Critical Design ReviewLFEV-Y5-2017
Lafayette Formula Electric VehicleYear 5
ECE 492 - Spring 2017
![Page 2: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/2.jpg)
Roadmap
1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan
2
![Page 3: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/3.jpg)
System Overview - Top
TSV Packs
TSV Packs
PedalsGLV
TSI
Motor
Controller
Cooling
Panel
Panel
3
![Page 4: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/4.jpg)
System Overview - Side
TSV Packs
GLV
TSI
MotorMC
Pedals
4
![Page 5: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/5.jpg)
System Overview - System Objectives
● TSI: Provide connection and safety for the power supply of the motor
● GLV: Provide 24V to all systems, excluding the motor
● VSCADA: Provide data acquisition capability, as well as diagnostics
● Cell App: Be able to wirelessly interface with SCADA system
● Cooling: Using 24V, provide constant feedback to SCADA while cooling the motor
● Cabling: Provide safe and consistent connections between subsystems.
5
![Page 6: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/6.jpg)
System Overview - System Objectives Cont.
● Interface Control Document: Provide documentation for both hardware and software and interfaces.
● Dyno: Build and prepare Dyno room for testing for all sub-systems
● TSV: Provide 96V to the motor, as well as diagnostic information, and update its charging algorithm
● Physics: Helping TSV team understand relevant research, as well as physical modeling of the car, and developing a cruise control algorithm
6
![Page 7: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/7.jpg)
System Overview - High Level System Block Diagram
7
![Page 8: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/8.jpg)
System Overview - High Voltage Connections
● 96V● 2/0 Cable
8
![Page 9: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/9.jpg)
System Overview - Communication Protocol
● CAN Bus● All sensors have unique ID● All stations jabber
○ Settable period
9
![Page 10: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/10.jpg)
System Overview - Safety Loop Faults
● All systems access safety loop● Driver resettable section● Non driver resettable section
Systems announce status on CAN Bus
10
![Page 11: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/11.jpg)
System Overview - Interfaces
● Hardware○ Cockpit○ Panels
● Software○ Dash○ Remote Computer○ Cell phone
11
![Page 12: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/12.jpg)
Hardware Interfaces - Driver Accessible
12
![Page 13: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/13.jpg)
Hardware Interfaces - Driver Inaccessible
13
![Page 14: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/14.jpg)
Software Interfaces - LCD Display
14
![Page 15: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/15.jpg)
Software Interfaces - Remote Displays
15
![Page 16: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/16.jpg)
Software Interfaces - Cell Phone
16
![Page 17: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/17.jpg)
Roadmap
1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan
17
![Page 18: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/18.jpg)
Schedule - TSI
18
![Page 19: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/19.jpg)
Schedule - GLV
19
![Page 20: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/20.jpg)
Schedule - TSV
20
![Page 21: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/21.jpg)
Schedule - VSCADA
21
![Page 22: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/22.jpg)
Schedule - Cell App
22
![Page 23: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/23.jpg)
Schedule - Cooling
23
![Page 24: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/24.jpg)
Schedule - DYNO
24
![Page 25: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/25.jpg)
Schedule - Interconnect
25
![Page 26: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/26.jpg)
Schedule - Car Physics Investigation
26
![Page 27: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/27.jpg)
Schedule - Management
27
![Page 28: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/28.jpg)
Roadmap
1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan
28
![Page 29: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/29.jpg)
Cost Analysis
29
TeamAllocated
Budget
Total
Spent
Budget
Remaining
Percentage
Spent
TSI $1,000 $153.61 $846.39 15.36%
GLV $1,000 $275.82 $724.18 27.58%
VSCADA $50 $0.00 $50.00 0.00%
Cell App $125 $0.00 $125.00 0.00%
Controller Cooling $600 $452.92 $147.08 75.49%
Interconnect $1,000 $1122.20 -$122.20 112.20%
Dyno $50 $0.00 $50.00 0.00%
TSV $500 $388.95 $111.05 77.79%
Shipping / Tax /
Misc$1,175 $159.94 $1,015.06 13.61%
TOTAL $5,500 $2,553.44 $2,946.56 46.43%
http://sites.lafayette.edu/ece492-sp17/cost-summary/
![Page 30: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/30.jpg)
Cost Analysis - Allocated Budget
30
Team Allocated Budget
TSI $1,000
GLV $1,000
VSCADA $50
Cell App $125
Controller Cooling $600
Interconnect $1,000
Dyno $50
TSV $500
Shipping / Tax / Misc $1,175
TOTAL $5,500
![Page 31: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/31.jpg)
Cost Analysis - Current Budget Status
31
TeamAllocated
Budget
Total
Spent
Budget
Remaining
TSI $1,000 $153.61 $846.39
GLV $1,000 $275.82 $724.18
VSCADA $50 $0.00 $50.00
Cell App $125 $0.00 $125.00
Controller Cooling $600 $452.92 $147.08
Interconnect $1,000 $1122.20 -$122.20
Dyno $50 $0.00 $50.00
TSV $500 $388.95 $111.05
Shipping / Tax / Misc $1,175 $159.94 $1,015.06
TOTAL $5,500 $2,553.44 $2,946.56
![Page 32: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/32.jpg)
Cost Analysis - Percentage Spent per Subsystem
32
TeamPercentage
Spent
TSI 15.36%
GLV 27.58%
VSCADA 0.00%
Cell App 0.00%
Controller Cooling 75.49%
Interconnect 112.20%
Dyno 0.00%
TSV 77.79%
Shipping / Tax /
Misc13.61%
TOTAL 46.43%
Ideal 71.86%
![Page 33: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/33.jpg)
Cost Analysis - Percentage Spent Overall
33
TeamPercentage
Spent
TSI 15.36%
GLV 27.58%
VSCADA 0.00%
Cell App 0.00%
Controller Cooling 75.49%
Interconnect 112.20%
Dyno 0.00%
TSV 77.79%
Shipping / Tax /
Misc13.61%
TOTAL 46.43%
Ideal 71.86%
![Page 34: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/34.jpg)
Roadmap
1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan
34
![Page 35: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/35.jpg)
System States
35
![Page 36: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/36.jpg)
Roadmap
1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan
36
![Page 37: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/37.jpg)
Demo Plan
● 4 Packs● Spin motor● Safety Loop● CAN Bus communication● Cell communication● IMD Fault safety loop
37
![Page 38: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/38.jpg)
Roadmap
1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan
38
![Page 39: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/39.jpg)
VSCADACraig Lombardo & Austin Wiles
39
![Page 40: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/40.jpg)
Why Do We Need VSCADA?
● VSCADA acts as the “brains” of the car● Comprehensive control and monitoring of the subsystems in the LFEV● Dynamometer control to simulate operations of an actual car
○ Physics Modeling● VSCADA displays information to both the driver and developers
○ Driver: limited information○ Developer: extensive information
40
![Page 41: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/41.jpg)
VSCADA - Installing Software
1. git clone https://github.com/LafayetteFormulaElectricVehicle/VSCADA.git2. cd VSCADA/3. make install4. ./scada or ./configuration
41
![Page 42: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/42.jpg)
VSCADA - Control Flow
42
![Page 43: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/43.jpg)
VSCADA - Web Server
● HTTP Web Server● Can query database using endpoints provided by web API● Information sent to Cell in JSON format
43
![Page 44: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/44.jpg)
VSCADA - Database Structures
44
![Page 45: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/45.jpg)
VSCADA - Database Structures cont.
Criticality Scale
45
![Page 46: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/46.jpg)
VSCADA - Database Structures cont.
46
![Page 47: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/47.jpg)
VSCADA - Maintenance View
47
![Page 48: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/48.jpg)
VSCADA - Drive View
48
![Page 49: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/49.jpg)
VSCADA - Charging View
49
![Page 50: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/50.jpg)
Roadmap
1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan
50
![Page 51: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/51.jpg)
Cell AppKemal Dilsiz & Raji Birru
51
![Page 52: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/52.jpg)
Cell App - In depth design - Layout
● Customizable Display● Automatically generated generic data availability● ViewPager for multiple display tabs
52
![Page 53: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/53.jpg)
Cell App - Landscape Layout
53
![Page 54: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/54.jpg)
Cell App - Activity Diagram
54
![Page 55: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/55.jpg)
Cell App - In-Depth Design - Data Structures
Dictionary of dictionaries, provides a generic way to locally store data temporarily
Hashcodes
> “tsvcell1voltage”
> “03/03/2017 17:56:34”
newSystem.put(“03/03/2017 17:56:34”, “8.1”);
allSystems.put(“tsvcell1voltage”, newSystem);
55
![Page 56: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/56.jpg)
Cell App - Content Diagram
56
![Page 57: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/57.jpg)
Roadmap
1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan
57
![Page 58: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/58.jpg)
TSIChrister Hoeflinger, Jack Plumb,
& Adam Ness
58
![Page 59: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/59.jpg)
TSI - System Overview
Safely connect tractive system voltage to motor controller
● Interface with throttle and brake pedals
● Interface with Insulation Monitoring Device (IMD)
● Send voltage, current, and IMD resistance to SCADA
● Control drive state
● Tractive System Measuring Point
59
![Page 60: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/60.jpg)
TSI - High Level Block Diagram
60
![Page 61: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/61.jpg)
TSI - System State Diagram
61
![Page 62: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/62.jpg)
TSI - Circuit Schematic - Throttle Plausibility Overview
62
![Page 63: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/63.jpg)
TSI - Circuit Schematic - Throttle Plausibility
● Two separate, linear potentiometers
● Biased 5V apart
63
![Page 64: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/64.jpg)
TSI - Circuit Schematic - Throttle Plausibility cont’d
Multiple Failure Modes1. Deviation of more than 10% pedal travel between the sensors1
12017-18 Formula SAE Rules Rev. A
64
![Page 65: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/65.jpg)
TSI - Circuit Schematic - Throttle Plausibility cont’d
Multiple Failure Modes2. Open or short circuit condition
which generates a signal outside of the normal operating range (5% - 95% travel).
12017-18 Formula SAE Rules Rev. A
65
![Page 66: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/66.jpg)
TSI - Circuit Schematic - Throttle Enable
66
![Page 67: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/67.jpg)
TSI - Circuit Schematic - Microcontroller
67
![Page 68: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/68.jpg)
TSI - Circuit Schematic - High Voltage Inputs
68
![Page 69: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/69.jpg)
TSI - Circuit Schematic - Throttle/Voltage Isolation
69
![Page 70: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/70.jpg)
TSI - Circuit Schematic - High Voltage Present Light
70
![Page 71: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/71.jpg)
TSI - Box Inventor
71
![Page 72: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/72.jpg)
TSI - Box Inventor
72
![Page 73: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/73.jpg)
TSI - Box Inventor
73
![Page 74: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/74.jpg)
Roadmap
1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan
74
![Page 75: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/75.jpg)
GLVKyle Phillips, Joe Sluke, & Chris Bennett
75
![Page 76: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/76.jpg)
GLV - Sub-Systems
Responsibilities of GLV can be divided into 4 main sub-systems.
1) GLV Power - providing 24V to all the main systems of the vehicle.
1) Safety Loop - serve as the direct means to control the Accumulator Isolation Relays in the
packs (enable/disable of high voltage systems).
1) Vehicle Computer Interface (VCI) - deliver information about GLV Power and the Safety
Loop to the VSCADA computer and route the CANBUS to the VSCADA computer
1) Vehicle User Interface (VUI) - includes physical panels, buttons, switches, screens and lights
on the car, such as the exterior panels and the cockpit panel
76
![Page 77: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/77.jpg)
GLV - GLV Power
Requirements:● Provide 24V to all subsystems for 3 hours● Rechargeable battery● Protected from overcharge, overcurrent, overdischarge and overvoltage.
Battery Choice● 24V, LiFeP04 (Lithium Iron Phosphate Battery), 10Ah. ● Internal battery management system ● Lightweight (2.63 kg)
77
![Page 78: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/78.jpg)
GLV - Safety Loop
Requirements: ● Drive the coils of the Accumulator Isolation Relays (AIRs) with 24V● Trippable by VSCADA, TSI, Cooling Controller, TSV● Trippable internally and externally by E-STOP Big Red Buttons.
78
![Page 79: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/79.jpg)
GLV - Safety Loop - Components
Switch Description Effect
Circuit Breaker A basic resettable circuit breaker
Powers Cooling
System, Dashboard,
VSCADA, and TSI
GLVMS Grounded Low Voltage Master Switch
BRBLS Big Red Button Left Side
BRBRS Big Red Button Right Side
Cooling System Fault Switch Allows Cooling System to trigger fault
24V to Accumulator
Isolation Relays
IMD Switch Insulation Monitoring Device, triggers fault if HV and GLV are galvanically
isolated
PACKMAN Fault Control Allows PACKMAN board on any pack to trigger a fault
SCADA Relay Allows SCADA computer to trigger fault
MRESET (Latching) Exterior Master Reset Button
BRB (Car Dash) Driver accessible Big Red Button
Inertia Switch Driver accessible Inertial switch, opened by a 6g+ collision.
CPR(Latching) Driver accessible Collision Protection Reset Latching Relay.
TSVMS Tractive System Voltage Master Switch
79
![Page 80: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/80.jpg)
GLV - Safety Loop
80
![Page 81: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/81.jpg)
GLV - Vehicle User Interface (VUI)
Requirements:● Design panels for dyno room● Design panels for interior and exterior of vehicle ● Provide interface for VSCASA
81
![Page 82: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/82.jpg)
GLV - Exterior Panel
82
![Page 83: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/83.jpg)
GLV - Cockpit Panel
83
![Page 84: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/84.jpg)
GLV - Vehicle Computer Interface (VCI)
Requirements: ● GLV Battery State of Charge Monitoring● CAN2USB Interface ● I²C Bus ● UART Bus ● Safety Loop Monitoring
84
![Page 85: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/85.jpg)
GLV - Safety Loop Monitoring
85
![Page 86: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/86.jpg)
GLV - High-Level System Design
86
![Page 87: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/87.jpg)
GLV - Physical Layout
87
![Page 88: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/88.jpg)
GLV - Physical Layout
88
![Page 89: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/89.jpg)
GLV - Physical Layout
89
![Page 90: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/90.jpg)
GLV - Physical Layout
90
![Page 91: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/91.jpg)
GLV - Box Design
91
![Page 92: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/92.jpg)
GLV - Break Out Board (BOB)
Last year’s BoB shortcomings:● Did not address VCI requirements (safety loop, temp, current monitoring…)● Inadequate number of relays used ● Inadequate containment of safety loop circuit
Our proposed changes:● Add opto-isolators for safety loop monitoring ● Add more relays and move more of safety loop on board ● Use I2C capable chips to relay temp and current readings to SCADA● Connect TSI and VSCADA via UART for throttle control ● Add DAC and ADC chips to connect VSCADA and Huff Box.
92
![Page 93: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/93.jpg)
GLV - BoB High Level
93
![Page 94: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/94.jpg)
GLV - BoB Layout
94
![Page 95: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/95.jpg)
Roadmap
1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan
95
![Page 96: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/96.jpg)
Controller
Cooling SystemXingyuan Guo & Yi Han
96
![Page 97: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/97.jpg)
Cooling System
Major Goal:
● Cool the motor controller, provide information to SCADA, shut
system down when necessary using safety loop.
Objectives:
● Automatic fan, pump speed control; as well as manual override
● CAN interface
● Safety loop interface● Mechanical design
97
![Page 98: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/98.jpg)
Cooling System - Overall Electrical Connections
98
![Page 99: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/99.jpg)
Cooling System - Water Cooling Layout
99
![Page 100: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/100.jpg)
Cooling System - Compatibility and Independence
● 24 VDC
● Koolance products (compatible with dyno, easy to
integrate)
● Run independently
100
![Page 101: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/101.jpg)
Cooling System - Automatic Speed Control w/ Manual Override
Overall Process101
![Page 102: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/102.jpg)
Cooling System - CAN Bus Interface
Oscilloscope
displaying 2 types of
data frames
(Through stackable
CAN shield using
MCP2515 CAN
controller)
102
![Page 103: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/103.jpg)
● Open the safety loop when fluid temperature is too high
Cooling System - Safety Loop
103
![Page 104: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/104.jpg)
Roadmap
1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan
104
![Page 105: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/105.jpg)
System Test
Plan Greg Flynn
105
![Page 106: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/106.jpg)
System Testing - Overview
● 7 Major tests○ Accumulator integration○ Accumulator charging○ CAN Bus link○ Safety loop○ Cruise Control○ 24h endurance test○ Shutdown
106
![Page 107: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/107.jpg)
System Testing - Accumulator Integration
107
![Page 108: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/108.jpg)
System Testing - Accumulator Charging
108
![Page 109: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/109.jpg)
System Testing - CAN Bus link
109
![Page 110: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/110.jpg)
System Testing - Safety Loop
110
![Page 111: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/111.jpg)
System Testing - Cruise Control
111
![Page 112: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/112.jpg)
System Testing - 24h Endurance Test
112
![Page 113: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/113.jpg)
System Testing - Shutdown
113
![Page 114: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems](https://reader030.vdocument.in/reader030/viewer/2022040520/5e78ff3ed53fe51288267bfd/html5/thumbnails/114.jpg)
TSV Packs
TSV Packs
PedalsGLV
TSI
Motor
Controller
Cooling
Panel
Panel
114