cross head removal for man b&w
TRANSCRIPT
The reciprocating action of piston is converted into rotary motion for crankshaft by means of the cross head where the piston rod and connecting rod are attached on both sides.
A routine maintenance has to be performed on crosshead bearing as per maker’s instruction. Following procedure is to be followed when carrying out crosshead bearing removal of a MAN MC-C engine:
1) Inform company and take permission.
2) Take immobilization certificate from port.
3) Read the manual and have a toll box meeting with everyone involved in the job. Discuss the procedure.
4) Prepare important tools and spares to be used in this operation
5) A risk assessment of all personnel doing the operation to be prepared and documented
6) Shut main engine starting air
7) Engage turning gear to the main engine crankshaft
8) Open indicator cocks of all cylinders
9) Stop main engine lube oil pump after cooling down of engine
10) Open crank case doors of fore and aft unit
11) Open crank case doors of that unit in which maintenance is to be carried out.
12) Put blower and ventilate the crankcase thoroughly as it is an enclosed space.
13) Prepare enclosed space entry checklist.
14) After sufficient ventilation wearing proper PPE you can enter the C/C.
15) Turn the crank throw to 90° before BDC.
16) Check the bearing clearance by inserting feeler gauge b/w bearing cap and crosshead journal exactly next to the landing surface of the piston rod foot.
17) The wear limit for a cross head bearing shell is limited to 50% reduction of the oil wedge length (L).[ L=10mm]
18) Turn the crankshaft down enough to give access to nuts and screws on piston rod.
19) Mount two chain blocks on the top of the crankcase for suspending the piston rod.
20) Loosen and remove the locking wire and screws on the piston rod foot.
21) Mount the lifting eye bolt on each side of the piston rod foot.
22) Turn the crosshead to TDC.
23) Hook the chain blocks to the eye bolt on the piston rod foot. And turn the crosshead down so that piston is now suspended on the chain blocks.
24) Turn to BDC.
25) Mount the hydraulic jack on the crosshead bearing cap nut and loosen them. [pressure : 1500-1650 bars]
26) Mount the lifting attachment on the head of the connecting rod.
27) Suspend the two chain blocks from the lifting brackets in the athwart ship direction.
28) Mount the 2 eye bolts on the top of the cross head bearing cap.
29) With the help of the two chain blocks lift the bearing cap. Take it out of the engine and place it on a wooden base.
30) To check the upper bearing shell, remove the locking screws and push the shell out.
31) Mount the chain blocks to the lifting brackets on the frame box wall.
32) Turn the crosshead up until the piston rod lands on the crosshead. Ensure that the guide ring in the crosshead fits correctly in the centre hole of the piston rod.
33) Do not remove the chain blocks or the lifting eye bolts.
34) Turn the crosshead to TDC and attach the chain blocks to the lifting arrangement and haul it tight.
35) Mount the four supports for the guide shoes on the crosshead guide.
36) Carefully and slowly turn the crankshaft towards to exhaust side and make sure the crosshead guide sits on the supports.
37) Turn the crank throw towards BDC slowly while following with the chain blocks, thus continuously supporting the connecting rod.
38) In case it is necessary to remove the lower bearing shell, tilt the connecting rod towards the door on the cam shaft side with means of chain blocks.
39) Dismount the locking screws and turn the bearing shell so far up that an eye bolt can be mounted. Lift the bearing shell out.
Top clearance in crosshead bearing
Max: 0.29mm Min: 0.17mm
Video for Cross head bearing removal-
[vsw id="llij_8RgqDg" source="youtube" width="550" height="400" autoplay="no"]
You may also like to read-Ways of starting and testing emergency generator
Reference:
Maintenance Manual MAN B&W MC-C engine
Image Credits:
Maintenance Manual MAN B&W MC-C engine
patrix
Related posts:
Main Engine Liner Removal Procedure for S50MC-C Engine
Procedure for Removing Main Bearing of MAN B&W MC-C Engine
Chain Tightening Procedure for MAN B&W Engine
Free Sample- Main Engine Bearing Report
Jack Bolts for Marine Engine and the Procedure for Tensioning
Do Like Us on Facebook
Follow Us on Twitter
Top of Form
FREE SIGN UP FOR MORE INTERESTING ARTICLES
Email:
Bottom of Form
Facebook comments:
Leave a comment!
Click here to cancel reply »
Top of Form
Add your comment below, or trackback from your own site. You can also subscribe to these comments via RSS.
Be nice. Keep it clean. Stay on topic. No spam.
Name (required)
710848313 marineinsight http://w w w .aw e end_of_article 1
Mail (will not be published) (required)
Website (optional)
This is a Gravatar-enabled weblog. To get your own globally-recognized-avatar, please register at Gravatar.
Sign up to our newsletter!
Bottom of Form
Top of Form
9915 0 /tech/procedures
Post Comment
2b31480d5a
9915
2028323541 marineinsight http://w w w .aw e personal_safety 1
Email:
Bottom of Form
Recent News
Number of Pirate Attacks Sharply Decreased in 2011
Neptune Terminals Sets New Terminal Handling Record At 12.85 Million Metric Tonnes
Simplifying Port Operation through Automated Balloon Cranes
First True Hybrid System To Be Installed On Board An Offshore Supply Vessel
Using BIM Technology to build the Panama Canal of the Future
Dredging Corporation of India signs MOU with Ministry of Shipping for the year 2012-13 Dredging
Submit
Wärtsilä Signs Long-Term Service Agreement With Prestige Cruise Holdings
Popular
Latest
Comments
7 Reasons Deck Cadets and Junior Engineers are Not Getting JobsSeptember 5, 2011
Duties of a 4th Engineer on a ShipNovember 4, 2010
A Woman Chief Engineer from Brazil Describes Her Interesting LifeMarch 14, 2011
How to Synchronize Generators on a Ship?October 18, 2010
Bunkering is Dangerous : Procedure for Bunkering Operation on a ShipOctober 19, 2010
The Very First Flotel in the World: Edda FidesMarch 16, 2012
How to Charge Refrigeration Plant on Ships?March 16, 2012
Cargo Ship Mont-Blanc and the Halifax Explosion: World’s Largest Man-made Accidental ExplosionMarch 15, 2012
10 Ways to Enhance the Security of a ShipMarch 15, 2012
How to Improve Energy Efficiency of Ships?March 13, 2012
ankush (DMET '08): Well said sir...
KABIR KHAN: THIS IS TRUE THAT MANY INSTITUTE ARE PROMISING 100...
Renjith: How do you remove excess charge in a reefer plant?...
datta rohakale: in gas charging in refer plant... after creatin...
Davis mwangi: Ma'am am v proud of you a really wanna be a marine...
Top of Form
Subscribe to Latest Maritime News
Email:
Bottom of Form
Random Posts
1634722164 marinenew s http://w w w .aw e New s_-_Marine_ 1
(refresh random posts)
Latest Video Post
Video : IMO Works to Make Ship Recycling Safer and Environmentally Friendly
Resources
23 Places to Find Maritime Jobs
What is the Salary of Seafarers?
Best Maritime Colleges in the United States
Top 6 Books on Marine Auxiliary Machinery
23 Maritime Forums and Discussion Boards
Shore Jobs for Seafarers
Top 5 Books on Marine Boiler
How to find Contacts in Maritime Companies?
Most Commented
7 Reasons Deck Cadets and Junior Engineers are Not Getting Jobs
Duties of a 4th Engineer on a Ship
A Woman Chief Engineer from Brazil Describes Her Interesting Life
How to Synchronize Generators on a Ship?
Bunkering is Dangerous : Procedure for Bunkering Operation on a Ship
About Us
Contact Us
Subscribe to Marine Insight
Privacy Policy
Follow us on Twitter
Follow us on Facebook
Forums
Jobs
Directory
Copyright © 2010 MarineInsight — All Rights Reserved
Read more: http://www.marineinsight.com/tech/proceduresmaintenance/procedure-for-cross-head-bearing-removal-for-marine-engine-man-bw-s50mc-c/#ixzz1pPKXCCta