current developments in tetra k.-h. (charly) hengevoß board member tetra mou association

22
1 Current developments in TETRA K.-H. (Charly) Hengevoß Board Member TETRA MoU Association Rohill Engineering B.V.

Upload: ziv

Post on 05-Jan-2016

38 views

Category:

Documents


0 download

DESCRIPTION

Current developments in TETRA K.-H. (Charly) Hengevoß Board Member TETRA MoU Association Rohill Engineering B.V. Fire Exits. Agenda. TETRA – The living standard How to interconnect two TETRA systems TETRA Release 2 is more than TEDS... TETRA Release 2 – A world filled with applications - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

1

Current developments in TETRA

K.-H. (Charly) Hengevoß

Board Member

TETRA MoU Association

Rohill Engineering B.V.

Page 2: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

2

Fire Exits

Page 3: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

3

Page 4: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

4

Agenda

• TETRA – The living standard

• How to interconnect two TETRA systems

• TETRA Release 2 is more than TEDS...

• TETRA Release 2 – A world filled with applications

• The future beyond TETRA Release 2

Page 5: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

5

The living standard

• Standardisation started in the late 80s• First version of air interface specification

ETSI ETS 300 392-2 ed 1 published in March 1996• First nationwide TETRA public safety network

completed in 2002• TETRA Association formed in 1995• First IOP Test certificates in 1999• Core document for TETRA Release 2,

the ETSI EN 300 392-2 V 3.1.1, published in 09/2006

Page 6: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

6

How to interconnect two TETRA systems

• European integration includes cross-border police co-operation

• Specification for harmonised radio anddata communication

• ETSI standard TETRA satisfies keySchengen requirements

• EU decision to conduct a pilot testprogramme

Page 7: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

7

Three-Country Pilot   

• National sub-networks were connected in June 2003

• First tests of cross-border communications in October/November 2002

• Practical test with police forces, fire brigades, rescue services, customs and civil protection carried out in May/June 2003

• Final report published inNovember 2003

http://www.3countrypilot.com

Page 8: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

8

Does TETRA handle data?

• Database look up

• AVL

• Email

• Data transmission

• Limited slow scan video

• But multimedia applicationsare more difficult...

Page 9: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

9

Evolution: Application vs. TETRATETRA 1 Circuit Data

TETRA 1

Short Data Services

TETRA 1

Single Slot Packet Data

TETRA 1 Multi-slot Packet Data

TETRA 2

TEDS

Database look up

AVL

Email

File transfer e.g. Still image

Slow scan video

QoS managed video

Not suitable Suitable Effektive

today

Page 10: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

10

Mission critical data applications with TETRACurrent applications require data transmission capacity

– Frequent messages, small payload• GPS position data from portables and vehicles• Database requests• Status messaging

But some applications require higher data throughput– Infrequent messages, much higher payload

• Picture of a wanted person• File transfer• Slow scan video

TETRA Single Slot Packet Data

TETRA Multi Slot Packet Data

Page 11: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

11

TETRA Enhanced Data Service - TEDS

Backward compatible with TETRA Release 1- Network integration capability

Flexible data rates and spectrum use- 25, 50, 100, and 150 kHz channels bandwidths- Can trade off data rate, spectrum and range

Integrated TETRA 1 and TEDS systems- i.e. Can receive TETRA 1 calls on TEDS channels

Technology selected for TEDS use- Multi-carrier QAM (Quadrature Amplitude Modulation) in all bandwidths- D8PSK in 25 kHz

Page 12: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

12

Gross data transmission rates for QAM

Modulation scheme

Channel bandwidths

25 kHz 50 kHz 100 kHz 150 kHz

4-QAM 38,4 76,8 153,6 230,4

16-QAM 76,8 153,6 307,2 460,8

64-QAM 115,2 230,4 460,8 691,2

Page 13: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

13

How do data, range, bandwidth vary?600 kb/s

500 kb/s

300 kb/s

200 kb/s

Range (km)

400 kb/s150 kHz

100 kHz

50 kHz

25 kHz

Modulation scheme64QAM16QAM4QAM

D8PSK (25 kHz)

100 kb/s

FramingRate

Page 14: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

14

How does this compare with TETRA 1?600 kb/s

500 kb/s

300 kb/s

200 kb/s

Range (km)

400 kb/s150 kHz

100 kHz

50 kHz

25 kHz

Modulation scheme64QAM16QAM4QAM

D8PSK (25 kHz)

100 kb/s

FramingRate

TETRA 1

Page 15: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

15

The Power of TETRA Release 2

Legend:Circle size = coverage areaCircle height = data capacity

TETRA 1 + TETRA 2 at 25 kHz

TETRA 2 at 50 kHz

TETRA 2 at 100 kHz

TETRA 2 at 150 kHz

TETRA 2 at 100 kHz

TETRA 2 at 50 kHzTETRA 2 at 150 kHz

All TETRA 2 sites include TETRA 1

Page 16: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

16

The news in TETRA Release 2

• New speech codec

• USIM requirement for TETRA

• Interworking and Roaming with other networks „3G“

• Enhancement of the air interface

• Extension of operating range of TETRA• Support for further requirements (e.g. location

information)

Page 17: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

17

TETRA Release 2 brings newcapabilities to fire

Floorplans of burning buildingsTETRA 1Database of plans held on CD in cab

TETRA 2Updated plans can be downloaded as appliance is on route

Fire fighters get latest information

Check database of hazardous chemicalsTETRA 1Text based results from database search

TETRA 2Text and image results from database search

Fire fighters get clearer information

Page 18: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

18

TETRA Release 2 brings newcapabilities to AmbulanceTransmit ECG trace from ambulance to doctorin hospitalTETRA 1Transmit compressed ECG

TETRA 2Less compression means more details on ECG

More accurate diagnostic for rare heart conditions

Transmit pictures from crash sceneTETRA 1Still images or slow scan video

TETRA 2More detailed video images

Doctors can make more accurate predictions

Page 19: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

19

TETRA 2 Data Applications

User Benefit

Police Mobile surveillance camera that doesn‘t alert the suspect

Greater details can prove vital to remotely monitor operations

Transport Live update of arrival/departure boards

More relevant and accurate information to passengers

Transport Check image database to see manifests, passenger lists etc.

Helps reduce smuggling of goods and people

Oil, Gas & Utilities

Camera monitoring at very remote locations to check on lone workers

Increase safety for remote workers

Oil, Gas & Utilities

Camera monitoring of areas at risk – used to supplement telemetry data

Faster and more accurate understanding of events

Page 20: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

20

Status of TETRA Release 2

• Core document EN 300 392 – 2 v 3.1.1 has been delivered 20.09.2006.

• Work on related aspects as e.g. PEI almost completed

• European Regulators working on frequency allocation

• Manufacturers started development

• 27th/28th March 2007 a user/manufacturer workshop on prioritising the introduction takes place in Bonn

Page 21: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

21

The future beyond TETRA Release 2

• Intention to describe and define functional and operational user requirements, capabilities, applications and scenarios beyond 2015

• Activities towards globalisation of future telecommunications standardisation work

- Transfer of ETSI Project DAWS to the European- American joint project MESA connected with

TIA’s APCO Project 25/34

• Increasing the transparency in patents and licences- ETSI revised its own „Patent Policy“ to meet future requirements

Page 22: Current developments in TETRA K.-H. (Charly) Hengevoß Board Member  TETRA MoU Association

22

Thank you for your Thank you for your attentionattention

[email protected]@rohill.com