Project : BAGUIO TECHNOHUB CAMPUS, BPO-A
Location : Camp John Hay, Baguio City
Subject : CPM Network
EVENT ACTIVITY
1 - 2 Mobilization
2 - 3 Application for Excavation Permit
2 - 5 Preparation of Permit Plans & Application for Bldg. Permit
3 - 4 Temfacil / staking-out
4 - 6 Excavation & Trimming for Footing & Foundation
5 - 6 Dummy
6 - 7 Fabrication & Installation, Rebars for Foundation
& Columns (fisrt lift)
7 - 8 Concreting of foundation
8 - 9 Formworks, Foundation to Ground Level Columns
9 - 10 Concreting of Columns, Foundation to Ground level
6 - 11 Fabrication of Forms for Beams & Slabs
8 - 12 Rebars; Columns splicing & ties, shear wall & stairs from
ground to second level
10 - 13 Backfill and Compaction
11 - 13 Dummy
13 - 14 Rebars for slab on fill
13 - 14a Roughing-ins for MEPF at ground level
14 - 15 Concreting of slab on fill
14a - 14 Dummy
15 - 16 Formworks for Columns; Shear wall & stairs from
ground to second floor
15 - 19a CHB installation; ground to second level16 - 17 Concreting of Columns, Shear Walls & Stairs
ground to second level
17 - 18 Rebars; Beams and slabs for second floor
17 - 19 Formworks; Beams and slabs for second floor
17 - 17a Roughing-ins for MEPF at second floor
17a - 19 Dummy
19 - 20 Concreting; Beams and slabs for second floor
20 -21 Rebars; Columns splicing & ties, shear wall & stairs from
second to third level
21 - 22 Formworks for Columns; Shear wall & stairs from
second to third floor22 - 23 Concreting of Columns, Shear Walls & Stairs
second to third level
23 - 25 Formworks; Beams and slabs for third floor
23 - 24 Rebars; Beams and slabs for third floor
23 - 25a Roughing-ins for MEPF at third floor
20 - 25b CHB installation; second to third level
25a - 25 Dummy
25 - 26 Concreting; Beams and slabs for third floor
26 - 27 Rebars; Columns splicing & ties, shear wall & stairs from
-
8/7/2019 CPM Network_Event Description-edited for printing
2/12
EVENT ACTIVITY
third to fourth level
25b - 28 Dummy
27 - 28 Formworks for Columns; Shear wall & stairs from
third to fourth floor
28 - 29 Concreting of Columns, Shear Walls & Stairs
third to fourth level
29 -30 Formworks; Beams and slabs for fourth floor
29 - 31 Rebars; Beams and slabs for fourth floor
30 - 31 Dummy
31a - 32 Roughing-ins for MEPF at fourth floor
31 - 32 Concreting; Beams and slabs for fourth floor
32 - 33 Rebars; Columns, shear wall & stairs from
fourth level to roofdeck
28 - 33a CHB installation; third to fourth level
33 - 34 Formworks for Columns; Shear wall & stairs from
fourth floor to roofdeck
33a - 34 Dummy
34 - 35 Concreting of Columns, Shear Walls & Stairs
fourth level to roofdeck
35 - 36 Formworks; Beams and slabs at roofdeck
35 - 37 Rebars; Beams and slabs at roofdeck
35 - 37a Roughing-ins for MEPF at roofdeck
37 - 38 Concreting; Beams and slabs at roofdeck
37a - 37 Dummy
38 - 39 Installation of Structural Roof framings at roofdeck
39 - 40 Roofing works
38 - 41 CHB installation; fourth level to roofdeck37 - 41 Ceiling and Partitions, ground to fourth floor
40 - 43 Wall finishes at roofdeck
41 - 42 Wall finishes, ground to fourth floor
41 - 42b Tile Works
20 - 34a Duct works and refrigerant piping
40 - 42a Fire Protection Works
40 - 44 Electrical & Auxiliary Works
44 - 45 Elevator Works
43 - 46 Fabrication, Delivery for Interior Fit-out
43 - 45a Pumps and accessories
46 - 47 Testing & Commissioning
47 - 48 Turn-over
48 - 49 Occupancy Permit
49 - 50 Dummy
47 - 50 Demobilization
Prepared by:
-
8/7/2019 CPM Network_Event Description-edited for printing
3/12
EVENT ACTIVITY
EXCELL CONTRACTORS AND DEVELOPERS, INC.
-
8/7/2019 CPM Network_Event Description-edited for printing
4/12
DURATION
10
9
44
11
30
0
7
3
2
1
30
11
15
0
2
2
1
0
2
101
6
7
3
0
1
2
2
1
5
4
3
10
0
1
2
-
8/7/2019 CPM Network_Event Description-edited for printing
5/12
DURATION
0
2
1
5
4
0
3
1
2
10
2
0
1
5
4
3
1
0
2
3
1030
20
31
30
34
30
40
5
65
9
5
3
7
0
5
-
8/7/2019 CPM Network_Event Description-edited for printing
6/12
DURATION
-
8/7/2019 CPM Network_Event Description-edited for printing
7/12
1 2 3 4 5 6 7 8 9 10 11 12
-
8/7/2019 CPM Network_Event Description-edited for printing
8/12
47
48
227
230
227
230
-
8/7/2019 CPM Network_Event Description-edited for printing
9/12
-
8/7/2019 CPM Network_Event Description-edited for printing
10/12
49
50
237
237
237
237
-
8/7/2019 CPM Network_Event Description-edited for printing
11/12
25 26 27 28 29 30
-