cp-is implementation forum implementing cp -is at a...

62
CP-IS Implementation Forum Implementing CP-IS at a local authority Presented by Rahial Kazmi Implementation Manager

Upload: phungkhuong

Post on 29-Jun-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

CP-IS Implementation Forum

Implementing CP-IS at a local authority

Presented by Rahial Kazmi

Implementation Manager

Page 2: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Purpose

• Introduction

• Overview implementation lifecycle

• CP-IS lessons learnt

Page 3: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

The implementation process

• Project governance and structure

• Technical

• Business change

• Information governance

• Communication and engagement plus training

Page 4: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

• Leeds City Council

• London Borough of Hackney

CP-IS implementation experience

Page 5: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Project governance and structure

Project team

• Project resource, PM, BA, technical lead, business lead

Governance

• Project board, joint implementation, points of escalation

Page 6: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

The implementation process

Technical

• Connect to the NHS Spine

• Match NHS numbers

• Configure your social care system , UAT

• CP-IS client, end point registration

Business change

• Map your safeguarding processes, capture NHS numbers, DBSB

• Maintain data quality and NHS number matching rate

• Develop business as usual processes

• Manage notifications

• Manage rejection messages

IG

• Engage with lG leads

• Privacy statement

• Access control, audit mechanism

• Business continuity

Comms

• Engage local health and social care organisations

• Engage internal staff

• Set a go-live date and communicate regularly towards this date

• Explain as simply and clearly as possible what is going to happen with all stakeholders

• Ensure everyone is on board, roles and responsibility plus Training

Page 7: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Child Protection - Information Sharing

Lucinda Cain

Page 8: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Leeds

□2nd largest local authority

□172,344 children and young people

□535 children with CP Plans

□1251 children looked after

Page 9: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Leeds and CP-IS

□First upload 29th September 2016

□Connected via the CP-IS Proxy Solution

□Leeds Teaching Hospitals Trust in the process of implementation

□15 notifications of access

Page 10: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Leeds’ Journey

Connectivity Case Management

System

NHS Numbers Business Processes

CP-IS

Page 11: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

What did we need to do?

Page 12: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

How did we do it?

Serv

ice L

ead

Stakeholder engagement

Project management

Data

Lead

SFTP process

Connectivity

Testing

Technic

al Lead

Case management upgrade

Case management design

End to end testing

Applications L

ead

NHS number matching and imports

Page 13: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Things to consider:

□Clear distinction of responsibility

□Relationship with NHS Digital project manager

□Testing

□NHS number processes

□Partner readiness

Page 14: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Who is involved now?

Social workers

Integrated Safeguarding

Unit

Applications team

Business Partners

Page 15: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

What has changed?

□ Building a picture about how often children placed out of area are attending unscheduled settings.

□ Closer relationships with health partners as we work with them to implement in unscheduled health settings.

□ Process to establish the positive impact of information sharing between settings.

Page 16: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

What’s next?

□NHS Numbers

□LTHT go live

□Other unscheduled settings

□Continued analysis of the impact

Page 17: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Implementing CP-IS at a local authority

Jeremy Tuck and Joanne Ridgley

BREAK-OUT SESSION

27 April 2017

Page 18: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

The Importance of governance and

project collaboration

Page 19: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Local (Hackney) Project Board and Team

PROJECT BOARD

• Project Sponsor: Rotation Senior Managers Children’s / Adults

• Senior Supplier: ICT

• Senior Users: Social Care

PROJECT TEAM

• Project manager (Jeremy Tuck)

• Social Care Practice Lead (social worker – Joanne Ridgley)

• Children’s Social Care business reps

• Technical lead – network, system config, data integrity

• Mosaic Configuration expert – configure workflow

Page 20: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Project teams and BAU teams

• Project teams always seem to be able to implement a piece of work

and then are on their way with all that tacit knowledge!

• Ensure BAU ICT teams are involved in ALL aspects of the work –

being clear that the Project must deliver to time:

• Invited to project team meetings

• Held specific training sessions

• If the BAU teams are not able to manage you haven’t succeeded

• Ensure Practitioners are involved in discussions with the Trust, the

comms and take them through the NHS Digital plan

Page 21: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

The use of Project Collaboration Tools

Page 22: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Federating project team actions in a user-friendly way Wunderlist – task management tools

Page 23: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Cross-reference the NHS Digital Plan Health Integration Platform: END PROJECT REPORT Page 20 of 29

ref Output Fit for purpose measure Ext. ref Status

Document Number: 18150411 Document Name: HIP End Project Report

14 HIE API Transition Into Service Agreed The HIE Transition Into Service document provides all the necessary information for ongoing support.

Follow On Action

5.3 Child Protection Information Sharing (CP-IS)

15 Letter of Agreement Letter signed and in place HSCIC pre 2a

Completed (waivered)

16 Letter of Acceptance Successful receipt of letter of acceptance HSCIC pre 2b

Completed (waivered)

17 Servelec Corelogic CP-IS Go-Live Plan Agreement with Servelec Corelogic of the approach

HSCIC 3 Complete

18 Email to NHS Digital of go live date Delivery of the Email to NHS Digital HSCIC 4 Complete

19 Briefings to LBH CYPS Local Safeguarding Boards and Primary NHS Trusts

Briefings delivered HSCIC 5 Complete

20 CP-IS Communications Plan CP-IS part of the project Comms Plan HSCIC 6 Complete

21 CP-IS Solution Design document The design document appropriately describes the scope and nature of the way in which safeguarding alerts will be delivered to the N3 Spine.

S75. c Complete

22 CP-IS Configuration Requirement Document

Hardware requirements completed HSCIC 7a Complete

23 Order for extending N3 for CP-IS use Agreement received from ICT Technical Services

HSCIC 8 Complete

24 CP-IS Test Plan Test Plan in place HSCIC 10 Complete

25 CP-IS N3 Readiness Action Plan List of actions that appropriately describe all obstacles and issues to resolve in order to secure the N3 access needed to enable CP-IS to go live for Spine Safeguarding alerts

Complete

Page 24: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Project dependencies – upgrading Mosaic

November 2016 December 2016 January 2017

2016

01 02 03 04 07 08 09 10 11 14 15 16 17 18 21 22 23 24 25 28 29 30 01 02 05 06 07 08 09 12 13 14 15 16 19 20 21 22 23 26 27 28 29 30

2017

02 03 04 05 06 09 10 11 12 13 16

project: Homerton Integration Platform

last update:

Activity Due date

Non-working

IN PROGRESS: HIE Portal

IN PROGRESS: Data Stream

IN PROGRESS: Hospital Sharing

Hospital Sharing BUILD work

CP-IS Business Analysis

PID 27: CP-IS Business Analysis 'to be'

PID 51: Agree process for managing Acknowledgement response …

PID 43: Business continuity plans amended

PID 44: Update Privacy Statement

PID 50: Complete local Risk Assessment

CP-IS : Mosaic TEST Configuration

CP-IS Build in test

Build Checklist

Build forms (PID35&36)

Build workflow in TEST

Revise forms or workflow following service design comme …

CP-IS : Testing

PID 40: Prepare CP-IS Test scripts

Advise of time scales needed to build on go-live weekend

Testing by Project Team

Demo changes to Managers

UAT with CYPS testers

Iteration and Re-testing

Sign off by UAT testers

Test with Live records

Sign off for go live

CP-IS Technical readiness

LO: Leave

Mosaic 5.13 in place

Develop the tool for validating NHS number

Install NHS Numbers Tool

PID 24: Prepare supplier technical tests

PID 33: Manage CP-IS Client Installation

PID 34: Configure Network for Messaging

PID 64: Bulk upload CP-IS records NHS Number Matching (M …

Checklist

Agree the process for uploading these into Mosaic

Get the batch match back from NHS Digital

Match any other records via PDS tool

Test on CP-IS environment

Upload them into Mosaic

CMR

CAB

Go-live

CP-IS Training

PID 46: Prepare for CP-IS Training

PID 47: Undertake CP-IS training

PID 48: Staff trained on CP-IS (milestone)

PID 49: Train users on the business process for NHS Numbers

CP-IS Go-Live

Agree the go-live date and plan

PID 18: Email to HSCIC of go live date

PID 45: Email NHS Digital about go live

PID 55: Ensure all tasks on LA Checklist completed

Prepare CMR

Achieve CAB agreement

PID 53: Provide Go live statistics

Update all CP / LAC records with NHS Nos

Test go-live configuration

Go Live

PID 56: Business Go Live (BGL)

Floor walking

Xmas Support

New Year Floorwalking

PID 54: Complete Lessons Learnt template

PID 58: Confirmation adoption of CP-IS and transition into Business …

CP-IS Handover

PID 52: Familiarise staff with the Incident Support Model

PID 57: Ensure CP-IS is Accepted Into Service

Not started : Project Management

Not Started : Data stream

Not Started : Hospital Sharing

Not Started : HIE Portal

Health Analysis not started B

Create Wunderlist Task

Completed in Wunderlist

Card

Mosaic Upgrade

NHS Numbers Tool

NHS Final Matching

Go Live

Page 25: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Pre and post go live, and floorwalking

November 2016 December 2016 January 2017

2016

01 02 03 04 07 08 09 10 11 14 15 16 17 18 21 22 23 24 25 28 29 30 01 02 05 06 07 08 09 12 13 14 15 16 19 20 21 22 23 26 27 28 29 30

2017

02 03 04 05 06 09 10 11 12 13 16

project: Homerton Integration Platform

last update:

Activity Due date

Non-working

IN PROGRESS: HIE Portal

IN PROGRESS: Data Stream

IN PROGRESS: Hospital Sharing

Hospital Sharing BUILD work

CP-IS Business Analysis

PID 27: CP-IS Business Analysis 'to be'

PID 51: Agree process for managing Acknowledgement response …

PID 43: Business continuity plans amended

PID 44: Update Privacy Statement

PID 50: Complete local Risk Assessment

CP-IS : Mosaic TEST Configuration

CP-IS Build in test

Build Checklist

Build forms (PID35&36)

Build workflow in TEST

Revise forms or workflow following service design comme …

CP-IS : Testing

PID 40: Prepare CP-IS Test scripts

Advise of time scales needed to build on go-live weekend

Testing by Project Team

Demo changes to Managers

UAT with CYPS testers

Iteration and Re-testing

Sign off by UAT testers

Test with Live records

Sign off for go live

CP-IS Technical readiness

LO: Leave

Mosaic 5.13 in place

Develop the tool for validating NHS number

Install NHS Numbers Tool

PID 24: Prepare supplier technical tests

PID 33: Manage CP-IS Client Installation

PID 34: Configure Network for Messaging

PID 64: Bulk upload CP-IS records NHS Number Matching (M …

Checklist

Agree the process for uploading these into Mosaic

Get the batch match back from NHS Digital

Match any other records via PDS tool

Test on CP-IS environment

Upload them into Mosaic

CMR

CAB

Go-live

CP-IS Training

PID 46: Prepare for CP-IS Training

PID 47: Undertake CP-IS training

PID 48: Staff trained on CP-IS (milestone)

PID 49: Train users on the business process for NHS Numbers

CP-IS Go-Live

Agree the go-live date and plan

PID 18: Email to HSCIC of go live date

PID 45: Email NHS Digital about go live

PID 55: Ensure all tasks on LA Checklist completed

Prepare CMR

Achieve CAB agreement

PID 53: Provide Go live statistics

Update all CP / LAC records with NHS Nos

Test go-live configuration

Go Live

PID 56: Business Go Live (BGL)

Floor walking

Xmas Support

New Year Floorwalking

PID 54: Complete Lessons Learnt template

PID 58: Confirmation adoption of CP-IS and transition into Business …

CP-IS Handover

PID 52: Familiarise staff with the Incident Support Model

PID 57: Ensure CP-IS is Accepted Into Service

Not started : Project Management

Not Started : Data stream

Not Started : Hospital Sharing

Not Started : HIE Portal

Health Analysis not started B

Create Wunderlist Task

Completed in Wunderlist

Card

Mosaic Upgrade

NHS Numbers Tool

NHS Final Matching

Go Live

Page 26: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Plan for the unexpected

• OFSTED inspection

• The need for a full upgrade of Mosaic (required a full mini plan)

• Business Case and justifications about NHS Numbers

Page 27: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Reporting: things that aren’t immediately obvious

• The need to have bespoke CP-IS reports – made sure this was part

of the Business Analysis

• Helped when we started getting loads of notifications

• Reporting affected business choices:

• A key reason for implementing work-steps and NOT case notes

as the means to capture CP-IS notes

Page 28: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Mosaic

Page 29: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Use of Servelec Corelogic Mosaic

• Went live with Children’s in July 2013

• Implemented Adults including Finance in October 2014

• Upgraded to Mosaic in September 2015

• Currently on Mosaic 5.13.0

Page 30: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Need for Health and Social Care integration

• Child Protection Information Sharing (CP-IS)

• Integrated Independence Team – workflow processes and reporting

for SALT

• East London Foundation Trust (Mental Health) – streamline use of

the system and ensure Care Act compliance

• Hospital Social Work team (Hospital admissions and discharges)

• Integrated Learning Disabilities Service – recording across RiO and

Mosaic: from assessments to support plan, sessions and case

closure.

• Statutory reporting and data integrity checking with health (need for

a common identifier)

Page 31: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Information

Governance :

Episodes of Care

Page 32: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Broader Requirement for an NHS Number capability

• Pre-requisite for Child Protection Information Sharing (CP-IS)

• Health and Social Care (Safety and Quality) Act 2015

• Unique identifier

• The ‘duty to share’

• Our commitment in the IG Toolkit (part of N3 compliance)

• Safeguarding delays as the Trust re-enters data

• Unique reference for all data sharing in and with Health

• Other authorities – reliance on manual processes or access to RiO

Page 33: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Who should we hold an NHS No. for?

Mosaic records are created for individuals who are –

• Service Users

• Carers

• Family or household members

• Friends or other

• Adopters and prospective adopters

• Foster carers and prospective foster carers

• Reported Missing by another Local Authority

• Residence order carer, Special Guardianship carer

• Shared lives approved carers and prospective shared lives carers

We shouldn’t hold NHS Numbers for all of the above

Page 34: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Episodes of care

An “episode of care” was locally defined to ensure that we

legitimately hold the NHS number for our service users and carers

ONLY.

‘When an individual has moved beyond a contact stage, and

requires intervention by a Social Care Professional to either keep

them safe, or provide support either during or following an

assessment of need (eg Safeguarding, equipment or direct service

provision)’.

Page 35: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Adult Workflows - Episodes of care

The following Adult Workflows have been identified as being an

‘episode of care’ and where the NHS number should be sought:

Community Care Assessment

Community Care Assessment (MH)

Carer assessment (Adults)

Immediate Services (adults)

Occupational Therapy assessment

Integrated Independence Team Commencement

Review (ASC)

Safeguarding adult manager decision

Sensory assessment

Substance Misuse Team assessment

Mental Health Review

Telecare assessment

Page 36: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Children’s Workflows - Episodes of care

The following Workflows have been identified as being an ‘episode of

care’ and where the NHS number should be sought:

(** NHS Number process already in place for CP-IS related workflows)

Assessment

Private Fostering assessment

SWIS intervention

Prevention and diversion assessment

Targeted assessment

Universal Plus checklist

YH Substance Misuse service assessment

Youth Offending Team (gangs) assessment

Page 37: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

A little bit about the

broader health

integration piece

Page 38: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Cerner Health Information Exchange

Page 39: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Data Sets

• Workshops with Practitioners from Health and Social Care

• City of London and London Borough of Hackney

• Adults and Children’s services

• 3 Phases of data identified: from simple to more comprehensive

• Subject to a Data Sharing Agreement

Shared from Social Care out Shared from Health to Mosaic

Advocate and Next of Kin details Accessible Information Standards Case status (open/closed) Current allocated team/s Current allocated worker/s

Medication List Confirmed Diagnosis Allergies Immunisations Visits

Page 40: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Integrations developed with Servelec Corelogic

Two bits of software developed:

• HIE API – view health data in Mosaic

• MIV (Mosaic Information Viewer) – allow external systems access

Cerner Millennium EPR

Cerner HIE

MIG MOSAIC

HL7 standard

GPs

Hackney

Page 41: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Standard admin configuration

Page 42: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Standard admin configuration

Page 43: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Health Integration

Mosaic

End user experience

Page 44: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a
Page 45: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a
Page 46: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a
Page 47: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a
Page 48: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a
Page 49: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a
Page 50: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a
Page 51: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a
Page 52: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

What social care data

do health see?

Page 53: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a
Page 54: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

• Integrated work done from Hackney’s side

• CCG Cerner supplier to complete their work

• Upgrade Mosaic to v5.13.2 when the Council is ready

• Agree a new Data Sharing Agreement

Cerner Millennium EPR

Cerner HIE

MIG

MOSAIC

HL7 standard

GPs

Hackney

Final steps on the CCG portal integration

Page 55: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Conclusions….

Page 56: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Timeframe

Issues affecting the timeline:

• Improving workflow in Mosaic

• Setting in place a sustainable NHS Number tool

Page 57: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

What worked well

• Checking & Incorporating all aspects of the NHS Digital plan

• Good governance: a project board

• Social Care representation constanty

• NHS Digital support – fortnightly meetings / calls (Mark Wright)

• Good engagement with Local trust (Homerton University Hospital)

• Good weekly team meetings (divided 30 min practice / 30 min tech)

• Communications strategy

• Regular updates

• Senior engagement constantly

• Having a broader technical strategy (e.g. the Building Blocks)

Page 58: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

What could have been improved

• Understanding the way Mosaic needs to be configured

• Working through the process end-to-end (Trust needed to upgrade /

improve their own system, but only knew this at the end)

• PSN Compliance and network configuration genuinely were hard

work – but you can’t anticipate this: rather put in place your best

people

• Broader engagement around NHS Numbers (adults) with NHS

Digital

• Plan for the unexpected – OFSTED had a big impact on momentum

Page 59: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Conclusions and lessons

• Know who will use it: Mosaic Roles across the organisation

• Have you adopted the right functionality (e.g. case histories)

• Work in partnership (City of London - Ellie Ward)

• Closely with Corelogic – and their roadmap

• Making it sustainable: stand-alone and part of BAU (Gabriel Rangel)

• Work with NHS Digital: Issues with the new DAAG process (adults)

• Practice lead and professionalism (Joanne Ridgley)

• Technically and IG savvy: APIs, consent and Network config.

• Present and let all know what you’re doing

• Know what your own roadmap (next release)

Page 60: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

Contacts

Hackney Council:

• Lisa Aldridge ([email protected])

• Ross Tuckley ([email protected])

Independently

• Jeremy Tuck ([email protected])

• Joanne Ridgley ([email protected])

Page 61: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

61

Questions?

Page 62: CP-IS Implementation Forum Implementing CP -IS at a …files-eu.clickdimensions.com/hscicgovuk-amnje/files/6.implementing... · CP-IS Implementation Forum Implementing CP-IS at a

www.digital.nhs.uk

@nhsdigital

[email protected]

0300 303 5678

www.digital.nhs.uk/cpis