cs 410 the matchmaker project
DESCRIPTION
CS 410 The MatchMaker Project. SBIR Approval Presentation 08Dec03 Presented by Craig Gilkey, Nick Hundstad, & Michael Urban http:www.cs.odu.edu/~mpereras/CS410web.html. The Single’s Dilemma. Problem Statement. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/1.jpg)
08 December 2003 CS 410 (SBIR Approval) 1
The
MatchMaker
CS 410The MatchMaker Project
SBIR Approval Presentation
08Dec03Presented by Craig Gilkey, Nick Hundstad, & Michael
Urban http:www.cs.odu.edu/~mpereras/CS410web.html
![Page 2: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/2.jpg)
08 December 2003 CS 410 (SBIR Approval) 2
The
MatchMaker
The Single’s Dilemma
![Page 3: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/3.jpg)
08 December 2003 CS 410 (SBIR Approval) 3
The
MatchMaker
Problem Statement Single people routinely attend
social gatherings for the purpose of meeting others with similar interests.
This purpose is significantly hampered by a lack of basic compatibility based dating services at these social functions.
![Page 4: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/4.jpg)
08 December 2003 CS 410 (SBIR Approval) 4
The
MatchMaker
Social Gatherings for Singles
Bars and Clubs Cruises and Resorts Group Oriented Social Activities
Ex. Masons, Christian Singles Groups, Jaycees
![Page 5: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/5.jpg)
08 December 2003 CS 410 (SBIR Approval) 5
The
MatchMaker
Characteristics of the Problem
Need for Rapid Communication Compatibility Matching
![Page 6: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/6.jpg)
08 December 2003 CS 410 (SBIR Approval) 6
The
MatchMaker
Rapid Communication Single at a bar/social gathering:
On average, 3.3 hours trying to meet someone (MSNBC, 2003)
‘Time constraints are the main reason for going into a dating service’ (Shipp, 2003)
78% of online dating service customers: ‘speed of (internet dating) service was a primary consideration’ (Jupiter, 2003)
![Page 7: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/7.jpg)
08 December 2003 CS 410 (SBIR Approval) 7
The
MatchMaker
Compatibility Lack of Compatibility is a
key factor in unsuccessful relationships (Dixon, 2003)
Long term relationships need compatibility (Warren, 2003)
‘Most online dating services use compatibility to match’ (MSNBC, 2003)
Monica Godfrey and Andrew Lehrer met online. (Photo: CBS)
![Page 8: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/8.jpg)
08 December 2003 CS 410 (SBIR Approval) 8
The
MatchMaker
Need for Compatibility: U.S. Census
![Page 9: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/9.jpg)
08 December 2003 CS 410 (SBIR Approval) 9
The
MatchMaker
Singles on Cruise Ships A ‘limited or nonexistent
perspective as to who they are compatible with’ (Motter, Campbell, 2003)
10 major cruise lines carried 7.6 million passengers on 3,575 different cruises in 2002 (Garrison, 2003)
Of these, 54% were single
From Carnival Cruise Lines (2003)
![Page 10: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/10.jpg)
08 December 2003 CS 410 (SBIR Approval) 10
The
MatchMaker
Match-up methods underway Singles on Cruise
Ships, 83% had used available ‘match-up’ methods set up by the ship (Campbell, 2003) Cocktail Hour and
Meet and Greet socials (Travelocity, 2003)
NO Compatibility match-up
Pic of the Americana Lounge on The
Carnival Sensation
(Carnival, 2003)
![Page 11: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/11.jpg)
08 December 2003 CS 410 (SBIR Approval) 11
The
MatchMaker
The Bottom Line At social gatherings, singles
need a compatibility based dating service that utilizes both portability and fast communication
![Page 12: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/12.jpg)
08 December 2003 CS 410 (SBIR Approval) 12
The
MatchMaker
Our Societal Goal The MatchMaker Project
intends to create more compatible relationships between singles by incorporating portability and fast data transfer into a dating service.
![Page 13: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/13.jpg)
08 December 2003 CS 410 (SBIR Approval) 13
The
MatchMaker
Our Product Goal Design a handheld Bluetooth™ device
capable of meeting the societal goals Others with Similar interest via Rapid
Communication and Portability Cheaper than current solutions Does not require Cell Phone Towers
Initial Market: Cruise Lines, NCL and Carnival
By January 2005 (before Spring Break) Future Market: General Public
By August 2005
![Page 14: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/14.jpg)
08 December 2003 CS 410 (SBIR Approval) 14
The
MatchMaker
The MatchMaker will have the look and feel of a cell phone
![Page 15: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/15.jpg)
08 December 2003 CS 410 (SBIR Approval) 15
The
MatchMaker
Range of Bluetooth
![Page 16: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/16.jpg)
08 December 2003 CS 410 (SBIR Approval) 16
The
MatchMaker
![Page 17: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/17.jpg)
08 December 2003 CS 410 (SBIR Approval) 17
The
MatchMaker
![Page 18: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/18.jpg)
08 December 2003 CS 410 (SBIR Approval) 18
The
MatchMaker
![Page 19: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/19.jpg)
08 December 2003 CS 410 (SBIR Approval) 19
The
MatchMaker
![Page 20: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/20.jpg)
08 December 2003 CS 410 (SBIR Approval) 20
The
MatchMaker
Name NickGender maleAge 22Marital Status Single - never marriedBody Type AthleticHeight 6'Eyes BlueHair BolndEthnicity caucasionSmoking noDrinking SociallyHave Kids noWant (more) kids don’t knowEducation Some CollegeEmployment Status StudentOccupation Student/ComputerrelatedIncome less than $25,000Religion ChristianAttend Services RarelyPolitical Views Middle of the roadAstrology TaurusLanguages English
Compare Data
About My Match CriticalGender preferences Y woman seeking manAge Y 18-25Marital Status N Single - never marriedBody Type N slim,average,athleticHeight N 5'5"- 6'3"Eyes N anyHair N anyEthnicity N caucasianSmoking N noDrinking N noHave Kids N anyWant(more)kids N yes,don't knowEducation N highschool or beyondEmployment Status N Full-time,Part-time,Self-employed,StudentOccupation N anyIncome N anyReligion Y Christian,None/AgnosticAttend Services Y weeklyPolitical Views N anyAstrology N anyLanguages N English
![Page 21: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/21.jpg)
08 December 2003 CS 410 (SBIR Approval) 21
The
MatchMaker
![Page 22: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/22.jpg)
08 December 2003 CS 410 (SBIR Approval) 22
The
MatchMaker
Name NickGender maleAge 22Marital Status Single - never marriedBody Type AthleticHeight 6'Eyes BlueHair BolndEthnicity caucasionSmoking noDrinking SociallyHave Kids noWant (more) kids don’t knowEducation Some CollegeEmployment Status StudentOccupation Student/ComputerrelatedIncome less than $25,000Religion ChristianAttend Services RarelyPolitical Views Middle of the roadAstrology TaurusLanguages English
Compare Data
About My Match CriticalGender preferences Y woman seeking manAge Y 18-25Marital Status N Single - never marriedBody Type N slim,average,athleticHeight N 5'5"- 6'3"Eyes N anyHair N anyEthnicity N caucasianSmoking N noDrinking N noHave Kids N anyWant(more)kids N yes,don't knowEducation N highschool or beyondEmployment Status N Full-time,Part-time,Self-employed,StudentOccupation N anyIncome N anyReligion Y Christian,None/AgnosticAttend Services N weeklyPolitical Views N anyAstrology N anyLanguages N English
![Page 23: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/23.jpg)
08 December 2003 CS 410 (SBIR Approval) 23
The
MatchMaker
![Page 24: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/24.jpg)
08 December 2003 CS 410 (SBIR Approval) 24
The
MatchMaker
![Page 25: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/25.jpg)
08 December 2003 CS 410 (SBIR Approval) 25
The
MatchMaker
Prototype Decide on how the database will look Create computer end input Software /
GUI Decide on how Matchmakers will
analyze the database / exchange information
Make software to run on a PC the way it would run on MatchMaker Device
![Page 26: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/26.jpg)
08 December 2003 CS 410 (SBIR Approval) 26
The
MatchMaker
Proof of Concept– Phase 1
Test 1 Use computer GUI screens to create
two test profiles Set up two computers with Bluetooth
devices run through simulated MatchMaker link and exchange of databases
![Page 27: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/27.jpg)
08 December 2003 CS 410 (SBIR Approval) 27
The
MatchMaker
![Page 28: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/28.jpg)
08 December 2003 CS 410 (SBIR Approval) 28
The
MatchMaker
Test 3 Test functionality when 9
MatchMakers come in contact with each other at once
![Page 29: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/29.jpg)
08 December 2003 CS 410 (SBIR Approval) 29
The
MatchMaker
Innovation Although compatibility matching
has already been implemented, the portability is a new solution to the real-time dating issue
![Page 30: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/30.jpg)
08 December 2003 CS 410 (SBIR Approval) 30
The
MatchMaker
Management Plan 4 Phases of Organization
Phase 0: Project Conception (77 days) Phase 1: Feasibility/ Prototype (111 days) Phase 2: Plan-Detailed Specifics (212
days) Phase 3: Production Phase (127 days)
Program Duration: 527 days [End of Production… August 2005]
![Page 31: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/31.jpg)
08 December 2003 CS 410 (SBIR Approval) 31
The
MatchMaker
Funding Plan Based on…
Staff Salaries SBIR Funding
(Phases 1 & 2) Through National
Science Foundation Required Resources Time Until Phase
Completion
![Page 32: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/32.jpg)
08 December 2003 CS 410 (SBIR Approval) 32
The
MatchMaker
Phase 0 Project Staff
![Page 33: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/33.jpg)
08 December 2003 CS 410 (SBIR Approval) 33
The
MatchMaker
Phase 0 Personnel MatchMaker Research Team (MMR)
Project Manager Overall Planning and Operations
R&D Manager Prototype Development and Engineering
Staff Marketing Manager
Beta Test (Phase 2), Cruise Line Relations Web Designer/Legal Consultant
Contractual Analysis and Web Site
![Page 34: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/34.jpg)
08 December 2003 CS 410 (SBIR Approval) 34
The
MatchMaker
Phase 0 Tasks & Deliverables
TasksDays
Start Date
End Date
Initial Conception5 09/04/0
309/09/03
Solution and Problem Research20 09/09/0
309/29/03
Primary Feasibility Research20 10/01/0
310/20/03
Feasibility Documentation20 10/01/0
310/20/03
Feasibility Presentation1 10/28/0
310/28/03
Market Research and Analysis10 10/29/0
311/09/03
Milestone Documentation15 11/01/0
311/16/03
Milestone Presentation1 11/12/0
311/12/03
Web Page Development20 10/28/0
311/27/03
Final Proposal Review20 11/10/0
311/30/03
Approval Presentation 1 12/8/03 12/8/03
Final Web Page Review 1 12/8/03 12/8/03
Phase 2 SBIR Documentation Review
112/8/03 12/8/03
Length: 77 days/ ODU Fall (2003) Semester
Phase 0 Deliverables Feasibility Milestones SBIR Approval for
Phase 2 MatchMaker Web
Page
![Page 35: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/35.jpg)
08 December 2003 CS 410 (SBIR Approval) 35
The
MatchMaker
Phase 1 Project Staff
![Page 36: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/36.jpg)
08 December 2003 CS 410 (SBIR Approval) 36
The
MatchMaker
Phase 1 Personnel MatchMaker Future Development
Team (MMFD) CpE (Hardware Programming
Engineer) Prototype hardware programming
Software Testers (2) College Students Low-end Software Testing (Phase 1 & 2) General Office Work
![Page 37: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/37.jpg)
08 December 2003 CS 410 (SBIR Approval) 37
The
MatchMaker
Phase 1 Tasks & Deliverables
Length: 111 days/ ODU Spring (2004) Semester
Phase 1 Deliverables Prototype Design Independent Market
Research Initial Software
Testing SBIR Approval for
Phase 2
TasksDay
sStart Date
End Date
Software Design 45 12/15/03 2/15/04
Prototype Hardware Design 45 12/15/03 2/15/04
Software Development: Java Applet
431/15/04 3/15/04
Hardware Design Testing 15 2/18/04 3/5/04
Prototype Hardware Review 5 3/6/04 3/11/04
Software Development: USB 43 1/15/04 3/15/04
Software Testing 20 3/19/04 4/8/04
Software Review 4 4/9/04 4/13/04
Prototype Integration 6 4/15/04 4/21/04
Prototype Testing 5 4/23/04 4/28/04
Prototype Integration Review 2 4/29/04 4/30/04
Updated Marketing Plan Review 1 3/15/04 3/15/04
Phase 2 SBIR Write Up 5 4/10/04 4/14/04
Phase 2 SBIR Documentation Review
14/15/04 4/15/04
SBIR Presentation 1 5/15/04 5/15/04
![Page 38: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/38.jpg)
08 December 2003 CS 410 (SBIR Approval) 38
The
MatchMaker
Phase 1 Budget
Phase 1 Budget $99,927.40
29%
7%
11%12%
12%
12%
1%2%
2%2%0%
10%
Hardware Engineer III
Software Testers
Nicholas Hundstad
Craig Gilkey
Mike Urban
Mike Pereras
Laptops
Development
Workstation
Server (linux)
Bluetooth USB interface
Microsoft Developer Kit
![Page 39: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/39.jpg)
08 December 2003 CS 410 (SBIR Approval) 39
The
MatchMaker
Phase 1 Budget Items
SBIR Funding Request : $99,927.40 ($100,000)
Phase 1 - 4 Months Units Salaries/ Cost With Benefits Total for Time4
Hardware Engineer III 1 64,313.00$ 90,038.20$ 30,012.73$ Software Testers 2 10,000.00$ 20,000.00$ 6,666.67$ Nicholas Hundstad 1 24,000.00$ 33,600.00$ 11,200.00$ Craig Gilkey 1 24,000.00$ 33,600.00$ 11,200.00$ Mike Urban 1 24,000.00$ 33,600.00$ 11,200.00$ Mike Pereras 1 24,000.00$ 33,600.00$ 11,200.00$ Laptops 2 1,000.00$ 2,000.00$ Development 1 2,000.00$ 2,000.00$ Workstation 4 600.00$ 2,400.00$ Server (linux) 1 2,000.00$ 2,000.00$ Bluetooth USB interface 2 24.00$ 48.00$ Microsoft Developer Kit 1 10,000.00$ 10,000.00$
99,927.40$
![Page 40: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/40.jpg)
08 December 2003 CS 410 (SBIR Approval) 40
The
MatchMaker
Phase 2 Project Staff
![Page 41: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/41.jpg)
08 December 2003 CS 410 (SBIR Approval) 41
The
MatchMaker
Phase 2 Personnel Expanded MMFD (Phase 2)
Mechanical Engineer Physical Device Design, Shock Testing
Marketing/Cruise Consultant Sales Contract, Marketing, Beta Test
Legal Consultant FCC Compliance, Contracts
![Page 42: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/42.jpg)
08 December 2003 CS 410 (SBIR Approval) 42
The
MatchMaker
Phase 2 Tasks & Deliverables
Length: 212 days/ ODU Summer (2004) Semester
Phase 2 Deliverables Preliminary Sales
Contracts Cruise Line
Questionnaire Testing (HW/SW)
Shock On-Site Testing
TasksDay
sStart Date
End Date
Budget Analysis for Phase 1 60 05/15/04 07/15/04
Training Guidelines for Maintenance Personnel
1506/20/04 07/05/04
Software Testing 210 5/16/04 12/16/04
Hardware (Shell) Construction 144 5/30/04 10/24/04
Construct Cruise Line Questionnaire
457/01/05 8/16/05
Preliminary Product Sales Contract
4505/30/04 07/14/04
Market Analysis: Open Sale 120 07/01/04 10/01/04
Test Analysis 30 12/01/04 01/01/04
Final Pre-Production Product Review
1001/01/05 01/15/05
![Page 43: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/43.jpg)
08 December 2003 CS 410 (SBIR Approval) 43
The
MatchMaker
Phase 2 BudgetPhase 2 Budget $413,270.27
12%
15%
13%
21%3%
5%
5%
5%
5%0%1%2%
5%8%
Mechanical Engineer II
Hardware Engineer III
Contract Administrator/ MarketingConsultantLegal Consultant/ Attorney
Software Testers
Nicholas Hundstad
Craig Gilkey
Mike Urban
Mike Pereras
Laptops
Development
Bluetooth Developer Kit
Travel Expenses
Trial Product
![Page 44: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/44.jpg)
08 December 2003 CS 410 (SBIR Approval) 44
The
MatchMaker
Phase 2 Budget Items
SBIR Funding: $413,270.27 ($750,000)
Phase 2 - 8 Months Units Salaries/ Cost With Benefits Total for Time8
Mechanical Engineer II 1 57,624.00$ 80,673.60$ 53,782.40$ Hardware Engineer III 1 64,313.00$ 90,038.20$ 60,025.47$ Contract Administrator/ Marketing Consultant1 59,830.00$ 83,762.00$ 55,841.33$ Legal Consultant/ Attorney 1 92,719.00$ 129,806.60$ 86,537.73$ Software Testers 2 10,000.00$ 20,000.00$ 13,333.33$ Nicholas Hundstad 1 24,000.00$ 33,600.00$ 22,400.00$ Craig Gilkey 1 24,000.00$ 33,600.00$ 22,400.00$ Mike Urban 1 24,000.00$ 33,600.00$ 22,400.00$ Mike Pereras 1 24,000.00$ 33,600.00$ 22,400.00$ Laptops 2 1,000.00$ 2,000.00$ Development 2 2,000.00$ 4,000.00$ Bluetooth Developer Kit 1 10,000.00$ 10,000.00$ Travel Expenses 1 20,000.00$ 20,000.00$ Trail Product 150 121.00$ 18,150.00$
413,270.27$
![Page 45: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/45.jpg)
08 December 2003 CS 410 (SBIR Approval) 45
The
MatchMaker
Phase 3 Project Staff
![Page 46: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/46.jpg)
08 December 2003 CS 410 (SBIR Approval) 46
The
MatchMaker
Phase 3 Personnel Extended MMFD (Phase 3)
Maintenance Technicians Train other technicians that the Cruise
Lines provide Sanitation Basic Repair
HW Outsource: EIMO
![Page 47: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/47.jpg)
08 December 2003 CS 410 (SBIR Approval) 47
The
MatchMaker
Phase 3: Outsourcing Contract
![Page 48: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/48.jpg)
08 December 2003 CS 410 (SBIR Approval) 48
The
MatchMaker
Why We Chose EIMO Injection Molding Facilities
Rapid Prototyping Facilities (in U.S.) State-of-art Robotics (Staubli TM) Bluetooth Capable
Avoidance of Overseas Tariffs, Shipping +$8.85 apiece, +~6 months deliver time
Cost per Unit (includes shipping and packaging costs): $13.25 Final cost 1st 10,000 units:$132,500.00
![Page 49: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/49.jpg)
08 December 2003 CS 410 (SBIR Approval) 49
The
MatchMaker
Phase 3 Tasks & Deliverables
Length: 127 days Phase 3
Deliverables Sales Contracts
Finalized HW Outsource
Produces Units Maintenance
Trainers Online Product Release to
General Public
TasksDays Start
DateEnd Date
Instruction of Maintenance Trainers
157/4/05 7/22/05
Tech Support Contract Signed with Cruise Line
13/22/05 3/22/05
Sales Contract Finalized 1 3/22/05 3/22/05
Production Of Units (Via Hardware Outsource)
903/28/05 7/29/05
Advertising Analysis- Open Market
606/6/05 8/26/05
Trainer’s Initial Training 15 7/4/05 7/22/05
Product Reaches General Public 1 8/31/05 8/31/05
![Page 50: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/50.jpg)
08 December 2003 CS 410 (SBIR Approval) 50
The
MatchMaker
Phase 3 BudgetPhase 3 $1,453,920.93
2% 2% 2%
3%
0%
4%
1%
1%
1%
1%
83%
Mechanical Engineer II
Hardware Engineer III
Contract Administrator/Marketing ConsultantLegal Consultant/ Attorney
Software Testers
Maintenance Trainers
Nicholas Hundstad
Craig Gilkey
Mike Urban
Mike Pereras
Initial Product Batch
![Page 51: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/51.jpg)
08 December 2003 CS 410 (SBIR Approval) 51
The
MatchMaker
Phase 3 Budget ItemsPhase 3 - 4 months Units Salaries/ Cost With Benefits Total for Time
4Mechanical Engineer II 1 57,624.00$ 80,673.60$ 26,891.20$ Hardware Engineer III 1 64,313.00$ 90,038.20$ 30,012.73$ Contract Administrator/ Marketing Consultant1 59,830.00$ 83,762.00$ 27,920.67$ Legal Consultant/ Attorney 1 92,719.00$ 129,806.60$ 43,268.87$ Software Testers 2 10,000.00$ 20,000.00$ 6,666.67$ Maintenance Trainers 4 31,604.00$ 176,982.40$ 58,994.13$ Nicholas Hundstad 1 25,000.00$ 35,000.00$ 11,666.67$ Craig Gilkey 1 25,000.00$ 35,000.00$ 11,666.67$ Mike Urban 1 25,000.00$ 35,000.00$ 11,666.67$ Mike Pereras 1 25,000.00$ 35,000.00$ 11,666.67$ Initial Product Batch 10000 121.35$ 1,213,500.00$
1,453,920.93$
![Page 52: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/52.jpg)
08 December 2003 CS 410 (SBIR Approval) 52
The
MatchMaker
Project Calendar
![Page 53: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/53.jpg)
08 December 2003 CS 410 (SBIR Approval) 53
The
MatchMaker
Project Calendar
![Page 54: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/54.jpg)
08 December 2003 CS 410 (SBIR Approval) 54
The
MatchMaker
Project Calendar
![Page 55: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/55.jpg)
08 December 2003 CS 410 (SBIR Approval) 55
The
MatchMaker
Project Calendar
![Page 56: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/56.jpg)
08 December 2003 CS 410 (SBIR Approval) 56
The
MatchMaker
What’s After Production New Customers To Target
Other Cruise Lines General Public
Summer, 2005 Production Out Years
Dependant on Market Saturation Point Cruise Lines: 2 years after production
starts (2007) General Public: 4 years after Production
(2009)
![Page 57: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/57.jpg)
08 December 2003 CS 410 (SBIR Approval) 57
The
MatchMaker
Evaluation PlanProject Assessment
Success/Failure, and Timeliness
Milestones Compatibility Software Prototype Design
Hardware Testing Shock Testing Range of Bluetooth
Contractual Aspect Cruise Line Outsourcing
![Page 58: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/58.jpg)
08 December 2003 CS 410 (SBIR Approval) 58
The
MatchMaker
Marketing Plan Initial Market: Cruise Ships
Carnival: 20 Ships, NCL: 13 Ships Cruise Line Purchases Units from us
Rent them out to customer Typical Cost: Cruise + Airfare = $1089.66
Typical Customer spends $230.20 on Drinks, Excursions, Services
Average number passengers: 2,045 Of which 54% are single
Of those: ~350 with a singles program Our Estimated Target Use per Cruise: 10 % Why 10%? Promoted during ticket sale and on ship
![Page 59: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/59.jpg)
08 December 2003 CS 410 (SBIR Approval) 59
The
MatchMaker
21%
33%46%
Non Single
Singles Not Witha SinglesProgramSingles with aSingles Progam
10%
44% 46% Other Singles
Non Singles
Singles UsingDevice
![Page 60: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/60.jpg)
08 December 2003 CS 410 (SBIR Approval) 60
The
MatchMaker
Competition Matrix
Yahoo! Personals ● ● ● ●* ● ● ●
Match.com ● ●* ●* ● ●* ● ●+ *eHarmony ● ●* ● ●
Kiss.com ● ● ●* ● ● +
Lavalife ● ● ● ●* ●
uDate ● ● ● ●* ● ●
SMS ● ● ● ●* ● ●* ● ●*
AmericanSingles ● ● ● ●* ● ● ●
Gaydar ● ● ● ● ~$50
Lovegety ● ● ● ● ~$21
Crusie Ships ● ● ~$1000
The cs410 MatchMaker ● ● ● ● ● ● ● + ● ● ~$150
* - Pay for Service+ - Possible feature
![Page 61: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/61.jpg)
08 December 2003 CS 410 (SBIR Approval) 61
The
MatchMaker
Marketing Test Test/ Trial run: 300 units on 1
Ship Near End of Pre-Production (Phase
2) Through a Singles Cruise Agency
Large Organized Group Exit Survey of Participants Internal Data Collection
![Page 62: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/62.jpg)
08 December 2003 CS 410 (SBIR Approval) 62
The
MatchMaker
Market Sale During Cruise Ticket Sale
Tack Questionnaire Onto Cruise Line Initial Customer Information Form
Personal Data Collected for Device Arrival: Device Preprogrammed with Data
Onboard Have the opportunity for passengers to rent
a device for the duration Device will be available for exiting/ personal
sale to passengers
![Page 63: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/63.jpg)
08 December 2003 CS 410 (SBIR Approval) 63
The
MatchMaker
$0$100,000$200,000$300,000$400,000$500,000$600,000$700,000
Phase 1 Phase 2 Phase 3 1stQuarter
2ndQuarter
3rdQuarter
4thQuarter
2nd year 2ndQuarter
OverheadProfits
Return on Investment
![Page 64: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/64.jpg)
08 December 2003 CS 410 (SBIR Approval) 64
The
MatchMaker
Profit Analysis Initial Market Unit Cost:
$209.95 Selling to Singles on Cruise: $225.95
Production Cost: $121.35 Profit Per unit: $88.60
Number Sold to Meet Cost: 8,686 Units (Based on Cost: $770,068.60)
Initial Production: 10,000 Units
Future Production:Initial Market Analysis + Test Surveys
![Page 65: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/65.jpg)
08 December 2003 CS 410 (SBIR Approval) 65
The
MatchMaker
Incentive for Cruise Ship to Buy Cruise Line Buys (1) Unit: $209.95
Rents to Each Customer: $25 Unit is Paid for in 10 Months (10 uses)
PROFIT for the Cruise Line from that point on
Increased renown of Cruise LineCosts vs Profit: Cruise Ships
$0
$50
$100
$150
$200
$250
$300
$350
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CostsProfit
![Page 66: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/66.jpg)
08 December 2003 CS 410 (SBIR Approval) 66
The
MatchMaker
Secondary Markets General Single Population
34.7 million singles between the ages of 20 and 44
Release: August 2005 Advertising Analysis: Phase 2 & 3
Bluetooth Devices Download MatchMaker program onto
a PDA, Cell phone or other Bluetooth enabled device
![Page 67: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/67.jpg)
08 December 2003 CS 410 (SBIR Approval) 67
The
MatchMaker
Contract Aspects Contractual Agreement
Will sell x devices to Cruise Line companies Will offer a 90-day manufacturer’s warranty Disclaimer
FCC compliance Will apply during Phase I testing
Manufacturer’s Contract Contract for mass-production in Phase II
![Page 68: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/68.jpg)
08 December 2003 CS 410 (SBIR Approval) 68
The
MatchMaker
Product Disclaimer Will not guarantee successful
relationships Will not guarantee honest compatibility
data transmission Will not prevent “stalking” Will not give pick-up lines Will not replace device if improperly
handled (i.e. abuse, negligence, mishandle, misuse)
![Page 69: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/69.jpg)
08 December 2003 CS 410 (SBIR Approval) 69
The
MatchMaker
Risks Societal
Acceptance as a solution ‘Star Trek Convention’
Effect Fear that it could be used
as a prostitution tool (WiredNews, 2003)
Stalkers
![Page 70: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/70.jpg)
08 December 2003 CS 410 (SBIR Approval) 70
The
MatchMaker
Risks Financial
Failure to achieve financial backing for Phase 3
Cost of components
![Page 71: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/71.jpg)
08 December 2003 CS 410 (SBIR Approval) 71
The
MatchMaker
Risks Technical Risks
Hardware Failure Managerial Risks
Few breaks in schedule Schedule Risks
FCC Approval is Delayed (red tape)
Unforeseen Production Delays
![Page 72: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/72.jpg)
08 December 2003 CS 410 (SBIR Approval) 72
The
MatchMaker
Why Continue Into CS 411? All Materials are COTS Products
Incl. BlueTooth chip, Wiring, LCD Screen All tested at source Competitive Prices (for 2 models)
Similar BlueTooth Cell Phone Products ~1,500 LOC for Java Applet in Sony Ericcson
model (Ewired, 2003) With Testing: 2-3 months programming
Device not restricted to particular geography
![Page 73: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/73.jpg)
08 December 2003 CS 410 (SBIR Approval) 73
The
MatchMaker
Why Chose OUR SBIR Project? Plan is WITHIN requested SBIR
Funding Phase 2 Request: Savings of $318,579.73
Outsourcing Hardware (EIMO): in U.S. Guaranteed Portion of Sales and Salaries
to U.S. Interests: ~54% (Hallman, Vicksburg EIMO Plant, 2003)
![Page 74: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/74.jpg)
08 December 2003 CS 410 (SBIR Approval) 74
The
MatchMaker
Conclusion The MatchMaker Project
On Schedule Staff is Available Meets SBIR Funding Request Can reach Production in 20 months
time Budget Market is ripe for the picking
![Page 75: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/75.jpg)
08 December 2003 CS 410 (SBIR Approval) 75
The
MatchMaker
Any Questions? Thank you for your time!
![Page 76: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/76.jpg)
08 December 2003 CS 410 (SBIR Approval) 76
The
MatchMaker
Current Transmission Solutions 1) Require Cell phone towers
SMS Text and Pic messages SMS.ac has relationships with
over 400 operators/mobile networks worldwide (SMS, 2003)
Requires existing phones like Sprint Sanyo 6100 pic phone
Price: $200 (FCPG, 2003) (Dateline, 2003)
*SMS = Standard Message Service
![Page 77: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/77.jpg)
08 December 2003 CS 410 (SBIR Approval) 77
The
MatchMaker
Current Transmission Solutions 2)Use Bluetooth, but
Individual Phones are Too Costly Sprint PCS Treo 660
The cost without a contract is $599 USD (Handspring /Palm, 2003)
Sprint Sanyo 6100 pic phone
![Page 78: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/78.jpg)
08 December 2003 CS 410 (SBIR Approval) 78
The
MatchMaker
Cell Phone Use Underway?
‘Normal’ Systems: Like Sprint PCS(?) No transmission towers on Cruise
Liners Satellite Phone Relay only
(Travelocity, Carnival 2003)
![Page 79: CS 410 The MatchMaker Project](https://reader036.vdocument.in/reader036/viewer/2022062406/56814a88550346895db799f8/html5/thumbnails/79.jpg)
08 December 2003 CS 410 (SBIR Approval) 79
The
MatchMaker
Blue Tooth Capabilities Focus of Use: Inside Large Rooms
10 meters range Numerous Large Spaces on board
“Unable to penetrate masonry walls” (Bruzzese ,2003)
Room to Room SMART Access Points? Bluetooth Compliant Server (Linux Op Sys) (1)Red-M's 1050AP smart access point:
$495