Page 1: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

CSO Annual Report for 2015

1

Page 2: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Last CSO Construction Milestones are Achieved

On January 1, 2015:  32 of the 35 Projects in MWRA’s Long‐Term CSO Control and Schedule Seven were complete.  The last 3 CSO projects are now complete.

Last Construction Milestones Achieved

p p j p

Last Construction Milestones AchievedOct 2015 MWRA to complete construction of control gate and

floatables control at outfall MWR003, and MWRA Rindge Avenue Siphon relief.

10/28/15

g p f

Dec 2015 MWRA, in cooperation with BWSC, to complete construction of Reserved Channel sewer separation.

12/11/15

MWRA i i i h C b id l 12/23/15MWRA, in cooperation with Cambridge, to complete construction of CAM004 sewer separation.

12/23/15

2

Page 3: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

33. MWR003 Gate, Floatables Control and Siphon Relief

Water Resource: Alewife Brook

$3,763,000

CSO Outfalls:MWR003CAM004

Frequency of Discharge (typical year)MWR003 before project:  1MWR003 with project:   5CAM004 before project: 63CAM004 with project:       Eliminated

Annual Discharge Volume (typical year)Annual Discharge Volume (typical year)MWR003 before project:  0.06 mgalMWR003 with project:  1.0 mgalCAM004 before project: 24.1 mgalCAM004 with project:      Eliminated

3

Page 4: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

34. Reserved Channel Sewer Separation - BWSC

Water Resource: Reserved ChannelBWSC installed 81,200 linear feet of new sewer and storm drain 

Water Resource: Reserved Channel

$70,559,000

to separate 365‐acre area of South Boston tributary to four CSO outfalls along the Reserved Channel.

CSO Outfalls:BOS076, BOS078, BOS079, BOS080

Frequency of Discharge (typical year)f jBefore project:  37

With project:   3

Annual Discharge Volume (typical year)Before project:  28 million gallonsp j gWith project: 1.5 million gallons

CSO Reduction by Volume:  95%

4

Page 5: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

35. CAM 004 Sewer Separation – Cambridge

City of Cambridge installed 55,300 linear feet of new or rehabilitated sewer and storm drain to separate a 211‐acre area east of Fresh Pond Parkway Closed Outfall

Water Resource: Alewife Brook acre area east of Fresh Pond Parkway.  Closed Outfall CAM004.

$100,000,000 $54,000,000 (MWRA Share)

CSO Outfalls:CAM004

Frequency of Discharge (typical year)CAM004 before project: 63CAM004 with project: Eliminated

Annual Discharge Volume (typical year)Annual Discharge Volume (typical year)CAM004 before project: 24.1 mgalCAM004 with project: Eliminated

5

Page 6: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Long-Term CSO Control Plan Accomplishments

CSO reduction and water quality improvement every yearsince 1987.since 1987.

Many outfalls closed by the communities in the late 1980’s Elimination of dry weather overflows by 1990 Completion of Deer Island transport upgrades by 1992 >100 CSO system optimization measures 1993‐97 Construction of 35 CSO projects 1996‐2015

181 CSO‐related federal court milestones to date. Completion of the last construction project in the

Boston Harbor Case in December 2015. 

6

Page 7: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Long-Term CSO Control Plan Accomplishments

35 CSO projects designed and constructed in 20 years (1996‐2015)

125 contracts and agreements 82 construction 33 engineering 10 planning/tech. support

5 MWRA/CSO Community agreementstotaling $423 milliontotaling $423 million

$907 million capital investment by MWRA

7

p y

Page 8: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Long-Term CSO Control Plan Benefits

The LTCP brings 84 CSO outfalls into compliance:

34 outfalls are closed to CSO discharges

5 outfalls along the South Boston beachesh 25 l l f lhave 25‐year storm level of control

4 outfalls have upgraded wet weathertreatment (CSO facilities)treatment (CSO facilities)

Frequency and volume of dischargegreatly reduced at remaining outfalls

Reduces system‐wide CSO dischargevolume in a typical year by 88%, with93% of remaining volume treated at

8

93% of remaining volume treated atMWRA’s CSO facilities.

Page 9: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

CSO Reduction by Receiving Water

9

Page 10: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

A Water Resource Focus

10

Page 11: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Focus on Water Resources (Alewife, Mystic and Chelsea)

11

Page 12: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

CSO Cost by Receiving Water – Total $906.6 Million

Does not include the >$200M investment in the Deer Island transport system by the early

12

Does not include the >$200M investment in the Deer Island transport system by the early 1990’s, which greatly reduced CSO discharge, especially benefiting the Charles River.

“Regional” includes area‐wide planning and system optimization measures.“Lower Charles River” includes the Back Bay Fens.

Page 13: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Current Water Quality in Boston Harbor and Its Tributaries: Compliance with Swimming Standards

Mystic River mainstem Inner Harbor/Chelsea/Mystic confluence% meeting 

Percent of samples meeting the Enterococcusswimming limit 104 counts/100mL for all weather conditions, 2010‐2015 and change in CSO volume, in million gallons, 1988‐2015.

gswimming standards

% meeting swimming standards

84%87%

80%

100%

2

3

4

Percent  tre

Overflow Volum

e       

on Gallons)

%  of CSO discharge receiving  treatment

Lower Charles River basin Outer Harbor

North Dorchester Bay% meeting swimming standards

% meeting swimming standards

% meeting swimming standards

88% 99%

40%

60%

0

1

1988 1998 2008

ated

Annu

al O

(Billio

Total CSO volume discharged over time

g

2015

SouthernHarbor

Lower Neponset River/South Dorchester Bay

Treatment plant outfalls closed in 2000

No CSO discharges since 2010

88%96%

Southern Harbor

No CSO discharges i 200

% meeting swimming standards

% meeting swimming standards

76%99%

Treatment plant outfalls closed in 1998

since 2007

Page 14: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Current Water Quality at Boston Harbor Beaches: Compliance with Swimming Standards

Constitution BeachSouth Boston Beaches

% meeting standards after CSOs eliminated

% meeting standards after CSOs eliminated

20

30

10

20

30

\ \

98%94%

after CSOs eliminated

No CSO

0

10

1988 2005 2011 20151988 2000\‐\

01988 2005 2011 20151988 2000

\‐\

Malibu/Savin Hill BeachTenean Beach

Volume of CSO over time (MG)

Volume of CSO over time (MG)No CSOs

% meeting standards after CSOs eliminated

300

400

300

400

Wollaston Beach84%

88%

% meeting standards

% meeting standards after CSOs eliminated

after CSOs eliminated

90%

0

100

200

1988 2005 2011 20151988 2000\‐\

0

100

200

300

1988 2005 2011 20151988 2000\‐\

88%

No CSOs located near  this beach  

Volume of CSO over time (MG)Volume of CSO over time (MG)

No CSOs

No CSOs

Percent of samples meeting the Enterococcus swimming limit 104 counts/100mL for all weather conditions, 2010‐2015 and change in CSO volumes near each beach, 1988‐2015.

Page 15: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

South Boston Beaches Meet Bacteria Limits onMore Sampling Days

Results from DCR swimming season sampling were used to calculate the fraction of sampling dayswhere at least one bacteria sample failed to meet the posting limit of 104 cfu/100 mL Enterococcusat South Boston beaches. Bar graph includes results for Carson, M St and City Point beaches for2011‐2015 swimming seasons.

Page 16: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Change in Lower Charles River Water Quality Over Time

Upper Charles BasinWatertown Dam to BU Bridge

Mid‐basinBU Bridge to Science Museum

Samples collected from: 1989‐1997 2008‐2015

56%%

Dry / Damp  81%96%

Dry / Damp 

38%

11%

95%

86%

51%

y / p

Light Rain

Heavy Rain

73%

32%

96%

94%

73%

y / p

Light Rain

Heavy Rain

Samples meeting 104 limit  Samples meeting 104 limit 

Charles River mouthNorth End/Coast Guard Base

Downstream of EsplanadeScience Museum to New Charles Dam

82%97%

Dry / Damp  93%97%

Dry / Damp 

Samples meeting 104 limit Samples meeting 104 limit

80%

48%

97%

100%

83%

Light Rain

Heavy Rain

96%

55%

97%

96%

81%

Light Rain

Heavy Rain

Dots are MWRA sampling locations. State swimming standards for Enterococcus single sample limit is 104 cfu/100 mL.  Rainfall:  Heavy Rain is at least 0.5 inches of rain in previous 48 hours; Light Rain is between 0.1 and 0.5 inches of rainfall in previous 48 hours.  2008 – 2015 period is considered current conditions, following substantial  completion of infrastructure improvements.  Data from intervening years  (2000 – 2007) are excluded.

Samples meeting 104 limit  Samples meeting 104 limit 

Page 17: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Change in Alewife Brook and Mystic River Water QualityOver Time

Samples collected from: 1989‐1997 2008‐2015

Alewife BrookLittle River to Alewife confluence

Lower Mystic mainstemRt 16 bridge to Earhart Dam

13%Dry / Damp 95%Dry / Damp

l l l l

10%

0%

56%

38%

12%

Dry / Damp 

Light Rain

Heavy Rain

95%

68%

99%

92%

64%

Dry / Damp 

Light Rain

Heavy Rain

Samples meeting 104 limit  Samples meeting 104 limit 

Upper Mystic MainstemMystic Lakes to Medford Sq.

Mystic River mouthEarhart Dam to Tobin Bridge

81%93%

Dry / Damp  88%95%

Dry / Damp 

Samples meeting 104 limit  Samples meeting 104 limit 

45%

31%

73%

43%

Light Rain

Heavy Rain

74%

55%

88%

62%

Light Rain

Heavy Rain

Dots are MWRA sampling locations. State swimming standards for Enterococcus single sample limit is 104 cfu/100 mL.  Rainfall:  Heavy Rain is at least 0.5 inches of rain in previous 48 hours; Light Rain is between 0.1 and 0.5 inches of rainfall in previous 48 hours. 2008 – 2015 period is considered current conditions, following substantial  completion of infrastructure improvements.  Data from intervening years  (2000 – 2007) are excluded.

Page 18: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Change in Lower Neponset River Water Quality Over Time

Samples collected from: 1989‐1997 2008‐2015

Lower Mills DamBaker Dam, Milton/Dorchester `

Lower NeponsetRt 3A bridge to Old Colony YC

21% 65%21%

14%

7%

91%

62%

39%

Dry / Damp 

Light Rain

Heavy Rain

65%

45%

37%

87%

66%

44%

Dry / Damp 

Light Rain

Heavy Rain

Samples meeting 104 limit Samples meeting 104 limit 

Granite Ave BridgeNear I‐93, Milton/Dorchester

Neponset River mouthSouthern Dorchester Bay

50%77%

Dry / Damp  95%99%

Dry / Damp 

Samples meeting 104 limit Samples meeting 104 limitSamples meeting 104 limit 

34%

15%

59%

47%

Light Rain

Heavy Rain

94%

42%

94%

81%

Light Rain

Heavy Rain

Samples meeting 104 limit 

Dots are MWRA sampling locations. State swimming standards for Enterococcus single sample limit is 104 cfu/100 mL.  Rainfall:  Heavy Rain is at least 0.5 inches of rain in previous 48 hours; Light Rain is between 0.1 and 0.5 inches of rainfall in previous 48 hours. 2008 – 2014 period is considered current conditions, following substantial completion of infrastructure improvements.  Data from intervening years  (2000 – 2007) are excluded.

Page 19: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Change in Inner Harbor Water Quality Over Time

Samples collected from: 1989‐1997 2008‐2015

Chelsea CreekDownstream of Headworks

Inner HarborTobin Bridge to Falcon Terminal

96%97%

Dry / Damp 96%98%

Dry / Damp 

80%

73%

97%

100%

75%

Light Rain

Heavy Rain

92%

64%

98%

95%

79%

Light Rain

Heavy Rain

Samples meeting 104 limit Samples meeting 104 limit 

Fort Point ChannelBroadway to Northern Ave.

Inner Harbor Mouth /Reserved Channel

64%75%

Dry / Damp  98%98%

Dry / Damp 

Samples meeting 104 limit  Samples meeting 104 limit 

37%

19%

54%

32%

Light Rain

Heavy Rain

99%

74%

95%

82%

Light Rain

Heavy Rain

Dots are MWRA sampling locations. State swimming standards for Enterococcus single sample limit is 104 cfu/100 mL.  Rainfall:  Heavy Rain is at least 0.5 inches of rain in previous 48 hours; Light Rain is between 0.1 and 0.5 inches of rainfall in previous 48 hours. 2008 – 2015 period is considered current conditions, following substantial completion of infrastructure improvements.  Data from intervening years  (2000 – 2007) are excluded.

Page 20: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Change in Boston Harbor Enterococcus Bacteria in Wet Weather

Prior to Boston Harbor projects (1989‐1991) Most Boston Harbor projects complete (post‐2007)

Contours show the geometric means of Enterococcus bacteria samples collected when more than 0.2 inches of rain fell in the previous day.  Blue areas meet the EPA geometric mean standard for Enterococcus (35 cfu/100 mL) and red‐purple areas exceed the standard.Enterococcus (35 cfu/100 mL) and red purple areas exceed the standard.  

Page 21: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

MWRA CSO Capital Investment and Spending

Total capital cost (planning, design and construction):  $906.6 M

Spent thru Dec 2015:  $891.0 M

$Remaining spending of $15.6 M for:

• Cambridge CAM004 surface restoration:  $9.7 M

• BWSC Reserved Channel project close‐out and Dorchester inflow removal:  $3.8 M

• 3‐year CSO performance assessment thru 2020:  $2.0 M

21

Page 22: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Remaining Federal Court Obligations

There are 184 CSO relatedThere are 184 CSO relatedmilestones in Schedule Seven.  

Three milestones are left:

March 2016: Submit CSO annual progress report (for 2015).

January 2018: Commence 3‐year performance assessment.January 2018: Commence 3 year performance assessment.

December 2020:   Submit results of 3‐year performance assessment.

22

Page 23: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Remaining Federal Court Obligations

Remaining Schedule Seven Milestones

Jan 2018 MWRA to commence three-year performance assessment of its Long-Term CSO Control Plan. The assessment shall include post-construction monitoring in accordance with EPA’s Combined SewerOverflow (CSO) Policy, 59 Fed. Reg. 18688 (Apr. 19, 1994).f ( ) y g ( p )

Dec 2020 MWRA to submit results of its three-year performance assessment ofits Long-Term CSO Control Plan to the EPA and DEP. MWRA todemonstrate that it has achieved compliance with the levels of controldemonstrate that it has achieved compliance with the levels of control(including as to frequency of CSO activation and as to volume ofdischarge) specified in its Long-Term CSO Control Plan.

MWRA will continue to submit compliance progress reports tothe Court, on a semi‐annual basis (next report:  June 2016).

23

Page 24: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

The 2006 Agreement and Remaining Regulatory Matters

In April 2006, the Court approved a joint motion filed by DOJ, EPA and MWRA that formalized an agreement with EPA and DEP on MWRA’s long‐term control plan obligations.  With this agreement:

MWRA added projects to elevate the level of control for the Charles River Basin, increasing CSO plan cost by $37.4 million.

EPA and DEP approved MWRA’s revised recommended projects or schedules for the South Boston Beaches, Alewife Brook and East Boston.

EPA and DEP agreed not to add any other CSO control requirements through EPA and DEP agreed not to add any other CSO control requirements through 2020.

DEP agreed to issue a series of 3‐year CSO variance extensions for the Charles River Basin and Alewife Brook/Upper Mystic River through 2020, and EPARiver Basin and Alewife Brook/Upper Mystic River through 2020, and EPA agreed to approve the extensions, limited to the requirements in the LTCP.

EPA and DEP agreed that if MWRA demonstrates, by December 2020, that it has attained the levels of control in the approved plan, any further or future

24

has attained the levels of control in the approved plan, any further or future CSO control requirements would be the responsibility of each permittee, for its respective outfalls.

Page 25: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

CSO Compliance with State Water Quality Standards

25

Page 26: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

Highlights

With completion of the CSO Control Plan:

All Boston Harbor Cleanup projects are complete and All Boston Harbor Cleanup projects are complete and providing environmental benefit.

181 of 184 CSO related court milestones are achieved.

39 of 84 CSO outfalls are closed or have 25‐year storm control.

CSO t iti b h d h llfi h b d CSOs to sensitive use areas – beaches and shellfish beds – are eliminated (25‐year storm control in South Boston).

CSO discharge volume is reduced from 3 3 billion gallons in CSO discharge volume is reduced from 3.3 billion gallons in 1988 to 0.4 billion gallons (88% reduction).

93% of remaining discharge volume is treated at MWRA’s four 26

g gCSO facilities.

Page 27: CSO Annual Report for 2015 - MWRA - Home · The last 3 CSO projects are now complete. Last Construction Milestones Achieved p pj p Oct 2015 MWRA to complete construction of control

THE END

QUESTIONS?

27