Arun Bhimani, S.E.PresidentLiftech Consultants Inc.
Crane Loads & Wharf Structure Design:Putting the Two TogetherAAPA Facilities Engineering SeminarJanuary 2006 – Jacksonville, Florida
Erik Soderberg, S.E.PrincipalLiftech Consultants Inc.www.liftech.net
![Page 2: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/2.jpg)
2 of 77
Crane Size Growth:1st Container Crane & Jumbo Crane
![Page 3: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/3.jpg)
3 of 77
Crane Service Wheel LoadsWaterside Operating Wheel Loads
Year Manufactured
Whe
el L
oad
(t)
0102030405060708090
100
1960 1970 1980 1990 2000
![Page 4: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/4.jpg)
4 of 77
Crane LoadsCrane loads increasingConsequences of misapplication more severeCodes becoming more complexChance of engineering errors increasing
![Page 5: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/5.jpg)
5 of 77
Presentation OutlineThe Problem – Overview Wharf Designer’s PerspectiveCrane Designer’s PerspectivePutting the Two TogetherQ&A and Feedback
![Page 6: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/6.jpg)
6 of 77
The Problem – Overview
Crane Purchaser
WharfDesigner
CraneSupplier
PortConsultant
![Page 7: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/7.jpg)
7 of 77
Crane Purchaser DifficultiesPurchaser specified
“Allowable wheel load: 200 kips/wheel”
Suppliers submitSupplier A 180 k/wheelSupplier B 200 k/wheelSupplier C 220 k/wheel
Which suppliers are compliant?
![Page 8: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/8.jpg)
8 of 77
Crane Supplier DifficultyPurchaser specified
Allowable wheel load: 200 kips/wheel
In some cases, linear load (kips/ft)
Not definedOperating or out-of-service?
Service or factored?
Wind profile?
Increase for storm condition?
![Page 9: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/9.jpg)
9 of 77
Wharf Designer DifficultyClient provides limited crane load data
No loading pattern
No basis given – Service or factored?
Same loads given for landside and waterside
No details of wind or seismic criteria
![Page 10: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/10.jpg)
10 of 77
Wharf Designer PerspectiveCodes and Design Principle
Crane Girder Design
Design for Tie-down Loads
Crane Stop Design
Seismic Design Considerations
![Page 11: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/11.jpg)
11 of 77
Codes and Design Principle
![Page 12: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/12.jpg)
12 of 77
Crane FEM, DIN, BS, AISC …, Liftech
Wharf StructuresACI 318 Building Code and Commentary ASCE 7-05 Minimum Design Loads for Buildings and
Other StructuresAISC Steel Construction
Manual
Design Codes & Standards
![Page 13: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/13.jpg)
13 of 77
Required Strength ≤ Design Strength
Required Strength = ∑ Service Loads * Load Factors
Design Strength = Material Strength * Strength Reduction Factor Ф
Design Principle - Wharf Structure DesignLoad Resistance Factored Design (LRFD)
![Page 14: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/14.jpg)
14 of 77
0.900.90Ten
Concrete Ф Factors
0.70/.65
0.75/.70
Comp
0.750.85
ShearLoad FactorsACI 318
1.6*1.61.2from 2002
1.31.71.4to 2001WLD
* 1.3 if directionality factor is not included
Load Factors & Ф Factors
![Page 15: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/15.jpg)
15 of 77
Generally use service loads
Factor of safety typically 2.0
Design Principle – Soil CapacityAllowable Stress Design
![Page 16: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/16.jpg)
16 of 77
Crane Girder Design
![Page 17: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/17.jpg)
17 of 77
Required Crane Geometry DataSill BeamTie-downs
Stowage pin
Bumper
(n-1) S
C craneLn = number of wheels per cornerS = average wheel spacing
![Page 18: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/18.jpg)
18 of 77
Typical Wheel Loading Geometry
7 at 5’
9’ 7 at 5’
40’ 4’ 40’
Typical Wheel Spacing
Recommended Wheel Design Load Geometry
![Page 19: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/19.jpg)
19 of 77
Wharf LoadsD – Wharf structure self weightL – Wharf live load, includes containers and yard equipment (does not control)
Crane Loads (ASCE 7-05)D – Weight of crane excluding lifted loadL – Lifted load or rated capacity
Dead Loads and Live Loads
![Page 20: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/20.jpg)
20 of 77
ACI Load Factors – Crane Loading
Load FactorsACI 318
1.301.61.2from 20021.451.71.4to 2001
CompositeLDYear
Some designers treat crane dead load as live load and use the 1.6 factor. This results in 23% overdesign; 1.6 / 1.3 = 1.23.
![Page 21: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/21.jpg)
21 of 77
Example Combination Table: Service Wheel LoadsMode Operating Stowed
WOP1 WOP2 WOP3 WOP4 WS1 Dead Load DL 1.0 1.0 1.0 1.0 1.0 Trolley Load TL 1.0 1.0 1.0 1.0 1.0 Lift System LS 1.0 1.0 1.0 1.0 Lifted Load LL 1.0 1.0 1.0 Impact IMP 0.5 Gantry Lateral LATG 1.0 Op. Wind Load WLO 1.0 1.0 Stall Torque Load STL 1.0 Collision Load COLL 1.0 Storm Wind Load WLS 1.0 Earthquake Load EQ
50 x S 70 x S Allowable Wheel Loads (tons/wheel)
LS WS 65 x S 90 x S
S = Average spacing, in meters, between the wheels at each corner.Example: S = 1.5 m, Allowable LS Operating = 50 t/m * 1.5 m = 75 t/wheel
![Page 22: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/22.jpg)
22 of 77
Example Combination Table: Factored Wheel LoadsMode Operating Stowed
WOP1 WOP2 WOP3 WOP4 WS1 Dead Load DL 1.2 1.2 1.0 1.0 1.2 Trolley Load TL 1.2 1.2 1.0 1.0 1.2 Lift System LS 1.2 1.2 1.0 1.2 Lifted Load LL 1.6 1.6 1.0 Impact IMP 0.8 Gantry Lateral LATG 0.8 Stall Torque Load STL 1.0 Collision Load COLL 1.0 Storm Wind Load WLS 1.6 Earthquake Load EQ
60 x S 80 x S Allowable Wheel Loads (tons/wheel)
LS WS 75 x S 100 x S
S = Average spacing, in meters, between the wheels at each corner.Example: S = 1.5 m, Allowable WS Storm = 100 t/m * 1.5 m = 150 t/wheel
![Page 23: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/23.jpg)
23 of 77
Design for Tie-down Loads
![Page 24: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/24.jpg)
24 of 77
Multiple Tie-downs at a Corner
Uneven tie-down forces
![Page 25: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/25.jpg)
25 of 77
Causes of Uneven Distribution Some reasons why forces are not evenly distributed:
Crane deflection
Contruction tolerances
Wharf pins not centered
Links not perfectly straight due to friction
Undeflected Shape
Deflected Shape
![Page 26: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/26.jpg)
26 of 77
Tie-down LoadsManufacturers typically provide the service corner uplift force
Needed data:
Factored corner uplift force
Distribution between tie-downs
Direction of force (allow for slight angle)
![Page 27: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/27.jpg)
27 of 77
Crane Stop Design
![Page 28: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/28.jpg)
28 of 77
0
1 0
2 0
3 0
4 0
5 0
6 0
7 0
-1 4 9 1 4 1 9 2 4
Bumper Load Provided by Manufacturer
Rated Bumper ReactionBumpers sized for collision at maximum gantry speed
Does not address runaway crane
H
Displacement
HV slow
V gantry
V runaway crane
Displacementmetering pin
gas
oil
![Page 29: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/29.jpg)
29 of 77
H= maximum load that can develop, i.e. the load at which the crane tips.
D = crane weight
H = approximately 0.25 x D per stop
Recommended Crane Stop Design Load
H
D
DH
Tipping Force
Stability Stool
![Page 30: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/30.jpg)
30 of 77
The mass of typical jumbo A-frame cranes can be ignored
For certain wharves and cranes, a time-history analysis may be necessary
Large, short duration wheel loads can be ignored
Localized rail damage may occur
The crane may derail
Wharf Seismic Design – Crane Loading
![Page 31: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/31.jpg)
31 of 77
Crane Designer PerspectiveBasic LoadsStorm Wind LoadLoad Combinations and FactorsTie-down Loads
![Page 32: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/32.jpg)
32 of 77
Basic Loads
![Page 33: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/33.jpg)
33 of 77
Dead and Live Loads
DL: Crane structure weightTL: Trolley structure weightLS: Lift System Weight
LL: Rated container load
Dead Loads Live Loads
Crane
Rated Load
Lift System
Trolley
![Page 34: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/34.jpg)
34 of 77
Inertial LoadsIMP: Vertical impact due to hoist
acceleration
LATT: Lateral due to trolley acceleration
LATG: Lateral due to gantry acceleration
![Page 35: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/35.jpg)
35 of 77
Overload
COLL: Crane Collision
SNAG: Snagging headblock
STALL: Stalling hoist motors
Normally do not control
![Page 36: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/36.jpg)
36 of 77
Environmental Loads
WLO: Wind load operating (In-Service)
WLS* : Wind load storm (Out-of-Service)
EQ: Earthquake load
*Often a major source of discrepancies
![Page 37: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/37.jpg)
37 of 77
Wind Load, Storm
![Page 38: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/38.jpg)
38 of 77
WLS: Out-of-Service WindWind Force = ∑A x Cf x qz
A = Area of crane elementCf = Shape coefficient (including shielding)
qz = Dynamic pressure, function of:
Mean recurrence interval (MRI)
Gust duration
, where Vref is a location-specific, code-specified reference wind speed
Exposure (surface roughness)
2refV Need to
clearly specify
From wind tunnel testing
![Page 39: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/39.jpg)
39 of 77
Shape Coefficient, Cf
Empirical values: FEM, BSI, etc.
Wind tunnel tests are more accurate
Boundary layer
Angled wind effects
Shielding effects
![Page 40: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/40.jpg)
40 of 77
Angled Wind
0 45 90 135 180Rea
ctio
n
Wind Direction, Degrees
Wind Tunnel Test Liftech Equations
Fx Fz
FxFz
![Page 41: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/41.jpg)
41 of 77
WLS: Out-of-Service WindWind Force = ∑A x Cf x qz
A = Area of elementCf = Shape coefficient (including shielding)
qz = Dynamic pressure, function of:
Mean recurrence interval (MRI)
Gust duration
, where Vref is a location-specific, code-specified reference wind speed
Exposure (surface roughness)
2refV Need to
clearly specify
From wind tunnel testing
![Page 42: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/42.jpg)
42 of 77
Mean Recurrence Interval
Years in Operation
.39
.64
.87
.9950
.01
.02
.04
.101
.10
.18
.34
.6410
.64.22100 yrs
.87.4050 yrs
.98.6425 yrs
.99997.9310 yrs10025MRI
Probability of Speed Being Exceeded
Example:Chance of 50-yr wind being exceeded in 25 years: 40%
![Page 43: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/43.jpg)
43 of 77
WLS: Out-of-Service WindWind Force = ∑A x Cf x qz
A = Area of crane elementCf = Shape coefficient (including shielding)
qz = Dynamic pressure, function of:
Mean recurrence interval (MRI)
Gust duration
, where Vref is a location-specific, code-specified reference wind speed
Exposure (surface roughness)
2refV Need to
clearly specify
From wind tunnel testing
![Page 44: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/44.jpg)
44 of 77
Gust Duration
![Page 45: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/45.jpg)
45 of 77
Wind Speed vs. Gust DurationV t
/ Vho
ur
Gust Duration (seconds)Ratio of probable maximum speed averaged over “t” seconds to hourly mean speed. Reference, ASCE 7-05.
( )
( )46.1
52.104.11
min103
min103
sec3
min10min103
VV
VV
VV
VV
VVhourly
hourly
=
⎟⎠⎞
⎜⎝⎛=
⎟⎟⎠
⎞⎜⎜⎝
⎛⎟⎟⎠
⎞⎜⎜⎝
⎛=
Example: converting 10-min speed to 3-sec speed
1.04
1.52
![Page 46: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/46.jpg)
46 of 77
Code Gust Durations
50 yrs3 secHK 2004
50 yrs3 secASCE 7-02
50 yrs10 minFEM 1.004
50 yrs10 minEN 1991-1-4
MRI Gust DurationCode
Code definitions of basic wind speed
![Page 47: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/47.jpg)
47 of 77
Typical Pressure Profiles
Shape of profile depends on surrounding surface roughness
0
25
50
75
100
125
150
175
200
500 1000 1500 2000Wind pressure, Pa
Hei
ght,
m
Smooth gradient
Stepped profile
![Page 48: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/48.jpg)
48 of 77
Variation in WLS
10-20%
113%15.6%
Effect on F *
5-10%
46%7.5%
Effect on V
Open terrain to ocean exposure
Profile
3 sec to 10 min
Gust duration
25 to 50 yrsMRIVariationVariable
*See later slides for effect on calculated tie-down load!
![Page 49: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/49.jpg)
49 of 77
Recommendations for Specifying WLS
Return Period Use 50-yr MRIBasic wind speedGust duration Use local civil codeProfileOther factorsShape coefficients Wind tunnel tests
Do not mix and match between codes for pressure and load factors !
![Page 50: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/50.jpg)
50 of 77
Corner Reactions – Angled Wind
Do not use spreadsheet !
Use frame analysis program
Frame stiffness is significant to reactions
![Page 51: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/51.jpg)
51 of 77
Load Combinations
![Page 52: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/52.jpg)
52 of 77
Load Combinations
Load combinationsOperatingOverloadStorm wind (out-of-service)
Design approaches Generally Allowable Stress Design (ASD)
![Page 53: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/53.jpg)
53 of 77
Operating Condition Loads
DL: Crane weight*
LL: Rated container load
IMP & LAT: Inertial loads
WLO: Wind load, in service
*Excluding Rated Load
![Page 54: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/54.jpg)
54 of 77
Out-of-Service & Overload
DL: Crane weight*
WLS: Wind load storm (out-of-service)
Overload Conditions (in and out-of-service)
*Including trolley and lift system
![Page 55: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/55.jpg)
55 of 77
RecommendationsRequesting crane data
Ask for basic loadsCombine per ACI load factors
Requesting tendersProvide factored load tablesAsk to fill in tablesSpecify allowable factored loads
![Page 56: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/56.jpg)
56 of 77
Tie-down Loads
![Page 57: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/57.jpg)
57 of 77
Tie-Down Failures
![Page 58: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/58.jpg)
58 of 77
Crane Tie-downs
![Page 59: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/59.jpg)
59 of 77
Wind Load & Crane Reactions
FD
wind
Fstow pin
F tie-down
Fgantry
AB
![Page 60: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/60.jpg)
60 of 77
Error in Calculated Tie-down Force
MomentRightingMomentgOverturnin
BD
hFwind ==
2
γ
( ) ( )1
11
21
211
,
,
−−+
=
⎥⎦⎤
⎢⎣⎡ −
⎥⎦⎤
⎢⎣⎡ −+
=γ
γeBDhF
A
BDhFeA
FF
Wind
Wind
CalculatedTiedown
ActualTiedown
Ratio of moments:
Error in calculated tie-down force:if “e” = error in wind force,
DFwind
Fstow pin
Ftie-down
Fgantry
AB
![Page 61: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/61.jpg)
61 of 77
Error in Tie-down ForceTi
edow
n Fo
rce
Rat
io(A
ctua
l/Cal
cula
ted)
, Overturning Moment / Righting Momentγ
0
1
2
3
4
5
1 2 3
20% error in V
10% error in V
5% error in V
No error in V
![Page 62: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/62.jpg)
62 of 77
Example:
Error in calculated tie-down force = 74% !
Tied
own
Forc
e R
atio
(Act
ual/C
alcu
late
d)
, Overturning Moment / Righting Momentγ
0
1
2
3
4
5
1 2 3
20% error in V
10% error in V
5% error in V
No error in V
Error in wind speed = 10%; γ = 1.4Error in wind pressure = 21%
![Page 63: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/63.jpg)
63 of 77
Stability Load Factors
1.3*0.90.9
ACIFactorLoad
1.21.2Wind Load, 50-year MRI
1.01.0TL + LS1.01.0Dead Load
FEMBSI
* 1.6 with ASCE 7-02 “directionality factor”
![Page 64: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/64.jpg)
64 of 77
Uplift: Factored vs. Service
FactoredService
x 1.3 =
x 0.9 =
Load Factor
“Uplift”“No Uplift”+135-50 Calculated Uplift+585+450Wind Load
-450-500Dead Load
Load
![Page 65: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/65.jpg)
65 of 77
Recommended Tie-down Strength RequirementsDesign using Factored Load
Turnbuckle B.S. = 1.6* x factored load
Proof test to 100% of factored load
Structural componentsAllowable stress of 0.9 x Fyield
* 2.5 for off-the-shelf turnbuckles.
![Page 66: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/66.jpg)
66 of 77
Putting the Two Together
![Page 67: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/67.jpg)
67 of 77
Problem OverviewCrane supplier and wharf designer work with incomplete and inconsistent data
Crane supplier generally uses Service Load approach
Wharf designer generally uses Factored Load approach
Neither knows what basis the other uses
![Page 68: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/68.jpg)
68 of 77
Solution
![Page 69: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/69.jpg)
69 of 77
Missing
Link
Crane Purchaser
WharfDesigner
CraneSupplier
Port
Crane purchaser provide or facilitate detailed information
![Page 70: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/70.jpg)
70 of 77
Obtain From Wharf DesignerAssumed wheel arrangement
Service or factored
Load factors
Load combinations for operating, overload, and out-of-service conditions
Complete wind criteria
Allowable wheel loads, kips/ft** Crane supplier tends to provide kips/wheel
![Page 71: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/71.jpg)
71 of 77
Example Combination Table: Service Wheel LoadsMode Operating Stowed
WOP1 WOP2 WOP3 WOP4 WS1 Dead Load DL 1.0 1.0 1.0 1.0 1.0 Trolley Load TL 1.0 1.0 1.0 1.0 1.0 Lift System LS 1.0 1.0 1.0 1.0 Lifted Load LL 1.0 1.0 1.0 Impact IMP 0.5 Gantry Lateral LATG 1.0 Op. Wind Load WLO 1.0 1.0 Stall Torque Load STL 1.0 Collision Load COLL 1.0 Storm Wind Load WLS 1.0 Earthquake Load EQ
50 x S 70 x S Allowable Wheel Loads (tons/wheel)
LS WS 65 x S 90 x S
S = Average spacing, in meters, between the wheels at each corner.Example: S = 1.5 m, Allowable LS Operating = 50 t/m * 1.5 m = 75 t/wheel
![Page 72: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/72.jpg)
72 of 77
Example Combination Table: Factored Wheel LoadsMode Operating Stowed
WOP1 WOP2 WOP3 WOP4 WS1 Dead Load DL 1.2 1.2 1.0 1.0 1.2 Trolley Load TL 1.2 1.2 1.0 1.0 1.2 Lift System LS 1.2 1.2 1.0 1.2 Lifted Load LL 1.6 1.6 1.0 Impact IMP 0.8 Gantry Lateral LATG 0.8 Stall Torque Load STL 1.0 Collision Load COLL 1.0 Storm Wind Load WLS 1.6 Earthquake Load EQ
60 x S 80 x S Allowable Wheel Loads (tons/wheel)
LS WS 75 x S 100 x S
S = Average spacing, in meters, between the wheels at each corner.Example: S = 1.5 m, Allowable WS Storm = 100 t/m * 1.5 m = 150 t/wheel
![Page 73: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/73.jpg)
73 of 77
Ask Crane Supplier ForWheel arrangement
Wheel loads for individual loads
Combined wheel loads for operating, overload, and out-of-service conditions
Complete wind criteria used and basis for shape factors
Individual and corner factored loads for tie-downs including direction of loading
![Page 74: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/74.jpg)
74 of 77
Example Design Basic Load Table Wharf Designer needs from Crane
Supplier
![Page 75: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/75.jpg)
75 of 77
Recap
Obtain detailed crane and wharf design dataStick to one crane design codeStick to one wharf design codeUse consistent design basis
Facilitate communication
![Page 76: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/76.jpg)
76 of 77
Q & A
![Page 77: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/77.jpg)
77 of 77
Arun Bhimani, S.E.PresidentLiftech Consultants Inc.www.liftech.net
Thank you
Erik Soderberg, S.E.PrincipalLiftech Consultants Inc.
This presentation will be available for download on Liftech’s website:
www.liftech.net
Crane Loads & Wharf Structure Design:Putting the Two Together
![Page 78: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/78.jpg)
78 of 77
Quality Assurance Review:
Principal: Arun Bhimani
Editor: Erik Soderberg
Author: Arun Bhimani
Liftech Consultants Inc. file data:N:\Papers & Presentations\!Working\AAPA 2006 \Crane_Loads_and_Wharf_Design_AAPA..ppt
Copyright 2006 by Liftech Consultants Inc. All rights reserved.The information included in this presentation may not be altered, copied, or used without written authorization from Liftech Consultants Inc. Anyone making use of the information assumes all liability arising from such use.
![Page 79: Crane Loads & Wharf Structure Design: Putting the Two Together](https://reader034.vdocument.in/reader034/viewer/2022042707/58831f9f1a28ab151a8ba860/html5/thumbnails/79.jpg)
79 of 77
Liftech Consultants Inc. Presentation Source Documentation:
Source documents will be stored in: Presentation\Waiting to Archive\AAPA 2006\Crane_Loads
FYI - Much content originally came from the TOC 2005 Europe presentation.