CMS Week, 3-7 November 2003 1
CSC Trigger Test Beam ReportCSC Trigger Test Beam ReportCSC Trigger Test Beam ReportCSC Trigger Test Beam Report
Cast of many
CMS Week, 3-7 November 2003 2
Beam Test of 2 CSC’s at X5aBeam Test of 2 CSC’s at X5aBeam Test of 2 CSC’s at X5aBeam Test of 2 CSC’s at X5a
/
Goals: 1) Verify that the peripheral crate electronics (mainly DMB/TMB) are ready for production2) Complete an electronic chain test of data transmission from CSC front-end electronics to counting-room trigger electronics, all operating synchronously with the 40 MHz structured beam3) Test new XDAQ-based software
CMS Week, 3-7 November 2003 3
Beam Test SetupBeam Test SetupBeam Test SetupBeam Test Setup
Peripheral Crate2 DMB, 2 TMB1 CCB, 1 MPC
FED crate 1 DDU
PC
TTC crate
DAQ Data
Trigger primitives
S1 S2 S3
beam
CSC 1 CSC 2
Track Finder CrateTRIDAS
2 CSC’s, all on-chamber boards
Up to 80K events read out in 2.6s spill
CMS Week, 3-7 November 2003 4
Typical Muon Event (CSC1 tilted)Typical Muon Event (CSC1 tilted)Typical Muon Event (CSC1 tilted)Typical Muon Event (CSC1 tilted)
CMS Week, 3-7 November 2003 5
CSC Peripheral CrateCSC Peripheral CrateCSC Peripheral CrateCSC Peripheral CrateFrom front-end cards
2 Trigger Motherboards (TMBs) for trigger primitive generation, and 2 DAQ Motherboards (DMBs) for chamber read out
Muon Port Card (MPC), which sends trigger primitives on optical links
DDU, interface to DAQ
Clock & Control Board (CCB) with TTCRx
CMS Week, 3-7 November 2003 6
CSC Track-Finder CrateCSC Track-Finder CrateCSC Track-Finder CrateCSC Track-Finder CrateSector Processor, receives optical data
CCB with TTCRx MPC, for in-crate tests
CMS Week, 3-7 November 2003 7
2003 Test Beam Chronology2003 Test Beam Chronology2003 Test Beam Chronology2003 Test Beam Chronology
• Phase I – structured beam• May 23-June 1
• ALCT timing tests
• CLCT and TMB studies
• High-rate tests
• Phase II – unstructured beam• June 13-28
• CLCT and TMB studies
• Low-rate and high-rate tests
• Phase III – additional structured beam• September 18-22
• Trigger optical link data transmission tests (MPC to SP) from peripheral electronics to counting room electronics
ALCT = anode pattern logic & BX assign
CLCT = cathode pattern logic
CMS Week, 3-7 November 2003 8
Phase I ResultsPhase I ResultsPhase I ResultsPhase I Results
• Optimal timing found
• Fairly high efficiency (~98-99%) achieved
• Peripheral crate system basically working as desired
• Chamber angle, HV, threshold scans
CMS Week, 3-7 November 2003 9
Structure repeats during 2.6 s spill length
48 bunches25 ns bunch spacingbunch width 3-5 ns
SPS orbit period
1.2 s
23 s
2003 Synchronous Beam 2003 Synchronous Beam StructureStructure
2003 Synchronous Beam 2003 Synchronous Beam StructureStructure
CMS Week, 3-7 November 2003 10
Bunch Structure, ALCT Delay TuningBunch Structure, ALCT Delay TuningBunch Structure, ALCT Delay TuningBunch Structure, ALCT Delay Tuning
BX efficiency vs. ALCT delay setting 0-31 ns
Chamber 1 Chamber 2
Expect muons in 48 out of 924 bx verified by CLCT BXN from data
CMS Week, 3-7 November 2003 11
BX Distributions With Optimal Anode DelaysBX Distributions With Optimal Anode DelaysBX Distributions With Optimal Anode DelaysBX Distributions With Optimal Anode Delays
Note logarithmic scale
Cathodes: • Data mostly in 3 BX (no fine time-adjustment possible)
Anodes: • Data 98.7% in 1 BX (after fine time-adjustment)
Chamber 1 Chamber 2
CMS Week, 3-7 November 2003 12
CLCT PositionsCLCT PositionsCLCT PositionsCLCT Positions
• Relative position of key half-strip from CLCTs from Chamber 2 vs. Chamber 1
• Note: Chamber 1 is vertically higher than Chamber 2 (thus the offset in position).
Zoom
CMS Week, 3-7 November 2003 13
Correlated LCT EfficiencyCorrelated LCT EfficiencyCorrelated LCT EfficiencyCorrelated LCT Efficiency
The efficiency to identify a correlated LCT (ALCT+CLCT) in csc #3 in a straight line path from an LCT found in csc #8 (within a 2.5 half-strip and 2.5 WG tolerance) is:
• 98.6% in one BX• 99.5% in two BX (correct BX or one after)• 99.7% in three BX (correct BX 1)
(as determined from Track-Finder data from Phase 3)
abs(wg3-wg8)
abs(wg3-wg8)
abs(strip3-strip8)
abs(strip3-strip8)
CMS Week, 3-7 November 2003 14
Trigger Rate TestsTrigger Rate TestsTrigger Rate TestsTrigger Rate Tests
Expected LCT rate at LHC < 25 KHz (ME1/1)
data consistent with dead-time = 225 ns
Chamber #1 CLCT
0
500
1,000
1,500
2,000
0 500 1,000 1,500 2,000 2,500 3,000
Beam Intensity (KHz)
CL
CT
Ra
te (
KH
z) SLHC (10xLHC) SLHC
(10xLHC)
CMS Week, 3-7 November 2003 15
Test Beam, Phases 2 & 3Test Beam, Phases 2 & 3Test Beam, Phases 2 & 3Test Beam, Phases 2 & 3
• Timing-in procedures improved & documented• Very high efficiencies achieved
• Highest trigger efficiency of 99.9% required low rate (few kHz)
• 2-chamber “excellent event” (CFEB, CLCT, ALCT) efficiency limited to 99% due to CFEB timing
• Improved scans taken:• Angle scan• HV scan• Comparator threshold scan• Pattern requirements scan• Logic scope read out on most data
• True time history of LCTs logged by Track-Finder• QPLL tested
CMS Week, 3-7 November 2003 16
CSC Track-Finder TriggerCSC Track-Finder TriggerCSC Track-Finder TriggerCSC Track-Finder Trigger
Test 3 × 1.6 Gb/s optical link connections from CSC electronics
Uses TLK2501 chipset from TI
Requires very stable reference clock for error-free operation
Failed during May tests without PLL
Home-built VCXO & PLL clock patch added to clean incoming TTC clock for links, but TTC QPLL also tested
CMS Week, 3-7 November 2003 17
TTC QPLL Mezzanine cardTTC QPLL Mezzanine cardTTC QPLL Mezzanine cardTTC QPLL Mezzanine card Three made available to
CSC group for testing during Sept.03 structured beam test
Provides stable clock signalsat 40, 80, and 160 MHz at correct LHC frequency
Installed on Clock and Control Board (CCB) with 40 MHz clean clock sent to backplane and 80 MHz clock sent by twisted pair to SP and MPC
• Noticed that CCB commands have 1 BX extra latency with TTCRq
TTCRq
CMS Week, 3-7 November 2003 18
PLL ResultsPLL ResultsPLL ResultsPLL Results
Using either the home-built VCXO+PLL solution or the CERN QPLL solution for the 80 MHz reference clock to TLK2501 receivers:
• PLL locks to incoming machine clock
• Measured frequency: 40.078893(1) MHz
• No errors on optical links reported over many hours of PRBS and data tests
Data successfully logged by both CSC DAQ and CSC Track-Finder readout
• SP data FIFO synchronized to L1A
CMS Week, 3-7 November 2003 19
TTCRq (QPLL) Test ResultsTTCRq (QPLL) Test ResultsTTCRq (QPLL) Test ResultsTTCRq (QPLL) Test Results
QPLL 80 MHz clock directly to MPC transmitters & home-built VCXO+PLL for SP receivers:
• No link errors for 20 minute PRBS test
QPLL 80 MHz clock directly to SP receivers andMPC uses default clock multiplier:
• No link errors for 15 minute PRBS test• Successfully logged data for 10K events (run 5151)
QPLL 40 MHz clock on TF crate backplaneand SP uses DLL in FPGA for clock multiplier:
• Solution tried for Phase 1 (May) structured beam running• Link errors observed in PRBS test
TTCRq on CCB in peripheral crate• Able to take data with same trigger efficiency
(i.e. TTCRq works for peripheral crate electronics as well and is compatible with TTCRm)
CMS Week, 3-7 November 2003 20
Data-taking Mode, Phase 3Data-taking Mode, Phase 3Data-taking Mode, Phase 3Data-taking Mode, Phase 3Most data logged using two independent
DAQ systems:• “CFEB Control” for DDU data
(same as Phases 1&2)• “SP DAQ” for Track-Finder data
(standalone SP readout)• SP records 5 BX of input data for each L1A, with
most trigger data arriving on central BX• Allows study of time-dependence of trigger data
XDAQ-based event builder also able to log data• Underlying SP code the same as for standalone
DAQ since it was written using XDAQ• All analysis of SP and DDU data from either DAQ
system is done using the XDAQ-based software
CMS Week, 3-7 November 2003 21
Data ComparisonData ComparisonData ComparisonData ComparisonCSC Track-Finder DataCSC Data from DAQ
CSC 2CSC 1
CMS Week, 3-7 November 2003 22
Detailed TMB–SP ComparisonDetailed TMB–SP ComparisonDetailed TMB–SP ComparisonDetailed TMB–SP Comparison
Run TMB data through MPC simulation to compare with SP• MPC is not directly read out
• Use BXN reported by TMB for each LCT
Preliminary comparison between SP and TMB for all 5 BX read out by SP for every L1A match:• 98% agreement for ~70K events
Mismatches between TMB and SP data are in BX assignment only, not in LCT frames
CMS Week, 3-7 November 2003 23
SP – TMB MismatchesSP – TMB MismatchesSP – TMB MismatchesSP – TMB Mismatches
Nearly all of the mismatches involve differing BX assignment for LCTs from the TMB for csc#8
• Data frames are in agreement, however
Excluding csc#8 in these cases and comparing TMB and SP for csc#3 near perfect agreement
• Just 32 discrepancies from an analysis of 60K events, where BX assignment of TMB for csc#3 differs
For these mismatches, the SP usually has the LCTs on the central BX in the SP read-out
• So trigger data appears to be good!
Conclusion for DAQ readout of TMB data:• TMB #8 has BX error 2% of time• TMB #3 has BX error 5×10-4 of time