Page 1: curso asme

Overview of Process PlantPiping System Maintenance

and Repair

Participant’s Workbook

Page 2: curso asme

CONTACT INFORMATION

ASME Headquarters1-800-THE-ASME

ASME Professional Development1-800-THE-ASME

Eastern Regional Office8996 Burke Lake Road - Suite L102Burke, VA 22015-1607703-978-5000800-221-5536703-978-1157 (FAX)

Midwest Regional Office1117 S. Milwaukee Ave.Building B - Suite 13Libertyville, IL 60048-5258847-680-5493800-628-6437847-680-6012 (FAX)

Northeast Regional Office326 Clock Tower CommonsRoute 22Brewster, NY 10509-9241914-279-6200800-628-5981914-279-7765 (FAX)

International Regional Office1-800-THE-ASME

Southern Regional Office1950 Stemmons Freeway - Suite5037CDallas, TX 75207-3109214-746-4900800-445-2388214-746-4902 (FAX)

Western Regional Office119-C Paul DriveSan Rafael, CA 94903-2022415-499-1148800-624-9002415-499-1338 (FAX)

You can also find information onthese courses and all of ASME,including ASME ProfessionalDevelopment, the Vice Presidentof Professional Development,and other contacts at the ASMEWeb site...

http://www.asme.org

Page 3: curso asme

Overview of Process Plant Piping SystemMaintenance and Repair

Edited by:

Vincent A. CarucciCarmagen Engineering, Inc.

Copyright © 1999 by

All Rights Reserved

Page 4: curso asme

TABLE OF CONTENTS

Part 1: PARTICIPANT NOTES……………………………………….3

Part 2: BACKGROUND MATERIAL…………………………………36I. Introduction ……………………………………………………..…..37II. Inspection and Testing Practices ………………………....………40III. Inspection Frequency and Extent ……………………….………45IV. Evaluation and Analysis of Inspection Data ……..…….…….…49V. Repairs, Alterations, and Rerating ………………………..…..…55VI. Inspection of Buried Piping …………………………..…….…..…65VII. Summary …………………………………………….……….……68VIII. Suggested Reading ……………………...…………..………….69

Page 5: curso asme

3

Part 1:Participant Notes

Page 6: curso asme

4

Notes:

Notes:

1

Overview of Process PlantPiping System

Maintenance and Repair

2

Course Outline

• Introduction• General• Inspection and Testing Practices• Inspection Frequency and Extent• Evaluation and Analysis of Inspection Data• Repairs, Alterations, and Rerating• Inspection of Buried Piping• Closure

Page 7: curso asme

5

Notes:

Notes:

3

Scope of API 570

• Inspection, repair, alteration, rerating of in-service metallic piping systems

• To be used by qualified organizations andindividuals

• Included fluid services: process fluids,hydrocarbons, similar flammable or toxicservices

4

Scope of API 570 (Cont.)• Excluded and optional piping systems

– Hazardous services below threshold limits– Water, steam, steam-condensate, BFW, Category

“D” services– Systems on movable structures governed by

jurisdictions– Systems integral with mechanical devices– Internal piping– Plumbing and sewers– Size ≤ NPS 1/2– Non-metallic or lined piping

Page 8: curso asme

6

Notes:

Notes:

5

Definitions

• Alteration - Physical change affectingpressure containing capabilityor flexibility

• Repair - Work to restore piping systemto be suitable for designconditions

• MAWP - Maximum permitted internalpressure for continuousoperation at design temperature

6

Definitions (Cont.)

• Rerate - Change in design pressure,design temperature, or both

• Piping Circuit - Pipe section exposed tosimilar corrosivity, withsimilar design conditionsand material

Page 9: curso asme

7

Notes:

Notes:

7

Types of Pipe Deterioration• Injection points• CUI• Service-specific and

localized corrosion• Environmental

cracking• Fatigue cracking• Brittle fracture

• Deadlegs• Soil-to-air interfaces• Erosion and

corrosion/erosion• Corrosion under

linings and deposits• Creep cracking• Freeze damage

8

Typical InjectionPoint Circuit

Figure 1

**

*

*

*

*

*

Ove rh ead L in e Gre ate r of3D or 1 2"

In jectio np oin t

O ve rhea dCo nde ns e rsIn jectio n p oint

pipin g ci rcuitD isti lla tionT o we r

* = Typical T ML

Page 10: curso asme

8

Notes:

Notes:

9

Systems Susceptible to CUI• Areas exposed to:

– Mist overspray from cooling water towers– Deluge systems– Steam vents– Process spills, moisture ingress, acid vapors

• CS systems operating in range 25-250°F• CS systems in intermittent service over 250°F• Deadlegs and attachments protruding from

insulation

10

Systems Susceptible to CUI(Cont.)

• Austenitic stainless steels operating in range150-400°F

• Vibrating systems with damaged insulationjacketing

• Steam-traced systems with tracing leaks• Systems with deteriorated coatings and/or

wrappings

Page 11: curso asme

9

Notes:

Notes:

11

Locations Susceptible to CUI• Penetrations/breaches in

jacket• Damaged/missing

jacketing• Hardened, separated, or

missing caulking• Piping low points in

systems that haveinsulation breach

• Insulation plug locations

• Insulation termination points• Jacket seams on top of

horizontal piping orimproperly lapped/sealedjacket

• Bulges or staining ofinsulation or jacketing, ormissing bands

• Carbon or low-alloy steelcomponents in high-alloysystems

12

Inspection Types

• Internal visual• Thickness measurement• External visual• Vibrating piping• Supplemental inspection

– Radiography – Thermography– AET – UT

Page 12: curso asme

10

Notes:

Notes:

13

External Visual Inspection• Observations by non-inspectors• Scheduled inspections by qualified inspector

and documented• Check for:

– Leaks – Misalignment– Vibration – Support condition– Corrosion – Insulation condition– Paint condition – Unrecorded field– Incorrect components modifications or

temporary repairs

14

Thickness MeasurementLocations (TMLs)

• Specific inspection areas along piping circuit– Nature of TML varies by location– Selection considers potential for local corrosion

and service-specific corrosion

• Thickness monitoring at TMLs– TMLs distributed in circuit– More TMLs and more frequent monitoring based

on situation

Page 13: curso asme

11

Notes:

Notes:

15

Thickness MeasurementLocations (TMLs) (Cont.)

• Test points - circles– Within TMLs

Pipe Size Circle Diameter

≤ NPS 10 ≤ 2”

> NPS 10 ≤ 3”

– Thickness averaging

• Mark TMLs for follow-up measurements

16

TML Selection• More TMLs:

– Leak has high risk potential– High potential for localized

corrosion– High CUI potential

• Fewer TMLs:– Low risk if leak– Long, straight piping

• No TMLs:– Extremely low risk if leak– Non-corrosive service

– Higher corrosion rates– Complex system

– Relatively non-corrosiveservice

Page 14: curso asme

12

Notes:

Notes:

17

Thickness MeasurementMethods

• UT for pipe over NPS 1

• RT for pipe ≤ NPS 1

• Use appropriate UT procedures

• Pit depth measurements

18

Pressure Testing

• Normally not part of routine inspections– Some jurisdictional exceptions

• Done per ASME B31.3

• Normally a hydrotest

• Special considerations for stainless steelpiping

Page 15: curso asme

13

Notes:

Notes:

19

Other Inspections

• Material verification and traceability

• Valve inspection

• Weld inspection

• Flanged joint inspection

20

Piping Service Classes

• Highest potential of immediate emergency if leak• Examples:

– Flammable service that may auto-refrigerate– Pressurized services that may rapidly vaporize and form explosive

mixture– H2S in gas stream (> 3 wt. %)– Anhydrous hydrogen chloride; HF– Pipe over or adjacent to water; over public throughways

• Services not in other classes• Includes most process unit piping and selected off-site piping• Flammable services that do not significantly vaporize when leak

• Services harmful to human tissue but located in remote areas

1

2

3

Class Description

Page 16: curso asme

14

Notes:

Notes:

21

Inspection Intervals

• By Owner-user or inspector based on:– Corrosion rate and remaining life calculations– Piping service classification– Applicable jurisdictional requirements– Judgment based on operating conditions,

inspection history, current inspection results,conditions warranting supplemental inspections

22

Inspection Intervals (Cont.)

• Maximum thickness measurement intervalsshorter of:– Half remaining life (considers corrosion rate)– Maximum specified in API 570

• Review/adjust intervals as needed

Page 17: curso asme

15

Notes:

Notes:

23

Maximum InspectionIntervals

Circuit Thickness VisualType Measurements, years External, years

Class 1 5 5

Class 2 10 5

Class 3 10 10

Injection points 3 By Class

Soil-to-air interfaces - By Class

24

Extent of VisualExternal Inspection

• Bare piping– Assess condition of paint and coating systems– Check for external corrosion, other deterioration

• Insulated piping– Assess insulation condition– Additional inspection if susceptible to CUI

Page 18: curso asme

16

Notes:

Notes:

25

CUI InspectionConsiderations

• Insulation damage at higher elevations may causeCUI at lower areas remote from damage

• RT or insulation removal and VT normally required• Expand inspection as necessary• CUI inspection targets specified in API 570• Systems that may be excluded

– Remaining life over 10 years– Adequately protected against external corrosion

26

CUI Inspection Targets

Pipe Amount of Follow-up Amount of NDE atClass NDE or Insulation Suspect Areas on Piping

Removal Where Within SusceptibleInsulation Damaged Temperature Ranges

1 75% 50%

2 50% 33%

3 25% 10%

Page 19: curso asme

17

Notes:

Notes:

27

Extent of ThicknessMeasurements

• Obtain thickness readings on representativesampling of TMLs on each circuit

• Include sampling data for variouscomponents and orientations in each circuit

• Include TMLs with earliest renewal datebased on prior inspection

• More TMLs → more accurate prediction ofnext inspection date

28

Extent of Other Inspections• Small-bore piping (SBP), ≤ NPS 2

– Primary process lines and Class 1 secondary lines:+ Per all API 570 requirements

– Classes 2 and 3 SBP+ Inspection optional+ Inspect deadlegs where corrosion expected

• Secondary, auxiliary SBP– Inspection optional if associated with instruments

or machinery– Consider classification and potential for cracking,

corrosion, CUI

Page 20: curso asme

18

Notes:

Notes:

29

Extent of Other Inspections(Cont.)

• Threaded connections– Inspection based on SBP and auxiliary piping

requirements– Select TMLs that can be radiographed– Additional considerations if potentially subject to

fatigue damage

30

Remaining Life Calculations

• RL =

Where: RL = Remaining life, yearstact = Minimum measured thickness,

in. (May average at test point)tmin = Minimum required thickness

for location, in. Per B31.3 ordetailed calculations.

CRtt minact −

Page 21: curso asme

19

Notes:

Notes:

31

Remaining Life Calculations(Cont.)

• RL for circuit based on shortest calculated RL

• Determines– Inspection interval– Repair/replacement needs

32

Corrosion Rate Calculations

• Long term and short term– Compare to determine which governs– Rationalize if significantly different

• CR (LT) =

• CR (ST) =

)sinspectioninitialandlastbetweenyears(tt lastinitial −

)sinspectionpreviousandlastbetweenyears(tt lastprevious −

Page 22: curso asme

20

Notes:

Notes:

33

Corrosion Rate EstimationNew Systems or Changed

Service ConditionsDetermine using one of the following:• Data from other systems of similar material in

comparable service• Estimated from Owner-user’s experience or from

published data on systems in comparable service• Thickness measurements

– After maximum 3 months service– Consider using corrosion coupons or probes to help

establish measurement timing– Repeat until establish CR

34

Example 1

• Pipe = NPS 16, tinitial = 0.375”• Service = Gas with 3.5% H2S• treq = 0.28• tmeas = 0.36, 0.32, 0.33, 0.34, 0.32• In operation 10 years

Page 23: curso asme

21

Notes:

Notes:

35

Example 1 (Cont.)• Service → Class 1 → 5-year interval

• CR/Maximum = = 5.5 x 10-3 in./yr.

• CA/Available = (0.32 - 0.28) = 0.04 in.

• Maximum Interval = = 3.6 years< 5 years

∴ Maximum thickness measurement interval =3.6 years

1032.0375.0 −

310x5.5x204.0

36

MAWP Determination• Based on applicable code (ASME B31.3)• MAWP of system based on weakest component

(e.g., pipe, flanges, valves, fittings, etc.)• Unknown material - Calculate based on lowest

grade material and joint efficiency of code• MAWP calculation based on:

– Actual measured thickness– Double estimated corrosion until next inspection– Allowances needed for other loadings

Page 24: curso asme

22

Notes:

Notes:

37

Example 2

• DP = 500 psig, DT = 400°F• Pipe = NPS 16, STD weight, A-106 Gr. B,

OD = 16 in.• S = 20,000 psi, E = 1.0• tmeas = 0.32 in.• CR = 0.01 in./yr.• Next planned inspection - 5 years

38

Example 2 (Cont.)

• Estimated thinning until next inspection -5 x 0.01 = 0.05 in.

MAWP = 2 S Et/D= 2 x 20,000 x 1 x [0.32 - 2 x 0.05]/16= 550 psig > 500 psig

∴ OK

Page 25: curso asme

23

Notes:

Notes:

39

Example 3

• Same system as Example 2• Change next planned inspection to 7 years• Estimated thinning until next inspection -

7 x 0.01 = 0.07 in. MAWP = 2 S Et/D

= 2 x 20,000 x 1.0 [0.32 - 2 x 0.07]/16= 450 psig

40

Example 3 (Cont.)

∴ Not acceptable. Must either:

– Reduce inspection interval– Confirm maximum operating pressure will not

exceed 450 psig before 7th year– Renew pipe before 7th year

Page 26: curso asme

24

Notes:

Notes:

41

Minimum RequiredThickness Determination

• Based on:– Pressure, mechanical, structural considerations– Appropriate design formulae and code allowable stress

• Consider general and localized corrosion• Consider increasing calculated value if high

potential failure consequences– Unanticipated/unknown loads– Undiscovered metal loss– Resistance to normal abuse

42

Local Thin AreaEvaluation Alternatives

• ASME B31.G criteria• Numerical stress analysis and ASME Section VIII,

Division 2, Appendix 4 criteria– Code allowable stress but < 2/3 SMYS at temperature– Additional considerations if temperature in creep range

• Additional considerations if corroded longitudinal weldand E < 1.0– Weld includes base metal each side of weld within greater

of 1 in. or twice measured thickness

• Additional considerations for corroded pipe caps

Page 27: curso asme

25

Notes:

Notes:

43

Piping Stress Analysis• Piping to be supported and restrained to:

– Safely carry weight– Have sufficient flexibility for thermal movement– Not vibrate excessively

• Not normally part of inspection, but:– Prior analyses identify high stress locations– Compare predicted thermal movements with actual– Analysis often needed to solve vibration problems

• New analyses may be needed if conditionschange or system modified

44

Recordkeeping Requirements• Owner-user responsibility• Permanent/progressive records required• To include:

– Service – Classification– Identification – Inspection interval– Inspection and test details – Results of thickness measurements

and responsible individual and other inspections and tests done– Repairs (temporary and – Pertinent design information and

permanent), alterations, piping drawingsreratings done

– Maintenance and other – Date and results of externalevents affecting system inspectionsintegrity

Page 28: curso asme

26

Notes:

Notes:

45

Authorization and Approval ofRepairs, Alterations, and Rerating• Authorization

– Work by appropriate repair organization– Authorized by inspector before starting– Piping engineer must approve alterations first– Inspector may designate hold points

• Approval– Design, execution, materials, welding procedures, examination,

testing to be approved by inspector or piping engineer– Owner-user to approve on-stream welding– Consult piping engineer before repairing service-induced cracks– Inspector to approve all repairs/alterations at hold points and

after completion

46

Welded Repairs

• Follow principles of ASME B31.3 or originalconstruction code

• Temporary repairs– Full encirclement split sleeve or box-type

enclosure (generally not for cracks)– Fillet welded split coupling or lap patch if:

• Localized deterioration• SMYS < 40,000 psi• Material matches base metal unless otherwise approved

Page 29: curso asme

27

Notes:

Notes:

47

Welded Repairs (Cont.)

– May be welded onstream with proper design,inspection, procedures

– Replace with permanent repair next opportunity+ May extend if approved/documented by piping engineer+ Owner-user establishes appropriate procedures

• Defect repair– Remove defect to sound metal– Deposit weld metal

48

Welded Repairs (Cont.)• Locally corroded areas

– Remove surface irregularities and contamination– Deposit weld metal

• Remove/replace cylindrical section• Insert patch

– Full-penetration weld– 100% RT or UT for Class 1 or 2 systems– Rounded corners, 1 in. minimum radius

• NDE after welding (e.g., PT, MT, etc.)

Page 30: curso asme

28

Notes:

Notes:

49

Typical Welded Repairs

Figure 2Split Sleeve

tst

CL

See Detail 2

MT or PTSee Detail 1

ts

t

CL

1/8"

Max

imum

Gap

Field Weld

ts

Field Weld

Backing Strip

LEGEND:ts = Sleeve Thicknesst = Pipe Thickness

Detail " 1 "Fillet Girth Weld

Detail 2Butt Weld for Seam

50

Typical Welded Repairs(Cont.)

Figure 3Complete-Encirclement Box

CL

CL

CL

Lifting Lugs

Split Box andEnd Plates on CL Typ.

Typ.

Typ.(2) 3/4" - 3000# Couplings

End Plate,(2) Required

NewContainmentBox

Typ.

Page 31: curso asme

29

Notes:

Notes:

51

Typical Welded Repairs(Cont.)

Figure 4Partial Box

52

Typical Welded Repairs(Cont.)

Figure 5Lap Patch

tp

t

1/8"

Max

imum

Gap LEGEND:

tp = Sleeve Thicknesst = Pipe Thickness

Detail " 1 "

See Detail 1

Page 32: curso asme

30

Notes:

Notes:

53

Non-Welded Repairs

• Temporary onstream repairs of locallythinned sections, circumferential lineardefects, flange leaks, etc.

• Bolted leak clamp or box• Design must consider:

– Control of axial thrust load if piping may separate– Effect of clamping forces on pipe component– Need for and properties of leak sealing fluids

54

Typical Non-Welded Repairs

Figure 6Flange Clamp

Page 33: curso asme

31

Notes:

Notes:

55

Typical Non-Welded Repairs(Cont.)

Figure 7Bolted Box

56

Welding and HotTapping Requirements

• Per principles of ASME B31.3 or originalconstruction code

• Procedures, qualifications, recordkeeping• Hot tapping (or other onstream welding)

– Per API Publication 2201– Detailed inspection, design, installation, safety

procedures required

Page 34: curso asme

32

Notes:

Notes:

57

Welding and Hot TappingRequirements (Cont.)

• Preheat– Per applicable code and welding procedure– May be alternative to PWHT

• PWHT– Per applicable code and welding procedure– May be needed due to service– Local PWHT may be possible

58

Welding and Hot TappingRequirements (Cont.)

• Design– Full-penetration groove welds for butt joints– New and replacement components per applicable code– Special design considerations for fillet-welded patches

• Materials• NDE

Page 35: curso asme

33

Notes:

Notes:

59

Pressure Testing

• Done if practical and deemed necessary byinspector

• Normally required after alterations and majorrepairs

• May use NDE instead after consultation withinspector and piping engineer

60

Pressure Testing (Cont.)

• If not practical to pressure test final closureweld:– Pressure test new or replacement piping– Closure weld is full-penetration butt weld between

WN flange and standard pipe component, orstraight pipe sections of equal diameter andthickness, axially aligned, equivalent materials.SO and SW flange alternatives identified

– 100% RT or UT– MT or PT root pass and completed weld for butt-

welds, and on completed weld for fillet welds

Page 36: curso asme

34

Notes:

Notes:

61

ReratingRequirements to be met:• Design calculations• Inspection verifies

condition and CA provided• Safety valves reset• All system components

acceptable• Records updated• Meet original or latest

code

• Must be pressure testedunless already done atsufficient pressure

• Acceptable to inspector orpiping engineer

• Piping flexibility adequatefor design temperaturechanges

• Temperature decreasejustified by impact testresults

62

Inspection of Buried Piping• Significant external corrosion possible• Inspection hindered by inaccessibility• Above-grade visual surveillance for leak indications• Close-interval potential survey• Pipe coating holiday survey• Soil resistivity• Cathodic protection monitoring

Page 37: curso asme

35

Notes:

Notes:

63

Other Requirements forBuried Pipe

• Inspection Methods

• Intervals

• Extent

• Repair Methods

64

Summary

• Inspection, repair, alteration, rerating of in-service piping systems are normal activities

• Requirements and procedures are necessaryto maintain piping system integrity

• API 570 is industry standard to be used

Page 38: curso asme

36

Part 2:Background Material

Page 39: curso asme

37

I. IntroductionThe structural integrity of piping systems must be maintained after they havebeen placed into service so that they will provide safe, reliable, long-termoperation. Therefore, existing piping systems require periodic inspection todetermine their current condition and permit evaluation of their structural integrityto permit future operation. Should unacceptable deterioration or flaws beidentified, pipe repairs may be required. Existing piping systems might alsorequire alterations or rerating to accommodate new operational needs (or toaccommodate deterioration that cannot or will not be repaired).

Process plants must adopt and follow established procedures for the inspection,repair, alteration, and rerating of piping systems after they have been placed intoservice. API 570, “Piping Inspection Code – Inspection, Repair, Alteration, andRerating of In-Service Piping Systems,” provides the basic procedures to befollowed by process plants. This course is based on API 570.

Scope of API 570

API 570 was developed for the petroleum refining and chemical processindustries. But since most of its requirements have broad applicability, it may beused for any piping system. It must be used by organizations that maintain orhave access to an authorized inspection agency, a repair organization, andtechnically qualified piping engineers, inspectors, and examiners (as defined inAPI 570).

While API 570 applies to all petroleum refineries and chemical plants, its scopedefines both specific included fluid services, and excluded and optional pipingsystems. Thus, API 570 requirements do not necessarily have to be applied toevery piping system in a refinery or chemical plant.

Included Fluid Service

Unless identified by API 570 as being an excluded or optional system, API 570applies to piping systems for process fluids, hydrocarbons, and similar flammableor toxic fluid services. Examples of these are the following:

• Raw, intermediate, and finished petroleum or chemical products.

• Catalyst lines.

• Hydrogen, natural gas, fuel gas, and flare systems.

• Sour water and hazardous waste streams or chemicals above thresholdlimits, as defined by jurisdictional regulations.

Page 40: curso asme

38

Excluded and Optional Piping Systems

API 570 permits the following fluid services and classes to be excluded from itsspecific requirements. This is done to focus attention (with associated manpowerand budget expenditures) on applications that would have the most significantconsequences should a pipe failure occur. However, any of these excludedsystems may be included in a plant’s API 570 program at the option of the owner.

• Fluid services that are excluded or optional include the following:

- Hazardous fluid services below threshold limits, as defined byjurisdictional regulatories.

- Water (including fire protection systems), steam, steam condensate, boilerfeedwater, and Category D fluid services (as defined by ASME B31.3).

• Classes of piping systems that are excluded or optional are as follows:

- Piping systems on movable structures covered by jurisdictional regulation(e.g., piping systems on trucks, ships, barges, etc.).

- Piping systems that are an integral part or component of rotating orreciprocating mechanical devices (e.g., pumps, compressors, etc.) wherethe primary design considerations and/or stresses are derived from thefunctional requirements of the device.

- Internal piping or tubing of fired heaters or boilers.

- Pressure vessels, heaters, furnaces, heat exchangers, and the fluidhandling or processing equipment (including internal piping andconnections for external piping).

- Plumbing, sanitary sewers, process waste sewers, and storm sewers.

- Piping or tubing with an outside diameter not exceeding that of NPS ½

- Nonmetallic piping and polymeric or glass-lined piping.

API 570 permits these services and systems to be excluded from its specificrequirements to focus inspection, engineering, and maintenance resources onareas that would have the largest potential effect should leakage or failure occur.However, this should not be interpreted that these “excludable or optional”systems should be completely ignored. Furthermore, the consequences of afailure in some of these systems could be dangerous or unacceptable inparticular circumstances. Therefore, owners may wish to include some of theseservices or systems in their API 570 program in all respects, and differentrequirements and procedures may be used for other services or systems. Forexample:

Page 41: curso asme

39

• The failure of a high pressure steam or boiler feedwater system could havesignificant personnel safety consequences. An owner might include suchservices in his API 570 program.

• The failure of an NPS ½ vent connection in an “included” fluid service couldhave significant personnel safety and economic consequences. An ownermight wish to include such systems in his API 570 program.

Definitions

API 570 contains definitions of technical terms that are used in the standard.The following are several of these terms used in this course:

• Alteration A physical change in any component that has designimplications affecting the pressure containing capability orflexibility of a piping system beyond the scope of its design.

• Repair The work necessary to restore a piping system to a conditionsuitable for safe operation at the design conditions.

• MAWP The maximum internal pressure permitted in the pipingsystem for continued operation at the most severe conditionof coincident internal or external pressure and temperature(minimum or maximum) expected during service.

• Rerate A change in either or both the design temperature or themaximum allowable working pressure.

• Piping Circuit A section of piping that has all points exposed to anenvironment of similar corrosivity and that is of similar designconditions and construction material.

Page 42: curso asme

40

II. Inspection and Testing PracticesTypes of Pipe Deterioration

The piping inspection techniques that are used must consider the type(s) ofdeterioration that might be found in particular services or locations. The followingtypes and areas of deterioration might occur:

• Injection point corrosion • Deadleg corrosion

• Corrosion under insulation (CUI) • Soil-to-air (S/A) interfaces

• Service specific and localizedcorrosion

• Erosion and corrosion/erosion

• Environmental cracking • Corrosion beneath linings anddeposits

• Fatigue cracking • Creep cracking

• Brittle fractures • Freeze damage

Several of these items are briefly discussed below.

Injection Points

Portions of a piping system that are in the vicinity of injection points may besubject to accelerated or localized corrosion. Such regions should be treated asseparate inspection circuits and be thoroughly inspected periodically. API 570provides suggested lengths of pipe upstream and downstream of the injectionpoint that should be included in the injection point circuit. Figure 1 illustrates atypical injection point circuit.

Page 43: curso asme

41

**

*

*

*

*

*

Overhead Line Greater of3D or 12"

Injectionpoint

OverheadCondensersInjection point

piping circuitDistillationTower

* = Typical TML

Typical Injection Point CircuitFigure 1

Systems Susceptible to CUI

Piping systems may be subject to external corrosion under insulation (CUI) insituations where the integrity of the insulation system has been compromised.Therefore, special inspection attention should be paid to situations where CUImight be a concern. The following highlights areas and types of piping systemsthat might be more prone to CUI:

• Areas exposed to :

- Mist overspray from cooling towers

- Deluge systems

- Steam vents

- Process spills, moisture ingress,acid vapors

• Carbon steel piping operating in the range 25°F to 250°F.

• Carbon steel piping operating intermittently above 250°F.

• Deadlegs or other attachments protruding from insulation and at a differenttemperature than the active line.

• Austenitic stainless steel piping operating between 150°F and 400°F.

• Vibrating piping that may damage insulation jacketing.

Page 44: curso asme

42

• Steam traced piping that may have leaking tracers.

• Piping with deteriorated coating or wrapping.

Locations Susceptible to CUI

For systems that are susceptible to CUI, inspection efforts should be focused firston the most likely locations where corrosion might be found. The followingsummarizes such locations:

• Penetrations through or breaches in the insulation jacketing.

• Insulation terminations at flanges and other piping components.

• Damaged or missing insulation jacketing.

• Insulation jacket seams located on the top of horizontal piping.

• Improperly lapped or sealed insulation jacketing.

• Insulation termination points in vertical pipe.

• Caulking that has hardened, separated, or is missing.

• Bulged or stained insulation or jacketing, or missing bands.

• Piping low points in systems that have a breach in the insulation system.

• Carbon or low-alloy steel flanges, bolting, or other components underinsulation.

Types of Inspection

The particular type of inspection that is used depends on the details of the pipingsystem, the service, and the type(s) of deterioration expected.

• Internal Visual. Only applicable for large diameter piping, by using remoteinspection techniques, or at local areas that are accessible at openings.

• Thickness Measurement. Used to determine the extent of pipe thinning andmay be done with the system either in or out of service.

• External Visual. Done to determine the condition of the pipe exterior,insulation, paint and coating systems. Also used to check for misalignment,leakage, or vibration.

Page 45: curso asme

43

• Vibrating Piping. Excessive piping vibration should be reported toengineering for evaluation. Excessive pipe vibration or other line movementcould result in leakage at flanged joints or threaded connections, or a fatiguefailure. It should be remembered, however, that some amount of pipevibration is normal.

• Supplemental Inspection. Other inspection methods may also be used basedon the specific situation. These include radiography, thermography, acousticemission testing (AET), or ultrasonic thickness surveys.

Thickness Measurement Locations (TMLs)

TMLs are the specific areas in a piping circuit where inspections are made. TMLlocations and their number are selected based on the potential for localized orservice-specific corrosion and the consequences should a failure occur.

Pipe wall thicknesses are measured at “test points” within the TMLs, and thethickness readings may be averaged to arrive at a composite thickness readingat the TML. A test point is a circle having the following maximum diameters.

Pipe Size Circle Diameter≤ NPS 10 ≤ 2”

> NPS 10 ≤ 3”

TML Selection

The number and location of the TMLs must be based on the expected types andpatterns of corrosion expected in the particular service.

More TMLs• Leak has high potential to cause damage

• High potential for localized corrosion

• High CUI potential

• Higher corrosion rates

• Complex system

Fewer TMLs• Low risk if leak

• Large, straight piping

• Relatively non-corrosiveservice

No TMLs• Extremely low risk if leak

• Non-corrosive service

Page 46: curso asme

44

Thickness Measurement Methods

The following thickness measurement methods are normally used.

• UT for pipe over NPS 1

• RT for pipe ≤ NPS 1

• Pit depth measurements for pitted areas using pit depth gauges

In all areas, appropriate inspection procedures must be used to obtain reliableresults.

Pressure Testing

Except where local jurisdictions require it, pressure tests are not normally doneas part of a routine inspection. When pressure tests are done (e.g., afteralterations) they should be based on the following:

• Must meet ASME B31.3 requirements.

• Test fluid must be water unless this would have adverse consequences (e.g.,freezing, process contamination, water disposal problem).

• Stainless steel piping requires special attention (e.g., potable water and blowndry).

Other Inspections

Other inspections may also be required.

• Material verification and traceability. When alterations or repairs are made onlow or high-alloy piping systems, the inspector must ensure that the correctmaterials are used.

• Valve inspection. Inspect valves for any unusual corrosion patterns orthinning. Valves in high temperature cyclic service might be subject to fatiguecracking. All subsequent pressure tests should be per API 598.

• Weld inspection. Welds are always inspected as part of new construction,repairs, and alterations. They are also sometimes inspected for deteriorationas part of the normal inspection activity if problems are suspected.

• Flanged joint inspection. Flanged joints should be examined for signs ofleakage. The cause of any leakage found should be determined. Specialattention should be paid to flanges that have been clamped and pumped withsealant to stop leaks since the bolting might corrode and/or crack with time.

Page 47: curso asme

45

III. Inspection Frequency and Extent

Piping Service Classes

Process piping systems are categorized into different classes to help identifysystems where greater inspection efforts should be made. Greater effort shouldbe devoted to systems where there would be more significant safety orenvironmental impact should a leak occur.

Class Description1 • Highest potential of immediate emergency if leak.

• Examples:- Flammable service that may auto-refrigerate- Pressurized services that may rapidly vaporize and form

explosive mixture- H2S in gas stream (> 3 wt. %)

- Anhydrous hydrogen chloride; HF- Pipe over or adjacent to water; over public throughways

2 • Services not in other classes

• Includes most process unit piping and selected off-site piping3 • Flammable services that do not significantly vaporize when leak

• Services harmful to human tissue but located in remote areas

Inspection Intervals

Inspection intervals are determined based on the following:

• Corrosion rate and remaining life calculations

• Piping service classification

• Jurisdictional requirements

• Judgment of inspector and piping engineer based on experience

The maximum interval between thickness measurements should be the lower ofhalf the remaining life or what is specified in the following table:

Page 48: curso asme

46

Circuit TypeThickness

Measurements, Years Visual External, YearsClass 1 5 5Class 2 10 5Class 3 10 10Injection Points 3 By ClassSoil-to-Air Interfaces - By Class

The inspection intervals must be reviewed and adjusted as necessary based onthe results of the thickness measurements that are made.

Extent of Visual External Inspection

External visual inspection should also be conducted at the same maximumintervals as are used for thickness measurements.

Bare piping should be checked for:

• The condition of paint and coating systems

• External corrosion

• Other deterioration (e.g., leakage, damaged supports, etc.)

Insulated piping should be checked for:

• Damaged insulation or jacketing

• Signs of CUI for systems that might be subject to this

CUI Inspection Considerations

After external visual inspection, additional inspection must be done for systemspotentially subject to CUI. The additional inspection required depends on thepipe class and whether the insulation is damaged, as specified in the followingtable:

Page 49: curso asme

47

PipeClass

Amount of follow-up NDE orinsulation removal where

insulation is damaged

Amount of NDE at suspect areason piping within susceptible

temperature ranges1 75% 50%2 50% 33%3 25% 10%

The inspection may be expanded as necessary based on the initial results.

Systems with a remaining life of over 10 years, or that are adequately protectedagainst external corrosion, need not be included in the CUI inspection program.However, the condition of the insulation system should be periodically checkedby operating personnel to identify signs of deterioration.

Extent of Thickness Measurements

Each thickness measurement inspection must obtain thickness readings from arepresentative sampling of TMLs in each circuit. The sampling should includedata from the various components in the circuit and in different orientations (i.e.,horizontal and vertical). TMLs with the shortest remaining life must be included.The inspection should obtain as many measurements as necessary to accuratelyassess the condition of the piping system.

Extent of Other Inspections

Other inspections are also required to adequately assess the condition of apiping system.

Small-Bore Piping (SBP) [ ≤≤≤≤ NPS 2]

Inspect SBP per the following:

Service Class Inspection RequirementPrimary Process Piping All Inspect per all requirements of API 570

Secondary Process Piping 1 Inspect per all requirements of API 5702 & 3 Inspection is optional

Deadlegs 2 & 3 Inspect where corrosion was experiencedor is anticipated

Note that while inspection is optional for Class 2 or 3 SBP, the owner mustalways consider the potential consequence should a leak develop in SBP thathas not been inspected.

Page 50: curso asme

48

Secondary, Auxiliary SBP

Inspection is optional for SBP associated with instruments and machinery.Consider the following in determining whether inspection will be done:

• Piping system classification

• Potential for environmental or fatigue cracking

• Potential for corrosion based on experience with adjacent primary systems

• Potential for CUI

Threaded Connections

Threaded connections are inspected based on the same criteria as other SBP.TMLs for threaded connections should only include those that can beradiographed during scheduled inspections.

Threaded connections that might be subject to fatigue damage (e.g., thoseassociated with machinery systems) should be periodically assessed.Consideration may be given to using a thicker wall, adding bracing, and/or usinga welded connection in situations where the potential fatigue damage is aconcern.

Page 51: curso asme

49

IV. Evaluation and Analysis of Inspection DataRemaining Life Calculations

The remaining life of piping systems must be calculated based on the corrosionrate using the following:

Calculation EquationRemaining Life, RL

ratecorrosiontt minact −

tact = Actual minimum thickness, ininches, determined at inspection

tmin = Minimum required thickness, ininches, for the limiting section orzone

Corrosion Rate, CR (LT)

1

lastinitial

Dtt − D1 = Time (years) between last and

initial (nominal) inspections

Corrosion Rate, CR (ST)

2

lastpreviousl

Dtt − D2 = Time (years) between last and

previous inspections

The long term and short term corrosion rates should be compared and the highervalue used in the remaining life calculations. If there is a significant differencebetween the two corrosion rates, further evaluations should be made in anattempt to determine the cause. The remaining life of the circuit should be basedon the shortest calculated remaining life.

Corrosion Rate Estimation

The expected corrosion rate must be estimated for new piping systems or forsystems whose service has been changed. One of the following methods mustbe used to determine the probable corrosion rate.

• Data collected from other piping systems fabricated of similar material and incomparable service.

• Estimate based on the owner-user’s experience or from published data forsimilar material in comparable service.

• Make initial thickness measurements after no more than three months ofservice. Corrosion coupons or probes may be useful to help determine whenthickness measurements should be made. Make additional thicknessmeasurements as necessary until the corrosion rate is determined.

Page 52: curso asme

50

Example 1 - Inspection Interval DeterminationAn NPS 16 piping system has been in operation for 10 years and has been takenout of service for its first thorough inspection. The following information is given:

• Pipe service - Gas with 3.5% H2S• Minimum required thickness - 0.28 in.• Originally installed thickness - 0.375 in.• Thicknesses measured at five locations: 0.36, 0.32, 0.33, 0.34, 0.32

Based on the information provided, what maximum thickness measurementinterval should be used for this system?

Solution:The pipe service places this system into Class I. Therefore, the maximuminterval cannot be more than 5 years based only on the service. Now check theremaining life criterion.

CR/Maximum = 10

32.0375.0 − = 5.5 x 10-3 in./yr.

Available corrosion allowance = (0.32 - 0.28) = 0.04 in.

Maximum Interval = 310x5.5x204.0

− = 3.6 years < 5 years

∴ Maximum thickness measurement interval is 3.6 years.

MAWP Determination

The MAWP of a piping system must be determined based on the requirements ofthe applicable piping code (i.e., ASME B31.3 in the case of process plant pipingsystems). The MAWP of the system is that of the weakest component within thesystem. Thus, in addition to the pipe itself, all other system components must beconsidered (e.g., flanges, valves, etc.). If the pipe material is unknown, theMAWP calculations must be based on the lowest grade (i.e., weakest) materialand lowest weld joint efficiency that would be permitted by the code.

The MAWP calculation is based on:• The actual thicknesses determined by inspection.• Double the estimated corrosion loss until the next inspection is done.• Additional allowances that might be necessary in specific cases to account for

applied loadings other than pressure.

The following examples illustrate calculation of the MAWP. Note that in bothcases, only the pipe thickness is considered.

Page 53: curso asme

51

Example 2 – MAWP Determination

Design Pressure 500 psig

Design Temperature 400°F

Pipe Material A 106 Gr. B

Pipe Size NPS 16

Allowable Stress 20,000 psi (from B31.3)

Longitudinal Weld Efficiency 1.0 (A 106 Gr. B is seamless pipe)

Thickness Measured During Inspection 0.32 in.

Observed Corrosion Rate 0.01 in./year

Next Planned Inspection 5 years

Estimated Thinning Until Next Inspection 5 x 0.01 = 0.05 in.

MAWP = D

EtS2 (from B31.3)

MAWP = ( )16

05.0x232.0x1x000,20x2 −

MAWP = 550 psig > 500 psig

Since the MAWP exceeds the system design pressure, the system may remainin service at the design pressure without repairs, replacements, or rerating.

Page 54: curso asme

52

Example 3 – Check Increased Inspection IntervalFor the same system as in Example 1, determine if the inspection interval can beincreased to seven years.

Estimated thinning until next inspection = 7 x 0.01 = 0.07 in.

MAWP = D

EtS2 (from B31.3)

MAWP = ( )16

07.0x232.0x1x000,20x2 −

MAWP = 450 psig

The MAWP is less than the design pressure. Therefore, either the inspectioninterval must be reduced, the operating pressure must not exceed 450 psig, orthe pipe must be repaired or replaced.

Page 55: curso asme

53

Minimum Required Thickness Determination

The minimum required thickness of a piping system (i.e., the retirementthickness) must be determined considering all applicable design loads. Thedesign pressure of the system will normally govern the minimum requiredthickness. However, local loading conditions (e.g., wind or earthquake, valveweights, local thermal displacement stresses, etc.) might govern the minimumrequired thickness in particular situations. Both general and localized corrosionmust be considered.

In cases where there are significant safety or economic loss consequencesshould a failure occur, it is prudent to increase the minimum required thicknessabove the calculated value. This additional allowance is meant to account forunanticipated or unknown loads, undiscovered metal loss, tolerance in thethickness measurements, and resistance to normal abuse.

In all cases, the normal code design formulas and allowable stresses must beused.

Local Thin Area Evaluation

Local areas of a pipe may have thinned much more than the surrounding region.A conservative evaluation approach for such regions is to consider the locallycorroded region in isolation and determine the minimum thickness there. If thisapproach produces an acceptable MAWP, then there is no need to go further.However, if the resulting MAWP is not acceptable, then a more detailedevaluation approach using one of the following methods may be used.

• ASME B31.G criteria. This simplified approach considers the maximum depthand length of the locally thin area, the pipe diameter, and nominal thicknessto determine whether the thin area is acceptable. It intrinsically accounts forthe additional strength that the surrounding uncorroded pipe provides to thethin area.

• ASME Section VIII, Division 2, Appendix 4 criteria. This is a detailednumerical stress analysis approach that permits a more exact calculation andevaluation of the local stresses. The basic code allowable stress (rather thanthe Division 2 allowable stress) is used in this analysis, but not less than 2/3of the specified minimum yield stress (SMYS). Additional considerations arerequired if the design temperature is in the creep range of the material.

• Weld joint efficiency considerations. If the pipe has a longitudinal weld seamand its joint efficiency is less than one, the proximity of a thinned area to theweld is relevant.

Page 56: curso asme

54

- If the thinned area is more than the larger of 1 inch or twice the measuredthickness away from the weld, then weld joint efficiency does not need tobe considered.

- If the thinned area is closer to the weld, then weld joint efficiency must beconsidered.

• If a pipe cap is corroded, the location of the corrosion is relevant (i.e., in theknuckle region or central portion). The knuckle region of a cap requires alarger minimum thickness than the central portion.

Piping Stress Analysis

Performing a piping stress analysis is not normally a part of inspection andmaintenance. However, stress analysis considerations must still be kept in mind.

• The pipe must be adequately supported to carry its weight. Locations wheresupports have become damaged or are otherwise ineffective should beidentified for further evaluation or repair.

• Adequate flexibility to accommodate thermal displacements must beprovided. Identify situations where thermal expansion might be restricted(e.g., due to interference by adjacent items).

• The pipe must not vibrate excessively, since this could cause leakage atflanged joints and threaded connections, or cause a fatigue failure.

• A new stress analysis may be required if the design conditions are changed(e.g., due to equipment rerate) or if the system is modified (e.g., adding a newequipment item with associated piping to the system).

Recordkeeping Requirements

The owner-user is responsible for maintaining permanent and progressiverecords for all piping systems covered by API 570. These records form the basisfor developing a cost-effective inspection and maintenance program. Therecords must include the following information:

• Service• Identification• Inspection and test details and

responsible individual• Repairs (temporary and permanent),

alterations, reratings done• Maintenance activities and other

events affecting system integrity

• Classification• Inspection interval• Results of thickness measurements

and other inspections and tests done• Pertinent design information and

piping drawings• Date and results of external

inspection

Page 57: curso asme

55

V. Repairs, Alterations, and ReratingIn all cases, repairs and alterations must meet ASME B31.3 requirements.

Authorization and Approval

All repairs and alternations must be done by a qualified repair organization(defined in API 570) and must be authorized by the inspector before beginning.Alterations must also be approved by a qualified piping engineer. The inspectormay designate hold points during repairs and alterations to permit sufficient timefor inspection.

Additional approvals are required as follows:

• The inspector or piping engineer must approve the design, execution,materials, welding procedures, examination, and testing.

• The owner-user must approve all on-stream welding.

• The piping engineer should be consulted prior to weld repair of any cracksthat occurred in-service. The purpose of this is to attempt to identify thecause of the crack and correct it.

• The inspector must approve all repairs and alterations at the designated holdpoints and at completion of the work.

Welded Repairs

Welded repairs are preferably done while the piping system is out of service.However, it may be possible to make weld repairs while the piping system is inoperation in particular situations provided appropriate inspections, precautions,and hot work permit procedures are used. API 570 does not distinguish betweenshut down and on-stream repairs with respect to the specified requirements, andthe owner must develop appropriate on-stream repair procedures.

API 570 recognizes that it may be necessary to temporarily repair a pipingsystem to permit its continued operation as fast as possible. Thus, a distinctionis made between temporary and permanent repairs.

Page 58: curso asme

56

Temporary Repairs

• A full encirclement welded split sleeve or a box-type enclosure may beinstalled over the damaged or corroded area (See Figures 2 through 4). Thesleeve or box must be welded to the pipe at locations that are thick enough toremain intact during welding. A piping engineer must design these repairs.This method will typically not be used to repair longitudinal cracks in the pipewall unless the piping engineer is convinced that the crack will not propagatefrom under the repair.

• A fillet-welded split coupling or a lap patch may be used to repair localizeddeterioration (e.g., pitting or pinholes) if the SMYS ≤ 40,000 psi (See Figure5).

Temporary repairs should be removed and replaced with permanent repairs atthe next available maintenance opportunity. However, temporary repairs mayremain longer if the piping engineer approves this and documents it. In mostsituations, temporary repairs should generally be designed as if they will remaininstalled for a long time.

Page 59: curso asme

57

tst

CL

See Detail 2

MT or PTSee Detail 1

ts

t

CL

1/8"

Max

imum

Gap

Field Weld

ts

Field Weld

Backing Strip

LEGEND:ts = Sleeve Thicknesst = Pipe Thickness

Detail " 1 "Fillet Girth Weld

Detail 2Butt Weld for Seam

Welded Split SleeveFigure 2

Page 60: curso asme

58

CL

CL

CL

Lifting Lugs

Split Box andEnd Plates on CL Typ.

Typ.

Typ.(2) 3/4" - 3000# Couplings

End Plate,(2) Required

NewContainmentBox

Typ.

Complete-Encirclement BoxFigure 3

Partial BoxFigure 4

Page 61: curso asme

59

tp

t

1/8"

Max

imum

Gap LEGEND:

tp = Sleeve Thicknesst = Pipe Thickness

Detail " 1 "

See Detail 1

Lap PatchFigure 5

Permanent Repairs

• A relatively small defect may be repaired by completely removing it and thenfilling the resulting groove with weld metal.

• Locally corroded areas may be repaired by first removing any surfaceirregularities and contamination, and then restoring the thickness with weldmetal. This approach is only practical for relatively small areas.

• If the system can be taken out of service, a cylindrical section of pipe thatcontains the defective area can be removed and replaced.

Page 62: curso asme

60

• An insert patch (i.e., flush patch) may be used as a repair if:

- Full penetration groove welds are used.

- The welds are 100% radiographed or ultrasonically examined for Class 1or 2 piping systems.

- The patches have rounded corners with a 1 inch minimum radius.

Care must be taken to ensure that insert patches conform to the pipecurvature to avoid local geometric discontinuities that could act as stressconcentration points.

• In all cases, appropriate NDE should be done of the final welds to ensure thatthey are high quality. Butt welds will typically be 100% radiographically (RT)or ultrasonically (UT) examined, along with either liquid penetrant (PT) ormagnetic particle (MT) examination. Other welds will typically be PT or MTexamined.

Non-Welded Repairs

Non-welded repairs may be used to temporarily repair a locally damaged portionof a pipe or piping component while the system remains on-stream (or possiblydepressured but not gas-freed and cleaned). This approach may be used forlocally thinned sections or linear defects (either partially or completely throughthe pipe thickness), or leaking flanges.

Non-welded repairs typically employ a bolted clamp or box which encompassesthe damaged component (See Figures 6 and 7). The design of the clamp or boxmust be adequate for the pressure thrust force from the damaged pipe if there isconcern that the pipe will completely separate at the area of deterioration. Thepipe must also have adequate thickness at the clamp or box attachment points towithstand the applied bolting force needed to hold the clamp in place.

Bolted clamps or boxes will often require injection of a leak sealing fluid toprovide a tight seal at the pipe or component interface. The sealant must becompatible with the service fluid and design conditions.

Page 63: curso asme

61

Bolted Flange ClampFigure 6

Courtesy of Plidco International, Inc.

Bolted Pipe BoxFigure 7

Courtesy of Plidco International, Inc.

Page 64: curso asme

62

Welding and Hot Tapping Requirements

All welding must be done in accordance with ASME B31.3 or the original pipingconstruction code using qualified procedures and welders. Any welding that isdone while the system is in operation (e.g., hot tapping) must meet therequirements of API Publication 2201. All local design, inspection, testing, andhot work permit procedures developed by the owner must also be followed.

Preheat and Postweld Heat Treatment (PWHT)

Preheat and PWHT requirements must be per the applicable code (i.e., ASMEB31.3). Preheating to at least 300°F may be used as an alternative to PWHT ifthe system was originally given PWHT as a code requirement (i.e., based only onmaterial type and thickness), provided:

• The pipe is P-1 steel.

• Mn-Mo steels are operated at a high enough temperature to provide adequatefracture toughness and there is no hazard associated with pressure testing,startup, and shutdown.

• The minimum preheat temperature is measured and maintained, and the jointis covered with insulation immediately after welding to slow the cooling rate.

In situations where PWHT is required due to service considerations (e.g.,caustic), then the 300°F preheat alternative may not be used.

PWHT is preferably done in a 360° band around the pipe that encompasses theweld area. Local PWHT may be substituted on local repairs for all materialsprovided:

• An appropriate procedure is developed by a piping engineer.

• The procedure considers thickness, thermal gradients, material properties,charges resulting from PWHT, the need for full penetration welds, localstrains and distortions caused by local heating, and surface and volumetricNDE done after PWHT.

• A minimum 300°F preheat is maintained while welding.

• The PWHT temperature is maintained for a distance of at least twice the pipethickness from the weld.

• The PWHT temperature is monitored by two or more thermocouples.

• Controlled heat is also applied to any branch connection or other attachmentlocated within the PWHT area.

Page 65: curso asme

63

• The PWHT is required for code compliance and not for service considerations(e.g., caustic).

Design, Materials, and NDE

• All butt joints must be full-penetration groove welds.

• Piping components must be replaced if a repair is not likely to be adequate.

• Fillet welded patches must be designed by the piping engineer consideringthe following requirements:

- Appropriate weld joint efficiency

- The possibility of crevice corrosion

- Adequate strength per criteria specified in API 570

• New and replacement component materials must be per the applicable code.

• NDE must be per the applicable code, owner-user specifications, and API570.

Pressure Testing

Pressure testing is normally required after alterations and major repairs, or ifotherwise practical and deemed necessary by the inspector. NDE may beconsidered as an alternative to pressure testing only after consultation with theinspector and the piping engineer.

There may be situations where it is not practical to pressure test a final closureweld in a replacement section of pipe. The following requirements must be metin these cases:

• The new or replacement pipe section must be pressure tested. Thus, onlythe final closure weld is not pressure tested.

• The closure weld is a full-penetration weld between a weld neck flange and astandard pipe component; or between straight pipe sections, axially aligned(not miter cut) of equal diameter, thickness, and material. Alternatives thatinvolve slip-on and socket welded flanges are also identified in API 570.

• The final closure weld must be 100% RT or UT examined.

• MT or PT must be done on the root pass and final weld for butt welds, and oncompleted fillet welds.

Page 66: curso asme

64

Rerating

The following requirements must be met to permit rerating a piping system to anew design temperature or MAWP:

• Design evaluations must be done by the piping engineer or inspector to verifythe system for the new conditions.

• The rerating must meet the requirements of either the original constructioncode or the latest edition of that code.

• Current inspection data must verify that the system is adequate for theproposed conditions and has sufficient remaining corrosion allowance.

• The system must be pressure tested for the new conditions, unless recordsindicate that a previous test was done at a pressure that was greater than orequal to that required for the new conditions.

• The safety valves must be reset for the new design pressure and confirmed tohave adequate relieving capacity.

• The rerating must be acceptable to the inspector or piping engineer.

• All components in the system (e.g., valves, flanges, bolts, gaskets, etc.) mustbe checked and found to be acceptable for the new design conditions.

• Piping flexibility is adequate for the new design temperature. Newcalculations may be required to confirm this.

• The engineering records for the system must be updated.

• A decrease in the minimum operating temperature is justified by impact testresults (or exemptions) if required by the code.

Page 67: curso asme

65

VI. Inspection of Buried PipingCorrosive soil conditions may cause significant external deterioration of buriedpiping. Buried piping is typically protected from these soil conditions by using anexternal coating or wrap, or by using a cathodic protection system. Periodicinspection of a buried piping system is still required to ensure that the externalprotection system is effective; however, this inspection is hindered byinaccessibility.

Inspection Methods

Several methods may be used to inspect a buried piping system.

• A visual surveillance may be made above the area of the pipe for visibleindications of leaks. These indications could include:

- Surface contour change

- Softening of paving asphalt

- Bubbling crater puddles

- Soil discoloration

- Formation of liquid pools

- Odor

• A close-interval electric potential survey can be conducted over the buriedpipe. This survey may locate active corrosion points on the pipe surface.Corrosion cells can be located in this way since the electric potential at acorrosion area will be measurably different from that of an adjacent area.

• A holiday survey may be done on coated pipe to ensure that the coating isintact and free of holidays. The survey data can be used to determine theeffectiveness of the coating and the rate of coating deterioration.

• Soil resistivity measurements may be used to determine the corrosiveness ofthe soils in contact with the pipe. A mixture of different soils in contact withthe pipe can cause corrosion.

• If a cathodic protection (CP) system is used for corrosion protection, it shouldbe periodically monitored to ensure that it is providing adequate protection.NACE RP0169 and API RP 651 provide guidance for this monitoring.

• Direct inspection of buried piping may be done using intelligent pigging, videocameras, or excavation.

Page 68: curso asme

66

Inspection Frequency and Extent

Method Frequency/Comment

Above-grade visual 6 Months

Pipe-to-soil potential survey - 5 year interval for poorly coated pipewhere CP potentials are inconsistent

- Conduct survey along pipe route ifno CP or where leaks have occurreddue to external corrosion

Coating holiday survey Frequency based on indications thatother corrosion control methods areineffective

Soil corrosivity 5 year interval if no CP system andover 100 ft. is buried

CP system monitoring Per NACE 0169 and API RP 651

Internal Base on results of above-groundinspections

External (if no CP) Pigging or excavation intervals basedon measured soil resistivity per Table 1

Leak testing (i.e., pressure testing) Alternative or supplement to inspection.

• Hydrotest at 1.1 x MAOP

• Interval ½ of Table 1 if no CP

• Interval per Table 1 if CP

Soil Resistivity, ohm-cm Inspection Interval, years

< 2000

2000 – 10,000

> 10,000

5

10

15

Table 1

Page 69: curso asme

67

Repair of Buried PipingRepairs to buried piping may involve coatings, clamps, or welding.

• Coating repairs must be inspected to ensure that they meet the followingcriteria:- Sufficient adhesion to prevent underfilm migration of moisture- Sufficient ductibility to resist cracking- Free of voids and gaps- Adequate strength to resist damage due to handling and soil stress- Can support supplemental CP- Tested with a high-voltage holiday detector

• The location of clamp repairs must be logged in the inspection records. Theyare considered temporary repaired and are to be replaced with a permanentrepair at the first opportunity.

• Welded repairs of buried piping must meet the same requirements as thosefor above-ground piping.

Page 70: curso asme

68

VII. SummaryInspection, repair, alteration, and rerating of in-service piping systems are normalactivities that must be dealt with in process plants. Requirements andprocedures are necessary in carrying out these activities to ensure that pipingsystem integrity is maintained. API 570 is the industry standard that is used toform the basis for more detailed procedures that must be developed by processplant owners.

Page 71: curso asme

69

VIII. Suggested Reading1. API 570 Piping Inspection Code2. ASME B31.3 Process Piping3. ASME B31G Manual for Determining the Remaining Strength of

Corroded Pipelines4. API Publication 2201 Procedure for Welding or Hot Tapping on Equipment

Containing Flammables5. NACE RP0169 Control of External Corrosion on Underground or

Submerged Metallic Piping Systems6. API RP651 Cathodic Protection of Aboveground Petroleum

Storage Tanks

Page 72: curso asme
Page 73: curso asme

YOUR PATH TO LIFELONG LEARNINGASME offers you exciting, rewarding ways to sharpen your technical skills, enhance personal development and prepare for advancement.

*Short Courses - More than 200 short courses offered each year keepyou up to speed in the technology fast lane--or, help you fill in any gapsin your technical background.

*Customized Training at your organization’s site - Do you have ten ormore people at your site who could benefit from an ASME course?Most of our courses can be offered in-house and tailored to your latestengineering project. Bring a course to your company too.

*Self-study materials meet the needs of individuals who demandsubstantive, practical information, yet require flexibility, quality andconvenience. Return to each program again and again, as arefresher or as an invaluable addition to your reference library.

*F.E. Exam Review - A panel of seasoned educators outline a wide range of required topics to provide a thorough review to helppracticing engineers as well as engineering students prepare forthis challenging examination. 24 hours of videotape and notes.

*P.E. Exam Review - A comprehensive review of all the major exam topics that demonstrates the necessary math, logic and theory...and provides shortcuts that reduce the time and effort required to prepare yourselffor this challenging exam. 15 hours of videotape and notes.

FOR INFORMATION CALL 1-800-THE-ASME AND MENTION CODE CD.

INFORMATION REQUEST FORMPlease mail to ASME at 22 Law Drive, P.O. Box 2900, Fairfield, New Jersey, 07007-2900 or fax to 201-882-1717, call 1-800-THE-ASME, or email [email protected]

Send me information on the following:_____Short Courses _____ In-House Training _____ Self-Study Programs_____F.E. Exam Review _____ P.E. Exam Review

Name___________________________________________________________Title____________________________________________________________Organization_____________________________________________________Business Address_________________________________________________ City____________________________State_______________Zip___________Business Phone ( )____________________Fax ( )______________________E-mail Address____________________________________________________