Major events at Electric Loco Shed - 2019 20 COVID-19 PREPAREDNESS AND PROCUREMENT . 1. This shed has prepared 550 litres sanitizer at its lab as per WHO's recommendation indigenously. The shed manufactured sanitizers along with 02 nos. masks have been given not only to all the personnel (approximately 805 nos. of the shed staff) but also distributed to approximately 2000 Rly. Quarters of ASN which includes Durand Loco Colony, Domhani, Chelidanga, Traffic Colony to fight with the present grave situation. The shed has taken care the demand of sanitizers of other divisional personnel also. Procurement of 8000 nos. of 3-layer masks has been done and the same have been distributed among shed personnel and different railway colonies. Non-stock procurement of raw material for in-house preparation of 550 liters of hand sanitizer has been done. 2. Non-stock procurement of 600 liters of sodium hypochlorite solution along with 05 nos. spray machines has been done for disinfection of shed premises, sections and locomotives.

Upload: others

Post on 18-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Major events at Electric Loco Shed - 2019 – 20

COVID-19 PREPAREDNESS AND PROCUREMENT.

1. This shed has prepared 550 litres sanitizer at its lab as per WHO's recommendation

indigenously. The shed manufactured sanitizers along with 02 nos. masks have been

given not only to all the personnel (approximately 805 nos. of the shed staff) but also

distributed to approximately 2000 Rly. Quarters of ASN which includes Durand Loco

Colony, Domhani, Chelidanga, Traffic Colony to fight with the present grave situation.

The shed has taken care the demand of sanitizers of other divisional personnel also.

Procurement of 8000 nos. of 3-layer masks has been done and the same have been

distributed among shed personnel and different railway colonies.

Non-stock procurement of raw material for in-house preparation of 550 liters of hand

sanitizer has been done.

2. Non-stock procurement of 600 liters of sodium hypochlorite solution along with 05

nos. spray machines has been done for disinfection of shed premises, sections and

locomotives.

3. 150 nos. of 750 ml pouched Dettol liquid soap and 2000 nos. of 125 gm soap bars

have been procured and distributed among the shed personnel.

4. As a preventive measure, thermal screening of the personnel at shed has been

undergoing on daily basis through thermal temperature Gun.

6. Foot operated water tap along with soap dispenser has been manufactured through

In house effort for the use of shed personnel to avoid infection.

7. Social distancing norms are strictly being maintained at work premises of ELS/ASN.

8. Complete Electric Loco Shed including all sections is being disinfected twice with

Sodium Hypochlorite solution on daily basis.

9. Sanitization of Loco cab is being done on regular basis.

10. Work is being carried out through roaster duty at ELS/ASN.

11. Coloured posters containing Do’s / Don’ts have been pasted all over the shed for

creating awareness.

12. Sanitizer/Liquid soap has been kept at PPO & all sections of ELS/ASN and it has been

instructed to use these frequently to maintain hygiene.

13. Maintaining of social distancing with each other to prevent any type of infection.

Quality Certification

Six Sigma : As a part of quality certification process, ELS/ASN has been certified with Lean & Six Sigma implementation. The said certificate has been handed over to respected General Manager/ER during his visit on 10.01.2020 by M/s. Anexas, Europe, certifying body.

Implementation of 5S certification :

As a part of workplace Management process / quality certification process, ELS/ASN has been certified with the prestigious 5S Certificate. ELS/ASN has successfully achieved and implemented the standard of 5S in its workplace.

Presentation of 5S certificate

Integrated Management System (IMS) :

As a part of quality certification process, ELS/ASN has been certified with Integrated Management System (IMS) which includes ( ISO 9001-2015 – Quality Management System, ISO 14001:2015 – Environment management system & ISO 45001:2018 – Occupational Health & Safety management system) in Oct’19.

IMS certification of ELS/ASN

Consist Formation 1st time in Eastern Railway at ELS/ASN :

o 05 nos. of WAG-5 consist of 03 locos each formed at ELS/ASN which is 1st time in

Eastern Railway.

Consist formation by ELS/ASN.

Day Light Harvesting Project:

o Electric Loco Shed/Asansol commissioned solar pipe lights on 13.11.19 as a part of

day light harvesting. This is the 1st time in Eastern Railway that day light harvesting

has been started. Huge improvement in illumination level during day time has been

observed in the areas where the said light has been commissioned. The same has

not only increased illumination level in working place but also reduced energy

consumption.

Commissioning of MPCS-Version-III with GPS facility at shed level :

o For the 1st time in house MPCS V-III with GPS facility commissioned at ELS/ASN

despite this is a workshop level job. However now total 22 nos. ELS/ASN based

Locomotives are provided with version-III type MPCS, out of which 13 Locos have

been commissioned at ELS/ASN.

In-House MPCS commissioning :

Increased Holding of Locomotives. ELS/ASN has homed total 34 nos. Locomotives in 2019-20, thus the holding has increased

from 132 to 166 Locomotives.

Scrap To Art :

As advised by Divisional Railway Manger, ELS/ASN has fabricated a few models from

scrap as a part of “Scrap to Art”. An Art gallery has been formed at ASN Rly. Station with

the said models.

Sofa from scrap drum

Fighter Plane Mother with child

Robot from pipes, springs & nut bolts. Table from Sky-light glass

Peacock Lion

Prithvi Make in India emblem.

Respected PCEE/ER, DRM/ASN & CEE/OP/ER are seeing scrap to art models / sitting on sopha made from scrap.

Award from PCEE/ER :

Respected Principal Chief Electrical Engineer / Eastern Railway visited ELS/ASN on 13.07.19 & announced cash award of Rs.7000/- to ELS/ASN for good work.

Welcoming of respected PCEE/ER at ELS/ASN on 13.07.19.

PCEE/ER is seeing layout diagram of ELS/ASN

Inauguration of Induction Heater :

As an infrastructural developmental measure for implementing improved maintenance

practice, Induction heater has been procured through N.S. for heating of end shield of

Traction Motor. The said newly procured induction heater has been inaugurated by

respected PCEE on date 13.07.19.

PCEE/ER inaugurating Induction Heater

Auxiliary Park :

A rack for storing of Auxiliary motors named as “Auxiliary Park” inaugurated by PCEE/ER.

PCEE/ER inaugurating Auxiliary Park

PCEE/ER inaugurating Induction Heater

Timer Test Bench :

A highly sensitive timer test bench with micro-second accuracy for monitoring the simultaneous operation of three phase contacts of EMC fabricated internally at ELS/ASN. This has saved more than 03 lakh rupees.

Ideal Conditioon Testing Condition. Test Bench of EMC with micro sec. accuracy.

PCEE/ER inaugurating Timer Test Bench of EMC

PPT :

A Power point Presentation containing 46 slides presented before respected PCEE/ER covering all the aspects of the shed.

Meeting with all supervisors & officers by PCEE/ER on 13.07.19 .

Visit of DRM/ASN :

Respected Divisional Railway Manager / ASN visited ELS on 01.08.19.

Welcoming of respected DRM/ASN at ELS/ASN on 01.08.19.

DRM/ASN is inspecting ELS/ASN.

Independence Day Celebration:

73rd Independence Day celebrated at ELS/ASN on 15.08.19 by hoisting National Flag by Sr.DEE/TRS.

National Flag hoisting by Sr.DEE/TRS/ASN

Visit of PCEE/ER :

Respected Principal Chief Electrical Engineer / ER has visited Electric Loco shed, ASN on 06.09.19 accompanied by Divisional Railway Manager / ASN.

Visit of PCEE/ER accompanied by DRM/ASN on 06.09.19

Inauguration of Sand Dryer :

Respected Principal Chief Electrical Engineer / ER has inaugurated sand dryer along with the facility of automated sand filling machine fabricated at ELS/ASN in house (mostly of scrap material) & announced a cash award of Rs.5000/- for the said innovation.

Inauguration of Automated sand filling machine by PCEE/ER & DRM/ASN on 06.09.19.

Inauguration of TFP oil filtration Plant :

Respected Principal Chief Electrical Engineer / ER inaugurated a Transformer Oil Filtration Plant of 3000 LPH capacity of M/s. CEEDEE make on 06.09.19.

Inauguration of TFP oil filtration machine by PCEE/ER and DRM/ASN on 06.09.19

Visit of DRM/ASN :

Respected Divisional Railway Manager / ASN visited Electric Loco Shed, ASN on the occasion of Sri Sri Viswakarma Puja on 18.09.19.

Sri Sri Viswakarma Puja celebration at ELS/ASN.

Visit of respected DRM/ASN at ELS/ASN on the occasion of Sri Sri Viswakarma Puja.

AWARD FROM GENERAL MANAGER / ER :

Respected General Manager / ER visited Electric Loco shed, ASN on 11.10.19 accompanied by Divisional Railway Manager / ASN. The work of Electric Loco Shed, ASN has been highly appreciated & as a token of reorganization of the same, cash award of Rs.20000/- has been announced.

Welcoming of respected General Manager /ER Respected GM/ER & DRM/ASN are sitting in

sofa fabricated in-house from scrap.

Visit of respected GM/ER accompanied by DRM/ASN TRI-PLATE TEST BENCH : A Tri-plate test bench fabricated at ELS/ASN with internal resources for testing of valves provided in Tri-plate panel before fitment in Locomotive to reduce down time & also improve reliability has been inaugurated by respected General Manager / ER.

Inauguration of Tri-plate test bench by respected GM/ER.

In-house fabricated Tri-plate Test Bench

HOM TEST BENCH : HOM test bench has been fabricated in-house for leakage testing of HOM valve during major schedule / unscheduled changing before fitment in Loco to reduce down time & also improve reliability as previously the valve was being tested only after fitment in Loco & if there would be any problem the same would be rectified, this lead to unnecessary wastage of valuable man hour.

In-house fabricated HOM Leakage Test Bench DC-DC CONVERTER TEST BENCH : Fabrication of DC-DC converter test bench has been done with internal resources at shed level.

DC-DC Converter test bench

Inauguration of Staff Amenities : Respected General Manager has inaugurated a few staff amenities like a “Water Booth” consists of “Water Purifier cum cooler”, wash basin including mirror & also a Staff corner.

Inauguration of “Water Booth” by respected GM/ER.

Staff Corner & Water Booth.

Electrical Maintenance Hand Book :

Maintenance Hand Book prepared by Electrical section (E-2) as a ready reference to working personnel has been unveiled by respected GM/ER. The initiative will definitely upgrade the quality of day to day preventive maintenance at shed.

Unveiling of handbook of E-2 section by Hon’ble GM/ER

Pocket Trouble Shooting Directory :

Pocket Trouble Shooting Directory prepared by E-1 section has been unveiled by

GM/ER. This will be very much useful for pin point trouble shooting of Locomotives at

line as well as shed.

Inauguration of handbook of E-1 section by Hon’ble GM/ER

ORS Introduction : A drive has been carried out at ELS/ASN during Summer to avoid de-hydration of working personnel. Oral Re-hydration Salt water (O.R.S.) is being introduced to cope up with the scorching heat of summer. Daily approximately 150 to 200 working personnel are drinking the said ORS-water This drive has welcome by all staff & supervisors and also appreciated at all level.

Introduction of ORS to avoid de-hydration

Republic Day Celebration : ELS/ASN has celebrated 71st Republic Day on 26th Jan-2020. Flag hoisting has been done by Sr.DEE/TRS.

Flag Hoisting at ELS/ASN

Annual Sports Meet : Annual Sports meet 2020 was organised by TRS/ASN at Divisional Railway Stadium,

Asansol. The Meet was inaugurated by respected DRM/ASN/ER.

Annual Sports Meet 2020

In-House Commissioning of SIV:

o In-house SIV commissioning replacing ARNO to improve reliability of auxiliary

motors though it is a work shop level job.

Commissioning of SIV at shed level

Commissioning of CCTV Camera:

o CCTV camera installed at ELS/ASN to closely monitor the shunting work and other

day to day activities of ELS/ASN.

Monitoring of activities through CCTV camera.

Fitment of LED Lights :

o Fitment of LED High bay Fittings of 150 Watt capacity replacing conventional High

bay metal halides of 400 Watt for better illumination as well as energy conservation.

Fitment of LED High bay fittings at ELS/ASN

Renovation of Supervisors’ refreshment room :

Newly renovated Supervisors’ refreshment room :

Auxiliary Park:

o A rack for storing of Auxiliary motors named as “Auxiliary Park” has been fabricated

at ELS/ASN for systematic storing of auxiliary machines.

Newly fabricated Auxiliary Park Racks for systematic storing of Helical Springs :

o 02 nos. racks have been fabricated at heavy lifting bay with internal resources for

stacking of inner & outer helical springs in a systematic manner.

Stacking of Helical springs after commissioning of rack

Fabrication of Wheel Park :

o A wheel rack to be named as “Wheel Park” has been fabricated for proper stacking

of wheels to save valuable working space as well as to fetch aesthetic look.

Wheel Park

Inauguration of room for lady personnel

o Respected PCEE/ER has inaugurated newly constructed room with attached toilet for exclusive use of lady personnel of ELS/ASN during his visit.

Inauguration of room for lady personnel

Renovation of Ladies’ Toilet :

o Ladies’ toilet with modern amenities renovated with modern amenities like facilities

Wash basin, Mirror, Dustbin, Towel Hanger, Hand wash, Floor & wall tiles etc.

Inauguration of Ladies toilet,

Women’s Day Celebration at ELS/ASN

Sanitary Napkin Disposal Machine at ELS/ASN.

Training :

A training cum interactive session of supervisors arranged on 07.05.19 & 17.05.19 on Budget/Debit Credit / Disciplinary action/Own request/Mutual Transfer etc.

Interactive session on Budget – 07.05.19 Interactive session on HR - 17.05.19

As an input to staff amenity item, 04 nos. Water purifiers cum coolers have been installed at different locations of ELS/ASN in G-1 / E-4 / M-5 sections as well as at Sr.DEE/TRS Office.

Water cooler in Sr.DEE/TRS/Office Water cooler beside E-4 section

Water cooler in front of G-1 section Water cooler beside M-5 section

As per Rly.Bd’s Annual Wellness Assurance Checkup (AWAC) project, Health camp is being organized at ELS/ASN at regular interval.

Health Camp at ELS/ASN

As a part of digital Medical card project, UMID registration of all the TRS personnel has been completed by in-house effort.

UMID Registration Camp.

Training of all the TRS Personnel under Project Saksham, skill development programme launched by Rly’ Board, has been completed at ELS/ASN.

Mock Fire Drill:

Mock fire drill is conducted at the workplace in frequent basis to train the personnel

regarding fire fighting.

Mock Fire Drill at ELS/ASN OHE Assurance:

100% OHE assurance / Counseling done

Counseling on OHE power isolation

Disposal of scrap :

ELS/ASN has met the target regarding scrap disposal for the year 2019 – 20 as total scrap

of 145.37 M.T. ( Ferrous – 134.30 MT & Non-Ferrous – 11.07 MT) has been disposed off

against the target of 135 MT (Ferrous – 125 MT & Non-ferrous – 10 MT)