![Page 1: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/1.jpg)
Creating a Sustainable Land Use Plan
April 9, 2003
National Defense Industrial Association29th Environmental and Energy Symposium and
Exhibition
Dorothy Peterson, P.E.Naval Air Engineering Station, Lakehurst NJ
![Page 2: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/2.jpg)
• NAES covers 7400 acres in ecologicallysensitive NJ Pinelands
• Primary mission is engineering,prototyping, manufacture and testing ofaircraft launch/recovery systems andsupport equipment.
• Last Master Plan completed in 1988.• Business Development Office created after
1995 BRAC
![Page 3: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/3.jpg)
![Page 4: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/4.jpg)
• Aimed at expanding and enhancing ourmission.
• Pursues joint operations – “NJ Mega Base”• Builds partnerships to share resources• Lease available space to offset maintenance
costs
![Page 5: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/5.jpg)
Are a C P& T b ld g
Lag oo n
Ocean C
ounty
Burl ington County
2 0 2 4 Miles
N
EW
S
New JerseyMega-Base
Naval Air Engineering StationLakehurst, New Jersey
McGuireAFB
Fort Dix NAES
Figure 10
![Page 6: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/6.jpg)
• Successfully leased space - providing over$1M in maintenance and repair of Stationbuildings.
• Gained DoD and other government tenantsincluding AF, Army, NJ Army NationalGuard, Dept of Justice, and NJ State Police
• Potential conflicts arose, both man-madeand environmental constraints. No processor integration with other strategic goals.
![Page 7: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/7.jpg)
• Reduce base maintenance costs• Sustain our mission by reducing potential
encroachment• Maintain environmental excellenceThese are all sustainable development
principles: economic, business, social andenvironmental
![Page 8: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/8.jpg)
• Lack of BDO process frequently resulted insignificant yearly environmental “aspects”related to new tenant operations.
• Communication lapses could be addressedthrough ISO 14001
• Environmental needed to offer tools, notjust criticism - become a true partner.
![Page 9: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/9.jpg)
• Would provide BDO with needed tools andinformation - also provide basis for NEPAanalysis/ cumulative impacts
• Update the previous Master Plan and createnew zoning plan
• Involve all stakeholders to generate a 20year outlook
• Comply with Pinelands ComprehensiveManagement Plan
![Page 10: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/10.jpg)
• Would plans be impacted by encroachment?• Would NJ Pinelands approve proposed projects?• How would current repair/construction plans fit
with our vision?• Would existing hangar space and runways
accommodate future tenants?• Would latest INRMP surveys conflict with
planned actions?
![Page 11: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/11.jpg)
• BDO/ Environmental co-wrote Vision Plan,in-house
• Model Installation Focus Group, cross-functional team, shaped zoning and projects
• Used GIS to generate maps, perform spacialanalysis
![Page 12: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/12.jpg)
• Develop consistent with base zoning andconstraints
• Cluster development• Site new facilities near available utilities,
services• Protect environmentally critical areas,
conform to env. laws.• Abide by LTA historic district, architecture
![Page 13: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/13.jpg)
Man-made• Unexploded ordnance• Explosive safety arcs• AICUZ (aircraft noise,
accident potential zones)• Compatible land use• Security• Contaminated sites• Encroachment• SHPO
Natural• Wetlands and buffers• Threatened/ endangered
species• Flood-prone areas• Well-head protection
(drinking water)• Water allocation• Topography
![Page 14: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/14.jpg)
• Well-head protection areas• Latest UXO caution map• T&E locations and Grassland Bird Habitat• Pineland’s 300 foot wetlands buffers• 1994 Cultural Resource Survey, LTA
Historic District
![Page 15: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/15.jpg)
• Submittal of plan to Pinelands Commission– Required elements include: Ecologically
sensitive areas, future land use, status ofongoing or planned construction
• INRMP still under development• Field Training Requests - new mission
– War games, encampments, air drops
![Page 16: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/16.jpg)
u u
uu
u
u u
u u
u
uu
u
u
u u
u
u
u
u
u
l
n
u u
uu
u
u u
u u
u
uu
u
u
uuuu u
u
u
u u
u u
u
u
u
u
u
l
n
u
u
l
l
l
l
l
l
l
l
l
nn
n n
n
nn
n
n
n
Are a C P& T b ld g
Lag oo n
N7
0.5 0 0.5 1 1.5 2 Miles
N
EW
S
Ecologically Sensitive AreasNaval Air Engineering Station
Lakehurst, New Jersey
Bound
GrasslandsCurrentFuture
Wetlands - sensitiveAtlantic White CedarPalustrine EmergentPalustrine ForestedOpen WaterPalustrine Scrub/Shrub
T-e_sensitiveed01.shp
l Barred owl
n Bog turtle
u Pine Barrens Reed Grass
u Barratt's Sedge
u Sickle-leaved Golden Aster
u Torrey's Dropseed
u Pale Beak Rush
u Slender Nut Rush
Pine Snake Buffer
Northern Pine Snake
l Den
n Nest
Figure 21
![Page 17: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/17.jpg)
1988 2003
Are a C P& T b ld g
Lag oo n
2000 0 2000 4000 Feet
N
EW
S
ProposedLand Use
(long range)Naval Air Engineering Station
Lakehurst, New Jersey
RoadsPotentially Constrained
Zoning.shpAircraft ActivitiesCommercialMilitary SupportRDT&ESupport ServicesTenant
6000 0 6000 Feet
Figure 27
![Page 18: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/18.jpg)
• Tool generated to assist BDO/Planning• Readily shows areas which have little to no
man-made or environmental constraints• Nearly 300 acres identified• Clustered in eastern, most-developed
portion of the base.
![Page 19: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/19.jpg)
Are a C P& T b ld g
Lagoon
22
19
27
24 23
25
213
29
32 20
1
18
4
9
15
2 28
26
7
8
30
3112
51416
11
6
1713
10
Developable ParcelsLevel 1 (Preferred, open space)Level 2 (Forested, unconstrained)Level 3 (Existing or future use identified)
1000 0 1000 2000 Feet
N
EW
S
Naval Air Engineering StationLakehurst, New Jersey
Developable Parcels
Figure 28
![Page 20: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/20.jpg)
#
##
North Boundary Road
HydrantDropZone
Base BoundaryAirfield Clear ZoneBuildingRoad98Wetlands98Russian Ruins
Tenting areasTrap rangeopen field
Field Training Area# UXO Find
1000 0 1000 2000 3000 Feet
N
EW
S
Proposed 421st Phoenix ReadinessRegional Training Ground
Area = 268.6 acres
![Page 21: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/21.jpg)
• Vision Plan completed• Environmentally sensitive areas preserved• Developable parcels map used to foster business• New field training area designated, managed• Environmental Impact Study awarded• Joint Land Use Study approved (NJ Mega Base)• Won 2002 CNO Environmental Planning Award• High level of communication/coordination between
Environmental and BDO
![Page 22: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/22.jpg)
• Can you have an effective EMS if you don’tmanage long-term land use?
• Can you have sustainable land use withoutan EMS type process and plans?
• EMS documentation and plans need tosupport business (mission) goals to sustainitself. “feed the system”
![Page 23: Creating a Sustainable Land Use Plan · 2017. 5. 30. · Creating a Sustainable Land Use Plan April 9, 2003 National Defense Industrial Association 29th Environmental and Energy Symposium](https://reader034.vdocument.in/reader034/viewer/2022052009/601e139fcd93bb540734f19b/html5/thumbnails/23.jpg)
Dorothy Peterson, P.E.Naval Air Engineering StationCode 8.7.3Lakehurst NJ [email protected]