crossrail moving london forward terry morgan cbe chairman - crossrail

10
CROSSRAIL MOVING LONDON FORWARD Terry Morgan CBE Chairman - Crossrail

Upload: edmund-norton

Post on 05-Jan-2016

223 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: CROSSRAIL MOVING LONDON FORWARD Terry Morgan CBE Chairman - Crossrail

CROSSRAILMOVING LONDON FORWARD

Terry Morgan CBEChairman - Crossrail

Page 2: CROSSRAIL MOVING LONDON FORWARD Terry Morgan CBE Chairman - Crossrail

Header here max 30 charactersCrossrail route

Cost £14.8bn

Net benefit £42bn

Length 118km

Stations 40 (10 new)

Trains per hour 24

Journeys pa 200m

Page 3: CROSSRAIL MOVING LONDON FORWARD Terry Morgan CBE Chairman - Crossrail

Header here max 30 charactersTunnelling progress

Page 4: CROSSRAIL MOVING LONDON FORWARD Terry Morgan CBE Chairman - Crossrail

Header here max 30 charactersCrossrail: delivering a railway

13 14 15 16 17 182012

Railway Systems

Stations

Rolling Stock & Depot

NR Surface Works

Test and Com

mission

Trial O

peration

Crossrail TOC

Civils and Tunnelling

Property Acquisition

OSD & Urban Realm

Page 5: CROSSRAIL MOVING LONDON FORWARD Terry Morgan CBE Chairman - Crossrail

5

Under Platform Services Area

Station Structure

Track Systems

Traction Power & Overhead Line

Equipment

Emergency Walkway

Gravity Drainage

HV Power

LV Power

Tunnel Lighting

Communications& Control

Radio Systems

Signalling

Platf

orm

Doo

rs

Tunnel Ventilation

Pumped Drainage

Pump

Smoke Extract

Fire Detection Station Ventilation

Station Lighting Signage

Passenger Information

CCTVPA / VA

Hel

p Po

int

Fire Main Station Cable Management

System

Station Systems

Automatic Fare Collection

Lifts & Escalators

Station Management

System

Station Heating, Cooling and Air

Conditioning

Route Wide Railway Infrastructure

Route Control Centre

Back Up Control Facility

Bulk Supply Points

Auto Trans-former Sites

Depots & Stabling

Rolling Stock

Paddington

Railway and Tunnel Systems

Page 6: CROSSRAIL MOVING LONDON FORWARD Terry Morgan CBE Chairman - Crossrail

Header here max 30 charactersThe second half - Delivering a world class railway

Page 7: CROSSRAIL MOVING LONDON FORWARD Terry Morgan CBE Chairman - Crossrail

Header here max 30 charactersLightweight, energy efficient rolling stock

200m long trains; 1,500 capacityRegenerates energy during braking Aluminium constructionLightweight inside-framed bogiesReduced weight cuts energy consumptionReduced weight and ‘unsprung mass’ helps reduce noise and track-wear Driver advisory systemsSmart control systems for heating and lightingDigital asset management enables preventative maintenance

Page 8: CROSSRAIL MOVING LONDON FORWARD Terry Morgan CBE Chairman - Crossrail

Header here max 30 charactersSustainability

May 2015446 Apprentices

10,086 enrolled at TUCA

c. 12,000 employed on the project

3,886 jobs for local/previously unemployed people

Page 9: CROSSRAIL MOVING LONDON FORWARD Terry Morgan CBE Chairman - Crossrail

Header here max 30 charactersWider skills agenda

Page 10: CROSSRAIL MOVING LONDON FORWARD Terry Morgan CBE Chairman - Crossrail

Header here max 30 charactersThank you