Current Status and priorities regarding integration of electricity networks in the Mediterranean
Olivia Alonso García,
International Organisations Department
PAM Panel on External Trade and Investments
in the Mediterranean - Group on Energy:
MEDITERRANEAN ENERGY HIGHWAYS
November 17th, 2011
2
Integration of electricity networks and
joint initiatives – international TSO
cooperation
VLPGO: an example of worldwide cooperation
ENTSOE: the reference for European TSOs
Regional Groups within ENTSOE
IESOE: voluntary group for discussion of
experiences, challenges and cooperation
between interconnected operators
3
Very Large Power Grid Operators http://www.vlpgo.org/
VLPGO is a voluntary initiative of the world's largest Power Grid Operators, representing together more than 60% of the electricity demand in the world, whose mission is:
To develop an international consensus on strategic issues and a common vision (through information exchanges, collaborative projects) with respect to the technologies and best practices required to address those issues.
Different working groups:
• sharing lessons learned1: Synchophasor
• 2.a: Costs for Power System Security• 2.b: Electrical Power System Restoration• 2.c: Equipment & Installation Overstress
2: Security
• Exploration of the existing tools and techniques
• New solutions to integrate renewable based generation
3: RenewablesIntegration
•How demand response is currently treated in different operating procedures
•Explores future operating needs
4: DemandResponse
• Best practices for development and deployment of HVDC projects
• White papers and common positions 5: HVDC
• Jointly address the common set of challenges and opportunities as a result of PEV deployment
6: ElectricalVehicles
4
Regulation (EC) 714/2009 sets the
legal framework of ENTSOE (binding for
TSOs and Member States).
Tasks of ENTSOE (oriented to the
consecution of an Internal Electricity
Market within EU) driven by Regulation
and Commission / ACER agenda
Network Codes legally binding
through Comitology
Transparency
Ten Years Network Development
Plan (TYNDP), including European
generation adequacy outlook
Clear work program, annual
report, summer/winter outlooks,
monitoring
• Replaces former TSO organisations: ATSOI, BALTSO, RTSO, NORDEL, UCTE, UKTSOA
5
network codes required to facilitate the IEM
Markets
Capacity allocation & congestion management
Balancing
System Development
Generator connection
DSO & industrial load connection
System Operations
Operational security
Operational planning & scheduling
Load frequency control & reserves
7
44%
mid term
56%
long term
78%
22%
AC > 300 kV 29600 km 83%
17%
Total projects 42100 km
DC 9600 km
AC < 300 kV 2900 km
upgrade
new
Pilot TYNDP 2010
The TYNDP projects represent~14% of existing lines
€ 23 to 28 billion
for the first five years
8
Page 8
-20000
0
20000
40000
60000
80000
100000
1 25 49 73 97 121 145
Import_F
FR_W
FR_OTHER
PUMP_F (Turb)
FR_H_Res
F_LO
F_CC_58
F_CC_55
F_HC
F_N
FR_H_RoR
LOAD_F
PUMP_F (Pump)
LOAD+PUMP_F
Exprt_F_spain
Export_F_EU
LOAD+EU_F
-4000
-2000
0
2000
4000
6000
8000
10000
12000
14000
16000
1 25 49 73 97 121 145
Import_P
PUMP_P (Turb)
PT_W
PT_OTHER
PT_H_Res
P_CCGT_55
P_CCGT_58
P_HC
PT_H_RoR
LOAD_P
LOAD+PUMP_P
Export_P
PUMP_P (Pump)
Spillage_P
P_WIND_AVAILABLE
-10000
0
10000
20000
30000
40000
50000
1 25 49 73 97 121 145
Import_E
PUMP_E (Turb)
SP_W
SP_OTHER
SP_H_Res
S_OCGT
S_CCGT_55
S_CCGT_58
S_HC
S_L
S_N
SP_H_RoR
LOAD_S
LOAD+PUMP_S
PUMP_E (Pump)
Exprt_E
SP_W
SPILLAGE_S
S_WIND_AVAILABLE
TYNDP based on Regional proposals,
under pan-European methodology and
common hypothesis
2020
3200/3200
3200/3200
9
System Operation Com.
EuropeanOperational
Standards
Critical SystemProtection
Electronic Highway
AhT CoordinatedServices
AhT IncidentsClassif.
AhT OperationalReserves
AhT Frequency
Investigation
AhT ENTSOE Academy
System Development Com.
EU PlanningStandards
TYNDP
Syst. Adequacy & Market Modelling
Network Model & Data
Asset Implement. & Management
2050 Supergrid
AhT Power SystemDatabase
RG SWE
Market Committee
Market Integration
Ancillary Services
Renewables
MarketInformation & Transparency
EconomicalFramework
RG SWE
Requirements toGenerators
EDI
HarmonisationEFET/ebIX
EIC
ECAN
CIM for Market
Operational Security
Frequency & Reserves
Oper. planning & sched
ETSO-Vista
PlanningStandards
Legal & Regulatory Group Data Expert Group Network of Communication Experts
Research & Development Com.
Compliance & Enforcement
EnvironmentalImpact Ass.
DT Cap Cal
DT Day Ahead
DT IntradayEmergency Procedures
Industrial Load & DistributionConnection
Training & Certification
AhT EAS
RES intergroup
R&D Plan
Monitoring and K Sharing
Reserve Resource
Process
RG Continental Europe
System Protection& Dynamics
System Frequency
Network Models & Forecast Tools
CoordinatedSystem Operation
Compliance & Monitoring
S. ExtensionProjectsMEDRING
10
L’Union des Gestionnaires de réseaux de l’interconnexion
Electrique du Sud-Ouest de l’Europe
With the objective of
reviewing the performance of the interconnected system and to improve its design and operation, and propose the best work to strengthen the interconnections;
searching for the best technical and economical use of existing means to facilitate the operation of the electricity market;
A permanent Assembly and one President named each year
A permanent secretariat in Madrid and a reduced budget (20k€/year)
RENREE
RTE
COMELEC
11
Nowadays, multiple voluntary organizations and projects dealing with
Mediterranean cooperation in electricity sector
~ 4000 km
MEDRING (Mediterranean
Electricity Ring)
Plan Solaire Méditerranée
Centrales duPSM
Tronçon en projet : Inelfe, SAPEI, Fréjus
Champsdu Nord
Etats- membres de l’Union européenne (2009)
Union pour la méditerranée, pays concernés en premier lieu
par le PSM
TRANSGREEN
Tronçons existants : IFA 2000, SACOI
PSM
MEDGRID
DESERTEC
Paving the Way
for the
Mediterranean
Solar Plan
MoDPEHS Study:
Modular Development
Plan on pan - European
Electricity Highways
System 2050
12
Conclusions
ENTSOE is, for TSOs in Europe, the absolute reference and field of
work, with a clear mandate to contribute and facilitate the Internal
Electricity Market.
Other voluntary associations and initiatives have been created dealing
in particular with integration of power systems in the Mediterranean
bassin.
In order to achieve efficiency TSOs needs to address work in these
initiatives by taking advantage of the performed analysis and forums
and not duplicating efforts as well as being aware of regional
particularities.