  • 8/7/2019 CPM Network_Event Description-edited for printing

    1/12

    Project : BAGUIO TECHNOHUB CAMPUS, BPO-A

    Location : Camp John Hay, Baguio City

    Subject : CPM Network

    EVENT ACTIVITY

    1 - 2 Mobilization

    2 - 3 Application for Excavation Permit

    2 - 5 Preparation of Permit Plans & Application for Bldg. Permit

    3 - 4 Temfacil / staking-out

    4 - 6 Excavation & Trimming for Footing & Foundation

    5 - 6 Dummy

    6 - 7 Fabrication & Installation, Rebars for Foundation

    & Columns (fisrt lift)

    7 - 8 Concreting of foundation

    8 - 9 Formworks, Foundation to Ground Level Columns

    9 - 10 Concreting of Columns, Foundation to Ground level

    6 - 11 Fabrication of Forms for Beams & Slabs

    8 - 12 Rebars; Columns splicing & ties, shear wall & stairs from

    ground to second level

    10 - 13 Backfill and Compaction

    11 - 13 Dummy

    13 - 14 Rebars for slab on fill

    13 - 14a Roughing-ins for MEPF at ground level

    14 - 15 Concreting of slab on fill

    14a - 14 Dummy

    15 - 16 Formworks for Columns; Shear wall & stairs from

    ground to second floor

    15 - 19a CHB installation; ground to second level16 - 17 Concreting of Columns, Shear Walls & Stairs

    ground to second level

    17 - 18 Rebars; Beams and slabs for second floor

    17 - 19 Formworks; Beams and slabs for second floor

    17 - 17a Roughing-ins for MEPF at second floor

    17a - 19 Dummy

    19 - 20 Concreting; Beams and slabs for second floor

    20 -21 Rebars; Columns splicing & ties, shear wall & stairs from

    second to third level

    21 - 22 Formworks for Columns; Shear wall & stairs from

    second to third floor22 - 23 Concreting of Columns, Shear Walls & Stairs

    second to third level

    23 - 25 Formworks; Beams and slabs for third floor

    23 - 24 Rebars; Beams and slabs for third floor

    23 - 25a Roughing-ins for MEPF at third floor

    20 - 25b CHB installation; second to third level

    25a - 25 Dummy

    25 - 26 Concreting; Beams and slabs for third floor

    26 - 27 Rebars; Columns splicing & ties, shear wall & stairs from

  • 8/7/2019 CPM Network_Event Description-edited for printing

    2/12

    EVENT ACTIVITY

    third to fourth level

    25b - 28 Dummy

    27 - 28 Formworks for Columns; Shear wall & stairs from

    third to fourth floor

    28 - 29 Concreting of Columns, Shear Walls & Stairs

    third to fourth level

    29 -30 Formworks; Beams and slabs for fourth floor

    29 - 31 Rebars; Beams and slabs for fourth floor

    30 - 31 Dummy

    31a - 32 Roughing-ins for MEPF at fourth floor

    31 - 32 Concreting; Beams and slabs for fourth floor

    32 - 33 Rebars; Columns, shear wall & stairs from

    fourth level to roofdeck

    28 - 33a CHB installation; third to fourth level

    33 - 34 Formworks for Columns; Shear wall & stairs from

    fourth floor to roofdeck

    33a - 34 Dummy

    34 - 35 Concreting of Columns, Shear Walls & Stairs

    fourth level to roofdeck

    35 - 36 Formworks; Beams and slabs at roofdeck

    35 - 37 Rebars; Beams and slabs at roofdeck

    35 - 37a Roughing-ins for MEPF at roofdeck

    37 - 38 Concreting; Beams and slabs at roofdeck

    37a - 37 Dummy

    38 - 39 Installation of Structural Roof framings at roofdeck

    39 - 40 Roofing works

    38 - 41 CHB installation; fourth level to roofdeck37 - 41 Ceiling and Partitions, ground to fourth floor

    40 - 43 Wall finishes at roofdeck

    41 - 42 Wall finishes, ground to fourth floor

    41 - 42b Tile Works

    20 - 34a Duct works and refrigerant piping

    40 - 42a Fire Protection Works

    40 - 44 Electrical & Auxiliary Works

    44 - 45 Elevator Works

    43 - 46 Fabrication, Delivery for Interior Fit-out

    43 - 45a Pumps and accessories

    46 - 47 Testing & Commissioning

    47 - 48 Turn-over

    48 - 49 Occupancy Permit

    49 - 50 Dummy

    47 - 50 Demobilization

    Prepared by:

  • 8/7/2019 CPM Network_Event Description-edited for printing

    3/12

    EVENT ACTIVITY

    EXCELL CONTRACTORS AND DEVELOPERS, INC.

  • 8/7/2019 CPM Network_Event Description-edited for printing

    4/12

    DURATION

    10

    9

    44

    11

    30

    0

    7

    3

    2

    1

    30

    11

    15

    0

    2

    2

    1

    0

    2

    101

    6

    7

    3

    0

    1

    2

    2

    1

    5

    4

    3

    10

    0

    1

    2

  • 8/7/2019 CPM Network_Event Description-edited for printing

    5/12

    DURATION

    0

    2

    1

    5

    4

    0

    3

    1

    2

    10

    2

    0

    1

    5

    4

    3

    1

    0

    2

    3

    1030

    20

    31

    30

    34

    30

    40

    5

    65

    9

    5

    3

    7

    0

    5

  • 8/7/2019 CPM Network_Event Description-edited for printing

    6/12

    DURATION

  • 8/7/2019 CPM Network_Event Description-edited for printing

    7/12

    1 2 3 4 5 6 7 8 9 10 11 12

  • 8/7/2019 CPM Network_Event Description-edited for printing

    8/12

    47

    48

    227

    230

    227

    230

  • 8/7/2019 CPM Network_Event Description-edited for printing

    9/12

  • 8/7/2019 CPM Network_Event Description-edited for printing

    10/12

    49

    50

    237

    237

    237

    237

  • 8/7/2019 CPM Network_Event Description-edited for printing

    11/12

    25 26 27 28 29 30

  • 8/7/2019 CPM Network_Event Description-edited for printing

    12/12