8/6/2019 CP at MCPL
1/15
Welcome
Shri A. K. Goswami (IAS)Shri A. K. Goswami (IAS)Secretary, Govt. of IndiaDirector General, NPCChairman, NCPC
Dr. P. K. GuptaDirector, NCPC
Shri Bharatbhai JainMember Secretary,GCPC
Plant Visit ofMilestone Catalyst Pvt. Ltd.Milestone Catalyst Pvt. Ltd.
September 28, 2001
-
8/6/2019 CP at MCPL
2/15
Background
Milestone was incorporated in 1984 andpresently operates three manufacturingfacilities in Naroda
Cast Iron plant is the largest in thecountry
Tube / Pipe redrawing plant is thelargest in Gujarat
Vat Dyes plant is the only SSIunit in the world
-
8/6/2019 CP at MCPL
3/15
Vat Dyes Plant
Milestone Vat Dyes plant is manufacturing
Vat Green 1
Vat Green 2
Vat Green 9
Vat Dyes is being used for dyeing and printingof cotton yarns & fabrics.
We are exporting more than 90% of gross
production to developed & developingcountries.
-
8/6/2019 CP at MCPL
4/15
CP Initiatives
Adaptation of CP, GHK, EMS, IndlSymbiosis concept by management
GCPC endorsed VD plant as CP demo
projectThree days workshop on GHK conductedat plant
Evaluation of EMS is under progress
Industrial Symbiosis helped to divertGypsum to Cement factory
-
8/6/2019 CP at MCPL
5/15
CP Findings
Install temperature
scanner
Indicated poor
utilization ofcondensers
Tray Dryer effi..
IR Thermographs
of entire plant
AQ bags to bewashed and stackedafter drying
AQ bags werestacked dry
Reduction of AQdust
Qualitydeterioration
Employ qualifiedpersonnel
Lack of qualifiedpersonnel
ManagementAttitude
Optimum optionfor improvement
ExistingPractice
Potentiality
-
8/6/2019 CP at MCPL
6/15
CP Findings Contd..
Gypsum purityimproves from 30%to 80-85%
Using LSP toneutralize effluent
Low Gypsum %
Use of HL withLSP in ETP
Use screen withcalculator font
Drum markingwas hand written
Drum Labeling
Save manpower,electricity andreduce handing loss
Conventionalbatch sizes
Increase batchsize to reactorcapacity
Change to tubeside
Vapour passingthrough shell side
Change ofcondenser inlet
Scope forimprovement
Existing PracticePotentiality
-
8/6/2019 CP at MCPL
7/15
CP Economic Benefits
2.4 months> 15,000(300 X 12)
3,600
Drum Labeling
> 1,00,000
2.6 months2,70,000
NilIncrement of
batch sizes
58,000Realignment ofETP Stirrers
5.5 months24,00011,000Change ofCondenser inlet
3 months72,00018,000TemperatureScanner
Payback
period
Savings,Rs.
CapitalInvestment
Option
-
8/6/2019 CP at MCPL
8/15
GHK Findings
Good House Keeping (GHK) workshop wasorganised by GCPC from 30th April- 02nd May2001 with participation of 18 students fromCEPT & LD Engg. College.
Nearly 74 waste streams wereidentified by the students
Many options are beingimplemented and more are yet to
be reviewedGHK adaptation reduces waste by10% with NO Investment
-
8/6/2019 CP at MCPL
9/15
EMS Status
Under the guidance of Prof. Vipul Shah,Environment Management System (EMS)evaluation and implementation is beingcarried out by CEPT student.
Feasibility of cluster based EMS on theline of Swiss model
The time frame would be fourmonths
Organisational Environment Policyhas been arrived and framed.
-
8/6/2019 CP at MCPL
10/15
Environmental policy Environmental aspects
Legal and other requirements
Objectives and targetsObjectives and targets
Environmental management
program Structure and responsibility
Training, awareness andcompetence
Communication
EMS documentation Document control
Operational control
Emergency preparedness andresponse
Monitoring and measurement Nonconformance and corrective
and preventive action
Records
EMS audit
Management review
EMS Status Contd..
-
8/6/2019 CP at MCPL
11/15
ScopeforfurtherCP Area
Application of advance technology
Use of phase transfer catalyst
Use of different solvent
reduce loss with improved yieldUse of raw material as per stoicheometry
Improvement in energy utilisation
Steam generation
Boiler grate area
-
8/6/2019 CP at MCPL
12/15
Barriers
Financial Strength of SSI unit
Scale of operation
Lack of expertise in many fields
Long term planning & visionR & D and state of art testing facilities
Lack of measuring and monitoring
Historical database
Missing links with academyTechnical literature
New development
Alternatives ..many more
-
8/6/2019 CP at MCPL
13/15
Recommendation
Scope of CP exits everywhere
Make CP a Habit
CP is cyclic process that never ends
Sharing of information benefits bothCP: Avoid, reduce & recycle
CP: Hear, observe & share
Blend of CP with GHK, EMS and Indl
symbiosis benefits individually andcollectively
-
8/6/2019 CP at MCPL
14/15
Acknowledge
We acknowledge sincere thanks
CII
GCPC
GDFE
GPCB
NCPC
NIA
NPC
School of Planning
University of Kaiserslautern, Germany
-
8/6/2019 CP at MCPL
15/15