    Welcome

    Shri A. K. Goswami (IAS)Shri A. K. Goswami (IAS)Secretary, Govt. of IndiaDirector General, NPCChairman, NCPC

    Dr. P. K. GuptaDirector, NCPC

    Shri Bharatbhai JainMember Secretary,GCPC

    Plant Visit ofMilestone Catalyst Pvt. Ltd.Milestone Catalyst Pvt. Ltd.

    September 28, 2001

  • 8/6/2019 CP at MCPL

    2/15

    Background

    Milestone was incorporated in 1984 andpresently operates three manufacturingfacilities in Naroda

    Cast Iron plant is the largest in thecountry

    Tube / Pipe redrawing plant is thelargest in Gujarat

    Vat Dyes plant is the only SSIunit in the world

  • 8/6/2019 CP at MCPL

    3/15

    Vat Dyes Plant

    Milestone Vat Dyes plant is manufacturing

    Vat Green 1

    Vat Green 2

    Vat Green 9

    Vat Dyes is being used for dyeing and printingof cotton yarns & fabrics.

    We are exporting more than 90% of gross

    production to developed & developingcountries.

  • 8/6/2019 CP at MCPL

    4/15

    CP Initiatives

    Adaptation of CP, GHK, EMS, IndlSymbiosis concept by management

    GCPC endorsed VD plant as CP demo

    projectThree days workshop on GHK conductedat plant

    Evaluation of EMS is under progress

    Industrial Symbiosis helped to divertGypsum to Cement factory

  • 8/6/2019 CP at MCPL

    5/15

    CP Findings

    Install temperature

    scanner

    Indicated poor

    utilization ofcondensers

    Tray Dryer effi..

    IR Thermographs

    of entire plant

    AQ bags to bewashed and stackedafter drying

    AQ bags werestacked dry

    Reduction of AQdust

    Qualitydeterioration

    Employ qualifiedpersonnel

    Lack of qualifiedpersonnel

    ManagementAttitude

    Optimum optionfor improvement

    ExistingPractice

    Potentiality

  • 8/6/2019 CP at MCPL

    6/15

    CP Findings Contd..

    Gypsum purityimproves from 30%to 80-85%

    Using LSP toneutralize effluent

    Low Gypsum %

    Use of HL withLSP in ETP

    Use screen withcalculator font

    Drum markingwas hand written

    Drum Labeling

    Save manpower,electricity andreduce handing loss

    Conventionalbatch sizes

    Increase batchsize to reactorcapacity

    Change to tubeside

    Vapour passingthrough shell side

    Change ofcondenser inlet

    Scope forimprovement

    Existing PracticePotentiality

  • 8/6/2019 CP at MCPL

    7/15

    CP Economic Benefits

    2.4 months> 15,000(300 X 12)

    3,600

    Drum Labeling

    > 1,00,000

    2.6 months2,70,000

    NilIncrement of

    batch sizes

    58,000Realignment ofETP Stirrers

    5.5 months24,00011,000Change ofCondenser inlet

    3 months72,00018,000TemperatureScanner

    Payback

    period

    Savings,Rs.

    CapitalInvestment

    Option

  • 8/6/2019 CP at MCPL

    8/15

    GHK Findings

    Good House Keeping (GHK) workshop wasorganised by GCPC from 30th April- 02nd May2001 with participation of 18 students fromCEPT & LD Engg. College.

    Nearly 74 waste streams wereidentified by the students

    Many options are beingimplemented and more are yet to

    be reviewedGHK adaptation reduces waste by10% with NO Investment

  • 8/6/2019 CP at MCPL

    9/15

    EMS Status

    Under the guidance of Prof. Vipul Shah,Environment Management System (EMS)evaluation and implementation is beingcarried out by CEPT student.

    Feasibility of cluster based EMS on theline of Swiss model

    The time frame would be fourmonths

    Organisational Environment Policyhas been arrived and framed.

  • 8/6/2019 CP at MCPL

    10/15

    Environmental policy Environmental aspects

    Legal and other requirements

    Objectives and targetsObjectives and targets

    Environmental management

    program Structure and responsibility

    Training, awareness andcompetence

    Communication

    EMS documentation Document control

    Operational control

    Emergency preparedness andresponse

    Monitoring and measurement Nonconformance and corrective

    and preventive action

    Records

    EMS audit

    Management review

    EMS Status Contd..

  • 8/6/2019 CP at MCPL

    11/15

    ScopeforfurtherCP Area

    Application of advance technology

    Use of phase transfer catalyst

    Use of different solvent

    reduce loss with improved yieldUse of raw material as per stoicheometry

    Improvement in energy utilisation

    Steam generation

    Boiler grate area

  • 8/6/2019 CP at MCPL

    12/15

    Barriers

    Financial Strength of SSI unit

    Scale of operation

    Lack of expertise in many fields

    Long term planning & visionR & D and state of art testing facilities

    Lack of measuring and monitoring

    Historical database

    Missing links with academyTechnical literature

    New development

    Alternatives ..many more

  • 8/6/2019 CP at MCPL

    13/15

    Recommendation

    Scope of CP exits everywhere

    Make CP a Habit

    CP is cyclic process that never ends

    Sharing of information benefits bothCP: Avoid, reduce & recycle

    CP: Hear, observe & share

    Blend of CP with GHK, EMS and Indl

    symbiosis benefits individually andcollectively

  • 8/6/2019 CP at MCPL

    14/15