INCOMING MATERIAL INSPECTION REPORT format No.: G: 01 REV 0 TWPC ITP No.: TWPC/HEI/MECH/ITP Format No. : TWPC/HEI/MECH Unit : ECU-II Report No. TWC-IMIR-001 Project : Brahmaputra Cracker & Polymer Ltd Consultant: Engineers India Limited Date : 31-Jul-12 Contractor :Tiongwoon Project & Contracting Pte Ltd Name of Work : Hiring of Heav Work order No. : BCPL/C&P/6907/T-096/SK/65 Dated 31 May 2012 Job No. 6907 LR No. : Sl. No. Qty. Received Manufacturer/ Vendor Heat/ Batch No. 1 113-CC-101 Non-Shrink Grout GP2 ### 63 bags(25kg each) 2 113-CC-101 Non-Shrink Grout GP2 ### 72bags(25kg each) 3 113-CC-103 Non-Shrink Grout GP2 ### 75bags(25kg each) 4 113-CC-103 Non-Shrink Grout GP2 ### 90 bags(25kg each) Notes : INSPECTION ACTIVITY AT SITE ( Tick as applicable ) 1. Quantity verified and found in order 3. Heat/Batch/Tag No. mentioned on the material 4. Colour coding done as applicable 5.Site identification mrk on material 6. Correlation w.r.t. IRN/MTC/Lab Test Report 7. TC verification w.r.t. IRN/Spec./QAP 8. Check for Vendor/Source approval 9. Special Requirement if any. Based on above material are accepted. Contractor Field Engineer Contractor RCM/Site EIL Field Supervisor EIL Lead Engineer/Area Coordinator/Spread Incharge STANDARD SPECIFICATION No. 6 P.O No. & Date: TWPC/WO/6907/12/07/004/003 & 12 Jul 2012 SOR Item No. Material Description/ Tag No. Date of Receipt Qty. Accepted MTC No./ IRN No. With Date/ Field, Lab Test ,Etc Ref. Invoice/ Challan No. Fosroc Chemicals (India) pvt Limited ANK/12/G1156/2 & 01.08.2012 IN1MF0104903 Valid upto Dec'12 2153 Dated 30.07.2012 Fosroc Chemicals (India) pvt Limited ANK/12/G1152/2 & 01.08.2012 IM1MF0104781 Valid upto Dec'12 2153 Dated 30.07.2012 Fosroc Chemicals (India) pvt Limited ANK/12/G1155/1 & 01.08.2012 IN1MF0104902 Valid upto Dec'12 2154 Dated 30.07.2012 Fosroc Chemicals (India) pvt Limited ANK/12/G1148/1 & 01.08.2012 Valid upto Dec'12 2154 Dated 30.07.2012 2. Material condition appears to be good

Upload: chozha

Post on 27-Oct-2014

76 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Cube Test Format1

INCOMING MATERIAL INSPECTION REPORTSTANDARD SPECIFICATION No. 6-82-1010 Rev. 0

format No.: G: 01 REV 0 TWPC ITP No.: TWPC/HEI/MECH/ITP-01 Rev.0Format No. : TWPC/HEI/MECH/ITP-P04 Rev.0

Unit : ECU-II Report No. : TWC-IMIR-001Project : Brahmaputra Cracker & Polymer Ltd Consultant: Engineers India Limited Date : 31-Jul-12Contractor :Tiongwoon Project & Contracting Pte Ltd P.O No. & Date: TWPC/WO/6907/12/07/004/003 & 12 Jul 2012 Name of Work : Hiring of Heavy Lifting of EquipmentsWork order No. : BCPL/C&P/6907/T-096/SK/65 Dated 31 May 2012 Job No. : 6907

LR No. :

Sl. No. Qty. Received Manufacturer/ Vendor Heat/ Batch No.

1 113-CC-101 Non-Shrink Grout GP2 30-Jul-12 63 bags(25kg each)

2 113-CC-101 Non-Shrink Grout GP2 30-Jul-12 72bags(25kg each)

3 113-CC-103 Non-Shrink Grout GP2 30-Jul-12 75bags(25kg each)

4 113-CC-103 Non-Shrink Grout GP2 30-Jul-12 90 bags(25kg each)

Notes :

INSPECTION ACTIVITY AT SITE ( Tick as applicable )1. Quantity verified and found in order 3. Heat/Batch/Tag No. mentioned on the material 4. Colour coding done as applicable 5.Site identification mrk on material 6. Correlation w.r.t. IRN/MTC/Lab Test Report7. TC verification w.r.t. IRN/Spec./QAP,etc 8. Check for Vendor/Source approval 9. Special Requirement if any.

Based on above material are accepted.

Contractor Field Engineer Contractor RCM/Site Incharge

EIL Field Supervisor EIL Lead Engineer/Area Coordinator/Spread Incharge (Countersigned.)

SOR Item No.

Material Description/ Tag No.

Date of Receipt

Qty. Accepted

MTC No./ IRN No. With Date/ Field, Lab

Test ,EtcRef. Invoice/

Challan No.Observation/Remarks/

Storage Instruction.

Fosroc Chemicals (India) pvt Limited

ANK/12/G1156/2 & 01.08.2012

IN1MF0104903 Valid upto Dec'12

2153 Dated 30.07.2012

Fosroc Chemicals (India) pvt Limited

ANK/12/G1152/2 & 01.08.2012

IM1MF0104781 Valid upto Dec'12

2153 Dated 30.07.2012

Fosroc Chemicals (India) pvt Limited

ANK/12/G1155/1 & 01.08.2012

IN1MF0104902 Valid upto Dec'12

2154 Dated 30.07.2012

Fosroc Chemicals (India) pvt Limited

ANK/12/G1148/1 & 01.08.2012

IN1MF0104672 Valid upto Dec'12

2154 Dated 30.07.2012

2. Material condition appears to be good

Page 2: Cube Test Format1

TIONGWOON PROJECT & CONTRACTING PTE LTD

CRUSHING STRENGTH TESTING OF GROUTING MATERIAL CUBES

PROJECT : BRAHMAPUTRA PETROCHEMICAL COMPLEX,ETHYLENE CRACKER UNIT Report No : TWC-GCT-001CLIENT : BRAHMAPUTRA CRACKER & POLYMER LTD., LEPETKATA Date : 9-Aug-12CONSULTANT : ENGINEERS INDIA LIMITED Drg. No : 6907-113-16-48-3-501CONTRACTOR : TIONGWOON PROJECT & CONTRACTING PTE LTD Equipment No : 113-CC-101Name of Work : Hiring of Erection of Heavy Lifting Works IMIR No : TWC-IMIR-001Contract No : BCPL/C&P/6907/T-096/SK/65 Dated 31 May 2012 Batch No : IN1MF0104903EIL JOB NO : 6907

Date of Dimensions of CubeTWC EIL Remarks

Casting Testing L (mm) B (mm) H (mm)

1 101-P-1 ECU-I 5-Aug-12 9-Aug-12 4 70.6 70.6 70.6 0.755 4984.36 370000 74.2321983

2 101-P-2 ECU-I 5-Aug-12 9-Aug-12 4 70.6 70.6 70.6 0.77 4984.36 510000 102.320057

3 101-P-3 ECU-I 5-Aug-12 9-Aug-12 4 70.6 70.6 70.6 0.775 4984.36 400000 80.2510252

Sign : Sign :Name : Name :

TWC EIL

Sr.No

ID Mark on Cube

Type & Location of Structure

Age (Days)

Wt. of Cube (Kg)

Surface Area (mm2)

Crushing Load (N)

Crushing Strength (N/mm2)

Page 3: Cube Test Format1

TIONGWOON PROJECT & CONTRACTING PTE LTD

CRUSHING STRENGTH TESTING OF GROUTING MATERIAL CUBES

PROJECT : BRAHMAPUTRA PETROCHEMICAL COMPLEX,ETHYLENE CRACKER UNIT Report No : TWC-GCT-004CLIENT : BRAHMAPUTRA CRACKER & POLYMER LTD., LEPETKATA Date : 13-Aug-12CONSULTANT : ENGINEERS INDIA LIMITED Drg. No : 6907-113-16-48-3-501CONTRACTOR : TIONGWOON PROJECT & CONTRACTING PTE LTD Equipment No : 113-CC-101Name of Work : Hiring of Erection of Heavy Lifting Works IMIR No : TWC-IMIR-001Contract No : BCPL/C&P/6907/T-096/SK/65 Dated 31 May 2012 Batch No : IN1MF0104903EIL JOB NO : 6907

Date of Dimensions of CubeTWC EIL Remarks

Casting Testing L (mm) B (mm) H (mm)

1 101-P-4 ECU-I 5-Aug-12 13-Aug-12 7 70.6 70.6 70.6 0.771 4984.36 611116 122.606714

2 101-P-5 ECU-I 5-Aug-12 13-Aug-12 7 70.6 70.6 70.6 0.75 4984.36 763895 153.258392

3 101-P-6 ECU-I 5-Aug-12 13-Aug-12 7 70.6 70.6 70.6 0.7675 4984.36 791673 158.831425

Sign : Sign :Name : Name :

TWC EIL

Sr.No

ID Mark on Cube

Type & Location of Structure

Age (Days)

Wt. of Cube (Kg)

Surface Area (mm2)

Crushing Load (N)

Crushing Strength (N/mm2)

Page 4: Cube Test Format1

TIONGWOON PROJECT & CONTRACTING PTE LTD

CRUSHING STRENGTH TESTING OF GROUTING MATERIAL CUBES

PROJECT : BRAHMAPUTRA PETROCHEMICAL COMPLEX,ETHYLENE CRACKER UNIT Report No : TWC-GCT-002CLIENT : BRAHMAPUTRA CRACKER & POLYMER LTD., LEPETKATA Date : 9-Aug-12CONSULTANT : ENGINEERS INDIA LIMITED Drg. No : 6907-113-16-48-3-503CONTRACTOR : TIONGWOON PROJECT & CONTRACTING PTE LTD Equipment No : 113-CC-103Name of Work : Hiring of Erection of Heavy Lifting Works IMIR No : TWC-IMIR-001Contract No : BCPL/C&P/6907/T-096/SK/65 Dated 31 May 2012 Batch No : IN1MF0104902EIL JOB NO : 6907

Date of Dimensions of CubeTWC EIL Remarks

Casting Testing L (mm) B (mm) H (mm)

1 103-P-1 ECU-I 7-Aug-2012 9-Aug-12 3 70.6 70.6 70.6 0.739 4984.36 380000 76.2384739

2 103-P-2 ECU-I 7-Aug-2012 9-Aug-12 3 70.6 70.6 70.6 0.77 4984.36 350000 70.2196471

3 103-P-3 ECU-I 7-Aug-2012 9-Aug-12 3 70.6 70.6 70.6 0.749 4984.36 350000 70.2196471

Sign : Sign :Name : Name :

TWC EIL

Sr.No

ID Mark on Cube

Type & Location of Structure

Age (Days)

Wt. of Cube (Kg)

Surface Area

(mm2)Crushing Load (N)

Crushing Strength (N/mm2)

Page 5: Cube Test Format1

TIONGWOON PROJECT & CONTRACTING PTE LTD

CRUSHING STRENGTH TESTING OF GROUTING MATERIAL CUBES

PROJECT : BRAHMAPUTRA PETROCHEMICAL COMPLEX,ETHYLENE CRACKER UNIT Report No : TWC-GCT-006CLIENT : BRAHMAPUTRA CRACKER & POLYMER LTD., LEPETKATA Date : 18-Aug-12CONSULTANT : ENGINEERS INDIA LIMITED Drg. No : 6907-113-16-48-3-503CONTRACTOR : TIONGWOON PROJECT & CONTRACTING PTE LTD Equipment No : 113-CC-103Name of Work : Hiring of Erection of Heavy Lifting Works IMIR No : TWC-IMIR-001Contract No : BCPL/C&P/6907/T-096/SK/65 Dated 31 May 2012 Batch No : IN1MF0104902EIL JOB NO : 6907

Date of Dimensions of CubeTWC EIL Remarks

Casting Testing L (mm) B (mm) H (mm)

1 103-P-4 ECU-I 7-Aug-2012 18-Aug-12 11 70.6 70.6 70.6 0.77 4984.36 410000 82.2573008

2 103-P-5 ECU-I 7-Aug-2012 18-Aug-12 11 70.6 70.6 70.6 0.738 4984.36 360000 72.2259227

3 103-P-6 ECU-I 7-Aug-2012 18-Aug-12 11 70.6 70.6 70.6 0.74 4984.36 325000 65.203958

Sign : Sign :Name : Name :

TWC EIL

Sr.No

ID Mark on Cube

Type & Location of Structure

Age (Days)

Wt. of Cube (Kg)

Surface Area

(mm2)Crushing Load (N)

Crushing Strength (N/mm2)

Page 6: Cube Test Format1

TIONGWOON PROJECT & CONTRACTING PTE LTD

CRUSHING STRENGTH TESTING OF GROUTING MATERIAL CUBES

PROJECT : BRAHMAPUTRA PETROCHEMICAL COMPLEX,ETHYLENE CRACKER UNIT Report No : TWC-GCT-003CLIENT : BRAHMAPUTRA CRACKER & POLYMER LTD., LEPETKATA Date : 13-Aug-12CONSULTANT : ENGINEERS INDIA LIMITED Drg. No : 6907-113-16-48-3-501CONTRACTOR : TIONGWOON PROJECT & CONTRACTING PTE LTD Equipment No : 113-CC-101Name of Work : Hiring of Erection of Heavy Lifting Works IMIR No : TWC-IMIR-001Contract No : BCPL/C&P/6907/T-096/SK/65 Dated 31 May 2012 Batch No : IN1MF0104672EIL JOB NO : 6907

Date of Dimensions of CubeTWC EIL Remarks

Casting Testing L (mm) B (mm) H (mm)

1 103-B-1 ECU-I 8-Aug-2012 13-Aug-12 4 70.6 70.6 70.6 0.718 4984.36 250002 50.157292

2 103-B-2 ECU-I 8-Aug-2012 13-Aug-12 4 70.6 70.6 70.6 0.714 4984.36 319447 64.0898731

3 103-B-3 ECU-I 8-Aug-2012 13-Aug-12 4 70.6 70.6 70.6 0.721 4984.36 416670 83.5954867

Sign : Sign :Name : Name :

TWC EIL

Sr.No

ID Mark on Cube

Type & Location of Structure

Age (Days)

Wt. of Cube (Kg)

Surface Area

(mm2)Crushing Load (N)

Crushing Strength (N/mm2)

Page 7: Cube Test Format1

TIONGWOON PROJECT & CONTRACTING PTE LTD

CRUSHING STRENGTH TESTING OF GROUTING MATERIAL CUBES

PROJECT : BRAHMAPUTRA PETROCHEMICAL COMPLEX,ETHYLENE CRACKER UNIT Report No : TWC-GCT-002CLIENT : BRAHMAPUTRA CRACKER & POLYMER LTD., LEPETKATA Date : 18-Aug-12CONSULTANT : ENGINEERS INDIA LIMITED Drg. No : 6907-113-16-48-3-501CONTRACTOR : TIONGWOON PROJECT & CONTRACTING PTE LTD Equipment No : 113-CC-101Name of Work : Hiring of Erection of Heavy Lifting Works IMIR No : TWC-IMIR-001Contract No : BCPL/C&P/6907/T-096/SK/65 Dated 31 May 2012 Batch No : IN1MF0104672EIL JOB NO : 6907

Date of Dimensions of CubeTWC EIL Remarks

Casting Testing L (mm) B (mm) H (mm)

1 103-B-4 ECU-I 8-Aug-2012 18-Aug-12 9 70.6 70.6 70.6 0.766 4984.36 500000 100.313782

2 103-B-5 ECU-I 8-Aug-2012 18-Aug-12 9 70.6 70.6 70.6 0.74 4984.36 430000 86.2698521

3 103-B-6 ECU-I 8-Aug-2012 18-Aug-12 9 70.6 70.6 70.6 0.756 4984.36 420000 84.2635765

Sign : Sign :Name : Name :

TWC EIL

Sr.No

ID Mark on Cube

Type & Location of Structure

Age (Days)

Wt. of Cube (Kg)

Surface Area

(mm2)Crushing Load (N)

Crushing Strength (N/mm2)

Page 8: Cube Test Format1

TIONGWOON PROJECT & CONTRACTING PTE LTD

CRUSHING STRENGTH TESTING OF GROUTING MATERIAL CUBES

PROJECT : BRAHMAPUTRA PETROCHEMICAL COMPLEX,ETHYLENE CRACKER UNIT Report No : TWC-GCT-002CLIENT : BRAHMAPUTRA CRACKER & POLYMER LTD., LEPETKATA Date : 18-Aug-12CONSULTANT : ENGINEERS INDIA LIMITED Drg. No : 6907-113-16-48-3-503CONTRACTOR : TIONGWOON PROJECT & CONTRACTING PTE LTD Equipment No : 113-CC-103Name of Work : Hiring of Erection of Heavy Lifting Works IMIR No : TWC-IMIR-001Contract No : BCPL/C&P/6907/T-096/SK/65 Dated 31 May 2012 Batch No : IN1MF0104781EIL JOB NO : 6907

Date of Dimensions of CubeTWC EIL Remarks

Casting Testing L (mm) B (mm) H (mm)

1 103-B-4 ECU-I 11-Aug-2012 18-Aug-12 6 70.6 70.6 70.6 0.792 4984.36 450000 90.2824034

2 103-B-5 ECU-I 11-Aug-2012 18-Aug-12 6 70.6 70.6 70.6 0.773 4984.36 460000 92.288679

3 103-B-6 ECU-I 11-Aug-2012 18-Aug-12 6 70.6 70.6 70.6 0.773 4984.36 470000 94.2949546

Sign : Sign :Name : Name :

TWC EIL

Sr.No

ID Mark on Cube

Type & Location of Structure

Age (Days)

Wt. of Cube (Kg)

Surface Area

(mm2)Crushing Load (N)

Crushing Strength (N/mm2)

Page 9: Cube Test Format1

TIONGWOON PROJECT & CONTRACTING PTE LTD

CRUSHING STRENGTH TESTING OF GROUTING MATERIAL CUBES

PROJECT : BRAHMAPUTRA PETROCHEMICAL COMPLEX,ETHYLENE CRACKER UNIT Report No : TWC-GCT-002CLIENT : BRAHMAPUTRA CRACKER & POLYMER LTD., LEPETKATA Date : 22-Aug-12CONSULTANT : ENGINEERS INDIA LIMITED Drg. No : 6907-113-16-48-3-503CONTRACTOR : TIONGWOON PROJECT & CONTRACTING PTE LTD Equipment No : 113-CC-103Name of Work : Hiring of Erection of Heavy Lifting Works IMIR No : TWC-IMIR-001Contract No : BCPL/C&P/6907/T-096/SK/65 Dated 31 May 2012 Batch No : IN1MF0104672EIL JOB NO : 6907

Date of Dimensions of CubeTWC EIL Remarks

Casting Testing L (mm) B (mm) H (mm)

1 103-B-4 ECU-I 11-Aug-2012 22-Aug-12 10 70.6 70.6 70.6 0.768 4984.36 400000 80.2510252

2 103-B-5 ECU-I 11-Aug-2012 22-Aug-12 10 70.6 70.6 70.6 0.766 4984.36 560000 112.351435

3 103-B-6 ECU-I 11-Aug-2012 22-Aug-12 10 70.6 70.6 70.6 0.742 4984.36 420000 84.2635765

Sign : Sign :Name : Name :

TWC EIL

Sr.No

ID Mark on Cube

Type & Location of Structure

Age (Days)

Wt. of Cube (Kg)

Surface Area

(mm2)Crushing Load (N)

Crushing Strength (N/mm2)

Page 10: Cube Test Format1

TIONGWOON PROJECT & CONTRACTING PTE LTD

CRUSHING STRENGTH TESTING OF GROUTING MATERIAL CUBES

PROJECT : BRAHMAPUTRA PETROCHEMICAL COMPLEX,ETHYLENE CRACKER UNIT Report No :CLIENT : BRAHMAPUTRA CRACKER & POLYMER LTD., LEPETKATA Date :CONSULTANT : ENGINEERS INDIA LIMITED Drg. No :CONTRACTOR : TIONGWOON PROJECT & CONTRACTING PTE LTD Equipment No : Name of Work : Hiring of Erection of Heavy Lifting Works IMIR No :Contract No : BCPL/C&P/6907/T-096/SK/65 Dated 31 May 2012 Batch No : IN1MF010903EIL JOB NO : 6907

Date of Dimensions of CubeTWC EIL Remarks

Casting Testing L (mm) B (mm) H (mm)

Sign : Sign :Name : Name :

TWC EIL

Sr.No

ID Mark on Cube

Type & Location of Structure

Age (Days)

Wt. of Cube (Kg)

Surface Area (mm2)

Crushing Load (N)

Crushing Strength (N/mm2)