Crystal City-Pentagon City
Transportation Update
Department of Environmental Services –Transportation Division
June 23, 2015
Overview
• Crystal City streets program overview
• Capital investments for Crystal City-
Pentagon City
• County projects underway
• ART bus service enhancements
• Transit Development Plan and
opportunities for public input
2
Crystal City Streets Program
3
• Crystal City Sector Plan calls for an
ambitious series of projects dedicated to
improving mobility and access for residents
and workers
• Existing system of disconnected highway-
style one-way streets will be converted into
multimodal two-way streets and connected
at grade level and with enhanced:
Pedestrian and bicyclist mobility and safety
Transit access and routing
Streetscapes with modern lighting, new
textures and styles, and stormwater
features
• Crystal City Streets Program implements
the transportation network in the Sector
Plan created by staff, residents, and
employers, and adopted by the County
Board in 2010
Investing in Crystal City-Pentagon City
4
Street Projects
5
Transit Projects
Investing in Crystal City-Pentagon City
County Projects Underway
6
• ART Bus Facility
‒ New facility at South Eads and 32nd Streets to provide crucial
operational space for ART’s growing bus fleet.
‒ Construction starts this month.
• Crystal City Multimodal Center
‒ Improving vehicle and pedestrian safety and traffic circulation
around Crystal City Metro, and expanding bus stop capacity.
‒ Construction starts this month.
• Crystal City Potomac Yard Transitway
‒ Providing faster, more reliable bus
service along Route 1 corridor.
‒ Outreach this summer to explain how
transit lanes will operate.
ART Service Enhancements
7
Starting July 2015,
County is improving
ART service in:
• Columbia Pike
• Pentagon City
• Crystal City
And to destinations
in the Rosslyn-
Ballston corridor
and Shirlington
Near-Term Service Enhancements
8
Crystal City-Pentagon City Service Improvements
Route
#
Route
NameWeekday Saturday Sunday
Start
Date
42 Ballston /
Pentagon
Service Span:
6 am to 11 pm
• 17-min. peak period
frequency
• 36-min. frequency
midday; 35 min. at night
Service Span:
6:30 am to 11 pm
• Redirect service
from Pentagon
to Pentagon
City Metro
• 33-min.
frequency
New Service:
7 am to 7 pm
between Ballston
and Pentagon City
• 33-min.
frequency
January
2016
43 Crystal City /
Courthouse
Service Span:
5:55 am to 10:35 am & 3:20
pm to 7:47 pm
• 10-min. frequency
July
2015
87 Pentagon /
Shirlington
Service Span:
5:50 am to 11:30 pm
• 10-min. frequency peak
period between Arna Valley
and Pentagon
• 20-min. frequency peak
period between Arna
Valley and Shirlington
• 30-min. frequency midday
and night along entire route
Service Span:
7 am to 11:30 pm
• Redirect service
from Pentagon
to Pentagon
City Metro
• 30-min.
frequency
New Service:
7 am to 7 pm
between
Shirlington and
Pentagon City
• 30-min.
frequency
July
2015
Transit Development Plan (TDP)
• County is undertaking major update of TDP this year to:
‒ Re-examine transit needs and prioritize service and capital
improvements
‒ Develop ‘cost affordable’ 10-year plan for new services and
supporting capital improvements
‒ Ensure improvements are eligible for State funding
‒ Inform next update of County’s Capital Improvement Plan (CIP)
• Submission to Virginia Department of Rail and Public
Transportation required by spring 2016
9
TDP Development Process
• Development of the TDP will involve:
– System-wide analysis of bus service (both ART and Metrobus
routes in the County)
– Detailed review of Columbia Pike and Crystal City-
Pentagon City corridors
– Coordination with other local and regional planning efforts
– Community input throughout
• TDP will outline additional efforts needed to refine and
implement transit strategies
– After TDP is adopted, County will undertake detailed planning
and engineering work to implement transit improvements
10
TDP Community Input
11
Timeframe TDP Activity Opportunities for Input
Fall 2015 Initial transit needs
assessment and possible
strategies
• Participate in public
meetings
• Attend County staff
presentations at
community groups and
commissions
Winter
2015
Draft findings and preliminary
transit recommendations
Spring
2016
County Board review and
approval of the TDP and
service and infrastructure
recommendations
Public comments to County
Board
Updates available online:
Visit arlingtonva.us and search “transit development plan”
12
Questions?
Coming up…
Boundary Channel Drive Interchange presentation