cover memo metrolinx 2041 regional transportation plan...on-demand economy user-pay economy economic...
TRANSCRIPT
INFORMATION ONLY____________________________________________________________________________ Date: November 13, 2017 Subject: Draft 2041 Regional Transportation Plan
At the TTC Board meeting on November 13, 2017, staff from Metrolinx, will deliver a presentation on the Draft 2041 Regional Transportation Plan. Original signed by Chrisanne Finnerty Head of Commission Services
Draft 2041 Regional Transportation Plan
Antoine Belaieff, DIRECTOR, REGIONAL PLANNING, METROLINX
TTC BOARD OF DIRECTORS NOVEMBER 13, 2017
2008 “In 25 years, the GTHA will have an integrated transportation system that enhances our quality of life, our environment and our prosperity”
2
THE BIG MOVE OVER $30 BILLION IN INFRASTRUCTURE INVESTMENT
3
POPULATION GROWTH 2011 - 2041
4
TRAVEL DEMAND AND MODE SHARE (PEAK PERIODS)*
Current and Future Total Trips
Current Mode Share
5
EMPLOYMENT GROWTH 2006 - 2041
6
EMERGENCE OF NEW MOBILITY
7
IMAGE CREDIT: WAYMO
AUTONOMOUS VEHICLES
CLIMATE CHANGE 9
IMAGE CREDIT: KAREN CLEVELAND
10
THE DRAFT 2041REGIONAL TRANSPORTATION PLAN
11
THE DRAFT 2041 REGIONAL TRANSPORTATION PLAN
12
13
SCENARIO PLANNING
Rapid Growth of Core Areas Rapid Adoption of
Emerging Technologies Extreme Climate Change
On-Demand Economy User-Pay Economy Economic Decline
GTHA REGIONAL TRAVELLER PERSONAS
14
• GTHA traveller personas were developed through focus groupsand a survey of 8,500 residents.
• The personas are a tool to
formulating an RTP that responds to the needs, preferences and behaviours of GTHA travellers of today and tomorrow
19% Time & Balance
Seekers (RAYMOND)
15% Traditional Suburban
Travellers (JOHN)
15% Frustrated
Solution Seekers (SUSAN)
22% Connected Optimizing
Urbanites (DEV)
11% Satisfied Mature
Urbanites (BARBARA)
18% Aspiring Young
Travellers (CAMILLE)
PARTICIPATORY ENGAGEMENT FOR DEVELOPING THE NEXT PLAN
VISION THE GTHA URBAN REGION WILL HAVE A TRANSPORTATION SYSTEM
THAT SUPPORTS COMPLETE COMMUNITIES BY FIRMLY ALIGNING THE TRANSPORTATION NETWORK WITH LAND USE.
THE SYSTEM WILL PROVIDE TRAVELLERS WITH CONVENIENT AND RELIABLE CONNECTIONS AND SUPPORT A HIGH QUALITY OF LIFE, A
PROSPEROUS AND COMPETITIVE ECONOMY AND A PROTECTED ENVIRONMENT.
GOALS STRONG CONNECTIONS
COMPLETE TRAVEL EXPERIENCES
SUSTAINABLE COMMUNITIES
16
STRATEGY 1: COMPLETE DELIVERY OF CURRENT REGIONAL TRANSIT PROJECTS
EXISTING AND IN-DELIVERY REGIONAL RAIL AND RAPID TRANSIT
18
PROJECTS IN DEVELOPMENT
19
STRATEGY 2: CONNECT MORE OF THE REGION WITH FREQUENT RAPID TRANSIT
FREQUENT RAPID TRANSIT NETWORK CONCEPT
21
PROPOSED 2041 FREQUENT RAPID TRANSIT NETWORK
22
PRIORITY BUS
24
STRATEGY 3: OPTIMIZE OURTRANSPORTATION SYSTEM
PLAN FOR FIRST AND LAST MILE TO AND FROM GO STATIONS
26
DESIGN EXCELLENCE
28
MOBILITY AS A SERVICE (MAAS)
PROPOSED 2041 HOV AND REGIONAL EXPRESS BUS NETWORK
29
PROPOSED 2041 REGIONAL CYCLING NETWORK
30
TOWARDS VISION ZERO - REGIONALLY
31
STRATEGY 4: INTEGRATE LAND USE AND TRANSPORTATION
33
DESIGNING STREETS TO IMPROVE WALK ACCESS
CONNECTING LAND USE + TRANSIT
Area encompassed by dotted perimeter does not represent final station design concept. Surrounding land development concept is illustrative only.
STRATEGY 5: PREPARE FOR AN UNCERTAIN FUTURE
PREPARE FOR SHARED MOBILITY AND AUTONOMOUS VEHICLES
IMAGE CREDIT: URBAN HUB / THUSSENKRUPP
REDUCING EMISSIONS AND CLIMATE CHANGE ADAPTATION
37
A PROFOUND AND POSITIVE IMPACT
38
39
MORE PEOPLE AND JOBS NEAR FREQUENT RAPID TRANSIT
JOBS ACCESSIBLE IN 60- MINUTES BY PUBLIC TRANSIT: 2011
40
JOBS ACCESSIBLE IN 60- MINUTES BY PUBLIC TRANSIT: 2041
41
INCREASE IN TRANSIT TRIPS FOR DIFFERENT TRAVEL MARKETS
42
MAKING IT HAPPEN
43
REGIONAL DECISION-MAKING Formalize mechanisms for regional collaboration and integrated planning
Align regional planning areas
Monitor plan implementation and performance outcomes
FUNDING THE PLAN Address capital and operations
Use business case analysis and full lifecycle costing
Align transportation funding to RTP
DRAFT RTP ENGAGEMENT TIMELINE SEPT – DEC 2017
August December September October November
Toronto Public Roundtable Meeting (Nov 1)
Oct 2 Symposium
Launch Digital Engagement (Metrolinx Engage and social)
Sept 14 MX Board Meeting Draft RTP Tabled/Public
August 24 MX Board Members Review Draft RTP
Dec 7 MX Board Meeting
York Region Public Roundtable Meeting (Nov. 8)
Hamilton Public Roundtable Meeting (Nov. 6)
Halton Public Roundtable Meeting (Oct. 16)
Durham Public Roundtable Meeting (Oct. 10)
Corridor Committees
Aug 13-16 AMO
Toronto Councillor Briefing (Oct 30)
GTHA Council Tour (Confirmed - Oakville, Burlington, Milton, York, Peel, Hamilton, Mississauga, Brampton)
Regional Municipal Briefings (1 on 1 in place of MLPF/MTAC)
MLPF w/Regional Comms Table MLPF MLPF MTAC MTAC MTAC
Elected Officials Municipal Partner Stakeholder/Elected Official
Stakeholder Public Public/Elected Official
Provincial/Federal Engagement – key ministries/agencies
First Nations
Peel Public Roundtable Meeting (Oct. 5)
Oct 25 Stakeholder Forum
City of Toronto SmarTrack Meetings – Oct, 11, 12
45
46
NEXT STEPS
THE DRAFT PLAN IS LIVE: www.metrolinx.com/theplan
CONSULTATION AND ENGAGEMENT: Fall 2017
DRAFT PLAN UPDATE: Board of Directors Meeting
December 2017