crc consultation workshop – northern ireland market design & performance league table 26 march...

13
CRC Consultation Workshop – Northern Ireland Market Design & Performance League Table 26 March 2009 Rob Davis Policy Advisor, CRC

Upload: roy-henderson

Post on 12-Jan-2016

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: CRC Consultation Workshop – Northern Ireland Market Design & Performance League Table 26 March 2009 Rob Davis Policy Advisor, CRC

CRC Consultation Workshop – Northern IrelandMarket Design & Performance League Table26 March 2009

Rob Davis

Policy Advisor, CRC

Page 2: CRC Consultation Workshop – Northern Ireland Market Design & Performance League Table 26 March 2009 Rob Davis Policy Advisor, CRC

Agenda

• Cap and Trade Scheme• Distribution of allowances:

– Fixed price introductory phase– Auction

• The Safety Valve, the Secondary Market and Banking & Borrowing

• Revenue recycling• Performance League Table and metrics

Page 3: CRC Consultation Workshop – Northern Ireland Market Design & Performance League Table 26 March 2009 Rob Davis Policy Advisor, CRC

• Three year period

• No market cap set by Government– Unlimited purchase during month-long sale

– No sale in first year - 1st sale in April 2011 to cover 2010

and 2011 emissions

• Allowance price of £12/tCO2

• Learning by doing

• Establish accurate emissions cap

Introductory Phase

Page 4: CRC Consultation Workshop – Northern Ireland Market Design & Performance League Table 26 March 2009 Rob Davis Policy Advisor, CRC

April 2010

April 2011

Oct 2011

1st Sale takes place

•Participants pay for both actual 2010/11 and forecast 2011/12 allowances

•2010/11 and 2011/12 allowances released to participants

•Government holds 2 years of scheme revenue

1st Recycling payments made

•All revenue from April 2011 sale (i.e. 2 years’ worth of revenue) recycled back from Government to participants

•Government holds £0 of CRC revenue

Spot Trading

Jul 2011 Report and surrender

allowances for 2010/11

etc

April 2012

Jul 2012 Report on and

surrender allowances for

2011/12Oct

2012

2nd Recycling payments made

• Revenue from April 2012 sale recycled back from Government to participants

•Government holds £0 of scheme revenue

2nd Sale takes place

•Participants pay for forecast 2012/13 allowances

•2012/13 allowances released to participants

•Government holds 1 year of scheme revenue

First year of scheme: 2010/11

Second year of scheme: 2011/12

Third year of scheme: 2012/13

Sales/Revenue Recycling Timing

Page 5: CRC Consultation Workshop – Northern Ireland Market Design & Performance League Table 26 March 2009 Rob Davis Policy Advisor, CRC

Capped Phases

• First capped phase and auction in 2013

• Fixed quantity of allowances (the absolute market

cap) & variable price

• Auction Type: Sealed bid, uniform price

• Auction restrictions– Limited to scheme participants

– Limit on % of total allowances to any one participant

Page 6: CRC Consultation Workshop – Northern Ireland Market Design & Performance League Table 26 March 2009 Rob Davis Policy Advisor, CRC

Market Features

• The safety valve– Buy-only link to EU-ETS

– Administered by EA

• Banking and borrowing– Unlimited banking of allowances between scheme phases

(except between intro and capped phases)

– No borrowing of allowances from future years

• The secondary market– No restrictions

Page 7: CRC Consultation Workshop – Northern Ireland Market Design & Performance League Table 26 March 2009 Rob Davis Policy Advisor, CRC

Revenue Recycling

• Auction revenue recycled back to participants– Payment proportional to 2010 CRC emissions– Bonus or penalty based on position in league

table

For example:

Total CRC emissions in 2010: 100 tCO2

Organisation X emissions in 2010: 1 tCO2

= Organisation X receives 1% of revenue raised in sales or auctions

This is then adjusted by the bonus or penalty

Page 8: CRC Consultation Workshop – Northern Ireland Market Design & Performance League Table 26 March 2009 Rob Davis Policy Advisor, CRC

Revenue Recycling

• Six month gap between sale and revenue recycling

• 2011 – Double recycling

• Bonus or penalty payment based on position in league table

Year 1 maximum bonus or penalty of +/-10%

Year 2 maximum bonus or penalty of +/-20%

Year 5 maximum bonus or penalty of +/-50%

Page 9: CRC Consultation Workshop – Northern Ireland Market Design & Performance League Table 26 March 2009 Rob Davis Policy Advisor, CRC

League Table

• Published performance league table at the end of each year• 3 metrics:

1. Compulsory absolute metric (60%)• Change in annual emissions relative to preceding 5

year average

2. Voluntary early action metric (20%)• Extent of voluntary AMR• Extent of Carbon Trust Standard

3. Voluntary growth metric (20%)• Change in emissions per unit turnover/revenue

expenditure• Important trade-off between perceived ‘fairness’ and

simplicity• Inclusion of 3 tick box questions

Page 10: CRC Consultation Workshop – Northern Ireland Market Design & Performance League Table 26 March 2009 Rob Davis Policy Advisor, CRC

Absolute Metric

• Absolute emissions reductions – compulsory

• Change in annual emissions relative to average

annual emissions over the preceding 5 years (or

since start of the scheme):

– Recognises ongoing absolute emissions

reductions

– In line with overall objective of scheme

• Measure of change – not absolute

Page 11: CRC Consultation Workshop – Northern Ireland Market Design & Performance League Table 26 March 2009 Rob Davis Policy Advisor, CRC

Early Action Metric

• Combination of measures:

1. Extent of non-mandatory automatic metering:– Metric measures proportion of emissions not covered by

mandatory meters, that are covered by automatic metering

– One off calculation – same score in 2010, 2011 & 2012

2. Extent of emissions covered by EEAS or CTS

• Early Action Metric to be ended after introductory phase

Page 12: CRC Consultation Workshop – Northern Ireland Market Design & Performance League Table 26 March 2009 Rob Davis Policy Advisor, CRC

Growth Metric

• To provide credit for organisations that decouple economic and carbon growth

• To provide context to performance in absolute metric

• Based on:

– Change in annual emissions per unit turnover (rev. exp) relative to average emissions per unit turnover (rev. exp) over the preceding 5 years

• Measure of change – not absolute

Page 13: CRC Consultation Workshop – Northern Ireland Market Design & Performance League Table 26 March 2009 Rob Davis Policy Advisor, CRC

Formulating league table

• Participants awarded points score for each metric

• Weighted combined score determines position in

Performance League Table

• Weighting of metrics

– 60% Abs: 20% Early Action: 20% Growth