March 14 TAP M&E Presentation 1
Creating Efficiencies in MRO
for Enhanced Profitability
Pedro Miguel Rodrigues da Costa
21 March 2014 st
March 14 TAP M&E Presentation 2
Increase sales ( $ 425 000)
Resume
Low cost is a basic requirement of doing business in the 2000s….cost and therefore price must be competitive or
customers will take take their business elsewhere..
Lean tools can help us to reduce cost , to increase productivity, to be more cost effectively …
Increase productivity (13% )
Increase the process visual management
“Continuous Improvement as enabler of innovation and operational excellence”
March 14 TAP M&E Presentation 3
Welcome to TAP M&E
Continuous Improvement at M&E
Methodology and Tools
Case Studies:
Kainzen Event/A check A340
Conclusions
March 14 TAP M&E Presentation 4
Welcome to TAP M&E
Continuous Improvement at M&E
Methodology and Tools
Case Studies:
Kainzen Event/A check A340
Conclusions
March 14 TAP M&E Presentation 5
Continuous improvement team history
Timeline
July
2009
Jan
2010
Feb
2010
Apr
2010
May
2010
Diagnostic
on possible
opportuni-
ties to
capture at
TAP M&E
Starting point
Decision to
create an
internal team
to capture the
opportunities
Internal
recruiting
process
Team
setup
Team
start
First pilots
developed
at engines
dept
First pilots
at airframe
dept
Lean/Continuous
Improvement
March 14 TAP M&E Presentation 6 6
Team and project’s objectives
•To establish the
operational
transformation
program of TAP
M&E intended to
fuel business
growth and
sustained
improvements for
TAP Group
To eliminate waste sources or
inefficiencies of TAP M&E
productive processes
To identify best practices, to
promote knowledge sharing
among areas and to provide an
external perspective on the
problems face by the areas
To implement a dynamics of
active participation on
continuous improvement by the
entire organization
• To prioritize the opportunities
identified, with the detailed
design of the agreed solutions
• To launch the pilots of the
prioritized initiatives and to
develop the monitoring tools
and methods
• To outline the broad roll-out plan
of the identified initiatives for all
areas
March 14 TAP M&E Presentation 7
Structure of the Lean Team
Logistics pilot
EVP/Senior Manager of
TAP M&E
Lean team
Team leader
Team members
Change agents
Aircraft base maintenance
pilot
Engines pilot
Blue colors Blue colors
Central/local
logistic member
• Sponsors the project, and gives high
visibility to the whole organization
• Fosters cooperation between the
different areas
• Responsible for the project
• Manages resources, progress and
communication
• Typically the head of shift/team
in the production area
(dedicated 100% to the pilot)
• Responsible for the
implementation on the field of
the initiatives
• Dedication of 40-60% of the
time
• All areas are represented in the
team
• Participate in the discussion to
detail the initiatives to be
launched, to overcome
obstacles and track progress of
the pilot
Blue colors
A-check C-check
Purchase Organization
March 14 TAP M&E Presentation 8
Deputy COO
Marketing & Sales Purchasing &
Logistics Quality and Safety Engineering Human Resources
Finance and
Accounting
Information
Technologies
Engine
Maintenance
Aircraft
Maintenance
Components
Maintenance
• Controller
• Customer Service
• Engineering and Quality
• Planning and Control
• Logistics
• Engine Shop
• Support Shops
• Controller
• Engineering and Quality
• Planning and Control
• Logistics
• Base Maintenance
• Operational Maintenance
• Controller
• Engineering and Quality
• Planning and Control
• Logistics
• Avionics Shop
• MHP Shops
• Negociation
•Technical Purchasing
• Materials Management
• Rotables Management
• Wharehouse
• Equipment and Facilities
• COMAT (EWR)
• Quality Engineering
• Laboratories
• Fleet and Projects
• Technical Publications
• Third Parties and Costing
• Invoicing
• HR Development
• Technical Training
•Social and Labour Relations
• Sales Portugal
• Sales Engines
• Communication & Brand
Organizational
Transformation
Member Of Executive Board
Organization Maintenance & Engineering
Strategy and
Business Control
Sponsor
Continuous Iimprovement Project
March 14 TAP M&E Presentation 9
Welcome to TAP M&E
Continuous Improvement at M&E
Methodology and Tools
Case Studies:
Kainzen Event/A check A340
Conclusions
March 14 TAP M&E Presentation 10
Lean – Recognising Customer Value
Value Add Any process that changes the
nature, shape or characteristics
of the product, in line with
customer requirements
Non-Value Add Any work carried out that does
not increase product value but
adds cost or time. Unavoidable
with current technology or
methods
Waste The use of any material or
resource beyond what the
customer requires and is willing to
pay for. Should be removed
immediately
Before Lean:
After Lean: Waste
Value add
Non
value
add
Process
March 14 TAP M&E Presentation 11
Lean Tools
11
Suggestion Programs
5 Why´s
Standard Work
Employee Involvement
……..
………
VSM – Value Stream mapping
VAT – Value Added Time
Spaghetti Diagram
Takt Time 5S
Kainzen Events.
Visual Management
Fishbone
These tools help
to identify and
eliminate waste
from the process
Specifique tools
March 14 TAP M&E Presentation 12
Design Plan Implement Rollout Prepare Diagnose
Develop an implementation plan structured by work or value stream
Identify resources requirement
Identify implementation risks
Review , ajust , and standardized the new process
Form Team Plan and Initiate communications Compile data Plan activities …..
Analyze Operating system
Analyze management infrasstructure
Analyze mindsets and capabilities
Design target-state operating system Confirm targets
Design management infrastructure to support the operation system
Specify mindsets and capabilities to reinforce new way of working
Stabilize Implement Review progress Interface with more general initiatives o
Continuous Improvement Project
Standard process
It is important to ensure the consecution of all the
“standard” activities along the steps…
March 14 TAP M&E Presentation 13
Welcome to TAP M&E
Continuous Improvement at M&E
Methodology/Tools
Case Studies:
Kainzen Event/A check A340
Conclusions
March 14 TAP M&E Presentation 14
Case Study – Kainzen Event
Continuos Improvement Week
To implement a dynamics of
active participation on
continuous improvement by the
entire organization
March 14 TAP M&E Presentation 15
Case Study – Kainzen Event
Continuos Improvement Week
Sub-Area Name email
Continuos Improvement Projects 20-24 MAY 2013 Rev.09
Area ProjectTeam
PlaceContinuos
Improvement SupportMA/MB/PM Renato Marques [email protected]
MA/LG/EF Jorge Silva [email protected]
MA/LG/EF Virgilio Vaz [email protected]
MA/PC/PP/CD Luís Filipe Silva [email protected]
TI José Paulino [email protected]
MA/MO/ML Carlos Mendes [email protected]
LG/EI Vítor Santos [email protected]
TI José Paulino [email protected]
MM/PC Francisco Azevedo [email protected]
MM/PC/CP Pedro Carrapiço [email protected]
MM/PM Hugo Vitorino [email protected]
MM/PM Ricardo Madrinha [email protected]
MM/LG/PR Luís Janeiro [email protected]
MM/EQ António Ferreira [email protected]
MM/EQ/GC Vítor Gomes [email protected]
MM/PM João Vizinha [email protected]
MM/PM Cláudio Cunha [email protected]
MM/LG Ana Bidarra [email protected]
MM/LG Vera Costa [email protected]
MC/HP/AP João Abreu [email protected]
MC/IE/RA Pedro Macau [email protected]
MC/LG(HP) Carlos Xavier [email protected]
MC/LG(IE) Cristina Almeida [email protected]
MC/IE/EM José Simão [email protected]
MC/IE/EM Carlos Nunes [email protected]
MC/HP/AH Rui Miranda [email protected]
MC/HP/AH Pedro Neto [email protected]
MC/PC(HP) Pedro Trinchante [email protected]
Nuno
Soares
Nuno
Soares
MC IDGs test -TAT Meeting Room - IE
MC Renewal of the material
requisitions system
Meeting Room HP
34665
MMOptimization control process repair
parts ("Parts Pool")
Buld. 23, Meeting
Room- MM
Duarte
Pereira
MM Engine Documentation Process Buld. 23, Room 18 -
MM/PC
Duarte
Pereira
Pedro
Costa
MA Paperless Meeting Room
Meeting Room 1
floor do anex f ao
hangar 6
Pedro
Costa
MA Advance Work Station Position H6-Meeting Room- 44
-Topo Sul
March 14 TAP M&E Presentation 16
Case Study – Kainzen Event
Continuos Improvement Week
Sub-Area Name email
Continuos Improvement Projects 20-24 MAY 2013 Rev.09
Area ProjectTeam
PlaceContinuos
Improvement SupportLG/CP João Matos [email protected]
LG/AR Luzia Rato [email protected]
LG/CP/RE Patrícia Condeço [email protected]
LG/CP/RE Marina Erlich [email protected]
LG/AR/EX António Cardoso [email protected]
LG/AR/EX Ulisses Almeida [email protected]
RH/DE Ana Paulino [email protected]
RH/DE Andreia Rodrigues [email protected]
(todas)
FC/TC Carla Farinha [email protected]
FC/TC/CL Emília Fernandes [email protected]
TI José Paulino [email protected]
EC João Vilela [email protected]
EC Eunice Santos [email protected]
TI José Paulino [email protected]
MEGASIS Implementação, 4ªT/5ªM
MV/CM Joana Baeta [email protected]
TI José Paulino [email protected]
QS/EG/AU Margarida Duarte [email protected]
QS/EG/TM Ana Cascais [email protected]
QS/LB/ST Luís Bacelar [email protected]
Nuno
Soares
QSPlanning and scheduling of Annual
Audits-Improved Meeting Room - QS
Duarte
Pereira
Duarte
Pereira
MVImprovement of the initial customer
contact Room 2.41
Pedro
Costa
ECReducing the time available for the
KPIEC
FC
Request applicant, requests for
information-Example: account
statements
Meeting Room -
FC/TC-Local : 2º floor -
room 7 do Anexo F
Hangar 6
RH Appointement Managers Sala reuniões RHDuarte
Pereira
LG
Reduce the delivery time of the
repair processes documentation in
the expedition
Meeting room 4º
floor
Pedro
Costa
March 14 TAP M&E Presentation 17
Case Study – Kainzen Event
Continuos Improvement Week
Sub-Area Name email
Continuos Improvement Projects 20-24 MAY 2013 Rev.09
Area ProjectTeam
PlaceContinuos
Improvement Support
EG/FP J. Simões [email protected]
EG/FP J Almeida [email protected]
EG/FP Pedro Silva [email protected]
EG/FP João Picão [email protected]
TI José Paulino [email protected]
MEGASIS Implementação, 4ªT/5ªM
(todas) Final desenho, despacho
Full time Duarte Pereira Pedro Costa
Part time [email protected] [email protected]
Team Lider Tel: 36541 Tel: 36303
TM: 92 7988881 TM: 92 7988882
Nuno
Soares
Nuno Soares
Tel: 36894
TM: 96 2098291
Pedro
Costa
TI
Planning and scheduling for meeting
rooms and audiovisual media
support -Optimization
TI
EGInvestigation of Techical Incidents
Reports
Meeting room -
ME/EG
Continuous
Improvement
Week
All areas involved
14 Projects
50 Workers
6 hours/per day/worker
March 14 TAP M&E Presentation 18
Case Study – Kainzen Event
Continuos Improvement Week
To implement a dynamics of
active participation on
continuous improvement by the
entire organization
Projects presentations
March 14 TAP M&E Presentation 19
Case Study – A Check A340
To establish the
operational
transformation
program of TAP
M&E intended to
fuel business
growth and
sustained
improvements for
TAP Group
March 14 TAP M&E Presentation 20
Case Study – A Check A340
Standard Process-Prepare
Design Plan Implement Rollout Prepare Diagnose
Develop an implementation plan structured by work or value stream
Identify resources requirement
Identify implementation risks
Review , ajust , and standardized the new process
Form Team Plan and Initiate communications Compile data Plan activities …..
Analyze Operating system
Analyze management infrasstructure
Analyze mindsets and capabilities
Design target-state operating system Confirm targets
Design management infrastructure to support the operation system
Specify mindsets and capabilities to reinforce new way of working
Stabilize Implement Review progress Interface with more general initiatives o
Activities
• Kick-off meeting
• Meeting with colleagues from the Area to understand the problem’s context
• Interviews with operational elements to understand the context of the problem
• Set up and train the team
• ….
March 14 TAP M&E Presentation 21
Lisbon
TAP M&E offers a vast span of services ranging
from line maintenance to heavy maintenance
checks, engine overhaul, components
maintenance, engineering and planning
services, material support and integrated
maintenance packages, for the Airbus A300-600,
A310, A330, A340, A320 family; for the engine
models CFM56-3,-5A,
-5B,-5C,-7B and CF6-80C2/A/B.
Hangars: 3
Hangar Capacity: 3 WB, 5 NB
Hangar Area: 26,380 m²
Total Building Area: 71,200m²
Porto Alegre
TAP M&E makes available to its Customers
airframe maintenance for Boeing B727, B737 CL,
B737 NG, BBJ, B767; for Airbus A320 family; for
Embraer EMB 120, ERJ 135/145, E-JET
170/175/190/195 and Legacy; complete overhaul
for Landing Gears, APU and PWC engines
PW118/A/B, PW120/A, PW121, PW125B, PW127
and PT6; plus avionics and accessories
maintenance for over 17,000 part numbers.
Hangars: 5
Hangar Capacity: 1 WB, 5 NB
Hangar Area: 12,500 m²
Total Building Area: 55,000m²
Rio de Janeiro
TAP M&E provides aircraft
maintenance services (A, B, C, IL
and D checks, aircraft painting,
engineering and planning support) for
the Boeing B727, B737 CL/NG (incl.
BBJ), B747-200/300, B757, B767,
B777, DC10, MD11; for the Airbus
A300-B4, A300-600, A310, A330,
A340.
Hangar: 1
Hangar Capacity: 4 WB
Hangar Area: 14,500 m²
Total Building Area: 180,000m²
Aircraft Maintenance
Components Maintenance
Engines Maintenance
Warehouses
Offices and Labs.
Security control
to airport airside
Security control
to TAP premises
Hangar 6
Hangar 5
Hangar 4
Case Study – A Check A340
Visit site
March 14 TAP M&E Presentation 22
Base Maintence
Supervisor
H16
Hangar Manager
H16
Avionics Team Leader
H24
FC/H/LG
Team Leader
H24
Cabin Interior
Team Leader
H24
Engine
Team Leader
H24
Structures Team Leader
H24
Structure
Shop
H16
Painting Shop
H16 ……
Aircraft Maintenance Director
Controller Logistics
Engineering & Quality
Planning & Control
Base Maintenance
Operational Maintenance
Case Study – A Check A340
The Organization
March 14 TAP M&E Presentation 23
Fleet Intervals
(hours)
# A Checks Man-hours (Average)
Routine Non Routine
A319/20/21 750 390 288 103
A330 800
85 335
146
A340 800
24 356 217
“A” Checks performed to TAP fleet at 2012
Monday Tuesday Wednesday Thursday Friday
A319/20/21 A319/20/21 A319/20/21 A319/20/21
A340 –TAT : 36 hours
9:00 AM 21:00 PM
A330 A330
7:00 AM
In accordance with fleet operations demand, A-checks should be executed
according the following week schedule Conceptual
Goal
24 Hours
TAT : 24 Hours
Case Study – A Check A340
Define problem statement and Goal
March 14 TAP M&E Presentation 24
Interior
Cabin/Composite
Shop
Emergency
Equipment
Shop
Structure
Shop
Heat
Treatment
Shop
Painting Shop …….
Case Study – A Check A340
Meet with Managers/Goup Leaders HANGAR 6
Engine
Team
FC/LG/HID
Team
Cabin interior
Team
Avionics
Team
Structures
Team
Logisitic
Team
March 14 TAP M&E Presentation 25
Case Study – A Check A340
Standard Process-Diagnose
Design Plan Implement Rollout Prepare Diagnose
Develop an implementation
plan structured by work or value
stream
Identify resources requirement
Identify implementation
risks
Review , ajust , and standardized the
new process
Form Team
Plan and Initiate communications
Compile data
Plan activities
…..
Analyze Operating system
Analyze management infrasstructure
Analyze mindsets and capabilities
Design target-state operating system Confirm targets
Design management
infrastructure to support the
operation system
Specify mindsets and capabilities to reinforce new way
of working
Stabilize Implement
Review progress
Interface with more general initiatives o
Activities
• Definition of analyses to conduct (operational system, management infrastructure, attitudes
behaviors) based on the decision-making diagram
• Current – states analysis
• Detailed process analysis
• Operation Observation
• ------
March 14 TAP M&E Presentation 26
Case Study – A Check A340
Value Stream Map
March 14 TAP M&E Presentation 27
Case Study – A Check A340
Value add time
38%
March 14 TAP M&E Presentation 28
Case Study – A Check A340
Specifique tools
Workload
March 14 TAP M&E Presentation 29
Case Study – A Check A340
Specifique tools
Task cards -Sequence of work
Workload distributing
Transportation- Elapsed time for “aircraft parts” in
Closed Loop circuit workshop
March 14 TAP M&E Presentation 30
Case Study – A Check A340
Standard Process-Design
Design Plan Implement Rollout Prepare Diagnose
Develop an implementation
plan structured by work or value
stream
Identify resources requirement
Identify implementation
risks
Review , ajust , and standardized the
new process
Form Team
Plan and Initiate communications
Compile data
Plan activities
…..
Analyze Operating system
Analyze management infrasstructure
Analyze mindsets and capabilities
Design target-state operating system Confirm targets
Design management
infrastructure to support the
operation system
Specify mindsets and capabilities to reinforce new way
of working
Stabilize Implement
Review progress
Interface with more general initiatives o
Activities
• Identification of the change agents for each problem to approach
• Meeting with change agents to identify problem’s root causes (5 why´s methodology )
• Design of the ideal solution by the team and identification of constraints
• …..
March 14 TAP M&E Presentation 31
Logistic
Visual Management - Milestones Chart for each skill
Case Study – A Check A340
Design of the ideal solution by the team
Engine Flights Control/Landing gear
/Hidraulics Avionics
Structure Cabin Interior
18 13 12
14 11 7
Engine Logistic
1- GSE Equipment
OK NOK
If Not OK, Why (Docs):
Corrective actions:
TAT- 24 H- Can it be achieved?(Y/N)
TAT Delay (h):
Sign/Nº TAP
6- Components - Send to Shop
OK NOK
If Not OK, Why (Docs):
Corrective actions:
TAT- 24 H- Can it be achieved?(Y/N)
TAT Delay (h):
Sign/Nº TAP
March 14 TAP M&E Presentation 32
Per inspection, per group,
evaluate the correlation between
routine and non routine work
load (planned versus realized ) in
order to define and allocate
AMT needed per group/shift
Case Study – A Check A340
Design of the ideal solution by the team
March 14 TAP M&E Presentation 33
Case Study – A Check A340
Standard Process-Plan
Design Plan Implement Rollout Prepare Diagnose
Develop an implementation
plan structured by work or value
stream
Identify resources requirement
Identify implementation
risks
Review , ajust , and standardized the
new process
Form Team
Plan and Initiate communications
Compile data
Plan activities
…..
Analyze Operating system
Analyze management infrasstructure
Analyze mindsets and capabilities
Design target-state operating system Confirm targets
Design management
infrastructure to support the
operation system
Specify mindsets and capabilities to reinforce new way
of working
Stabilize Implement
Review progress
Interface with more general initiatives o
Activities
• Identification of the resources required to the implementation and assignment of tasks by
the various elements
• Definition of the initial pilot date
• Design of project follow-up meetings
• ……..
March 14 TAP M&E Presentation 34
Case Study – A Check A340
Preparation Meeting for A/C CS-TOB : 12th July
The Planning and Control department will post the Milestone Charts Planning & Control
Hangar Manager should fulfill the Master Milestones chart according with
his analysis and the information gathered from each Milestone Chart
Hangar Manager
After finishing the A Check , the Hangar Manager will give Planning & Control
Department Milestones Charts
Hangar Manager
Team leader of which group must complete the information requested for each
Milestone Chart, according with the timetable of his chart Team Leader
Planning & Control The Planning and Control department will archive the maps for further analysis
Each Task cards should have a milestone reference Planning & Control
A dashboard should be available near de aircraft in order to display
the visual management tools- Milestones Charts
Hangar Manager Tasks Resp. Insp. Prod. Testing
A
B
C
D
E
F
G
H
I
Mr. XY
Mr. XY
Mrs. ABC
Mrs. ABC
Mrs. ABC
Mrs. ABC
Mr. ZZZ
Mr. ZZZ
Mr. ZZZ
Status Planned
release
Tasks Resp. Insp. Prod. Testing
A
B
C
D
E
F
G
H
I
Mr. XY
Mr. XY
Mrs. ABC
Mrs. ABC
Mrs. ABC
Mrs. ABC
Mr. ZZZ
Mr. ZZZ
Mr. ZZZ
Status Planned
release
March 14 TAP M&E Presentation 35
Case Study – A Check A340
Standard Process-Implement
Design Plan Implement Rollout Prepare Diagnose
Develop an implementation
plan structured by work or value
stream
Identify resources requirement
Identify implementation
risks
Review , ajust , and standardized the
new process
Form Team
Plan and Initiate communications
Compile data
Plan activities
…..
Analyze Operating system
Analyze management infrasstructure
Analyze mindsets and capabilities
Design target-state operating system Confirm targets
Design management
infrastructure to support the
operation system
Specify mindsets and capabilities to reinforce new way
of working
Stabilize Implement
Review progress
Interface with more general initiatives o
Activities
• Implementation of the new solution
• Review and communicate progress status
• KPI measurement
• Meetings with change agents to discuss problems identified
• …….
March 14 TAP M&E Presentation 36
Case Study – A Check A340
Implemet
The implementation of the new process was carried out for 10 A-Checks.
Some issues that had to be addressed during implementation:
• Visual Management tools were implemented
• Debriefings with the complete team to discuss problems/challenges and
celebrate successes
• Address coordination issues with back-shops and Logistic
• Job cards distribution per Milestone had to be done in advance
• Rearrangements of Job Cards per Milestone
• Train people and create the mindset of technicians to fill in the
Visual Management Maps (Milestone Chart)
• Understand delays of specific groups and implement corrective actions
(tools, hand labor,equipment, etc)
March 14 TAP M&E Presentation 37
Case Study – A Check A340
Standard Process-Rollout
Design Plan Implement Rollout Prepare Diagnose
Develop an implementation
plan structured by work or value
stream
Identify resources requirement
Identify implementation
risks
Review , ajust , and standardized the
new process
Form Team
Plan and Initiate communications
Compile data
Plan activities
…..
Analyze Operating system
Analyze management infrasstructure
Analyze mindsets and capabilities
Design target-state operating system Confirm targets
Design management
infrastructure to support the
operation system
Specify mindsets and capabilities to reinforce new way
of working
Stabilize Implement
Review progress
Interface with more general initiatives o
Each transformation process has a standar process, but is easily adaptable to a given situation , allowing to tailor
individual situation
March 14 TAP M&E Presentation 38
Case Study – A Check A340
Rollout Planning
Responsible : Aircraft Planning and Control Area
Main Activities
TAP A330 Fleet :
Development and implementation of the visual management tool for the A checks - Milestones
Chart
Development and implementation a tool to forecast the number of resources need for each
group/shift
TAP A319/20/21 Fleet :
Development and implementation of the visual management tool for the A checks - Milestones
Chart
Development and implementation a tool to forecast the number of resources need for each
group/shif
March 14 TAP M&E Presentation 39
Welcome to TAP M&E
Continuos Improvement at M&E
Methodology/Tools
Case Studies:
Kainzen Event/A check A340
Conclusions
March 14 TAP M&E Presentation 40
Case Study – A Check A340
Conclusions
Monday Tuesday Wednesday Thursday Friday
A340 –TAT : 36 hours
Before
Planning and forecasting tool
Visual Management
151% 141%
131% 131%
Pre-Proj(2010)
Proj(2010)
2011 2012
Labour Hours (Spent/Estimated)
-13%
Productivity increase 13%
Monday Tuesday Wednesday Thursday Friday
A340
9:00 AM 9:00AM
After
Increase availability of resources ($ 425 000)
March 14 TAP M&E Presentation 41
Welcome to TAP M&E
Pedro Miguel Rodrigues da Costa
General Manager Continuous Improvement
21 March 2014
Thank you for your attention!
Do you have any questions?