K.T.Knöpfle MPI Kernphysik, Heidelberg [email protected] GERDA Collaboration Meeting at Cracow 18 - 20 February 2008 Cryogenic Vessel & Infrastructure Status Report for TG04

Upload: others

Post on 19-Oct-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

K.T.KnöpfleMPI Kernphysik, Heidelberg

[email protected]

GERDA Collaboration Meeting at Cracow18 -

20 February 2008

Cryogenic Vessel & InfrastructureStatus Report for TG04

Page 2: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 2

Outline• cryostat fabrication

schedule v6installation makrolon

/ superinsulation

inner/outer vessel integrationtests:

pressure, He leak, loads, evaporation, Rn

emanation

mounting tool for copper shield

• cyrogenic

infrastructure

status of tendering

• conlusions

Page 3: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 3

schedule: rev 6 of Nov 15

page 1/2

02/07/07 – 25/10/07* |

23/07/07 – 23/11/07* |

* rev 5 of Sep 21 – ‘final’

Page 4: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 4

schedule: rev 6 of Nov 15

page 2/2

toda

y

major milestones

new item

* rev 5 of Sep 21 – ‘final’

31/01/08 – 13/02/08* |

26/11/07 – 24/01/08* |

not accepted by MPI – keep !

Page 5: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 5

t

26nov07

He leak test inner vesselafter pressure test on 12nov

Page 6: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 6

t

26nov07

skirt

part of outervessel

Page 7: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 704dec07

inst

alla

tion

supe

rinsu

latio

n

Page 8: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 8

a few details

06dec07

bolt for Makrolon

fixation

Teflon spacer

Makrolon

installed below SI:9 pcs: 1811x1396x6 mm9 pcs: 2001x1396x6 mm

Page 9: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 9

parallel to SI installation

Rn emanation test-

more in Hardy’s talk -

05dec07

Page 10: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 10

cryostat integration

12dec07

inner / outer vessel integration

Page 11: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 11

t

Page 12: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 12

cryostat integration

Page 13: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 13

concrete design of 6dec07

ceiling almost to

o low

Page 14: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 14

t

verify(a)

alignment of top and bottom pads

(b) equal load distribution on all 8 pads

Page 15: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 15

t

Page 16: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 16

t

access

Page 17: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 17

t

Page 18: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 18

centering of pads

Page 19: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 19

Bosche

type KSB 2000 (kg) load cells

Al plate

preparations for load test

Page 20: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 20

Al plate

bottom of outer vessel

Page 21: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 21

t

load test in progress

12dec07

Page 22: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 22

load test

Al plate

bottom of outer vessel

stiffness of Belleville springs:59 kN

/ mm each

results

Page 23: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 23

cryostat integration

13dec07

neck covered with SI

ring to generate cylindrical shape

Page 24: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 24

end of 2007

20dec07

vess

el h

eigh

t 25

mm

less

than

spe

cifie

d

Page 25: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 25

2008

pum

ping

for a

ccep

tabl

e is

olat

ion

vacu

um

14jan08

Page 26: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 26

mounting tool for copper shield

‘tripod’

copper shield segment

tent

rotatable arm

platform 4x4 m2

internal platform

internal platform

Page 27: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 27

bottom

14jan08

view from platform

tripod

copper shield segment in frame

for evap test

for evap test

Page 28: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 28

mounting tool -

parts

motor driven

Page 29: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 29

t

Page 30: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 30

installation thru neck

installation thru neck

Page 31: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 31

t

Page 32: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 32

tinstallation test of large segment

Page 33: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 33

t

installation test of large segment

Page 34: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 34

t

installation test of large segment

one of 20 Al dummies

Page 35: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 35

t

installation test of small segment

Page 36: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 36

t

mounting tool test: (almost) all ok !

new, other paint

bolt too thick

Page 37: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 37

He leak test –

isolation vacuumHe leak test of isolation vacuum volume

small problem fixed with Terostat15jan08

Page 38: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 38

setup for evaporation test

heater

temp & pressure gauges

GN2 flow meter (MPI) safety valve

distribution of thermo couplescontrol of

cool down (ok)fill level (not ok)

Mo/Tu cool downTu/We fillingWe/Th settlingFr/Mo measureMo/We drainageTh/Mo warm-up

Page 39: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 39

evaporation test

23jan08

Page 40: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 40

evaporation test

GN2

flow meter

heater

LN225 m3

LN2

23jan08

Page 41: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 41

evaporation test

23jan08

Page 42: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 42

evaporation test

TC feed-thrus

to pump

24jan08

Page 43: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 43

evaporation test

pump stand

W10

24jan08

Page 44: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 44

evaporation test23jan08

Page 45: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 45

evaporation test

600 m3/h ‘ambientair vaporizer’

Page 46: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 46

evaporation test

spec.: ~ 4m3 N2@20deg ( = 300W)

24jan08 9:07

25jan08 12:14

very nice result !

Page 47: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 47

why GERDA cryostat not on photo?

Page 48: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 48

why ?

! W10 !

Page 49: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 49

weld W10

modification by TÜV -however, previous design(45 deg at cylinder) also

accepted

parts of TÜV approved weld map

Fillet

weld

(‚Kehlnaht‘) not

allowed

by

AD2000!

Page 50: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 50

WPS of 11 Dec 07

com

mun

icat

ed 1

1feb

08

20dec07

20dec07 no indication of V shape

Page 51: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 51

latest development

SIMIC (Dr. A.C.) on Thursday 14 Feb 08, 17:45, by phone:

1) W10 weld is fillet weld (‘Kehlnaht’)2) fillet weld can be certified according to ASME3) little delay since SIMIC is familiar with procedure4) detailed calculations to follow

No official

written

statement

by

SIMIC available

until

now.

Page 52: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 52

cryogenic infrastructure

tender for supply contract:

submitted 08Jan21published 08Jan31 TED document 2008-27384

time-limit for receipt of tenders:08Mar17

tender documents incl. Tech Specs:

www.mpi-hd.mpg/GERDA/tender(so far, more than 5 requests)

Page 53: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 53

PID for tender

further optimized

Page 54: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 54

cryogenic infrastructure

PID for lock which is relevant forsystem aspects

Keep it simple & safe!

to be discussed in integration session

Page 55: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 55

cryogenic infrastructurefurther progress:

• design & layout further optimized • part of hardware (vacuum) bought (T)• quote for manifold available• heater not in tender, new development:LNGS indicates ok for 2000 m3/h device

open issues:

• Rn

emanation of safety valves (cast stainless steel) not yet shown to be ok.

drawings from ‘Technical Specifications’

Page 56: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 56

conclusions -

1

inner/outer vessel pickled, passivated, rinsed with de-ionized water

12 Nov

inner vessel: pressure test passed (with water @ 3.6 bar)26 Nov

inner vessel: He leak test passed (sensitivity a few 10-9 mbar ℓ

/ s )

w48

Makrolon

installedw49

major part of superinsulation

installed

05Dec

1st extraction for Rn

emanation measurement (23m3) : ~15 mBq06Dec

2nd extraction for Rn

emanation measurement (30m3) : ~30 mBq

w50

inner / outer vessel integration12Dec

load test / optical inspection passed

13Dec

neck covered with superinsulationw51

top outer vessel head welded, cryostat on skirt

summary of fabrication & test history

2007 (since 05 November)

Page 57: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 57

conclusions –

1 cont.

w2

pumping isolation vacuumw3

test of mounting tool for copper shield passed

15Jan

isolation vacuum <10-3 mbarouter vessel

He leak test passed (sensitivity a few 10-7 mbar ℓ

/ s check !)

w4

evaporation test with completely filled cryostat (~70m3 LN2) passed25Jan 17:00 N2 gas flow <4m3/hw5

emptying cryostat, warming-up

w6

2nd pickling, passivation

& rinsing of inner vessel (4Feb @ 5oC )08Feb

outer vessel pressure test #1 cancelled by TÜV

w7 SIMIC communicates WPS for weld W10 (11Feb), OKed

by TÜV14Feb

outer vessel pressure test #2 cancelled, this time by SIMIC

summary of fabrication & test history

2008

Page 58: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 58

conclusions -

2

• at LNGS:1) Rn

emanation test

2) evaporation test 3) mounting of copper shield► schedule & sequence still unclear –

however,

agreement that items 2 & 3 shall not interfere with WT construction

• evaluation of quotes for cryogenic infrastructure on Monday, March 17, order asap

• evaluate Ar

exhaust gas heater options, tender, order asap

next steps(assuming final pressure test is done)

Page 59: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 59

end

Page 60: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 60

schedule: rev 5 of Sep 21

page 1/2

done, to be corrected

due items

Page 61: Cryogenic Vessel & Infrastructure Status Report for TG04 · 2nd pickling, passivation & rinsing of inner vessel (4Feb @ 5. o. C ) 08Feb outer vessel pressure test #1 cancelled by

2008 Feb 18 TG04 Status - K.T.Knöpfle 61

page 2/2

delivery to Hall A: 13 Feb 08

now scheduled for12 Nov 07

due items

schedule: rev 5 of Sep 21