Page 1: Curtain Wall Production Line_Liang Gong

FacadeTek Notes

Liang Gong, LEED AP BD+C

Revit Estimator

Ventana DBS

5/21/2015

Page 2: Curtain Wall Production Line_Liang Gong

Assembly Line:

1. Storage of Extrusions&Glass

2. Cutting Extrusions

3. CNC Machine Cutting

4. Sealing Horizontals to Verticals

5. Stacking Galvanized Backpan

6. Stacking Insulations

7. Stacking Shadowbox

8. Stacking Glass on Top

9. Sealing with Structural Silicone

10. Installing Reveal with Gaskets on It

11. Caulking Reveals

Page 3: Curtain Wall Production Line_Liang Gong

1. Storage of Extrusions

Boxing Process: Kellogg CW units as example

(weights 16-18lbs per sqft)

• 1 crate can hold 3500lbs-4500lbs weight

• 1 crate can hold 4 units

• 1 truck can hold 4 crates

Labeling System to match all

components in a single unit

Page 4: Curtain Wall Production Line_Liang Gong

2. Cutting Extrusions

Cuttings Instructions for Shop man Cutting Machine and Equipment

Page 5: Curtain Wall Production Line_Liang Gong

3. CNC machine cutting holes

CNC precisely cuts vertical mullion holes/notches, structural components and anchors

Lifting lug cut by CNC is used to lift units

when hoisting

Operator is manipulating CNC

8 different

tool in CNC

Page 6: Curtain Wall Production Line_Liang Gong

4. Sealing Horizontals to Verticals

5. Stacking Galvanized Backpan

6. Stacking Insulations

7. Stacking Shadowbox

This units has, from the bottom to top, galvanized backpan,

insulations and shadow box stacked on it, waiting to put

glass on it.

Butter

horizontal to

vertical

mullion

Page 7: Curtain Wall Production Line_Liang Gong

8. Stacking Glass on Top

9. Sealing with Structural Silicone (That’s why it’s called SSG)

Before infill structural silicone Infill structural silicone After infill structural silicone

Page 8: Curtain Wall Production Line_Liang Gong

Two part structural silicone mix Butterfly test and Dipstick test

Page 9: Curtain Wall Production Line_Liang Gong

10. Installing Reveal with Gaskets on It

11. Caulking Reveals

After installing reveal at the vertical around

glass, caulking the reveals to the glassReveals