    Neutralization at Coloral

    Complete industrial wastewater treatment plant for acidic

    and alkaline wastewater arising from production

    Coloral, a company with headquartersin Neuchtel, processes customer or-ders in the area of surface treatments.These include mechanical processes,such as sandblasting, brushing,engraving, CNC lasering, polishing,drilling and milling, among others.Electromechanical processes, such aschemical chromatization, chemicalengraving, decorative anoxic oxida-

    tion and other chemical processes,produce different types of acidic andalkal ine wastewater.

    These must be treated before theyare discharged into the public sewagetreatment plant.

    For the new CP system, the customerassigned Endress+Hauser with thedesign of a complete wastewater treat-ment i.e. neutralizat ion facility.

    Concept

    With CP (cathodic protection), a new

    surface treatment machine, Coloral is

    expanding to an industrial facility in La

    Neuveville.

    Even during the planning stage of this ex-

    pansion, the wastewater treatment concept

    received particular attention.

    Ordinary sur face treatment in the CP

    machine involves surface treatment of

    semi-finished products made of aluminum,

    using alka li and acid. During the process,small amounts of acidic and alkaline

    wastewater are produced. These are

    subject to continuous neutralization before

    entering the sewage system.

    Once or twice a month, the acidic and

    alkal ine baths in the CP machine must be

    replaced. The only way to treat the heavily

    contaminated wastewater is by means of

    batch neutralization.

    Due to space restrictions, a combination of

    both processes presented the only viable

    option.

    Chemical dosing station and pH measurement Reservoir Display on touch panel

    Scopeof

    delivery

    Endress

    +Hauser

    -Bas

    icengine

    ering

    -Det

    ailengin

    eering

    -CA

    Dwiring

    scheme

    -Ca

    binet

    -Soft

    ware

    -PLC

    program

    mablelo

    gic

    controlle

    r

    -Me

    asureme

    nttechn

    ology

    -Bas

    in,agita

    tor,valv

    es,

    pumps

    -Mo

    unting

    -Com

    missioni

    ng

    Fact

    s

    -Lowsp

    acerequ

    irements

    -Aut

    omaticc

    ontrolle

    r

    -Tur

    n-keysy

    stem

    -Com

    bination

    of

    continuo

    usandb

    atch

    neutraliz

    ation

  • 7/28/2019 CS003Ben_20_Coloral

    2/2

    Instruments International

    Endress+Hauser

    Instruments International AG

    Kaegenstrasse 2

    4153 Reinach

    Switzerland

    Tel. +41 61 715 81 00

    Fax +41 61 715 25 00

    http://www.endress.com

    [email protected]

    12.06/I.I.

    CS 003B/20/en/12.07

    EH/INDD CS2

    Planning, construction

    The key to success in this project was

    engineering and project management.

    The customer wanted a turn-key system

    including the process for wastewater treat-

    ment.

    The low space requirement, together with

    a combination of continuous and batch

    neutralization, presented a real challenge

    in the planning and construction of the

    system. A PLC system, type WAGO I/O,

    was used to build the cabinet.

    A touch panel was used to provide a qu ick

    and simple overview of the current opera-

    tion. The interactive display, showing the

    status of the basins, pumps, valves and lev-

    els, keeps you informed about the process

    sequence at all times.

    Using a rotary switch, the customer can

    switch between continuous and batch neu-

    tralization. This is of particular importance

    as the basin must first be completely emp-

    tied for batch neutralization. This is due

    to the fact that during clean ing of the CP

    machine, several hundred liters of diluted

    alka li and acid are produced. As these have

    different concentrations, space is needed

    initially in the neutralization basin after

    mixing to allow for the larger quantity of

    chemicals which must be added.

    When the plant was commissioned, itemerged that, due to the precision control

    of the PLC, chemical pumps with large

    dosing units are also suitable for dosing

    small amounts during normal operation.

    Continuous and batch basin

    View of the neutra lizat ion basin

    The PLC is then able to call on the maxi-

    mum dosing performance of the pumps

    duning batch neutralization.

    In the outlet of the system, the pH value is

    measured and continuously recorded using

    a graphic display recorder.