Fairfax County Parkway/Hooes Road and Seabrook Lane.
Due to the impact of project to existing bridge, a feasibility study was prepared. VDOT has approved the feasibility study. Due to high construction costs, DOT has requested project be put on hold until additional funds are available.
Springfield Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 02/09304Fund
Friday, November 20, 2009 Page 15 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
064270
Beverly Rd/Fleetwood Rd00000
$120,000$0
Provide raised concrete median on northbound and southbound approach of Beverly Road.
Construction substantially complete 8/31/09. Permit released 10/27/09.
Dranesville Ayers, RobertZore, TasneemMcCorkle, LisaHousley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/0903/08 01/08 03/08NA NA
Project Description Monthly Remarks
02/08 04/09 06/09 08/0903/0904/09304Fund
064271
Annandale Rd/Kerns Rd00000
$225,000$150,000
Intersection improvements including left and right-turn lanes.
Intermediate design is in progress. Design waiver for sub-standard turn lane and reduced lane width was submitted with intermediate submission 10/30/09.
Mason Khorashadi, BrooKresge, CarolGharavi, MoHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/1005/09 12/09 02/10 09/10TBD
Project Description Monthly Remarks
04/08 12/10 01/11 06/1112/1011/10304Fund
064273
Silverbrook Rd/Hooes Rd Intersection Imp.
00000
$350,000$0
Intersection improvement to configure turn lanes at Silverbrook Road and Hooes Road intersection.
Final design in progress. Notice to proceed issued 10/13/09 for additional traffic signal design services.
Mount Vernon Madhusudhan, G
McCorkle, LisaMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/1012/07NA NA NA NA
Project Description Monthly Remarks
10/08 07/10 08/10 12/1007/0906/10304Fund
064274
Route 29 Walkway00000
$250,000$0
Provide 10' wide asphalt trail on south side of Route 29 between Shreve Road and Fairview Park Drive.
Pre-final design was submitted to VDOT for review 8/12/08. Comments have been received. VDOT's HOT Lane project at this location is under construction and is in conflict with project's current design. This project on hold pending scope revision.
Providence Ayers, RobertFinnell, Richard
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/08TBDNA TBD TBD TBD
Project Description Monthly Remarks
08/08TBD TBD TBDTBDTBD 10/08
304Fund
Friday, November 20, 2009 Page 16 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
064276
West Ox Rd/Fairfax County Parkway00000
$500,000$0
Extend right turn lane on southbound Fairfax County Parkway. Add dual left turn lanes on northbound Fairfax County Parkway.
Second final design submitted 11/9/09.
Sully El Kaissi, MohamPreston, ClintonGharavi, Mo
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1009/07 11/08 04/09NA NA
Project Description Monthly Remarks
04/08 04/10 05/10 03/1103/1103/10
Hunter Mill304Fund
064288
Fairfax County Parkway/Sunrise Valley Drive
00000
Fairfax County Parkway/Sunrise Valley Drive
$1,160,000$0
Addition of dual left-turn lane on northbound Fairfax County Parkway.
VDOT permit received 10/7/09. Construction package forwarded to CMD 10/29/09.
Hunter Mill Salahuddin, KhaliPreston, ClintonMinnix, W. ToddStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0909/05 10/07 12/08NA NA
Project Description Monthly Remarks
10/07 12/09 01/10 10/1012/0811/09304Fund
4YP012
South Kings Highway/Harrison Lane00000
$3,000,000$0
Addition of left-turn lane from South Kings Highway to Harrison Lane.
Project is part of the Four-Year Transportation Program. Construction is 20% complete.
Lee Salahuddin, KhaliBarnes, DianneMinnix, ToddHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0803/06 08/06 03/07 07/07 09/08
Project Description Monthly Remarks
03/07 05/09 06/09 06/1006/1004/09304Fund
4YP013
Route 236/Beauregard Street00000
$2,180,000$0
Add a second left-turn lane from eastbound Route 236 to northbound Beauregard Street.
Project is part of the Four-Year Transportation Program. Construction substantially complete 1/16/09. Awaiting permit release.
Mason Ayers, RobertZore, TasneemGharavi, MoHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0707/05 04/06 05/06 11/06NA
Project Description Monthly Remarks
01/07 03/08 03/08 01/0905/0802/08304Fund
Friday, November 20, 2009 Page 17 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP020
Hunter Mill Road Walkway00000
$840,000$0
Walkway along Hunter Mill Road from Chain Bridge Road to Corbalis Park for a total distance of approximately 1900 LF.
Project is part of the Four-Year Transportation Program. Construction substantially complete 8/17/09. Final inspection has been requested. Awaiting permit release.
Providence El Kaissi, MohamKresge, CarolMinnix, W. ToddStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0801/06 05/06 03/08NA NA
Project Description Monthly Remarks
09/06 11/08 12/08 08/0908/0810/08304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB003
Lewinsville Rd Median
$150,000$0
Installation of a pedestrian safety median on Lewinsville Rd at Spring Hill Elementary School. Project is approx. 975 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design is in progress. A citizens meeting is scheduled for 11/19/09.
Dranesville Marsh, DennisFinnell, RichardMcCorkle, LisaStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0910/08NA NA NA NA
Project Description Monthly Remarks
12/09 04/10 05/10 10/1010/1003/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB004
Spring Hill Rd - Old Dominion to Pettit Ct
$480,000$0
Pedestrian improvements along east side of Spring Hill Rd from Old Dominion Dr to Pettit Ct. Project is approx. 1,550 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design in progress. Design alternatives are being evaluated. Additional survey received and forwarded to consultant.
Dranesville Marsh, DennisKresge, CarolGharavi, MoMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0909/08 12/09 01/10 08/10NA
Project Description Monthly Remarks
10/09 11/10 12/10 06/1103/1110/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB005
Turner Ave Walkway - Williamsburg Pond to Haycock
$50,000$0
Pedestrian improvements along east side of Turner Ave from Williamsburg Pond Ct to Haycock Rd. Project is approx. 200 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design is underway. Project plats are in progress.
Dranesville Marsh, DennisBarnes, DianneMcCorkle, LisaStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/1012/08 11/09 12/09 06/10NA
Project Description Monthly Remarks
02/10 09/10 10/10 02/1111/1008/10304Fund
Friday, November 20, 2009 Page 18 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP201
Pedestrian Improvements - Bond Funded
PB006
Westmoreland St Walkway - Chain Bridge to Dillion
$230,000$0
Pedestrian improvements along east side of Westmoreland St from Chain Bridge Rd to Dillon Ave. Project is approx. 700 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Two preliminary design alternatives are being developed. Additional survey received and forwarded to consultant. Schedule to be developed after design alternative is developed.
Dranesville Marsh, Dennis
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB007
Westmoreland St Walkway - Haycock to Temple
$230,000$0
Pedestrian improvements along west side of Westmoreland St from Haycock Rd to Temple Rodef Shalom. Project is approx. 845 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Scope being revised to add right-turn lane from southbound Westmoreland to Haycock Road. Project to be combined with Project No. RSPI01/1200 -Westmoreland Street/Haycock Road.
Dranesville Marsh, DennisPreston, ClintonMcCorkle, Lisa
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/1012/08 10/09 11/09 06/10NA
Project Description Monthly Remarks
05/10 09/10 10/10 08/1108/1108/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB008
Westmoreland St Walkway - Temple to Chesterbrook
$150,000$0
Walkway on west side Westmoreland St from Temple Rodef Shalom to Chesterbrook Presbyterian Church. Project is approx. 550 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design submitted to VDOT for review 8/20/09. Project plats are being revised. Plats were sent to LAD for review 10/28/09.
Dranesville Marsh, DennisPreston, ClintonMcCorkle, Lisa
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/1012/08 11/09 07/10NA NA
Project Description Monthly Remarks
03/10 10/10 11/10 02/1102/1109/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB009
Beulah Rd Walkway - Abbotsford to Clarks Crossing
$1,000,000$0
Pedestrian improvements along Beulah Rd from Abbotsford Dr to Coral Crest Ln and along Clarks Crossing Rd. Project is approx. 4,700 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design in progress. Citizen's information meeting is being planned for the fall 09. Coordination with Supervisors office is ongoing in preparation for meeting.
Hunter Mill Conley, TimKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/1002/09 11/09 01/10 08/10TBD
Project Description Monthly Remarks
03/10 04/11 05/11 10/1109/1102/11304Fund
Friday, November 20, 2009 Page 19 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP201
Pedestrian Improvements - Bond Funded
PB010
Colts Neck Rd Walkway - Lakes to Winterthur
$130,000$0
Pedestrian improvements along east side of Colts Neck Rd from South Lakes Dr to Winterthur Ln. Project is approx. 850 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. VDOT permit received 10/12/09. Draft construction package is being prepared. Land Acquisition is complete 11/6/09.
Hunter Mill Conley, TimFinnell, RichardMcCorkle, Lisa
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/0908/08 05/09 11/09NA NA
Project Description Monthly Remarks
09/09 02/10 03/10 07/1003/1001/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB011
Fox Mill Rd Walkway - Pkwy to Mill Heights
$100,000$0
Pedestrian improvements along south side of Fox Mill Rd from Mill Heights Dr across Fairfax County Pw. Project is approx. 800 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design in progress. 0 of 3 easements have been acquired.
Hunter Mill Conley, TimBuckley, BethFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/1008/08 06/09 01/10NA NA
Project Description Monthly Remarks
02/10 04/10 05/10 08/1008/1003/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB012
Glade Dr Walkway - Colts Neck to Shire Ct
$110,000$0
Pedestrian improvements along north side of Glade Dr from Colts Neck Rd to Shire Ct. Project is approx. 800 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design is in progress. Land acquisition package submitted 8/24/09. 0 of 3 easements have been acquired.
Hunter Mill Conley, TimFinnell, RichardFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0908/08 08/09 03/10NA NA
Project Description Monthly Remarks
07/09 09/10 10/10 02/1108/1008/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB013
McLearen Rd Walkway - Quincy Adams to Reston Pkwy
$150,000$0
Concrete sidewalk on north side of McLearen Rd from Fox Mill Shopping Ctr east across Transcontinental Pipeline. Project is approx. 250 LF.
Concrete sidewalk on the north side of McLearen Rd. from the Fox Mill Shopping Ctr. east across the Transcontinental Pipeline. Project length is approximately 250 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. VDOT permit received 9/9/09. Construction package sent to CMD 10/26/09. Task order being developed for annual contractor.
Hunter Mill Conley, TimFinnell, RichardGharavi, Mo
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0908/08 12/08 08/09NA NA
Project Description Monthly Remarks
02/09 11/09 11/09 02/1012/0911/09304Fund
Friday, November 20, 2009 Page 20 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP201
Pedestrian Improvements - Bond Funded
PB015
Reston Ave Walkway - Southington to Shaker Dr
$110,000$0
Pedestrian improvements along west side of Reston Ave from Southington Ln to Shaker Dr. Project is approx. 700 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design in progress. 0 of 2 easements have been acquired.
Hunter Mill Conley, TimPreston, ClintonGharavi, Mo
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0909/08 06/09 01/10NA NA
Project Description Monthly Remarks
06/09 03/10 04/10 07/1004/1002/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB017
Sunset Hills Rd Walkway - W&OD to Michael Faraday
$240,000$0
Pedestrian improvements along north side of Sunset Hills Rd from W&OD Trail to Michael Faraday Ct. Project is approx. 1,500 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design submitted on 10/13/09.
Hunter Mill Conley, TimBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0902/09 01/10 02/10 09/10NA
Project Description Monthly Remarks
10/09 12/10 01/11 04/1112/1011/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB018
Silverbrook Rd Walkway - Southrun to Monacan
$60,000$0
Pedestrian improvements along north side of Silverbrook Rd from Southrun Rd to Monacan Rd. Project is approx. 820 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design in progress.
Mount Vernon Conley, TimPreston, ClintonMcCorkle, Lisa
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0909/08 11/09 06/10NA NA
Project Description Monthly Remarks
10/09 08/10 09/10 12/1004/1007/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB019
Lee Jackson Hwy Walkway - Fair Ridge to Fire Station
$100,000$0
Pedestrian improvements along south side of Lee Jackson Hy from Fair Ridge Dr East to the police/fire station. Project is approx. 675 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final construction package submitted to CMD on 5/15/09. Walkway construction is 30% complete. Work is being completed with adjoining County stormwater pond project.
Springfield Ayodeji, OlawalePreston, ClintonLim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/0906/08 01/09 01/09NA NA
Project Description Monthly Remarks
07/09 05/09 05/09 01/1006/1005/09304Fund
Friday, November 20, 2009 Page 21 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP201
Pedestrian Improvements - Bond Funded
PB020
Silverbrook Rd Walkway - Silverthorn to Bayberry Ridge
$220,000$0
Pedestrian improvements along north side of Silverbrook Rd from Silverthorn Rd to Bayberry Ridge Rd. Project is approx. 650 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design is complete. 4 of 6 easements have been acquired. LAD is following up with property owner.
Springfield Conley, TimPreston, ClintonMcCorkle, Lisa
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0909/08 02/09 11/09NA NA
Project Description Monthly Remarks
10/09 02/10 03/10 06/1004/1001/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB021
Sydenstricker Rd Walkway - Briarcliff to Galgate
$180,000$0
Pedestrian improvements along north side of Sydenstricker Rd from Briarcliff Dr to Galgate Dr. Project is approx. 1,350 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design in progress.
Springfield Conley, TimBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/1005/09 11/09 06/10NA TBD
Project Description Monthly Remarks
02/10 09/10 10/10 04/1108/1008/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB022
Ashburton Ave Walkway - at Cedar Run
$476,000$0
Pedestrian improvements along west side of Ashburton Ave at Cedar Run. Project is approx. 250 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design submitted to VDOT for review 8/14/09. Partial comments received 10/13/09. Environmental permitting in progress.
Sully Conley, TimBuckley, BethMcCorkle, Lisa
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1001/09 01/10 08/10NA TBD
Project Description Monthly Remarks
01/10 11/10 12/10 06/1107/1010/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB023
Telegraph Rd Walkway - South Kings Hy to Lee District Park
$800,000$0
Pedestrian improvements along alternate sides of Telegraph Rd. from South Kings Hy to Lee District Park. Project is approx. 3,500 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design is in progress. Signal design is underway. Scope may change based on Telegraph Rd. Widening project. Coordination is on-going with VDOT.
Lee Marsh, DennisBarnes, Dianne
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/1004/09 01/10 02/10 09/10NA
Project Description Monthly Remarks
05/10 12/10 01/11 02/1210/1111/10304Fund
Friday, November 20, 2009 Page 22 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP201
Pedestrian Improvements - Bond Funded
PB024
Backlick Rd Walkway - Wilburdale Comm to Braddock
$150,000$0
Pedestrian improvements along west side of Backlick Rd from Wilburdale community to Braddock Rd. Project is approx. 1,100 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design in progress. Project plats are being revised to minimize land acquisition cost.
Mason Marsh, DennisKresge, Carol
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/1008/08 01/10 02/10 08/10NA
Project Description Monthly Remarks
08/09 11/10 12/10 05/1106/1010/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB025
Backlick Rd Walkway - Opposite Wilburdale Comm
$150,000$0
Pedestrian improvements along east side of Backlick Rd opposite the Wilburdale community. Project is approx. 360 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design submitted 10/2/09. Land acquisition is in progress.
Mason Marsh, DennisBuckley, BethMinnix, W. ToddMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0908/08 07/09 03/10NA NA
Project Description Monthly Remarks
08/09 06/10 07/10 11/1005/1005/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB026
Columbia Pike Walkway - Downing St to Lincolnia
$430,000$0
Pedestrian improvements along south side of Columbia Pk from Downing St to Lincolnia Rd. Project is approx. 900 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design in progress. Additional survey received and forwarded to consultant.
Mason Marsh, DennisPreston, ClintonMinnix, W. ToddHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/1012/08 12/09 01/10 08/10NA
Project Description Monthly Remarks
01/10 11/10 12/10 03/1112/1010/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB027
Columbia Pike Walkway - Maple Ct to Blair
$200,000$0
Pedestrian improvements along north side of Columbia Pk from Maple Ct to Blair Rd. Project is approx. 1,000 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design in progress. Additional survey received and forwarded to consultant. Project plats are being revised.
Mason Marsh, DennisPreston, ClintonMinnix, W. ToddMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1005/09 11/09 06/10NA TBD
Project Description Monthly Remarks
06/09 12/10 01/11 07/1109/1011/10304Fund
Friday, November 20, 2009 Page 23 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP201
Pedestrian Improvements - Bond Funded
PB028
Columbia Pike Walkway - Gallows to Annandale Church
$190,000$0
Pedestrian improvements along south side of Columbia Pk from Gallows Rd at the Annandale Methodist Church. Project is approx. 450 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design in progress. Additional survey received and forwarded to consultant.
Mason Marsh, Dennis
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/1102/10 12/10 02/11 08/11NA
Project Description Monthly Remarks
04/11 11/11 12/11 06/1206/1210/11304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB029
Leesburg Pike Walkway - Falls Church to Alexandria
$4,000,000$0
Rt 7 Pedestrian Initiative: Construct missing segments of walkway along Leesburg Pk from Falls Church to Alexandria. Project is approx. 13,200 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Preliminary design submitted to VDOT for review 5/11/09. It is anticipated project to be divided into individual segments at intermediate design. Schedule will be set at that time.
Mason Marsh, DennisBuckley, Beth
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/09TBDTBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB030
Lincolnia Rd Walkway - Deming Ave to N Chambliss
$50,000$0
Pedestrian improvements along north side of Lincolnia Rd from Deming Ave to North Chambliss St. Project is approx. 240 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design submitted 11/7/09. Project plats in progress.
Mason Marsh, DennisKresge, CarolFarsad, NahidMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/1010/08 12/09 01/10 08/10NA
Project Description Monthly Remarks
09/09 11/10 12/10 04/1106/1010/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB031
Montrose St Walkway - Braddock to Grafton
$90,000$0
Pedestrian improvements along west side of Montrose St from Braddock Rd to Grafton St. Project is approx. 520 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design submitted 11/7/09. Scope adjusted to minimize land acquisition cost.
Mason Marsh, DennisBuckley, BethMcCorkle, LisaStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/1010/08 07/09 08/09 03/10NA
Project Description Monthly Remarks
09/09 06/10 07/10 12/1007/1005/10304Fund
Friday, November 20, 2009 Page 24 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP201
Pedestrian Improvements - Bond Funded
PB032
Tyler St Walkway - Columbia Pike to Lake St
$140,000$0
Pedestrian improvements along east side of Tyler St from Columbia Pk to Lake St. Project is approx. 1,000 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design in progress. Project plats submitted to LAD for review.
Mason Marsh, DennisPreston, Clinton
Perry, Michael
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/1002/09 11/09 11/09 06/10NA
Project Description Monthly Remarks
02/10 09/10 10/10 03/1112/1008/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB033
Annandale Rd Walkway - Brice to Falls Church City Line
$80,000$0
Pedestrian improvements along the east side of Annandale Rd from Brice St to Falls Church City line. Project is approx. 190 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design in progress. Project plats in progress.
Providence Marsh, DennisPreston, Clinton
Jensen, Chris
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/1002/09 12/09 01/10 08/10NA
Project Description Monthly Remarks
02/10 11/10 12/10 05/1111/1010/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB034
Courthouse Rd Walkway - Chain Br to Plantation Ln
$140,000$0
Pedestrian improvements along north side of Courthouse Rd from Chain Bridge Rd to Oakton Plantation Ln. Project is approx. 410 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Revised final design and signal modification design plans distributed for review. Partial comments received. 0 of 2 easements have been acquired. Utility coordination in progress. VSMP permit application submitted 6/29/09.
Providence Shively, ErikBuckley, BethGharavi, MoMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0907/08 02/09 11/09NA NA
Project Description Monthly Remarks
04/09 01/10 02/10 07/1003/1012/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB035
Edgelea Rd Walkway - Oleander to Courthouse
$120,000$0
Pedestrian improvements along the east side of Edgelea Rd from Oleander Ave to Courthouse Rd. Project is approx. 350 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design submitted to VDOT for review 7/14/09. Partial comments received. 0 of 2 easements have been acquired.
Providence Shively, ErikBuckley, BethMinnix, W. ToddMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0906/08 01/09 11/09NA NA
Project Description Monthly Remarks
04/09 01/10 02/10 07/1003/1012/09304Fund
Friday, November 20, 2009 Page 25 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP201
Pedestrian Improvements - Bond Funded
PB036
Jefferson Ave Walkway - Summerfield to Marshall St
$250,000$0
Pedestrian improvements along south side of Jefferson Av from Summerfield Rd to Marshall St. Project is approx. 1,300 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Construction package submitted to CMD 10/30/09.
Providence Shively, ErikBuckley, BethMinnix, W. ToddJensen, Chris
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0905/08NA NA NA NA
Project Description Monthly Remarks
07/09 12/09 01/10 06/1005/1011/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB037
Lee Highway Walkway - at Blake Ln
$100,000$0
Construction of missing segment of pedestrian walkway along Lee Hwy at Blake Ln. Project is approx. 170 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Project on hold pending determination of feasibility of project. Coordination on-going with DOT.
Providence Marsh, Dennis
Strecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDNA TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 01/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB038
Oak St Walkway - Sandburg to W Morgan Ln
$120,000$0
Pedestrian improvements along south side of Oak St from Sandburg St to west of Morgan Ln. Project is approx. 410 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design in progress. Revisions have been made to the project plats and they have forwarded to LAD. The schedule has been adjusted accordingly. Coordinating with DOT about this project becoming part of Hot Lanes Enhancement Grant Project.
Providence Marsh, DennisPreston, ClintonMcCorkle, LisaStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0911/08 07/09 03/10NA TBD
Project Description Monthly Remarks
12/09 06/10 07/10 12/1009/1005/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB039
Sutton Rd Walkway - at Marywood Rd
$50,000$0
Construction of missing segment of pedestrian walkway along Sutton Rd at Marywood Rd. Project is approx. 50 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Second intermediate design submitted for review 9/08/09. Comments received and are being addressed. Project plats in progress.
Providence Marsh, DennisBuckley, BethGharavi, MoHousley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/1009/09 12/09 01/10 08/10NA
Project Description Monthly Remarks
01/10 11/10 12/10 04/1110/1010/10304Fund
Friday, November 20, 2009 Page 26 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP201
Pedestrian Improvements - Bond Funded
PB041
Franconia Rd Walkway - N side Governor's Hill Dr to Telegraph
$100,000$0
Pedestrian improvements along north side of Franconia Rd from Governor's Hill Dr to Telegraph Rd. Project is approx. 350 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Second intermediate design submitted for review 9/08/09. Comments received and are being addressed. Project plats in progress.
Lee Marsh, DennisBarnes, Dianne
Jensen, Chris
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/1002/09 02/10 03/10 10/10NA
Project Description Monthly Remarks
02/10 12/10 01/11 04/1111/1011/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01063
WB Little River Tpk & Pinecrest Vista Dr
$24,000$0
Loading pad and 130 LF of sidewalk Group 5: Final design in progress. Land rights required. Project plat in progress.
Mason Lauretti, FrancescPreston, Clinton
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/1001/09 01/10 06/10NA TBD
Project Description Monthly Remarks
04/09 08/10 08/10 10/1007/0908/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01125
SB Fort Hunt Rd near Gahant Rd
$21,200$0
Loading pad Group 1: Land acquisition complete. Construction package submitted to CMD 10/16/09.
Mount Vernon Lauretti, FrancescBuckley, BethFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/0901/08 01/09 09/09NA NA
Project Description Monthly Remarks
09/09 11/09 11/09 01/1012/0911/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01128
SB Fort Hunt Rd & Wellington Rd
$22,000$0
Concrete loading pad, sidewalk connection, and ditch regrading
Group 6: Final design is in progress. Land rights required.
Mount Vernon Lauretti, FrancescBarnes, Dianne
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/1001/09 12/09 05/10NA TBD
Project Description Monthly Remarks
08/09 07/10 07/10 09/1011/0907/10304Fund
Friday, November 20, 2009 Page 27 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
01130
SB Fort Hunt Rd & Oakbrooke Ave
$16,000$0
Concrete loading pad Group 6: Construction complete 10/23/09.
Mount Vernon Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0901/09NA NA NA NA
Project Description Monthly Remarks
12/08 09/09 09/09 10/0904/0909/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01180
Fort Hunt Rd NB @ Oakbrooke Ave EB
$19,500$0
Loading pad, curb ramp, and crosswalk
Group 6: Construction complete 10/23/09.
Mount Vernon Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/0912/08NA NA NA NA
Project Description Monthly Remarks
12/08 08/09 08/09 10/0904/0908/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01181
NB Fort Hunt Rd & Gladstone Pl
$23,000$0
Concrete loading pad, 4-foot wide asphalt sidewalk, and ditch regrading
Group 6: Final design is in progress. Construction package is being prepared.
Mount Vernon Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
10/0901/09NA NA NA NA
Project Description Monthly Remarks
12/08 11/09 11/09 01/1004/0911/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01182
NB Fort Hunt Rd & Wellington Rd
$20,000$0
Concrete loading pad, concrete sidewalk, and re-install shelter
Group 6: Final design in progress. Land rights required.
Mount Vernon Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
06/1003/09 12/09 05/10NA NA
Project Description Monthly Remarks
08/09 07/10 07/10 09/1011/0907/10304Fund
Friday, November 20, 2009 Page 28 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
01184
NB Fort Hunt Rd & Shenandoah Rd
$17,000$0
Concrete loading pad and 4-foot wide concrete sidewalk
Group 6: Final design in progress. Construction package submitted to CMD 10/21/09.
Mount Vernon Lacquement, Don
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/0901/09NA NA NA NA
Project Description Monthly Remarks
12/08 10/09 10/09 12/0904/0910/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01371
Burke Rd WB @ Shana Pl NB
$19,700$0
Loading pad and update pedestrian ramps
Group 11: Intermediate design in progress.
Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
03/10 04/10 04/10 06/1006/1004/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01372
Burke Rd WB @ Shanna Pl SB
$15,400$0
Loading Pad Group 10A: Utility coordination underway. Authorized for construction 10/15/09. Notice to proceed issued 11/9/09.
Springfield Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/09NA NA NA
Project Description Monthly Remarks
08/09 11/09 11/09 01/1012/0910/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01376
Burke Rd WB @ Old Burke Lake RD NB
$20,400$0
Loading pad, Sidewalk and culvert Group 11: Intermediate design in progress.
Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
03/10 04/10 04/10 06/1006/1004/10304Fund
Friday, November 20, 2009 Page 29 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
01377
Burke Rd WB @ Old Burke Lake Rd SB
$45,400$0
Loading pad Group 10A: Utility coordination underway. Authorized for construction 10/15/09. Notice to proceed issued 11/9/09.
Springfield Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/09NA NA NA
Project Description Monthly Remarks
08/09 11/09 11/09 01/1012/0910/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01383
Burke Rd EB @ Burke Lake Rd NB
$17,300$0
Loading pad and sidewalk. Group 11: Intermediate design in progress.
Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
03/10 04/10 04/10 06/1006/1004/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01387
Burke Rd EB @ Ridge Ford Dr SB
$16,800$0
Loading pad. Group 11: Intermediate design in progress.
Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
03/10 04/10 04/10 06/1006/1004/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01388
Burke Rd EB @ Ridge Ford Dr NB
$23,100$0
Loading pad, retaining wall, sidewalk and pedestrian ramp.
Group 11: Intermediate design in progress.
Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
03/10 04/10 04/10 06/1006/1004/10304Fund
Friday, November 20, 2009 Page 30 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
01467
Field Master DR SB @ Blarney Stone Dr EB
$16,100$0
Loading Pad Group 11: Pre-final design in progress. Land rights are required.
Springfield Lauretti, FrancescBarnes, Dianne
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/1008/09 04/10 09/10NA NA
Project Description Monthly Remarks
03/10 11/10 11/10 01/1101/1111/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01468
Field Master Dr SB @ Park Forest Dr EB
$18,000$0
Loading pad, update walkway and sidewalk.
Group 11: Intermediate design in progress.
Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
03/10 04/10 04/10 06/1006/1004/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01497
Field Master Dr NB @ Old Keene Mill Rd WB
$16,300$0
Loading pad Group 11: Pre-final design in progress.
Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1008/09NA TBD TBD TBD
Project Description Monthly Remarks
03/10 04/10 04/10 06/1006/1004/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01498
Field Mater Dr NB @ Blarney Stone Dr EB
$15,500$0
Loading pad Group 11: Pre-final design in progress. Land rights required.
Springfield Lauretti, FrancescBarnes, Dianne
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/1010/09 04/10 09/10NA NA
Project Description Monthly Remarks
03/10 11/10 11/10 01/1101/1111/10304Fund
Friday, November 20, 2009 Page 31 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
01543
Burke Lake Rd WB @ Gooding Pond Ct SB
$17,300$0
Loading pad Group 11: Pre-final design in progress.
Braddock Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1010/09NA NA NA NA
Project Description Monthly Remarks
03/10 04/10 04/10 06/1006/1004/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01544
Wilmington Dr NB @ Wolcott Dr EB
$14,600$0
Loading pad Group 10A: Design 95% complete. Land rights are required. Land acquisition work request submitted to LAD on 9/3/09. Property owner has expressed opposition to proposed pad and is refusing to sign the easement agreement.
Braddock Schmidt, NatashaBarnes, DianneFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/09 10/09 02/10NA
Project Description Monthly Remarks
08/09 03/10 03/10 05/1012/0903/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01551
Wilmington Dr SB @ Wolcott Dr WB
$18,500$0
Loading pad, sidewalk and pedestrian ramp
Group 11: Intermediate design in progress.
Braddock Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
03/10 04/10 04/10 06/1006/1004/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01552
Burke Lake Rd EB @ Timarron Cove Lane SB
$15,400$0
Loading pad Group 10A: Authorized for construction 10/15/09. Notice to proceed issued 11/9/09.
Springfield Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/09NA NA NA
Project Description Monthly Remarks
08/09 11/09 11/09 01/0912/0910/09304Fund
Friday, November 20, 2009 Page 32 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
01600
WB Arlington Dr near Windbreak Dr
$15,700$0
Loading pad, bench, and concrete sidewalk
Group 4: Final design in progress. Land acquisition authorized 9/23/09.
Mount Vernon Lauretti, FrancescKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/1010/08 09/09 02/10NA NA
Project Description Monthly Remarks
03/09 04/10 04/10 06/1006/0904/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01752
Alban Rd WB @ Alban Station Rlvd NB
$17,800$0
Loading Pad Group 9: Pre-final design in progress. Land rights required.
Mount Vernon Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
09/1009/09 03/10 08/10NA NA
Project Description Monthly Remarks
02/10 10/10 10/10 12/1012/1010/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01753
Alban Rd WB @ Alban Station Bld SB
$17,800$0
Loading pad Group 9: Intermediate design in progress.
Mount Vernon Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
02/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
02/10 03/10 03/10 05/1005/1003/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01754
Alban Rd WB @ Entrance to Alban Business Center NB
$18,300$0
Loading pad, sidewalk and pedestrian ramp
Group 9: Pre-final design in progress. Land rights are required.
Mount Vernon Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
09/1009/09 03/10 08/10NA TBD
Project Description Monthly Remarks
02/10 10/10 10/10 12/1012/1010/10304Fund
Friday, November 20, 2009 Page 33 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
01904
SB Colts Neck Road & Hunter Square Court
$29,000$0
Loading pad, sidewalk, and pedestrian ramp
Group 3: Final design is complete. Land acquisition complete 5/29/09. Coordination with Reston HOA Association is ongoing.
Hunter Mill Lauretti, FrancescBuckley, Beth
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/0907/08 01/09 05/09NA NA
Project Description Monthly Remarks
03/09 11/09 11/09 01/1006/0911/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01906
NB Reston Parkway & S Lakes Dr
$19,900$0
Loading pad and curb and gutter extension
Group 4: Final design in progress. Land acquisition in progress. 0 of 2 easements have been acquired.
Hunter Mill Lauretti, FrancescBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0907/08 06/09 11/09NA NA
Project Description Monthly Remarks
06/09 01/10 01/10 03/1009/0901/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
01907
Reston Pkwy NB @ Sunrise Valley Dr WB
$20,600$0
Loading pad and 5' sidewalk connection
Group 8: Intermediate design in progress.
Hunter Mill Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
07/09 12/09 12/09 02/1010/0912/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02022
SB Telegraph Road and Highland Meadows Ct
$29,200$0
Loading pad, 100' curb and gutter, concrete sidewalk, curb inlet and storm sewer
Group 1: Preliminary construction package submitted to CMD 7/2/09. VDOT permit application package re-submitted 9/15/09.
Lee Lauretti, FrancescBuckley, BethFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/0911/07 01/09 04/09NA NA
Project Description Monthly Remarks
01/09 11/09 11/09 01/1010/0911/09304Fund
Friday, November 20, 2009 Page 34 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
02023
Telegraph Rd SB @ Dunsmore Rd EB
$23,100$0
Loading pad, culvert and sidewalk Group 9: Intermediate design in progress.
Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
02/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
02/10 03/10 03/10 05/1005/1003/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02024
Telegraph Rd SB @ Glenwood Mews Dr WB
$16,300$0
Loading pad Group 9: Pre-final design in progress.
Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
02/1009/09NA NA NA NA
Project Description Monthly Remarks
02/10 03/10 03/10 05/1005/1003/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02025
Telegraph Rd SB @ Belleau Woods La EB
$16,300$0
Loading pad Group 9: Pre-final design in progress.
Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
02/1009/09NA NA NA NA
Project Description Monthly Remarks
02/10 03/10 03/10 03/1005/1003/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02026
Telegraph Rd SB @ Helmsdale La WB
$16,600$0
Loading pad Group 9: Pre-final design in progress. Project plats in progress.
Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
09/1009/09 03/10 08/10NA TBD
Project Description Monthly Remarks
02/10 10/10 10/10 12/1012/1010/10304Fund
Friday, November 20, 2009 Page 35 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
02041
Telegraph Rd NB @ Dunsmore Rd EB
$16,600$0
Loading pad Group 9: Pre-final design in progress. Land rights are required. LAD pursuing letter of permission.
Lee Lauretti, FrancescBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/1009/09 03/10 08/10NA TBD
Project Description Monthly Remarks
02/10 08/10 08/10 12/1012/1008/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02042
Telegraph Rd NB @ Wickford Dr EB
$17,100$0
Loading pad Group 9: Pre-final design in progress.
Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
02/1009/09NA NA NA NA
Project Description Monthly Remarks
02/10 03/10 03/10 05/1005/1003/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02043
Telegraph Rd NB @ Devereux Circle Dr EB
$16,500$0
Loading pad Group 9: Pre-final design in progress.
Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
02/1009/09NA NA NA NA
Project Description Monthly Remarks
02/10 03/10 03/10 05/1005/1003/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02123
Helmsdale La WB @ Telegraph Rd NB
$16,600$0
Loading pad Group 9: Pre-final design in progress.
Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
02/1009/09NA NA NA NA
Project Description Monthly Remarks
02/10 03/10 03/10 05/1005/1003/10304Fund
Friday, November 20, 2009 Page 36 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
02212
Columbia Pike EB @ Ashwood Pl SB
$18,600$0
Loading pad, sidewalk connection, and handicap ramp
Group 10A: Design 90% complete. Preparing to submit plan to CMD & MSMD for review.
Mason Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/09NA NA NA
Project Description Monthly Remarks
08/09 12/09 12/09 03/1012/0912/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02226
Columbia Pike WB @ Ashwood Pl SB
$18,600$0
Loading pad, sidewalk connection, and handicap ramp
Group 10A: Design 90% complete. Preparing to submit plan to CMD & MSMD for review.
Mason Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/09NA NA NA
Project Description Monthly Remarks
08/09 12/09 12/09 03/0912/0912/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02229
Columbia Pike WB @ Downing St SB
$14,600$0
Loading pad & Crosswalk Group 10A: Design 90% complete. Preparing to submit for review. Land rights are required.
Mason Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/09 10/09 03/10NA
Project Description Monthly Remarks
08/09 04/10 04/10 06/1012/0904/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02287
Annandale Rd NB at Franklin Rd EB
$17,100$0
Concrete loading pad and reconstruct existing curb cut ramp
Group 7: Pre-final design in progress.
Mason Lauretti, FrancescPreston, Clinton
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/1005/09 01/10 06/10NA NA
Project Description Monthly Remarks
02/09 08/10 08/10 10/1001/1008/10304Fund
Friday, November 20, 2009 Page 37 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
02292
Annandale Rd EB at Hockett St SB
$18,500$0
Concrete loading pad, curb cut ramp, and sidewalk connection
Group 7: Pre-final design in progress. Project plats in progress. Site being combined with 4YP202 - 02292.
Mason Lauretti, FrancescFinnell, Richard
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/1003/09 02/10 07/10NA NA
Project Description Monthly Remarks
09/09 09/10 09/10 11/1001/1009/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02329
Annandale Rd WB at Hockett St SB
$18,700$0
Concrete loading pad, curb cut ramp, and painted crosswalk
Group 7: Pre-final design in progress. Project plats in progress. Site being combined with 4YP202 - 02292.
Providence Lauretti, FrancescFinnell, Richard
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/1003/09 02/10 07/10NA NA
Project Description Monthly Remarks
09/09 09/10 09/10 11/1001/1009/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02330
Annandale Rd WB at Sheffield Ct SB
$19,000$0
Concrete loading pad, curb cut ramp, and sidewalk connection
Group 7: Pre-final design in progress. Land rights required.
Providence Lauretti, FrancescPreston, Clinton
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/1004/09 01/10 06/10NA NA
Project Description Monthly Remarks
09/09 08/10 08/10 10/1001/1008/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02331
Annadale Rd WB at Statecrest Dr SB
$23,600$0
Concrete loading pad and sidewalk connection
Group 7: Final design in progress.
Providence Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
11/0904/09NA NA NA NA
Project Description Monthly Remarks
02/09 12/09 12/09 02/1006/0912/09304Fund
Friday, November 20, 2009 Page 38 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
02334
Annandale Rd SB at Franklin Rd EB
$16,400$0
Concrete loading pad Group 7: Pre-final design in progress. Land acquisition package submitted 9/23/09.
Mason Lauretti, FrancescPreston, Clinton
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/1003/09 09/09 02/10NA TBD
Project Description Monthly Remarks
09/09 04/10 04/10 06/1001/1004/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02416
Arlington Blvd WB @ Greenway Blvd NB
$17,800$0
Loading pad, 5' wide concrete walk connection to EP
Group 10A. Design 90% complete. Preparing to submit plans for initial review.
Providence Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/09NA NA NA
Project Description Monthly Remarks
08/09 12/09 12/09 03/1012/0912/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02420
WB Arlington Boulevard Near Graham Rd
$28,700$0
Loading pad, bus shelter, 20 LF of sidewalk, and grate inlet
Group 1: Redesign submitted 5/09. Intermediate design submitted to VDOT on 7/30/09. Due to comments received dates have been revised "To Be Determined".
Providence Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDNA NA NA NA NA
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 09/08304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02421
WB Arlington Blvd & Allen St
$28,700$0
Loading pad, improved access, pedestrian ramp from frontage road, and drainage improvements
Group 4: Pre-final design in progress. VDOT review required. Design delayed due to complicated drainage issues. Pre-design submitted to VDOT on 7/30/09. Schedule to be determined once drainage issues are resolved.
Providence Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
01/09TBDNA TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 11/09304Fund
Friday, November 20, 2009 Page 39 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
02428
Arlington Blvd WB @ Chichester Lane NB
$16,200$0
Loading pad Group 10A: Design 90% complete. Preparing to submit plans for initial review.
Providence Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/09NA NA NA
Project Description Monthly Remarks
08/09 12/09 12/09 03/1012/0912/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02438
Hummer Rd NB at Marshall Dr EB
$16,000$0
Concrete loading pad Group 7: Final design complete. Construction package being prepared.
Mason Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0903/09NA NA NA NA
Project Description Monthly Remarks
02/09 12/09 12/09 02/1006/0912/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02463
Gallows Rd SB at Dolce Dr EB
$18,500$0
Concrete loading pad and trash receptacle
Group 7: Final design in progress. Construction package submitted to CMD 10/21/09.
Mason Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/0904/09NA TBD TBD TBD
Project Description Monthly Remarks
02/09 10/09 10/09 12/0906/0910/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02465
SB Fairview Park Dr & Yancey Dr
$15,700$0
Loading pad Group 4: Construction complete 10/30/09.
Providence Lauretti, FrancescBuckley, BethFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/0908/08 06/09 09/09NA NA
Project Description Monthly Remarks
03/09 09/09 09/09 10/0906/0909/09304Fund
Friday, November 20, 2009 Page 40 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
02471
NB Fairfview Park Dr & New Providence Dr
$20,000$0
Loading pad and bench Group 4: Construction complete 10/30/09.
Providence Lauretti, FrancescBuckley, BethFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/0907/08 03/09 09/09NA NA
Project Description Monthly Remarks
05/09 09/09 09/09 10/0908/0909/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02482
Chain Bridge Rd NB @ Glengyle Dr WB
$16,200$0
Loading pad Group 10A: Authorized for construction 11/3/09.
Providence Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/09NA NA NA
Project Description Monthly Remarks
08/09 11/09 11/09 01/1012/0911/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
02487
Chain Bridge Rd SB @ Glengyle Dr WB
$16,200$0
Loading pad Group 10A: Authorized for construction 11/3/09.
Hunter Mill Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/09NA NA NA
Project Description Monthly Remarks
08/09 11/09 11/09 01/1012/0911/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03066
Patrick Henry Dr SB @ Brook Dr EB
$15,400$0
Loading pad Group 10A: Design 85% complete.
Mason Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/09NA NA NA
Project Description Monthly Remarks
08/09 12/10 12/10 02/1012/0912/10304Fund
Friday, November 20, 2009 Page 41 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
03074
Old Keene Mill Rd WB @ Byron Ave SB
$23,000$0
Loading pad, curb & gutter, asphalt trail and pedestrian ramp
Group 9: Intermediate design in progress.
Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
02/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
02/10 03/10 03/10 05/1005/1003/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03077
Old Keene Mill Rd EB @ Westmore Dr SB
$22,000$0
Loading pad, curb & gutter, sidewalk and pedestrian ramp
Group 9: Pre-final design in progress.
Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
02/1009/09NA TBD TBD TBD
Project Description Monthly Remarks
02/10 03/10 03/10 05/1005/1003/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03082
WB Old Keene Mill Road & Ainsworth Ave
$33,000$0
Loading pad, sidewalk, curb ramps, and curb & gutter improvements
Group 3: Final design in progress. Land acquisition package submitted 6/8/09. 1 of 2 easements have been acquired.
Springfield Lauretti, FrancescPreston, Clinton
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0911/08 06/09 11/09NA NA
Project Description Monthly Remarks
12/09 01/10 01/10 03/1003/1001/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03083
WB Old Keene Mill Rd and Carrleigh Pkwy
$95,000$0
Loading pad, concrete sidewalk, curb & gutter extension, median cut, 2 pedestrian ramps, 2 crosswalks, and 4 pedestrian signals
Group 1 (design in conjunction with Stop No. 03128): Traffic signal design is in progress. Investigating adding shelter to scope. Project plats are in progress. Additional survey being ordered. Scope may expand. Schedule to be determined once scope is finalized.
Springfield Lauretti, FrancescBarnes, Dianne
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/08TBDNA TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 11/09304Fund
Friday, November 20, 2009 Page 42 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
03091
Old Keene Mill Rd WB @ Keene Dr NB
$20,400$0
loading pad, sidewalk and pedestrian ramp
Group 11: Intermediate design in progress.
Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
03/10 04/10 04/10 06/1006/1004/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03108
Leesburg Pike WB @ Patrick Henry Dr SB
$16,200$0
Loading pad Group 10A: Design 99% complete. Land acquisition required.
Mason Schmidt, NatashaPreston, ClintonFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/09 09/09 02/10NA
Project Description Monthly Remarks
08/09 03/10 03/10 05/1012/1003/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03115
Leesburg Pike WB @ Rio Dr SB
$16,200$0
Loading pad Group 10A: Design 85% complete. Land acquisition required.
Mason Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/09TBD TBD TBD
Project Description Monthly Remarks
08/09 04/10 04/10 06/1012/0904/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03120
Old Keene Mill Rd EB @ Keene Dr NB
$20,700$0
Loading pad, sidewalk and regrading ditch
Group 11: Intermediate design in progress.
Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
03/10 04/10 04/10 06/1006/1004/10304Fund
Friday, November 20, 2009 Page 43 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
03125
EB Old Keene Mill Rd @ Millwood Dr
$16,500$0
Loading pad Group 4: Final design in progress. Land acquisition complete on 10/20/09. Construction package being prepared.
Springfield Lauretti, FrancescZore, TasneemFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0910/08 06/09 11/09NA NA
Project Description Monthly Remarks
03/09 01/10 01/10 03/1006/0901/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03128
EB Old Keene Mill Rd and Carrleigh Pkwy
$85,000$0
Bus shelter, sidewalk, pedestrian signals, crosswalk, and median cut
Group 1 (design in conjunction with Stop No. 03128): Traffic signal design is in progress. Investigating adding shelter to scope. Project plats are in progress. Additional survey being ordered. Scope may expand. Schedule to be determined once it is finalized.
Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
06/08TBDNA TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 11/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03131
EB Old Keene Mill Road and Jansen Drive
$33,000$0
Loading pad, sidewalk, curb and gutter, and 2 pedestrian ramps
Group 3: Consultant coordinating with VDOT to resolve outstanding comments. Land acquisition required. VDOT comments addressed 7/16/09. Project plats are being revised.
Springfield Lauretti, FrancescJohnson, Vicki
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/1007/08 12/09 05/10NA TBD
Project Description Monthly Remarks
07/09 07/10 07/10 09/1010/0907/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03168
NB Frontier Dr near Franconia Rd
$39,400$0
Bus shelter and small retaining wall Group 4: Pre-final design in progress. Building permits required. Land rights required.
Lee Lauretti, FrancescBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/1001/09 11/09 04/10NA TBD
Project Description Monthly Remarks
03/09 06/10 06/10 08/1006/0906/10304Fund
Friday, November 20, 2009 Page 44 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
03265
EB Edsall Rd & Industrial Dr
$86,500$0
Bus shelter, sidewalk, 4 pedestrian ramps, 2 crosswalks, pedestrian signals, and drainage culvert
Group 3: Intermediate design submitted to VDOT for review 4/27/09. Comments received 7/14/09. Project plats in progress.
Mason Lauretti, FrancescKresge, Carol
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/1004/09 03/10 08/10NA TBD
Project Description Monthly Remarks
12/09 10/10 10/10 01/1104/1010/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03490
Backlick Rd SB @ Calamo St WB
$18,300$0
Loading pad and pedestrian ramp Group 9: Pre-final design in progress. Land rights required.
Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
09/1009/09 03/10 08/10NA NA
Project Description Monthly Remarks
02/10 10/10 10/10 12/1012/1010/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03491
Backlick Rd SB @ Springfield Blvd EB
$19,800$0
Loading pad Group 9: Pre-final design in progress. Land rights required.
Lee Lauretti, FrancescPreston, Clinton
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/1009/09 03/10 08/10NA NA
Project Description Monthly Remarks
02/10 10/10 10/10 12/1012/1010/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03496
Backlick Rd SB @ Barta Rd EB
$16,200$0
Loading pad Group 10A: Construction authorization on-hold due to possibility that DOT may request plan revision to include a bus shelter.
Lee Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/09NA NA NA
Project Description Monthly Remarks
08/09 11/09 11/09 01/1012/0911/0911/09
304Fund
Friday, November 20, 2009 Page 45 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
03668
Olley Lane NB @ Nester Rd WB
$15,400$0
Loading pad Group 10A: Authorized for construction 11/3/09.
Braddock Schmidt, NatashaPreston, ClintonFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/09 04/09 09/09NA
Project Description Monthly Remarks
08/09 11/09 11/09 01/1012/0911/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03671
Olley Lane NB @ Little River Tpk EB
$16,200$0
Loading pad, small 1.5-foot high retaining wall
Group 10A: Design 90% complete. Preparing to plans for initial review. Land rights are required.
Braddock Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/09 12/08 04/10NA
Project Description Monthly Remarks
08/09 05/10 05/10 07/1012/0905/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03690
Little River Trnpk EB at Morning Wind Ct SB
$37,500$0
Bus shelter, curb cut ramp, sidewalk connection, and curb & gutter extension
Group 7: Intermediate design in progress. Land rights required. LAD is coordinating with home owner regarding issue with mail box.
Mason Lauretti, FrancescHonnick, John
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/1012/09 03/10 10/10NA TBD
Project Description Monthly Remarks
03/09 11/10 11/10 11/1001/1011/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03691
EB Little River Tpk & Logsdon Dr
$20,900$0
Loading pad, curb ramp, and sidewalk connection
Group 5: Final design in progress.
Mason Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1001/09NA NA NA NA
Project Description Monthly Remarks
04/09 04/10 04/10 06/1007/0904/10304Fund
Friday, November 20, 2009 Page 46 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
03693
EB Little River Turnpike and Columbia Pike
$21,900$0
Loading pad and sidewalk connection Group 5: Final design in progress. Land rights required. Project plat in progress.
Mason Lauretti, FrancescPreston, Clinton
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/1003/09 11/10 06/10NA TBD
Project Description Monthly Remarks
04/09 08/10 08/10 10/1007/0908/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
03719
Lee Jackson Memorial Hwy WB @ Stringfellow Rd SB
$19,000$0
Loading pad and ashpalt sidewalk connection
Group 8: Pre-final design in progress.
Sully Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1006/09NA NA NA NA
Project Description Monthly Remarks
07/09 02/10 02/10 04/1010/0902/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
04077
WB Little River Tpk & Old Columbia Pike
$24,900$0
Loading pad and sidewalk connection Group 5: Final design in progress. Land rights required.
Mason Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
07/1003/09 01/10 06/10NA TBD
Project Description Monthly Remarks
04/09 08/10 08/10 10/1007/0908/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
04127
NB Pimmit Dr & Leesburg Pike
$25,600$0
Loading pad and trash receptacle Group 4: Final design is in progress. Plat is being finalized. LAD authorized on 10/15/09.
Dranesville Lauretti, FrancescBarnes, Dianne
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/1007/08 10/09 03/10NA TBD
Project Description Monthly Remarks
01/09 05/10 05/10 07/1004/0905/10304Fund
Friday, November 20, 2009 Page 47 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
04328
NB Magarity Rd & Ware Rd
$30,500$0
Loading pad, curb & gutter, drainage inlet, and pedestrian ramp
Group 6: Final design is in progress. VDOT comments received 9/8/09. Land rights required.
Dranesville Lauretti, FrancescKresge, CarolFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/1001/09 10/09 03/10NA NA
Project Description Monthly Remarks
10/09 05/10 05/10 07/1001/1005/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
04330
NB Magarity Rd & Griffith Rd
$18,000$0
Loading pad and sidewalk connection Group 6: Final design complete. Construction package being prepared.
Dranesville Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
11/0901/09NA NA NA NA
Project Description Monthly Remarks
12/08 12/09 12/09 02/1004/0912/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvementss
04331
NB Magarity Rd & Peabody Dr
$17,500$0
Loading pad and sidewalk connection Group 6: Final design in progress. Project plat in progress. LAD pursuing letter of permission.
Dranesville Lauretti, FrancescBarnes, Dianne
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/1003/09 12/09 05/10NA NA
Project Description Monthly Remarks
08/09 07/10 07/10 09/1011/0907/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
04380
Chain Bridge Rd EB @ Hunting Avenue NB
$18,500$0
Loading pad, asphalt walkway, and ditch regrading
Group 5: Final design in progress. Project plat is under review.
Dranesville Lauretti, FrancescKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/1012/08 11/09 04/10NA TBD
Project Description Monthly Remarks
04/09 05/10 05/10 07/1007/0905/10304Fund
Friday, November 20, 2009 Page 48 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
04389
Old Dominion Dr EB @ Valley Ave SB
$21,400$0
Loading pad, drainage culvert, & sidewalk connection
Group 8: Pre-final design in progress.
Dranesville Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/1011/09NA TBD TBD TBD
Project Description Monthly Remarks
07/09 04/10 04/10 06/1010/0904/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
04396
Old Dominion Dr WB @ Cloverlawn Ct NB
$17,900$0
Loading pad & sidewalk connection Group 8: Pre-final design in progress.
Dranesville Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1006/09NA TBD TBD TBD
Project Description Monthly Remarks
07/09 02/10 02/10 04/1010/0902/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
04399
Old Dominion Dr WB @ Kirby Rd NB
$15,300$0
Loading pad Group 8: Final design in progress.
Dranesville Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1006/09NA TBD TBD TBD
Project Description Monthly Remarks
07/09 02/10 02/10 04/1010/0902/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
04400
Old Dominion Dr WB @ Kirby Rd SB
$26,800$0
Loading pad Group 8: Final design in progress.
Dranesville Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1006/09NA TBD TBD TBD
Project Description Monthly Remarks
07/09 02/10 02/10 04/1010/0902/10304Fund
Friday, November 20, 2009 Page 49 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
04401
Old Dominion Dr WB @ Valley Ave NB
$24,200$0
Loading pad and sidewalk connection Group 8: Pre-final design in progress.
Dranesville Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0906/09NA TBD TBD TBD
Project Description Monthly Remarks
07/09 01/10 01/10 03/1010/0901/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
04402
Old Dominion Dr WB @ Valley Ave SB
$27,200$0
Loading pad and regrading drainage ditch
Group 8: Pre-final design in progress.
Dranesville Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1006/09NA TBD TBD TBD
Project Description Monthly Remarks
07/09 02/10 02/10 04/1010/0902/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
04403
Old Dominion Dr @ Birch Rd NB
$19,900$0
Loading pad, sidewalk connection & curb and gutter
Group 8: Pre-final design in progress.
Dranesville Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/1011/09NA TBD TBD TBD
Project Description Monthly Remarks
07/09 03/10 03/10 05/1010/0903/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
04554
Flint Hill Rd NB @ Rambling Rd EB
$17,800$0
Loading pad and sidewalk Group 11: Intermediate design in progress.
Hunter Mill Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
03/10 04/10 04/10 06/1006/1004/10304Fund
Friday, November 20, 2009 Page 50 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
04572
Flint Hill Rd SB @ Rambling Rd WB
$19,000$0
Loading pad, sidewalk and regrading ditch
Group 11: Intermediate design in progress.
Hunter Mill Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
03/10 04/10 04/10 06/1006/1004/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05073
WB Sunrise Valley Dr & Glade Dr
$21,800$0
Loading pad and bench Group 4: Final design in progress.
Hunter Mill Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
12/0908/08NA NA NA NA
Project Description Monthly Remarks
09/08 01/10 01/10 03/1006/0901/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05078
Sunset Hills Rd EB @ Town Center Pkwy SB
$19,900$0
Loading pad and bench Group 4: Pre-final design in progress. Project plat being revised. Land acquisition authorized 10/26/09.
Hunter Mill Lauretti, FrancescBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/1010/08 10/09 04/10NA TBD
Project Description Monthly Remarks
03/09 06/10 06/10 08/1006/0906/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05087
Glade Drive EB @ Soapstone Drive SB
$19,500$0
Loading pad, upgrade existing handicap ramp, & sidewalk connection
Group 10B: Design 80% complete.
Hunter Mill Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/09NA NA NA
Project Description Monthly Remarks
12/09 02/10 02/10 05/1005/1002/10304Fund
Friday, November 20, 2009 Page 51 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
05123
Soapstone Dr NB @ Rolling Green Ct EB
$17,000$0
Loading pad, sidewalk connection, and handicap ramp
Group 10B: Design 80% complete.
Hunter Mill Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/09NA NA NA
Project Description Monthly Remarks
12/09 02/10 02/10 05/1005/1002/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05124
Soapstone Dr NB @ Glencourse Lane EB
$17,000$0
Loading pad, sidewalk connection, and handicap ramp
Group 10B: Design 80% complete.
Hunter Mill Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/09NA NA NA
Project Description Monthly Remarks
12/09 02/10 02/10 05/1005/1002/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05133
Soapstone Dr SB @ Glencourse Lane EB
$16,200$0
Loading pad and trail connection Group 10B: Design 50% complete.
Hunter Mill Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/09NA NA NA
Project Description Monthly Remarks
12/09 02/10 02/10 05/1005/1002/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05136
Soapstone Dr SB @ Underoak Ct EB
$17,000$0
Loading pad and sidewalk connection Group 10B: Design 80% complete.
Hunter Mill Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/09NA NA NA
Project Description Monthly Remarks
12/09 02/10 02/10 05/1005/1002/10304Fund
Friday, November 20, 2009 Page 52 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
05137
SB Soapstone Dr near Hearthstone Ct
$15,400$0
Loading pad, drainage inlet and pipe Group 1: Pre-final design in progress. 1 of 1 easement has been acquired. Preparing to submit to Reston DRB.
Hunter Mill Lauretti, FrancescPreston, Clinton
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1001/08 03/09 09/09NA NA
Project Description Monthly Remarks
09/09 02/10 02/10 04/1012/0902/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05138
Soapstone Dr SB @ Woodhollow Ct EB
$14,600$0
Loading pad Group 10B: Design 20% complete.
Hunter Mill Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/09NA NA NA
Project Description Monthly Remarks
12/09 02/10 02/10 05/1005/1002/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05139
Glade Dr WB @ Soapstone Dr SB
$15,400$0
Loading pad Group 10B: Design 75% complete.
Hunter Mill Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/09 02/10NA NA
Project Description Monthly Remarks
12/09 02/10 02/10 05/1005/1002/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05168
EB South Lakes Dr & Chestnut Burr Ct
$16,900$0
Loading pad and curb ramp Group 2: Pre-final design in progress. 1 of 1 easement has been acquired. Preparing to submit to Reston DRB.
Hunter Mill Lauretti, FrancescFinnell, Richard
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/10 08/08 09/09NA NA NA
Project Description Monthly Remarks
06/09 02/10 02/10 04/1009/0902/10304Fund
Friday, November 20, 2009 Page 53 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
05217
SB Glade Dr & Cocquina Dr
$16,200$0
Loading pad Group 5: Final design in progress. Construction package submitted to CMD 10/19/09.
Hunter Mill Lauretti, FrancescFinnell, RichardFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/1008/08 02/10NA NA NA
Project Description Monthly Remarks
04/09 03/10 03/10 05/1007/0903/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05226
EB Sunrise Valley Dr near Glade Dr
$16,400$0
Loading pad Group 5: Final design in progress. Land rights required.
Hunter Mill Lauretti, FrancescFinnell, Richard
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/1001/09 02/10 07/10NA TBD
Project Description Monthly Remarks
04/09 09/10 09/10 11/1007/0909/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05227
Sunrise Valley Dr EB @ South Lakes Dr SB
$18,300$0
Loading pad and curb ramp Group 5: Final design in progress. Project plat is being revised. LAD authorized 10/15/09.
Hunter Mill Lauretti, FrancescBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/1001/09 10/09 03/10NA TBD
Project Description Monthly Remarks
04/09 05/10 05/10 07/1007/0905/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05525
Stringfellow Rd SB @ Brandy Station Rd WB
$19,200$0
Loading pad, 6-asphalt walkway, & curb and gutter
Group 8: Intermediate design in progress.
Sully Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1009/09NA TBD TBD TBD
Project Description Monthly Remarks
07/09 02/10 02/10 04/1010/0902/10304Fund
Friday, November 20, 2009 Page 54 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
05526
Stringfellow Rd SB @ Jasper Rd WB
$17,300$0
Load pad, curb & gutter, & curb cut ramp
Group 8: Pre-final design in progress. Land rights required.
Sully Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/1006/09 01/10 06/10NA TBD
Project Description Monthly Remarks
07/09 08/10 08/10 10/1005/1008/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05527
Stringfellow Rd NB @ Jasper Rd EB
$16,500$0
Loading pad and curb ramp Group 8: Pre-final design in progress.
Sully Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0906/09NA TBD TBD TBD
Project Description Monthly Remarks
07/09 01/10 01/10 03/1010/0901/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05528
Stringfellow Rd NB @ Cross Keys Ct WB
$24,300$0
Loading pad, sidewalk connection, drainage culvert, & curb cut ramp
Group 8: Pre-final design in progress. Land rights required.
Sully Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/1006/09 01/10 06/10NA TBD
Project Description Monthly Remarks
07/09 08/10 03/10 10/1005/1008/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05534
Lawyers Rd NB @ McLearen Rd EB
$20,300$0
Loading pad, sidewalk and upgrade an existing handicap ramp
Group 10A: Design 90% complete. Addressing comments from CMD.
Hunter Mill Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/09NA NA NA
Project Description Monthly Remarks
08/09 12/09 12/09 02/1012/09304Fund
Friday, November 20, 2009 Page 55 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
05536
NB Reston Parkway & Glade Drive
$30,000$0
Loading pad, sidewalk, and curb and gutter
Group 3: Pre-final design in progress. Land acquisition complete 6/30/09. Coordination with Reston HOA is on-going.
Hunter Mill Lauretti, FrancescBuckley, Beth
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1007/08 01/09 06/09NA NA
Project Description Monthly Remarks
05/09 02/10 02/10 04/1008/0902/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05567
Galesbury Ln SB @ Lee Jackson Memorial Hwy EB
$17,100$0
Loading pad Group 8: Construction package submitted to CMD 10/21/09.
Sully Lauretti, Francesc
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/0906/09NA TBD TBD TBD
Project Description Monthly Remarks
07/09 11/09 11/09 01/1010/0911/09304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05615
Helmsdale La WB @ Duddington Dr NB
$15,500$0
Loading pad Group 9: Pre-final design in progress. Land rights required.
Lee Lauretti, FrancescBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/1009/09 03/10 08/10NA NA
Project Description Monthly Remarks
02/10 10/10 10/10 12/1012/1010/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05618
Helmsdale La EB @ Amesbury Ct NB
$15,500$0
Loading pad Group 9: Intermediate design in progress.
Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
02/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
02/10 03/10 03/10 05/1005/1003/10304Fund
Friday, November 20, 2009 Page 56 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
05631
EB Great Falls Street and Aynsley Ln
$16,000$0
Loading pad Group 5: Final design in progress. Project plat is being revised.
Dranesville Lauretti, FrancescKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/1009/08 01/10 06/10NA TBD
Project Description Monthly Remarks
04/09 08/10 08/10 10/1007/0908/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05632
WB Great Falls Street and Eldorado Ct
$16,200$0
Loading pad Group 5: Final design in progress. Project plat is under review.
Dranesville Lauretti, FrancescBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/1009/08 01/10 06/10NA TBD
Project Description Monthly Remarks
04/09 08/10 08/10 10/1007/0908/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
05716
Burke Rd EB @ Old Burke Lake Rd NB
$15,400$0
Loading pad Group 10A: Design 90% complete. Preparing to submit for review. Land rights will be required.
Springfield Schmidt, Natasha
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/09 12/09 04/10TBD
Project Description Monthly Remarks
08/09 05/10 05/10 07/1012/1005/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
06119
Blake Ln SB at Kingsbridge Dr EB
$25,100$0
Concrete loading pad, curb cut ramps, and sidewalk connection
Group 7: Pre-final design in progress. Project plat is in progress.
Providence Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
07/1005/09 01/10 06/10NA NA
Project Description Monthly Remarks
10/09 08/10 08/10 10/1001/1008/10304Fund
Friday, November 20, 2009 Page 57 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP202
Bus Stop Inventory, Safety & Access Improvements
06253
Field Master Dr SB @ Rosewall Ct EB
$16,300$0
Loading Pad Group 11: Intermediate design in progress.
Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:
03/1012/09NA TBD TBD TBD
Project Description Monthly Remarks
03/10 04/10 04/10 06/1006/1004/10304Fund
4YP202
Bus Stop Inventory, Safety & Access Improvements
10101
Amherst Ave SB @ Springfield Blvd EB
$17,100$0
Loading pad Group 9: Pre-final design in progress. Land rights required.
Lee Lauretti, FrancescPreston, Clinton
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/1009/09 03/10 08/10NA NA
Project Description Monthly Remarks
02/10 10/10 10/10 12/1012/1010/10304Fund
4YP203
Spot Improvements - Braddock Road/Backlick Road
00000
$500,000$0
Install an additional left-turn lane on westbound Braddock Road to southbound Backlick Road
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design is in progress. Traffic signal proposal being revised to address comments from County. Design waiver package being revised to address comments from County.
Mason Madhusudhan, GBuckley, BethFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/1009/08 04/09 01/10 02/10 09/10
Project Description Monthly Remarks
12/09 12/10 01/11 06/1110/1011/10304Fund
4YP204
Spot Improvements - Shirley Gate Rd/Route 29
00000
$1,000,000$0
Intersection improvements at Route 29 to add additional thru lanes
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Scope has been revised to converting existing right turn lanes on Route 29 to shared thru and right turn lanes. A meeting has been scheduled with DOT and VHB to review intersection study and analysis for revised scope. Schedule to be revised after further review and agreement on intersection analysis.
Springfield Khorashadi, BrooBarnes, DianneMinnix, W. Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/08 09/08TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBDBraddock304Fund
Friday, November 20, 2009 Page 58 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP205
Spot Improvements - Zion Drive00000
$1,000,000$0
Reconstruct horizontal curve on Zion Drive east of Windsor Hill Drive.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design is in progress.
Braddock Ayodeji, OlawaleBuckley, BethMcCorkle, Lisa
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/1011/08 02/10 03/10 10/10NA
Project Description Monthly Remarks
11/09 12/10 01/11 12/1112/1111/10304Fund
4YP206
Spot Improvements - Rte 7/Towlston Road
00000
$750,000$0
Add left turn lane on north bound Towlston Road to west bound Route 7.
Preliminary design in progress.
Dranesville Conley, TimPM PDD:PM LAD:PM CMDE:PM CMDS:
07/1012/09 01/10 04/10 06/10 01/11
Project Description Monthly Remarks
07/10 04/11 05/11 12/1112/1103/11304Fund
4YP210
Poplar Tree Road Improvements00000
$5,500,000$2,500,000
Widening Poplar Tree Road to four lane divided section from Sully Station Drive to Braddock Ridge Drive.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design is in progress. Flood plain analysis is under review to determine impacts on adjoining properties. Addressing comments from VDOT to revise existing pavement section. Consultant will submit an addendum for new design work. Schedule to be revised once addendum is received.
Sully Khorashadi, BrooFinnell, RichardMinnix, W. ToddMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/1010/07 02/09 12/09 10/09 07/10
Project Description Monthly Remarks
06/09 10/10 11/10 08/1110/1009/10304Fund
4YP212
Route 29 Widening00000
$4,000,000$0
Phase III: Widen northbound Route 29 to 3 lanes on from Legato Road to Shirley Gate Road.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Preliminary design submitted to VDOT for review 9/22/09. Utility designation update in progress.
Springfield Madhusudhan, GPreston, ClintonMinnix, W. Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/1109/09 04/10 05/10 12/10TBD
Project Description Monthly Remarks
03/11 06/11 07/11 07/1207/1205/11304Fund
Friday, November 20, 2009 Page 59 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
4YP213
Lorton Road00000
$40,000,000$20,000,000
Widen Lorton Rd. to 4 lanes from Rte. 123/Furnace Rd. to Silverbrook Rd. and from Rte. 123/Lorton Rd. to Furnace Rd.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate plans submitted for review on 10/14/09. VDOT Design Field Inspection scheduled for 12/09/09. An alignment study, signal warrant study, and documentation of cultural resources are being prepared to address concerns raised at the community meetings held in September and October 2009.
Mount Vernon Roberson , JeanKresge, CarolMinnix, W. Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1109/08 10/09 01/10 02/10 09/10
Project Description Monthly Remarks
01/11 04/11 05/11 12/1212/1203/11304Fund
4YP214
Cinder Bed Road Improvements00000
$5,000,000$0
Improvements to the intersection of Cinder Bed Road and Newington Road. Relocate entrance to County vehicle maintenance facility.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final hydrologic and hydraulic analysis report submitted for review 7/16/09. Consultant submitted proposal for final design 11/12/09 and it is under review. Schedule to be developed once proposal is approved.
Mount Vernon Ayodeji, OlawalePM PDD:PM LAD:PM CMDE:PM CMDS:
06/09TBDTBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
D00448
Plaza America Pedestrian Improvements
PA02B
Sunset Hills Road: Reston Center to Town Center Parkway
$170,000$0
600 LF 8' wide asphalt trail100 LF 6' wide concrete walkway
Funding provided by Plaza America cash proffer contribution. Coordinating with Comcast to lower section of cable. Evaluating scope and cost of additional walkway that owner requested, land acquisition on hold.
Hunter Mill Zahirieh, ShahlaBarnes, DianneGharavi, MoHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/09TBDNA NA NA TBD
Project Description Monthly Remarks
02/09TBD TBD TBDTBDTBD 05/09
307Fund
D00448
Plaza America Pedestrian Improvements
PA050
Sunset Hills Rd Trail: Rstn Pkwy-Wiehle
$195,000$0
350 LF 8' asphalt trail from Sunset Hills Road to W&OD Trail
Partial funding provided by Plaza America proffer contribution and funds from the Old Reston Avenue roadway improvement project. Resolving issues with Dominion Virginia Power. Evaluated alternate alignments, but determined not feasible. Schedule to be determined once issues with Dominion Virginia Power are resolved. Cost estimate is being prepared.
Hunter Mill Zahirieh, ShahlaBuckley, BethTBD, To be DeterHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/06 04/08NA NA NA TBD
Project Description Monthly Remarks
04/06 10/09TBD TBD TBDTBD 04/09
307Fund
Friday, November 20, 2009 Page 60 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
D00448
Plaza America Pedestrian Improvements
PA060J
Sunset Hills Road @ Target EB Bus Stop Improvements
$30,000
Installation of a bus shelter Funding provided by Plaza America proffer contribution. Land acquisition required. Negotiations have been unsuccessful (memorandum to DOT 1/11/07 recommending deletion ~ follow up memorandum 4/9/08 and email 9/15/08 to DOT for status update). Proposed development may provide bus stop improvements and relocation of stop - DOT is following up.
Hunter Mill Guarino, MichaelBuckley, BethFarsad, NahidMcMillen, Barry
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/05NA NA TBD TBD TBD
Project Description Monthly Remarks
10/05 10/06TBD TBD TBDTBD 01/07
307Fund
D00448
Plaza America Pedestrian Improvements
PA060O
Sunset Hills Road @ WO&D Trail WB Bus Stop Improvements
$30,000$0
Installation of a bus shelter Partial funding provided by Plaza America proffer contribution. Loading pad is proposed at stop with walkway project - see Sunset Hills Road Walkway - W&OD to Michael Faraday, Project No. 4YP201 (PB017).
Hunter Mill Guarino, MichaelBuckley, BethFarsad, NahidHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/08NA NA TBD TBD TBD
Project Description Monthly Remarks
01/08 12/08TBD TBD TBDTBD 05/08
307Fund
K00447
Richmond Hwy Public Transport Initiative Phase 4A
RS102
Intersection Design - Belford Drive Old Mill Road, and Mohawk Lane
$357,000$0
Engineering and construction of intersection improvements at express bus service stops for Belford Drive, Old Mill Road, and Mohawk Lane.
Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. This project will be completed in phases. Meeting held on 8/26/09 with the consultant to check on the status of the project and to plan the next course of action to expedite the submission process to VDOT. Design waiver package submitted to VDOT 8/31/09.
Mount Vernon Madhusudhan, GPreston, ClintonFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/1102/10 05/10 05/11NA TBD
Project Description Monthly Remarks
03/11 08/11 09/11 01/1201/1207/11
Lee307Fund
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4D
RS211
Route 1 SB: South of Dogue Creek to Mobile Home Sales Park
$350,000$0
300 LF 8' Asphalt Trail and Pedestrian Bridge over Dogue Creek
Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/8/04. Developing design scope for project. Design to be performed by consultant. Schedule to be determined once contract executed with design consultant. Land acquisition required.
Mount Vernon Zahirieh, ShahlaPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD307Fund
Friday, November 20, 2009 Page 61 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4D
RS213
Route 1 SB: Sacramento Drive to Engleside Plaza (North of Woodlawn Court)
$350,000$0
1400 LF of 5-foot wide concrete sidewalk
Project is part of Four-Year Transportation Program endorsed by the BOS on 2/9/04. Plans submitted to VDOT 7/16/09. Preparing request to VDOT for right-of-way authorization to start land acquisition, including necessary environmental documentation. Schedule to be determined once VDOT authorizes initiation of land acquisition.
Mount Vernon Zahirieh, ShahlaKresge, Carol
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD307Fund
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4D
RS214
Route 1 SB: South of Sky View Drive
$42,500$0
170 LF 5-foot wide concrete sidewalk and bus stop pad
Project is part of Four-Year Transportation Program endorsed by the BOS on 2/9/04. Plans submitted to VDOT 7/16/09. Preparing request to VDOT for right-of-way authorization to start land acquisition, including necessary environmental documentation. Schedule to be determined once VDOT authorizes initiation of land acquisition.
Mount Vernon Zahirieh, ShahlaKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD307Fund
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4E
RS221
Route 1 NB: North of Reddick Avenue/Russell Road (towards Janna Lee Avenue)
$125,000$0
500 LF of 5-foot wide concrete sidewalk
Project is part of Four-Year Transportation Program endorsed by the BOS on 2/9/04. Plans submitted to VDOT 7/16/09l. Preparing request to VDOT for right-of-way authorization to start land acquisition, including necessary environmental documentation. Schedule to be determined once VDOT authorizes initiation of land acquisition.
Mount Vernon Zahirieh, ShahlaKresge, Carol
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD307Fund
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4E
RS222
Route 1 NB: South of Janna Lee Avenue to Buckman Road/Mt. Vernon Highway
$303,000$0
1210 LF of 5-foot wide concrete sidewalk
Project is part of Four-Year Transportation Program endorsed by the BOS on 2/9/04. Utility coordination in progress. VDOT is requiring additional public involvement due to additional easements. Land acquisition is required. Drainage issues on site impacting walkway design - coordinating with DOT, SWPD, and VDOT. Project on hold until final scope regarding drainage issues resolved.
Mount Vernon Zahirieh, ShahlaKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 02/09307Fund
Friday, November 20, 2009 Page 62 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4E
RS223
Route 1 NB: Mt. Vernon Hwy/Buckman Rd to Napper Rd
$125,000$0
Pedestrian crossing and signal at Mt. Vernon Hwy. and 500 LF 5-foot wide concrete sidewalk
Project is part of Four-Year Transportation Program endorsed by the BOS on 2/9/04. Land acquisition is required. Utility coordination in progress. Obtaining signal design proposal. Additional survey and drainage calculations required. Schedule to be determined once additional public involvement finished and approved by VDOT.
Mount Vernon Zahirieh, ShahlaKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD307Fund
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4F
RS232
Route 1 NB: South of Kings Village Road
$37,500$0
150 LF of 5-foot wide concrete sidewalk
Project is part of Four-Year Transportation Program. Utility coordination in progress. Plans submitted to VDOT on 7/16/09. Land acquisition is required. Preparing request to VDOT for right-of-way authorization to start land acquisition, including necessary environmental documentation. Schedule to be determined once additional public involvement finished and approved by VDOT.
Mount Vernon Zahirieh, ShahlaBuckley, Beth
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD307Fund
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4F
RS233
Route 1 NB: South of Fordson Road to Woodlawn Trail
$410,000$0
1640 LF of 5-foot wide concrete sidewalk
Project is part of Four-Year Transportation Program. Utility coordination in progress. Plans submitted to VDOT on 7/16/09. Land acquisition is required. Preparing request to VDOT for right-of-way authorization to start land acquisition, including necessary environmental documentation. Schedule to be determined once additional public involvement finished and approved by VDOT.
Mount Vernon Zahirieh, ShahlaBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD307Fund
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4H
RS252
Route 1 NB: Quander Road - Phase 2
$112,500$0
450 LF of 5-foot wide concrete sidewalk south of Quander
Project is part of Four-Year Transportation Program. Utility coordination in progress. Plans submitted to VDOT on 7/16/09. Land acquisition is required. Preparing request to VDOT for right-of-way authorization to start land acquisition, including necessary environmental documentation. Schedule to be determined once additional public involvement finished and approved by VDOT.
Mount Vernon Zahirieh, ShahlaBuckley, Beth
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD307Fund
Friday, November 20, 2009 Page 63 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4H
RS254
Route 1 SB: Belle Haven Towers - Phase 2
$137,500$0
550 LF of 5-foot wide concrete sidewalk and service drive crossing
Project is part of Four-Year Transportation Program. Utility coordination in progress. Plans submitted to VDOT on 7/16/09. Land acquisition is required. Preparing request to VDOT for right-of-way authorization to start land acquisition, including necessary environmental documentation. Schedule to be determined once additional public involvement finished and approved by VDOT.
Mount Vernon Zahirieh, ShahlaBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD307Fund
W00100
Braddock District WalkwaysW109
Roberts Road @ GMU
$570,000$0
700 LF 6' asphalt trail Project is part of the Second Four-Year Transportation Program. Walkway construction 90% complete. Completion of the remaining 80 LF transition to Roberts Road contingent upon an on-going utility adjustment. LAD negotiating to reduce the easement limits due to the reduced project scope.
Braddock Popoola, LarryBarnes, DianneSteele, TerrenceMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/08 02/09NANA NA NA
Project Description Monthly Remarks
NA08/09 08/09 12/0910/0908/09307Fund
W00200
Dranesville District WalkwaysW202A
Georgetown Pike Phase I
$500,000$0
Phase I: 1,260 LF of stonedust trail from Applewood Lane to the Village Center
Project scope reduced to trail section west of the village center due to citizen opposition east of the village center. VDOT authorized project for construction bid advertisement 11/10/09.
Dranesville Schmidt, NatashaKresge, CarolFarsad, NahidHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/09 08/09NANA NA TBD
Project Description Monthly Remarks
NA12/09 12/09 07/1005/0811/09307Fund
W00200
Dranesville District WalkwaysW202B
Georgetown Pike Phase II
$400,000$0
Trail align. study & design of 1,800 LF walkway. from Utterback Store Rd to Falls Manor Ct.
Preliminary design submitted to VDOT 11/10/09 for review.
Dranesville Popoola, LarryKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/10 05/10 10/10TBD
Project Description Monthly Remarks
05/10 02/11 02/11 08/1108/1102/11307Fund
Friday, November 20, 2009 Page 64 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
W00200
Dranesville Distict WalkwaysW202C
Georgetown Pike Environmental Certification
$60,000$0
Environmental Analysis along Georgetown Pike from Seneca Road to River Bend Road (approximately 4.2 miles)
Environmental analysis currently in progress. Phase I Enviromnental Site Assessment received. Received completed wetlands delineation report dated 7/9/09. Awaiting the 4(f) determination/exemption from VDOT.
Dranesville Schmidt, NatashaPM PDD:PM LAD:PM CMDE:PM CMDS:
11/09NA NA NA
Project Description Monthly Remarks
03/09NA NA NANANA
307Fund
W00200
Dranesville District WalkwaysW212
Walker Road Phase I
$350,000$0
5-foot wide concrete sidewalk (Phase I: 1200 LF of walkway north of Village Center to north end of Great Falls Elementary School property)
Project scope reduced due to citizens opposition. VDOT authorized project for construction bid advertisement on 11/10/09.
Dranesville Schmidt, NatashaKresge, CarolFarsad, NahidJensen, Chris
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/05 03/09 08/09NA NA NA
Project Description Monthly Remarks
NA12/09 12/09 07/1005/0811/09307Fund
W00300
Hunter Mill District WalkwaysW304
Wiehle Avenue Walkway
$480,000$0
1200 LF 6-foot wide asphalt walkway with retaining walls and drainage improvements
Reston Design Review Board(RDRB) approval received. RDRB requested additional details be provided. VDOT and County agencies comments received. Plans are being revised. Coordinating with property owner on updates to plans and preparing to go back to RDRB with additional details and plan updates.
Hunter Mill Guarino, MichaelZore, TasneemGharavi, Mo
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/10 01/02 09/08NA NA NA
Project Description Monthly Remarks
11/09 03/10 04/10 10/1008/1002/10307Fund
W00300
Hunter Mill District WalkwaysW308
Clarks Crossing Road Walkway
$139,000$0
250' 8-foot wide asphalt trail Construction complete 7/10/09. Awaiting permit release.
Hunter Mill Wozniak, WalterZore, TasneemGharavi, Mo
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/06 09/07 02/07NA NA NA
Project Description Monthly Remarks
05/06 05/09 05/09 07/0908/0905/09307Fund
Friday, November 20, 2009 Page 65 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
W00300
Hunter Mill District WalkwaysW311
Beulah Road Trail
$165,000$0
500' 10-foot wide trail (Section D) Enhancement grant funds approved to prepare a trail feasibility study (complete) and design Section D (500 LF 10-foot wide trail) in progress. Final design in progress. Pre-final submission submitted to VDOT 11/9/09. Citizen meeting held 9/23/09.
Hunter Mill Popoola, LarryKresge, Carol
Murdoch, Guy
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/10 02/10 08/10NA TBD
Project Description Monthly Remarks
03/10 09/10 11/10 05/1105/1109/10307Fund
W00400
Lee District WalkwaysW413
Florence Lane Walkway
$287,000$0
550 LF of 5-foot wide concrete sidewalk along the east side of Florence Lane between Candle Light Court and Beech Tree Drive
Project implementation was on-hold due to property owner opposition. Pre-final design submitted 10/13/09 for review.
Lee Popoola, Larry
Minnix, W. Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/10 02/10 07/10TBD
Project Description Monthly Remarks
02/10 09/10 09/10 12/1012/1009/10307Fund
W00500
Mason District WalkwaysW505
Old Col Pike-Elmdale
$290,000$272,000
700 LF of 6-foot wide walkway Funding for design only. Additional funding required. Project on hold pending approval of additional funding.
Mason Guarino, MichaelPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 08/03307Fund
W00600
Mt. Vernon District WalkwaysW611
West Potomac High School Walkway
$576,969$0
500 LF of 5-foot wide concrete sidewalk with curb and gutter and storm drainage improvements
Project is part of the Second Four-Year Transportation Program. Construction NTP issued 3/2/09. Construction substantially complete 8/17/09. Permit released 10/19/09.
Mount Vernon Royse, AndyBarnes, DianneFarsad, NahidHousley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/07 01/08 06/08NA NA NA
Project Description Monthly Remarks
06/07 12/08 03/09 08/0902/0911/08307Fund
Friday, November 20, 2009 Page 66 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
W00600
Mt. Vernon District WalkwaysW613
Mason Neck Trail Segment II
$1,906,000$1,163,718
First portion, Segment 2A is 1,500 LF of 8-foot wide asphalt trail
ROW certification obtained from VDOT for Segment 2A on 8/26/09. ECS provided updated geotechnical report on 9/18/09. Final plans and bid documents being reviewed by VDOT. Contract addendum negotiations to finish Segment 2B plans in progress.
Mount Vernon Royse, AndyKresge, CarolNolan, BillMurdoch, Guy
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/09 02/09 08/09NA NA TBD
Project Description Monthly Remarks
04/06 03/10 05/10 10/1010/1002/10307Fund
W00700
Providence District WalkwaysW705
Woodford Rd @ Wolftrap
$110,000$75,000
270 LF of 6-foot wide walkway replacement including extensive site grading and drainage facilities
Funding approved for replacement of an existing walkway. HOA 9/29/06 withdrew support for the project. Project on-hold pending resolution of HOA issues; coordinating with District Supervisor's office.
Providence Guarino, MichaelKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/05 01/06NA NA
Project Description Monthly Remarks
10/05 09/06TBD TBD TBDTBD 09/06
307Fund
W00700
Providence District WalkwaysW719
Lido Place Walkway
$194,500$0
600 LF of 4-foot wide sidewalk with drainage ditch, two 15" RCP culverts, and crosswalk
CMD authorized construction 7/15/09. Construction substantially complete 8/31/09. VDOT permit release 10/27/09.
Providence Gallo, MichaelBarnes, DianneMinnix, W. ToddHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/07 01/08 05/08NA NA NA
Project Description Monthly Remarks
04/07 08/09 08/09 08/0905/0908/09307Fund
009217
Stonecroft Boulevard Widening00000
$500,000$150,000
Widen Stonecroft Boulevard to a six-lane section from Conference Ctr. Dr.to Westfields Blvd. Project is 800 LF.
Construction to be managed by developer. Additional funding required. A meeting with WBOA was held on 7/30/09 to discuss the four bids received, construction schedule, and other construction issues. Marriott recorded the dedication deed on 8/21/09. Revised package submitted to LDS by the developer 9/1/09.
Sully Salahuddin, KhaliKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/05 04/07 10/07 01/08TBDNA
Project Description Monthly Remarks
03/06NA NA NANANA
312Fund
Friday, November 20, 2009 Page 67 of 68developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
Oct 2009
008909
Annandale Streetscape Columbia Pike - Annandale Fire Station
00000
$1,600,000$369,000
Streetscape improvements on north side of Columbia Pike from Backlick Road to Annandale Fire Station
VDOT Transportation Enhancement Grant approved and received 9/1/09. Final design in progress. NTP issued 10/8/09 for Maintenance of Traffic Plan. Due Diligence and NEPA documentation are complete.
Mason Ayers, RobertPreston, ClintonLim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/1002/98 01/99 10/99 12/00 12/02
Project Description Monthly Remarks
09/06 08/10 09/10 04/1110/1007/10315Fund
008912
McLean CRP00001
McLean Streetscape Demonstration Project
$1,700,000$0
Streetscape improvements to Chain Bridge Road from Westmoreland Street to Cedar Avenue.
This project is funded with VDOT Transportation Enhancement Grants. Construction substantially complete on 11/12/08. Punch-list items are being addressed. Permit released 10/28/09.
Dranesville Roberson , JeanBarnes, DianneFarsad, NahidHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0501/04 06/04 08/04 03/06NA
Project Description Monthly Remarks
12/05 11/07 02/08 11/0807/0810/07315Fund
008912
McLean CRP00002
McLean Utilities
$1,800,000$0
Underground utilities along Chain Bridge Road from Corner Lane to Laughlin Avenue.
Additional funding may be required due to increased material and utilities costs. Additional funding available through Mclean Revitalization Corp. Awaiting land acquisition rights before proceeding with redesign. Staff working with property owners and Supervisor's office to resolve issues to expedite acquisition of land rights. 2 of 13 easements have been acquired by McLean Revitalization Corp. and forwarded to LAD. DVP working on revision to duct bank.
Dranesville Ayers, RobertFinnell, RichardMinnix, Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/04 12/05 09/06TBD TBD TBD
Project Description Monthly Remarks
06/06TBD TBD TBDTBDTBD
315Fund