CP10 To Be Process Overview1High Level Overview2

40-60 Reads per bundled CP10 Read Order- try limit order duration to about 6 hours to allow Click to schedule order.6 mins per CP10 inspectionDouble check with Click on max duration per orderLeverage E_138 to notify FPA, SPS, ClerkUse E_138 to create notifications for follow up workCheck CP10 object type is different for SCG will not use E_151All CP10 FLOCs need a CP1O Measurement Point associated with it- E_158 Creates maintenance plan and measurement point.Read to add CP10 Read field on the GSO.2Replace/ Reinstate Anode 3

Already knows that the anode will bring the CP Service up NOT to testOtherwise initiate trouble shooting Let CP determine if it needs to be replacedIf not op qual and use and assist - is it OK to record the Op qual persons name3Riser/ Service Replacement4

What do we do for isolated mains?? Currently do not have mains in SAP.4Insulate MSA5

CGI (Could not Get In)6

CP10 Condition No Longer Exists7

Find out from Pete what values are required for E_158 to remove FLOC from maintenance plan. Code needs to be sent from the CP10 inspection order.7CP10 Trouble Shooting Order8

What are the requirements for CP10 troubleshooting order.8