csu, chico

5
2030 CAMPUS MASTER PLAN FALL 2019 CSU, CHICO

Upload: others

Post on 04-Apr-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

2030 CAMPUS MASTER PLAN

FALL 2019

CSU, CHICO

DRAFT REPORT | FALL 2019

FRAMEWORKS CHAPTER HEADING6 7

CAMPUS MASTER PLAN GUIDING FRAMEWORKS & GOALS

Enrich the academic and research environment through targeted building renovations and expansions, combined with strategic investment in new facilities.

� Transform the academic environment for today’s student

� Maximize existing academic space

� Increase facilities to improve the academic and research environment

Elevate the student experience by increasing the number of students living on campus and ensure all students have access to robust dining, recreation, and support options.

� Dedicate the campus core to the student experience

� Enhance opportunities for campus activity beyond classroom hours

� Create equitable student housing close to the campus core

� Improve and expand facilities for recreation, athletics, and learning

Make campus a more welcoming place for visitors through improved wayfinding. Explore mixed-use partnership opportunities and investment in strategic community assets.

� Enhance regional assets such as the University Farm

� Seek partnership opportunities with the City of Chico

� Create a visible and accessible arts and culture district

Invest in sustainable strategies such as on-site renewable energy production to achieve net zero. Enhance existing natural amenities such as Big Chico Creek.

� Implement carbon reduction strategies to achieve carbon neutrality by 2030

� Phase off natural gas and increase on-site renewable production

� Decentralize campus energy systems into efficient district level systems

� Improve landscape and stormwater function and aesthetic

Promote an inclusive environment by fostering a welcoming campus, access to robust support services, and facilities reflective of a diverse population.

� Improve services and facilities for counseling, health and wellness

� Increase resources to address food and basic needs insecurities

� Provide new and renovated facilities and open space to reflect today’s student

A LEARNING CHICO STATEAN EXPERIENTIAL CHICO STATE A CONNECTED CHICO STATE A SUSTAINABLE CHICO STATEAN INCLUSIVE CHICO STATEProvide safe and accessible pedestrian routes across all of campus. In key areas, expand bicycle access and support facilities to encourage sustainable modes of transit.

� Consolidate existing parking opportunities

� Improve safety and campus character of the Ivy/Warner corridor

� Extend and clarify the pedestrian network

� Re-introduce non-motorized vehicles into campus

A MOBILE CHICO STATE

DRAFT REPORT | FALL 2019

8 9

TODAY

CURRENT AND FUTURE STATESCAMPUS PLAN

2030

DRAFT REPORT | FALL 2019

10 11PROPOSED MASTER PLANCAMPUS PLAN

KEYImproved 10B Practice Field North Multi-Purpose Fields New Softball Facility Stormwater Detention Area Parking Structure Arena Pool Facility West Campus Gateway Plaza Acker Gymnasium Renovation University Stadium Seating Hammer Throw Venue Field 6&7 Improvements Existing Ropes Course Location Enhanced Pedestrian Gateway New Golf Practice Area Location South Field Improvements 1-4 Warner Street West Academic Building Creekside Residence Halls Rio Chico Creekside Houses Renovations Rio Chico Redevelopment Langdon Engineering Center Renovation 1st Street Extension & Plaza Warehouse FMS Office Building Forensic Anthropology/Admin/Office Bldg WREC Expansion + Health Center Student Services Center Renovation Meriam Library Renovation Bell Memorial Union Renovation Mixed Use Building

SUMMARY MAP AND

LABELS

LEGEND Deen House Renovation Sapp Hall Renovation Trinity Hall Renovation Glenn II Academic Building RCE Renovation/Sovereignty Center Kendall Hall Renovation Selvester's Cafe Demolition Laxson Auditorium Renovation Ayres Hall Renovation Physical Science Building Renovation Pedestrian Path Underpass Hotel & Convention Center Retail + Parking Structure Mixed Use Office Building Museum Academic/Admin/Office Buildings Expanded Surface Parking Modoc II Academic Building Holt Hall Renovation & Entry Addition Holt Hall Entry Plaza North Residence Halls Lassen Hall Renovation Shasta Hall Renovation Butte Hall Renovation & Addition Non-Motorized Vehicle Path Stormwater Daylighting North Campus Plaza Warner Street Laboratory/Research Building Whitney Hall Renovation Ivy/Warner Street Improvements 12kV Upgrades

03

01

02

03

04

31

05

32

06

33

08

35

07

34

09

36

10

37

11

38

12

39

13

40

14

41

15

42

16

43

17

22

44

49

18

23

45

50

19

24

46

51

20

25

47

52

21

26

27

48

53

54

55

56

57

58

59

60

61

01

28

29

30

02

05

06

07

08

60

14

04

56

10

15

1211

61

1316

1618

17

09

59

53

5251

51

3754

58

34

2127

20 22

19

28

5557

30

29

33

3635

49

50

40

41

39

38

31

32

4243

44

48

45

46

46

47

26

25

23

24