CU POWERHOUSE OPTIMIZATION PAUL C. CALDARA, P.E. Engineer, Energy Section Colorado Department of Regulatory Agencies Public Utilities Commission 1560 Broadway, Suite 250 Denver, CO 80202

Upload: others

Post on 19-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

CU POWERHOUSE OPTIMIZATION

PAUL C. CALDARA, P.E.

Engineer, Energy Section Colorado Department of Regulatory Agencies Public Utilities Commission 1560 Broadway, Suite 250 Denver, CO 80202

PRESENTER’S BACKGROUND

• PROFESSIONAL ENGINEER ON STAFF, COLORADO PUC, 2008 TO PRESENT

• MANAGER, UTILITY SERVICES, UNIVERSITY OF COLORADO AT BOULDER, 2000 – 2008

• ENGINEER, MARKETING, XCEL ENERGY, 1990 – 2000

2

BY THE WAY….

• ONLY THE COMMISSION SPEAKS FOR THE COMMISSION. STAFF CAN PROVIDE STAFF’S OPINION.

• THE DRAWINGS AND INFORMATION IN THE PRESENTATION ARE FOR ILLUSTRATIVE PURPOSES AND MAY NOT BE PRECISELY ACCURATE.

3

WHAT YOU NEED TO KNOW:

•PRIORITIES:

1) SAFETY

2) RELIABILITY

3) ECONOMICS

4

CAMPUS LOAD

• ELECTRICITY: 20mW, 120,000,000 kWh annually.

• STEAM: 150,000 lbs/hr winter steam load.

• CHILLED WATER: 3,300 tons, peaks in summer.

5

PURPA

• PUBLIC UTILITIES REGULATORY POLICY ACT,1978.

• ENCOURAGED THE DEVELOPMENT OF COGENERATION FACILITIES, AND PROVIDES THAT UTILITIES WOULD BE REQUIRED TO PURCHASE ELECTRICITY FROM, AND PROVIDE BACK-UP POWER TO CO-GENERATORS AT NON-DISCRIMINATORY RATES.

• CO-GENERATORS ARE EXEMPT FROM REGULATION AS PUBLIC UTILITIES.

• ELECTRIC UTILITIES ARE REQUIRED TO INTERCONNECT AND OPERATE IN PARALLEL WITH COGENERATION FACILITIES.

6

CO-GENERATION

7

CAMPUS LOAD: ELECTRICITY, STEAM, CHILLED WATER

CO-GENERATION

8

CO-GENERATION

9

CO-GENERATION

10

CO-GENERATION

11

CO-GENERATION

12

CO-GENERATION

13

EQUIPMENT

• TWO BOILERS: 130,000 lbs/hr AND 100,000 lbs/hr

• TWO 16 mW GAS COMBUSTION TURBINES

• TWO 80,000 lbs/hr HEAT RECOVERY STEAM GENERATORS

• 1 mW STEAM TURBINE

• THREE ABSORPTION CHILLERS

• THREE UTILITY FEEDERS

• ELECTRIC SWITCHGEAR

14

CIRCA 1910

15

CIRCA 1920-1930

16

CIRCA 1960

17

PRESENT DAY

18

SWITCHGEAR VAULT

19

13 kV SWITCHGEAR

20

13 kV SWITCHGEAR

21

13 kV SWITCHGEAR

22

MONITORING “THE BOARDS”

23

POWERHOUSE SWITCHGEAR PANEL

24

SYNCHROSCOPE

25

TURBINE CONTROLS

26

ABSORPTION CHILLER

27

ABSORPTION CHILLER

28

COMBUSTION GAS TURBINE

29

OUTSIDE OF TURBINE

30

TURBINE EXHAUST STACKS

31

COMBUSTION GAS TURBINE

32

GENERATOR END OF TURBINE

33

STEAM BOILER

34

STEAM BOILER, NATURAL GAS FLAME

35

STEAM BOILER, LOOKING UP

36

HRSG, LOOKING UP

37

PUMPS EVERYWHERE

38

• CO-GENERATION CAN INCREASE EFFICIENCY

BUT CAN ADD COMPLEXITY.

• THE SIZING OF EQUIPMENT IS IMPORTANT

BECAUSE YOU LIVE WITH YOUR DECISIONS FOR

A LONG TIME.

• THE MORE OPTIONS YOU HAVE TO SERVE LOAD,

THE MORE COMPLEX TO FIND TRUE

OPTIMIZATION.

39

• ALWAYS THINK BROADLY WHEN THINKING OF ENERGY AND ENERGY EFFICIENCY.

• LOOK FOR UNINTENDED CONSEQUENCES.

• REMEMBER YOUR PRIORITIES OF SAFETY, RELIABILITY, AND THEN ECONOMICS/EFFICIENCY.

40

THANK YOU

41