CPV DCS STATUS REPORT

Mikhail Bogolyubsky (IHEP, Protvino)Serguei Sadovsky (IHEP, Protvino)

CERN, DCS meeting, 30 January, 2007.

2006 DCS planning, CPV

DCS planning meeting 13.03.2006:

Detector CPV: D = 01.12.07 => D = 1-st Shut Down in 2008 (D - Date of the detector installation in the pit)

CPV FSM Pre-commissioning in Lab/CERN/SXL2 Who responsible Ready when?– Integrate all sub-systems in the DETECTOR FSM A.M., M.B. 01.07.07– Implement software interlocks (if required) A.M., M.B. 01.07.07 – Implement operations panels A.M., M.B. 01.07.07

• < D-4 weeks

• Commissioning at P2 – Hand-over PVSS project to ACC for verific.& integration S.S., M.B., A.M. D-4 weeks – Install PVSS project in server at P2 ACC D-2– Commission with sub-systems at P2 A.M., M.B. D-2– Commission the DETECTOR DCS with PHOS A.M., M.B. D– Commission together with other detectors A.M., M.B.,VO +All D+?

2006 DCS planning, CPV (2)

LV PS Pre-commissioning in Lab/CERN/SXL2 Who responsible Ready when?– Implement a “Lab setup”: PVSS-OPC-device M.B., A.M. 01.07.07– Implement FSM M.B., A.M. 01.07.07

– Implement the PVSS configuration, archival and alarms M.B., A.M. 01.07.07– Implement software interlocks (if required) M.B., A.M. 01.07.07 – Implement operations panels M.B., A.M. 01.07.07

• < D-4 weeks• Commissioning at P2• Hand-over PVSS project to ACC for verific.& integrat. S.S., M.B, A.M. D-4 weeks

– Install PVSS project in server at P2 ACC D-2– Install, cable & commission the LV PS devices at P2 V.V. D-2– Commission the LV PS devices with detector M.B., A.M. D

D = 1-st Shut Down in 2008 (D - Date of the detector installation in the pit)

2006 DCS planning, CPV (3)

HV PS Pre-commissioning in Lab/CERN/SXL2 Who responsible Ready when?– Implement a “Lab setup”: PVSS-OPC-device M.B., V.O. 01.07.06– Implement FSM M.B., V.O. 01.07.06

– Implement the PVSS configuration, archival and alarms M.B., V.O. 01.07.06– Implement software interlocks (if required) M.B., V.O. 01.07.06 – Implement operations panels M.B., V.O. 01.07.06

• < D-4 weeks• Commissioning at P2• Hand-over PVSS project to ACC for verific.& integrat. S.S., M.B, V.O. D-4

weeks– Install PVSS project in server at P2 ACC D-2– Install, cable & commission the HVPS devices at P2 V.V. D-2– Commission the HV PS devices with detector M.B., V.O. D

D = 1-st Shut Down in 2008 (D - Date of the detector installation in the pit)

2006 DCS planning, CPV (4)

Temperature Monitor Pre-commissioning in Lab/CERN/SXL2 Who responsible Ready when?– Implement a “Lab setup”: CRW-DAQ A.M., M.B. 01.08.07– Implement FSM A.M., M.B. 01.08.07

– Implement the PVSS configuration, archival and alarms A.M., M.B. 01.08.07– Implement software interlocks (if required) A.M., M.B. 01.08.07 – Implement operations panels A.M., M.B. 01.08.07

• < D-4 weeks• Commissioning at P2• Hand-over PVSS project to ACC for verific.& integration S.S., A.M., M.B. D-4 weeks

– Install PVSS project in server at P2 ACC D-2– Install, cable & commission the COOLING plant at P2 V.V. D-2– Commission the COOLING plant with detectorV.V., A.M., M.B. D

D = 1-st Shut Down in 2008 (D - Date of the detector installation in the pit)

GAS (Ar+CO2) Commissioning at P2 Who responsible Ready When? -- Hand-over PVSS project to ACC for verific. & integration GWG 1.08.06 -- Install PVSS project in server at P2 ACC 1.08.06 -- Install, cable & commission the GAS system at P2 GWG 1.08.06 -- Commission the GAS system with detector S.S., V.V., M.B. D < D-4 weeks

Detector

PVSS II PVSS II

Detector

Ethernet

Database(s)

OPCclient

DIMclient

3020

Detector(Ni100 sensors)

32

High Voltage Low Voltage Temp. Monitor

User interface

PVSS II

HV LV

PHOS-CPVC

on

tro

l ro

om

(A

CR

)[UI node]

ELMB

27/10/05

CR4-Y10

SY2527(2*A18833P)

Ethernet

E

CR3

CAEN OPCserver

PVSS IIOPC client

1

UX-C16

Wiener

E

CR3

Wiener OPCserver

PVSS IIOPC client

3

CR3

PCI-CAN

ELMB OPCserver

PVSS IIOPC client

C

1ACC

1

CR3

SG2

CR5

SG2

Gas system

PLC

Gas

E

Detector

PVSS IIDIP

[GWG]

Gas

GasPVSS

1

2 2 2

FSM of the CPV Detector

CPV Top Level Diagram

Wiener Crate State Diagram

Wiener Channel State Diagram

Wiener Control State Diagram

Wiener State Diagrams

Start Menu PVSS II 3.1 Console

Launching of the CPV DCS, screenshots

CPV top level, screenshots

Manage Wiener LV PS

LV channel setting, screenshots

Wiener power supplies in the Lab

Devise Editor and Navigator, screenshots

NOT_READY -> GO_READY

Remote Monitoring:

What is Ready & in Progress

• CPV FSM – in a good progress (the first prototype exists)

• LV Power supplies of the Wiener type – almost ready

• HV Power supplies of the CAEN type – TBD (the same as in HMPID)

• Temperature monitoring (ELMB) – TBD (the same as in PHOS)

• Gas system – almost ready (GWG)

• Connection of top the CPV Level with the top PHOS Level – TBD