c:usersdsongerdocumentsg19-16347 it package...

21

Upload: vutram

Post on 17-Mar-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

27:4

7 P

M

C002

General Notes

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

A.B.ABR.ABS.ABV.AC.A/CACC.A.C.C.AC. INSUL.ACC. PNL.ACT.A.C.U.ADD.ADDN.ADH.ADJ.A.F.F.A.H.U.AL.ALT.ALUM./AL.AMP.AMPL.ANCH.ANG.APPR.APPROX.ARCH.A.R.F.ASPH.A.S.R.ASSY.A.T.M.AUTO.AUX.AVG.AVS.AW.

ANCHOR BOLTABRASIVEABSORBINGABOVEACOUSTIC/ACOUSTICALAIR CONDITIONINGACCESSAIR CONDITIONING COMPRESSORACOUSTIC INSULATIONACCESS PANELACOUSTIC TILEAIR CONDITIONING UNITADDENDUMADDITIONADHESIVEADJUSTABLEABOVE FINISH FLOORAIR HANDLING UNITACOUSTICALLY LINEDALTERNATEALUMINUMAMPEREAMPLIFIERANCHORANGLEAPPROVEDAPPROXIMATEARCHITECT/ARCHITECTURALABOVE REFERENCE FLOORASPHALTAUTOMATIC SPRINKLER RISERASSEMBLYAUTOMATIC TELLER MACHINEAUTOMATICAUXILIARYAVERAGEACID VENT STACKACID WASTE

B.A.BB.B/BB.B.R.B/CBD.B.D.D.BDRY.BETW.BEV.B.F.BFE.B.F.P.B.I.BIT.B.L.BLDG.BLK.BLKG.BLR.BLR. F.BLR. H.BLVD.BM.B.M.B.N.BOT.BOT. EL.B.PL.BR.B.R.BRG.BRK.BRKR.BRZ.B.S.BSMT.BTU.BULL.B.U.R.B.W.

BURGLAR ALARMBALLED AND BURLAPPEDBACK-TO-BACKBASE BOARD RADIATIONBACK OF CURBBOARDBACK DRAFT DAMPERBOUNDARYBETWEENBEVELBARRIER FREEBOTTOM OF FOOTING ELEVATIONBACK FLOW PREVENTERBLACK-IRONBITUMINOUSBUILDING LINEBUILDINGBLOCKBLOCKINGBOILERBOILER FEEDBOILER HOUSEBOULEVARDBEAMBENCH MARKBULLNOSEBOTTOMBOTTOM ELEVATIONBASE PLATEBRASSBEDROOMBEARINGBRICKBREAKERBRONZEBOTH SIDESBASEMENTBRITISH THERMAL UNITBULLETINBUILT-UP ROOFINGBOTH WAYS

C-CA.CAB.CAP.CAT. NO.CB.C.BD.C.BR.C/CC.CL.CD.C.C.CEM.CEM. PLAS.CER.CERT.CF.CFH.CFM.C.G.CHAM.CHAN. OR [CHD.CHG.CHKD. PL.CHWR.CHWS.C.I.C.I.F.C.I.P.CIR.CIRC.CIRCUM.C.J.CL (CL)CL.CLG.CLO.CLR.CLRM.CLR. GL.CLR. W.GL.C.M.U.CNTR.CNVYR.CO.C.O.COEF.COL.COMB.COMPO.COMPR.COMPT.CONC.COND.CONF.CONN.CONST.CONT.CONTR.CONV.COR.CORR.COV.COV. PL.C.P.CPT.CRS.C.R.S.CSG.CSMT.CSTG.CSWRK.C.T.C.T.B.CTR.C.U.H.CU. FT.CULV.CW.CWR.CWS.CY.CYC.CYL.

CIVIL DRAWING-NO.COMPRESSED AIRCABINETCAPACITYCATALOG NUMBERCATCH BASINCHALKBOARDCIRCUIT BREAKERCENTER-TO-CENTERCOAT CLOSETCONDENSATE DRAINCEILING DIFFUSERCEMENTCEMENT PLASTERCERAMICCERTIFIEDCEILING FANCUBIC FOOT PER HOURCUBIC FEET PER MINUTECORNER GUARDCHAMFERCHANNELCHORDCHANGECHECKERED PLATECHILLED WATER RETURNCHILLED WATER SUPPLYCAST IRONCAST IRON FRAMECAST IRON PIPE/CAST-IN-PLACECIRCLE/CIRCULARCIRCUITCIRCUMFERENCECONTROL JOINTCENTERLINECLOSETCEILINGCLOSURECLEARCLASSROOMCLEAR GLASSCLEAR WIRE GLASSCONCRETE MASONRY UNITCOUNTERCONVEY0RCOMPANYCLEAN OUTCOEFFICIENTCOLUMNCOMBINATIONCOMPOSITIONCOMPRESSORCOMPARTMENTCONCRETECONDUITCONFERENCECONNECTIONCONSTRUCTIONCONTINUE/CONTINUOUSCONTRACTORCONVECTORCORNERCORRIDORCOVERCOVER PLATECONTROL PANELCARPETCOURSECARPET REDUCER STRIPCASINGCASEMENTCASTINGCASEWORKCERAMIC TILECERAMIC TILE BASECENTERCABINET UNIT HEATERCUBIC FEET/CUBIC FOOTCULVERTCOLD WATERCONDENSING WATER RETURNCONDENSING WATER SUPPLYCUBIC YARDCYCLESCYLINDER

D.D.A.DB.D.B.DBL.DEG.DEPR.DEPT.DES.DET.D.F.DGM.DIA.DIAG.DIFF.DIM.DIR.DISC.DISCONT.DISP.DIST.DIV.D.L.DMPFG.DMPR.DN.D.O.DR.DRN.DR. OP.D.S.D.S.P.D.T.D.T.C.DUP.DW.DWG.DWL.DWR.

DEEPDOUBLE ACTIONDECIBELDRY BULBDOUBLEDEGREE(S)DEPRESSEDDEPARTMENTDESIGNDETAILDRINKING FOUNTAINDIAGRAMDIAMETERDIAGONALDIFFUSERDIMENSIONDIRECTORYDISCONNECTEDDISCONTINUOUSDISPENSERDISTANCEDIVIDER/DIVISIONDEAD LOADDAMP PROOFINGDAMPERDOWNDOOR OPENINGDOORDRAINDOOR OPERATORDOWN SPOUTDRY STAND PIPEDRAIN TILEDRAIN TILE CONNECTORDUPLICATEDISHWASHERDRAWINGDOWELDRAWER

E.E-EA.E.A.E.C.E.D.E/EE.F.E.G.E.I.F.S.E.J.EL.ELAST.ELAST. FLASH.ELAST. W.P.ELEC.ELEC. CL.ELEC. CAB.ELEC. OPER.ELEV.EMERG.ENCL.ENGR.ENTR.EP.E.P.EPDM.EQ.EQUIP.EQUIV.E.R.ESP.E.S.R.EWCEXCAV.EXH.EXIST.EXP.EXP.B.EXP'D.EXT.EXTR.

EASTELECTRICAL DRAWING-NO.EXHAUST AIREACHELECTRICAL CONTRACTOREXHAUST DUCTEND-TO-ENDEXHAUST FANEXHAUST GRILLEEXTERIOR INSULATION FINISH SYSTEMEXPANSION JOINTELEVATIONELASTOMERICELASTOMERIC FLASHINGELASTOMERIC WATERPROOFINGELECTRIC/ELECTRICALELECTRICAL CLOSETELECTRICAL CABINETELECTRICALLY OPERATEDELEVATOREMERGENCYENCLOSUREENGINEERENTRANCE/ENTRYEPOXYELECTRICAL PANELETHYLENE PROPYLENE DIENE MONOMEREQUALEQUIPMENTEQUIVALENTEXHAUST REGISTEREXTERNAL STATIC PRESSUREELASTORMERIC SHEET ROOFINGELECTRIC WATER COOLEREXCAVATEDEXHAUSTEXISTINGEXPANSIONEXPANSION BOLTEXPOSEDEXTERIOREXTRUDED

F.F.A.FAB.F.A.C.P.FAS.F.BD.FBGLS.F. BRK.F.C.F.C.O.F.C.U.F.D.FDN.FDR.F.D.V.F.E.F.E.C.F/FF.FIN.F.H.F.H.C.FHMS.FHWS.FIG.FIN.FIN. FLR/F.F.FIXT.F.L.FLASH.FLDG.FLEX.FLR.FLR. FIN.FLUOR.FM. BD.FNFP.FPC.FPM.FPRFG.FR.F.R.FR/COV.FRMG.F.R.P.F.R.T.WD.FRZR.FS.FT OR 'F&TFTG.FURN.FURR.FUT.F.V.C.

FAHRENHEITFIRE ALARMFABRICATED/FABRICFIRE ALARM CONTROL PANELFASTENERFORM BOARDFIBERGLASSFIRE BRICKFLEXIBLE CONNECTIONFLOOR CLEAN OUTFAN COIL UNITFLOOR DRAINFOUNDATIONFEEDERFIRE DEPARTMENT VALVEFIRE EXTINGUISHERFIRE EXTINGUISHER CABINETFACE-TO-FACEFACTORY FINISHFIRE HYDRANTFIRE HOSE CABINETFLATHEAD MACHINE SCREWFLATHEAD WOOD SCREWFIGUREFINISH/FINISHEDFINISH FLOORFIXTUREFIRE LANEFLASHINGFOLDINGFLEXIBLEFLOORFLOOR FINISHFLUORESCENTFORMBOARDFENCEFIRE PROTECTIONFIRE PROTECTION CONTRACTORFEET PER MINUTEFIREPROOFINGFRAMEFIRE RETARDANT/FIRE RATEDFRAME AND COVERFRAMINGFIBERGLASS REINFORCED PANELINGFIRE RETARDANT TREATED WOODFREEZERFLOOR SINKFOOTFLOAT AND THERMOSTATIC TRAPFOOTINGFURNISH/FURNISHEDFURRING/FURREDFUTUREFIRE VALVE CABINET

G.GA.GAL.GALV.GALV. I.G.B.GC.GEN.GEN'L.GFCI.G.F.I.G.H.T.GI.GL.G.L.GLZ.GND.GPH.GPM.GR.GR. B.GRT.G.S.GSKT.GT.G.T.G.V.&B.GYP.BD.

GASGAUGEGALLONGALVANIZEDGALVANIZED IRONGRAB BARGENERAL CONTRACTORGENERATORGENERALGROUND FAULT CIRCUIT INTERRUPTERGROUND FAULT INTERRUPTERGLAZED HOLLOW TILEGREASE INTERCEPTORGLASSGRID LINEGLAZINGGROUNDGALLONS PER HOURGALLON'S PER MINUTEGRILLEGRADE BEAMGRAITEGREASE SEPARATORGASKETGROUTGREASE TRAPGATE VALVE AND BOXGYPSUM BOARD

HH.H.A. GL.H.B.G.BD.GC.H.C.HD.HDR.HDWD.HDWE.HEX.HGT.HHWR.HHWS.H.I.D.H.M.H.O.HORIZ.HOSP.HP.H.P.H.PR.HR.H.R.H.R.V.H.S.H.S.B.H.S.P.HSTWY.HTG.HTR.H.V.H/VH.V.A.C.H.V.C.H.W.HWR.HWS.HWY.HX.

HYDROGENHIGHHEAT ABSORBING GLASSHOSE BIBBHARDBOARDHEATING COILHOLLOW COREHEADHEADERHARDWOODHARDWAREHEXAGONHEIGHTHEATING HOT WATER RETURNHEATING HOT WATER SUPPLYHIGH INTENSITY DISCHARGEHOLLOW METALHUB OUTLETHORIZONTALHOSPITALHORSEPOWERHIGH POINTHIGH PRESSUREHOURHANDRAILHEAT RECOVERY VENTULATORHIGH STRENGTHHIGH STRENGTH BOLTHOSE STAND PIPEHOIST WAYHEATINGHEATERHIGH VOLTAGEHEATING AND VENTILATIONHEATING, VENTILATION, & AIR CONDITIONINGHOSE VALVE CABINETHOT WATERHOT WATER RETURNHOT WATER SUPPLYHIGHWAYHEAT EXCHANGER

I.D.I.E.I.F.IN. OR"INCAND.INCIN.INCL.INFO.INST'L.INSUL.INT.INTER.INV.I.W.

INSIDE DIAMETERINVERT ELEVATIONINSIDE FACEINCH/INCHESINCANDESCENTINCINERATORINCLUDE/INCLUDINGINFORMATIONINSTALL/INSTALLATIONINSULATE/INSULATIONINTERIORINTERMEDIATEINVERTINDIRECT WASTE

J.B.J.C.JST.JT.

JUNCTION BOXJANITOR CLOSETJOISTJOINT

K.D.K.O.P.K.P.KV.KVA.KW.

KNOCK DOWNKNOCK-OUT PANELKICK PLATEKILOVOLTKILOVOLT AMPEREKILOWATT

L-LAB.LAM.LAV.L.B.LBL.LBR.LBS. OR#LDG.LDRY.LEV.L.F.LGTH.L.H.L.H.R.B.LIN.LIN. DIFF.LIQ.L.L.L.L.H.L.L.V.LMST.L.O.L.P.L.P.G.L.PR.LPRF.L.R.P.LT.LTG.LTL.LTWT.LTWT. CONC.LVR.

LANDSCAPE DRAWING-NOLABORATORYLAMINATE/LAMINATEDLAVATORYLAG BOLTLABELLUMBERPOUNDSLANDINGLAUNDRYLEVELLINEAR FEET/FOOTLENGTHLEFT HANDLEFT HAND REVERSE BEVELLINEARLINEAR DIFFUSERLIQUIDLIVE LOADLONG LEG HORIZONTALLONG LEG VERTICALLIMESTONELOUVER OPENINGLOCATIONLIQUID PETROLEUM GASLOW PRESSURELIGHTPROOFLIGHTING/RECEPTACAL PANELLIGHTLIGHTINGLINTELLIGHTWEIGHTLIGHTWEIGHT CONCRETELOUVER

M.M-MACH.MACH. RM.MAINT.MAR.MAS.MATL.M.A.U.MAX.M.B.M.B.H.M.C.M.D.P.M.D.S.MECH.MED.MEMB.M.E.S.MET.MET. W.P.MEZZ.MFGR.MH.M.I.MIN.MISC.MIR.M.L.M.L. & PLAS.MLDGM.O.MOD.M.O.D.MON.MOV.M.S.B.M.T.MTD.MTG.MULL.MWK.

THOUSAND (1000)MECHANICAL DRAWING-NO.MACHINEMACHINE ROOMMAINTENANCEMARBLEMASONRYMATERIALMAKE-UP AIR UNITMAXIMUMMACHINE BOLT1000 BRITISH THERMAL UNITS/HOURMECHANICAL CONTRACTORMAIN DISTRIBUTION PANELMETAL DIVIDER STRIPMECHANICALMEDIUMMEMBRANEMETAL EDGE STRIPMETALMETALLIC WATERPROOFINGMEZZANINEMANUFACTURERMANHOLEMISCELLANEOUS IRONMINIMUMMISCELLANEOUSMIRRORMETAL LATHMETAL LATH & PLASTERMOLDINGMASONRY OPENINGMODELMOTOR OPERATED DAMPERMONUMENTMOVEABLEMAIN SWITCH BOARDMETAL THRESHOLDMOUNDED/INGMEETINGMULLIONMILLWORK

N.NAT.NEUT.N.I.C.NO. OR #NOS.N.S.N.T.S.

NORTHNATURALNEUTRALNOT-IN-CONTRACTNUMBERNOSINGNEAR SIDENOT-TO-SCALE

O.A.O.C.O.D.OFF.OH.OH.DR.O/OOPER.OPG.OPP.OPQ.ORIG.ORN.OZ.OSB.OXY.

OVERALLON CENTEROUTSIDE DIAMETEROFFICEOVERHEADOVERHEAD DOOROUT-TO-OUTOPERATOROPENINGOPPOSITEOPAQUEORIGINALORNAMENTALOUNCEORIENTED STRAND BOARDOXYGEN

P. OR 0/P.A.PART.PASS.P.B.P.BD.PC.P/CPCF.PCS.PED.PERIM.PERM.PERP.PFN.PG.P.G.P.H.PHOTO.P.I.V.PKG.PL.P.L.PLAS.PLAT.PLBG.PLF.PL. GL.PL. LAM.PLWD.PNL.PORT.POS.P.P.PREFAB.PRES.PRIM.PRL.PROJ.PROP.PRTN.P.R.V.PSF.PSI.PT.P.T.D.P.T.WD.P.T.W.R.PVC.PVMT.

PHASEPUBLIC ADDRESSPARTICLEPASSAGEPUSH BUTTONPARTICLE BOARDPIECEPRECASTPOUNDS PER CUBIC FOOTPIECESPEDESTALPERIMETERPERMANENTPERPENDICULARPREFINISHEDPAGEPRESSURE GAUGEPHYSICALLY HANDICAPPEDPHOTOGRAPHPOST INDICATOR VALVEPARKINGPLATEPROPERTY LINEPLASTERPLATFORMPLUMBINGPOUNDS PER LINEAR FOOTPLATE GLASSPLASTIC LAMINATEPLYWOODPANELPORTABLEPOSITIONPOWER PANELPREFABRICATEDPRESSUREPRIMARYPARALLELPROJECT/PROJECTIONPROPERTY/PROPOSEDPARTITIONPRESSURE REDUCING VALVEPOUNDS PER SQUARE FOOTPOUNDS PER SQUARE INCHPOINTPAPER TOWEL DISPENSERPRESERVATIVE TREATED WOODPAPER TOWEL WASTE RECEPTACLEPOLYVINYL CHLORIDEPAVEMENT

Q.T.Q.T.B.QTR.QTR. RD.QTY.

QUARRY TILEQUARRY TILE BASEQUARTERQUARTER ROUNDQUANTITY

R.A.R.A.D.RAD. OR R.R.A.F.R.A.G.R.A.R.R.C.RD.R.D.RECT.REC.RED.REF.REFL.REFR.REG.REINF.REM.REP.REPT.REQ'D.RET.RF.RFG.RF.H.R.H.R.H.M.S.R.H.R.B.R.H.W.S.RIO.RND. OR O/R.O.R.O.W.R.P.RPM.R.R.R.S.R.T.R.T.U.R.V.RVT.R.W.D.

RETURN AIRRETURN AIR DIFFUSERRADIUSRETURN AIR FANRETURN AIR GRILLERETURN AIR REGISTERROOF CONDUCTORROADROOF DRAINRECTANGLE/RECTANGULARRECEIVE/RECEIVEINGREDUCERREFER/REFERENCEREFLECTED/REFLECTIVEREFRIGERATORREGISTERREINFORCE/REINFORCING/REINFORCEMENTREMOVE/REMOVEABLEREPAIRRECEPTACLEREQUIREDRETURNROOFROOFINGROOF HATCHRIGHT HANDROUND HEAD MACHINE SCREWRIGHT HAND REVERSE BEVELROUND HEAD WOOD SCREWROUGH-IN-ONLYROUNDROUGH OPENINGRIGHT OF WAYRECEPTACLE PANELREVOLUTIONS PER MINUTERAILROADROOF SUMPRUBBER TILEROOF TOP UNITRELIEF VENTRIVETREDWOOD

S-S.SA.SAD.SAF.S.A.G.SAN.S.A.R.S.A.T.S.C.SCHED.S.C.R.S.D.S.DR.SECT.SERV.S.F.SGL.SHT.SHTHG.SHT. MET.SHWR.SIM.SK.S.N.D.S.N.R.SNS.SP.S.P.SPEC.SPKLR.SPKR.SPR.SPRYD.SQ.S.S.S.STL.ST.STD.STG.STL.STL. PL.STM.STOR.STR.STRUCT.STS.ST.STL.SUB.SUBST.SUPP.SURF.SUSP.SW.S.W.SWBD.SWGR.SYM.SYS.

STRUCTURAL DRAWING-NO.SOUTHSUPPLY AIRSUPPLY AIR DIFFUSERSUPPLY AIR FANSUPPLY AIR GRILLESANITARYSUPPLY AIR REGISTERSUSPENDED ACOUSTIC TILESOLID CORESCHEDULESHOWER CURTAIN RODSMOKE DETECTORSHOWER DOORSECTIONSERVICESQUARE FEET/SQUARE FOOTSINGLESHEETSHEATHINGSHEET METALSHOWERSIMILARSINKSANITARY NAPKIN DISPENSERSANITARY NAPKIN RECEPTACLESANITARY SEWERSPACESTATIC PRESSURESPECIFICATIONSSPRINKLERSPEAKERSPARESPRAYEDSQUARESERVICE SINKSTRUCTURAL STEELSTREETSTANDARDSEATINGSTEELSTEEL PLATESTEAMSTORAGESTRAIGHTSTRUCTURALSTORM SEWERSTAINLESS STEELSUBSTATIONSUBSTITUTESUPPORTSURFACE/SURFACINGSUSPEND/SUSPENSIONSWITCHSIDEWALKSWITCHBOARDSWITCH GEARSYMBOLSYSTEM

U.C.U.G.U.H.UNFIN.U.N.O.UR.USGS.U.SUB.UTIL.U.V.

UNDERCUTUNDER GROUNDUNIT HEATERUNFINISHEDUNLESS NOTED OTHERWISEURINALUNITED STATES GEOLOGICAL SURVEYUNIT SUBSTATIONUTILITYUNIT VENTILATOR

VENTVACUUMVARIABLEVARNISHVARIABLE AIR VOLUMEVINYL BASEVAPOR BARRIERVOLUME CONTROL DAMPERVINYL COMPOSITION TILEVOLUME DAMPERVENTILATE/VENTILATIONVERTICAL/VERTICALLYVESTIBULEVIBRATION ISOLATORVERIFY IN FIELDVINYL FABRICVOLTSVENEERVINYLVOLUMEVENEER PLASTERVENT STACKVENT THRU ROOF

V.VAC.VAR.VARN.VAV.V.B.V. BARR.VCD.VCT.V.D.VENT.VERT.VEST.V.I.V.I.F.VIN. FAB.VLT.VNR.VNY.VOL.V. PLAS.VS.VTR.

YARDYIELD POINTYIELD STRENGTHYEAR

YD.Y.P.YR.Y.S.

ZINCZC.

T.TAG.TAN.T.B.T&BTC.T/CTCC.T.D.TD.&WR.TECH.T/EL.TEL.TEMP.TEMP. GL.TF.T/FT.G.T/GT&GTHD.THERM.THK.THRESH.THRU.T/MT/PT/RTRFR.TS.T.S.T/S OR T.O.S.T./TOIL.T.U.TV.T.V.TV.M.T/W OR T.O.W.TYP.

THREADTRANSFER AIR GRILLETANGENTTEST BORINGTOP AND BOTTOMTOP OF CONCRETETOP OF CURBTEMPERATURE CONTROL CONTRACTORTRENCH DRAINTOWEL DISPENSER & WASTE RECEPTACLETECHNICALTOP ELEVATIONTELEPHONETEMPERATURETEMPERED GLASSTRANSFER FANTOP OF FOOTINGTRANSFER GRILLETOP OF GUTTERTONGUE AND GROOVETHREADTHERMOSTAT/THERMOMETERTHICK/THICKNESSTHRESHOLDTHROUGHTOP OF MASONRYTOP OF PAVEMENTTOP OF RIMTRANSFORMERTUBE SECTIONTHICKENED SLABTOP OF STEELTOILETTERMINAL UNITTELEVISIONTURNING VANETELEVISION MONITORTOP OF WALLTYPICAL

W.W/WAINS.W.C.W.CAB.W.C.O.WD.WDW.W.F.W.G.W.GL.W.H.W.L.W.M.W.O.W/OWP.W.P.W.PT.W.R.W.STPG.WT.W.V.W/WW.W.F.WWM.W_x_

WASTE/WATTSWITHWAINSCOTWATER CLOSETWALL CABINETWALL CLEAN OUTWOODWINDOWWASH FOUNTAINWATER GAUGEWIRE GLASSWATER HEATERWORKING LINEWIRE MESHWINDOW OPENINGWITHOUTWATERPROOFINGWEATHERPROOFINGWORKING POINTWASTE RECEPTACLEWEATHER STRIPPINGWEIGHTWALL VENTWALL-TO-WALLWELDED WIRE FABRICWELDED WIRE MESHWIDE FLANGE SECTION

ABBREVIATIONS

AND&

ANGLE

CENTERLINE

DIAMETER OR ROUND

AT@

BY (AS IN 6' X 8')X

PER/

PROPERTY LINE

SYMBOLS

TOWELDISPENSER ORMULTIPURPOSEUNIT

TOWELDISPENSERAND WASTERECEPTACLE

WASTERECEPTACLE

FULL-LENGTHMIRROR ANDBARRIER FREEMIRRORS

MIRROR OVERLAV ORCOUNTER

3'-4

"(M

AX.)

0' - 0"1'-8"

0' -

2"6'

-0"

0' -

0"1'-6

"

(MAX

.)

0' -

0"6" M

IN.

0' -

1"3'

-8"

(TYP

. HEI

GH

T)

0' -

1"5'

-4"

.3'-6

"TO

CO

NTR

OL

HANDDRYER

HOOKS SHELF(ABOVE)

0' -

2"5'-4

"

TYP.

HEI

GH

T

* OPERABLE CONTROLS SHALLFALL WITHIN FORWARDAPPROACH REACH RANGESREQUIRED BY CODEREGULATIONS

48" A.F.F.

.1'-3

"

15" A.F.F.

.2'-9

"

WALLMOUNTED OREMERGENCYTELEPHONE(B.F. FRONTAPPROACH)

E.W.C. ORDRINKINGFOUNTAINS

HIGH-LOWE.W.C. ORDRINKINGFOUNTAIN

FIREEXTINGUISHERCABINET

ELECTRICPANEL

FIREEXTINGUISHERAND WALLBRACKET

0' -

1"6'-8

"

0' -

1"5'-4

"

.4'

-0"

HEI

GH

TH

AND

LE B

.F.

.2'-3

"

(MIN

.)0' -

1"3'-3

"(M

IN.)

LOW

OFF

ICE

HT.

HIG

H-L

OW

FOU

NTA

IN O

RSI

NG

LE B

.F.

FOU

NTA

IN

.2'

-3"

(MIN

.)

.

3'-0

"

(MAX

.)LO

W O

FFIC

E H

T.

48"A.F.F.

0' -

1"4'-0

"

LIGHTSWITCH

CONTROLS

ELEVATOR PUSHBUTTONS

ELECTRONICDUPLEXTELEPHONE,OR T.V. OUTLETWITH LIGHTSWITCH

0' -

1"3'-6

"(M

AX.)

CLOCK

0' -

2"7'

-4"

(OR

AS

NO

TED

)

WALL SPEAKER CHALK BOARD ORTACKBOARD

0' - 1"VARIES

0' -

1"VA

RIE

S

0' -

1"0'

- 0"

0' -

1"2'

-0"

(STD

.)4 "

2'-1

0 1/

2"(B

.F. M

AX.)

WALL AND BASECABINETS

0' -

1"

0' -

0"1'

-6"

0' -

1"3'-4

"

4'-6

" (ST

D.)

4'-0

" (B.

F.)

SHELVING

BACKSPLASH

B.F. SHOWERSEAT

BARRIER FREEMEDICINECABINET

MEDICINECABINET

MOP STRIPAND SHELF

BARRIERFREE URINAL

STANDARDURINAL

SHOWER HEADAND VALVES

BARRIER FREE HANDHELD SHOWER HEADAND CONTROLS

WALLC.O.

0' -

0" 5" (T

YP.)

LINE OF WALLBASE

C.O. COVER

0' -

1"3'

-2" (

MIN

.)

0' -

1"33

" MIN

.

0' -

1"

.

4'-0

" MAX

.6'-0

" MIN

.

G.B.

.

1'-3" (MAX.)SHOWER 60" MIN. LENGTH HOSE WITH

HAND HELD OR ADJUSTABLESPRAY UNIT ON BARWALL LINE

NOTE: B.F. CONTROLSARE MOUNTED WITH-INTHIS AREA

0' -

2"6'

-4" (

STD

.)

0' -

1"3'

-4" (

STD

.)

FLUSHCONTROL

0' -

1"2'

-0"

0' -

0"

0' -

1"

1'-5

" B.F

.

15" (

MIN

.)

0' -

2"6'-0

"

0' -

2"6'-8

"

0' -

1"

3'-8

" (M

AX.)

IN C

ABIN

ETTO

SH

ELF

0' -

0"1'

-5" (

B.F.

MIN

.)

1'-7

" (B.

F. M

AX.)

FOLDEDPOSITION

DOORHARDWARE

HARDWARE-LEVER (B.F.)

0' -

1"3'-0

"

LOCKSET/LATCHSET LOCATION

LAVATORY

LINE OFWALL

.1'-3" (MIN.)

G.F.I. ELECT.OUTLET (SEENOTE BELOW)

.2'

-3"

.2'

-10"

.2'-6"

(B.F. MIN.)

33" M

IN.

.17

"-19

"

G.B.

. .

12" 24"

.16"-18"

WATERCLOSET

NOTE: ELECT. OUTLETNEAR SINKS TO BEMOUNTED 33" TO 36" A.F.F.

. .

.

12" 3'-6" (MIN.)

33" T

O 3

6"

4'-0

" (M

AX.)

URINAL

.

1'-3

" TO

4'-0

"

(B.F

. MAX

.).1-1/2"

LINE OFWALL

.

30" MIN.

. .

1'-3" 1'-3"

VANITY

.

1'-6"MAX.

3" MAX.

9" CLEAR(MIN.)

2'-3

" MIN

.

2'-1

0" M

AX.

LAVATORY

.

2'-5

" MIN

.2'

-10"

MAX

.

. 1'-6" MIN

SIGN

SIGNAGECHARACTERHEIGHT

CHARACTERS:5/8" MIN. 2"

MAX.

0' -

1"48

" MIN

. 60"

MAX

.

NOTE: MEASURED FROMBASELINE OF CHARACTER,BASED ON UPPERCASELETTER "I". ALL SIGNAGEMUST BE UPPERCASE &PLAIN SANS SERIF FONT CLEAR FLOOR AREA

FOR DOOR LATCHPULL SIDE

0' -

1"5'

-0"0' - 0" 0' - 0"

0' - 0"

1'-6"

9" 9"

TITLESCALE: 1/2" = 1'-0"1

DRAWINGNUMBER

ELEVATIONNUMBER 1

A101SHEET WHEREELEVATION IS

FOUND

ELEVATIONNUMBER

A101SHEET WHEREELEVATION IS

FOUND

1

2

3

4

SECTION ORDETAIL

NUMBER 1

A101SHEETWHERE

SECTION ORDETAIL IS

FOUND

1

A101

SECTIONOR DETAIL

NUMBER

SHEET WHERESECTION OR

DETAIL ISFOUND

MOUNTING HEIGHTS

ROOM, DOOR, & WINDOWIDENTIFICATION NUMBERS

101 DOOR IDENTIFICATION NUMBER

1 WINDOW IDENTIFICATION NUMBER

ROOM IDENTIFICATION BY FLOOR AS FOLLOWS:

BASEMENT FLOORS001

FIRST FLOORS101

SECOND FLOORS201

* CONTINUE FOR AS MANY FLOORS AS REQUIREDDOOR IDENTIFICATION NUMBERS SHALL REPEAT ROOM NUMBER.MULTIPLE DOORS IN A ROOM WILL USE A POSTSCRIPT LETTERFOR EACH ADDITIONAL DOOR REQUIRED

(MAX

.)

(MIN

.)

36" M

AX.

36" M

AX.

48" (

MAX

.)

(MAX

.)

A.F.

F.

15" A.F.F.

48" A.F.F.

.

.

GRABBARS

39"-41"

39" T

O 4

1"

.

.3'-0"(MAX.)

.

.

.

.

1'-3

" (M

IN.)

4'-0

" (M

AX.)1'

-0"

7"-9"

TOILET PAPER HOLDERDIMENSIONS

GRAB BAR DIMENSIONS

.

1-1/2"(CLEARBELOW)

.

CL

Ø

PL

NOT IN SCOPE OF WORK

G101A1

G102A1

G101A4

Room 1 Room 3 Room 5

Room 6Room 4Room 2

Room 11 Room 13 Room 15

Room 18Room 16Room 14

Room 10 Room 9

Room 7Room 8

NOT IN SCOPE OF WORK

NOT IN SCOPE OF WORK

SCOPE OF WORK1. WHITE BOARDS IN CLASSROOMS

2. INTERACTIVE TVS IN CLASSROOMS

3. I.T. BACKBONEENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

27:4

8 P

M

G100

Gilbert Elementary -Overall Plan

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

1/16" = 1'-0"A1 GILBERT ELEMENTARY - SCOPE OF WORKPROJECTNORTH

TRUENORTH

KEYNOTE LEGEND

1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD/SMART BOARD. FEILDVERIFY LOCATION. SALVAGE OR DISPOSE PER OWNERS REQUEST.

2 EXISTING BULLETIN BOARD TO REMAIN.

1

1

Room 1 Room 3 Room 5

Room 6Room 4Room 21

1

1

1

1

1

2

2

1

2

2

1 1

2

2 2

2 2

2

2

2

2

2

2

2

1 1

Room 8

Room 10 Room 9

Room 7

11

1

1 2 1 2

1

2 2

2 2 2 2

2

2

2

2

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

27:5

0 P

M

G101

Gilbert Elementary -Demolition Plans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

PROJECTNORTH

TRUENORTH

DEMOLITION NOTES:

1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.

SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.

5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.

6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.

7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.

8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.

9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.

10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.

11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.

12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.

13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.

14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.

15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.

1/8" = 1'-0"A1 GILBERT DEMOLITION GROUP 1 1/8" = 1'-0"A4 GILBERT DEMOLITION GROUP 2

PROJECTNORTH

TRUENORTH

1

1

Room 11 Room 13 Room 15

Room 18Room 16Room 14

111

2

2

2

2

1

2

2

111 1

1 1

2

2

2

2

NOT IN SCOPE OF WORK

NOT IN SCOPE OF WORK

GYM

2

2

2

2

2

2

2

2

2

2

2

2

2

2

KEYNOTE LEGEND

1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD/SMART BOARD. FEILDVERIFY LOCATION. SALVAGE OR DISPOSE PER OWNERS REQUEST.

2 EXISTING BULLETIN BOARD TO REMAIN. ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

27:5

0 P

M

G102

Gilbert Elementary -Demolition Plans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

PROJECTNORTH

TRUENORTH

1/8" = 1'-0"A1 GILBERT DEMOLITION GROUP 3

DEMOLITION NOTES:

1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.

SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.

5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.

6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.

7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.

8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.

9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.

10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.

11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.

12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.

13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.

14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.

15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.

KEYNOTE LEGEND

1 PROPOSED WHITE BOARD 4'x6'

2 PROPOSED WHITE BOARD 4'x8'

3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.

4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.

5 EXISTING BULLETIN BOARD

ALTERNATE PRICING NOTE:

1. PROVIDE MAGNETIC WHITE BOARD

3 3

3

3

3

3

2

1

4

4

1

4

1

2

1

4

1

11

4

4

2

Room 1 Room 3 Room 5

Room 6Room 4Room 2

84"AFF

84"AFF

84"AFF

84"AFF 84"AFF

84"AFF

5

5

2

5

5

1

15

5

2

15

5

5 5

5 5

5

5

TV TO BE MOUNTED @ 2'-4" AFF

TV TO BE MOUNTED @ 2'-4" AFF

3

1

11

2

4

3

2

4

3 4

2

3 1 4

Room 8 Room 7

Room 9Room 10

84"AFF84"AFF

84"AFF84"AFF

1

5 5

2 1

55

1

1

55 55

5

5

5

5

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

27:5

2 P

M

G103

Gilbert Elementary - FloorPlans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

GENERAL CONSTRUCTION NOTES:

1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS AND CONDITIONS.2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE

ATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND

SUPERVISION.4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE NEAT

AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE STATE ANDLOCAL CODES.

6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, ORFACE OF METAL STUDS, UNLESS OTHERWISE NOTED.

7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.

8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAINING TOALL OWNER FURNISHED EQUIPMENT.

9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.

10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2 MICHIGANBUILDING CODE.

11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.

12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALLFIRE RATED ASSEMBLY CONSTRUCTION.

13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS

NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDING OPERATIONAS LITTLE AS POSSIBLE DURING CONSTRUCTION.

15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.

16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS AND INTERACTIVETELEVISIONS.

17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 32" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESS OTHERWISENOTED.

PROJECTNORTH

TRUENORTH

PROJECTNORTH

TRUENORTH

1/8" = 1'-0"A1 GILBERT FLOOR PLAN GROUP 1 1/8" = 1'-0"A4 GILBERT FLOOR PLAN GROUP 2

33

3 3

1

4

12

4

1

1

4

1

3

4

2

5

22

11

4

4

Room 11 Room 13 Room 15

Room 18Room 16Room 14

1

84"AFF

84"AFF84"AFF

84"AFF

84"AFF

84"AFF

1

5

1

5

5

1

5

5

5

5

NOT IN SCOPE OF WORK

NOT IN SCOPE OF WORK

GYM

DOCKING STATION. PROVIDED BY OWNER.

1

5

55

5

5

55

5

3

2

2

5

5

5

5

5

5

5

5

KEYNOTE LEGEND

1 PROPOSED WHITE BOARD 4'x6'

2 PROPOSED WHITE BOARD 4'x8'

3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.

4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.

5 EXISTING BULLETIN BOARD

ALTERNATE PRICING NOTE:

1. PROVIDE MAGNETIC WHITE BOARD

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

27:5

3 P

M

G104

Gilbert Elementary - FloorPlans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

GENERAL CONSTRUCTION NOTES:

1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS AND CONDITIONS.2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE

ATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND

SUPERVISION.4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE NEAT

AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE STATE ANDLOCAL CODES.

6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, OR FACEOF METAL STUDS, UNLESS OTHERWISE NOTED.

7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS. COORDINATEWITH ALL TRADES AND OWNER.

8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENT SUPPLIERSAND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAINING TO ALL OWNERFURNISHED EQUIPMENT.

9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.

10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2 MICHIGANBUILDING CODE.

11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.

12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALLFIRE RATED ASSEMBLY CONSTRUCTION.

13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS

NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDING OPERATIONAS LITTLE AS POSSIBLE DURING CONSTRUCTION.

15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.

16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS AND INTERACTIVETELEVISIONS.

17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 32" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESS OTHERWISENOTED.

PROJECTNORTH

TRUENORTH

1/8" = 1'-0"A1 GILBERT FLOOR PLAN GROUP 3

NOT IN SCOPE OF WORK

NOT IN SCOPE OF WORK

NOT IN SCOPE OF WORK

H101A1

H102A1

H103A1

H1041

H101A4

SCOPE OF WORK1. WHITE BOARDS IN CLASSROOMS

2. INTERACTIVE TVS IN CLASSROOMS

3. I.T. BACKBONEENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

27:5

5 P

M

H100

Middle/High School -Overall Plan

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

3/64" = 1'-0"A2 MIDDLE/HIGH SCHOOL - SCOPE OF WORKPROJECTNORTH

TRUENORTH

2

1

2

1

Room 201 Room 202 Room 203 Room 204

Room 205

Room 206Room 207Room 208

1

2

1

1

1

1 1 1 1

1

1

1

1

CONFERENCE

1

1

KEYNOTE LEGEND

1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD. FEILD VERIFY LOCATION.SALVAGE OR DISPOSE PER OWNERS REQUEST.

2 EXISTING CHALK BOARD/BULLETIN BOARD TO REMAIN.

3 REMOVE EXISTING TVs IN ROOM. FIELD VERIFY LOCATIONS. SALVAGE OR DISPOSE PEROWNERS REQUEST.

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

27:5

7 P

M

H101

Middle/High SchoolDemolition Plan

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

PROJECTNORTH

TRUENORTH

DEMOLITION NOTES:

1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.

SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.

5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.

6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.

7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.

8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.

9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.

10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.

11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.

12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.

13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.

14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.

15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.

1/8" = 1'-0"A1 MIDDLE/HIGH SCHOOL DEMOLITION GROUP 1

GENERAL CONSTRUCTION NOTES:

1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS ANDCONDITIONS.

2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THEATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.

3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION ANDSUPERVISION.

4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE

NEAT AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLESTATE AND LOCAL CODES.

6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK,OR FACE OF METAL STUDS, UNLESS OTHERWISE NOTED.

7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.

8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTSPERTAINING TO ALL OWNER FURNISHED EQUIPMENT.

9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.

10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2MICHIGAN BUILDING CODE.

11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.

12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAINALL FIRE RATED ASSEMBLY CONSTRUCTION.

13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS

NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDINGOPERATION AS LITTLE AS POSSIBLE DURING CONSTRUCTION.

15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.

GENERAL CONSTRUCTION NOTES:

1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS ANDCONDITIONS.

2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THEATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.

3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION ANDSUPERVISION.

4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE

NEAT AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLESTATE AND LOCAL CODES.

6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK,OR FACE OF METAL STUDS, UNLESS OTHERWISE NOTED.

7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.

8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTSPERTAINING TO ALL OWNER FURNISHED EQUIPMENT.

9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.

10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2MICHIGAN BUILDING CODE.

11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.

12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAINALL FIRE RATED ASSEMBLY CONSTRUCTION.

13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS

NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDINGOPERATION AS LITTLE AS POSSIBLE DURING CONSTRUCTION.

15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.

GENERAL CONSTRUCTION NOTES:

1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS ANDCONDITIONS.

2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THEATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.

3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION ANDSUPERVISION.

4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE

NEAT AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLESTATE AND LOCAL CODES.

6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK,OR FACE OF METAL STUDS, UNLESS OTHERWISE NOTED.

7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.

8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTSPERTAINING TO ALL OWNER FURNISHED EQUIPMENT.

9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.

10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2MICHIGAN BUILDING CODE.

11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.

12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAINALL FIRE RATED ASSEMBLY CONSTRUCTION.

13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS

NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDINGOPERATION AS LITTLE AS POSSIBLE DURING CONSTRUCTION.

15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.

1/8" = 1'-0"A4 MIDDLE/HIGH SCHOOL DEMOLITON GROUP 2PROJECTNORTH

TRUENORTH

2

1

1

1

1

NOT IN SCOPE OF WORK

NOT IN SCOPE OF WORK

** EXISTING TV TO REMAIN

RELOCATE CLOSET &BLACK BOOK SHELF.REFER TO H106 FORNEW LOCATION.

Room 144

Room 156

Room 152 Room 154Room 140Room 138Room 134

**

1

11

1

2

1

1

2

NOT IN SCOPE OF WORK

NOT IN SCOPE OF WORK

Hallway

Hallway

2

1

1

1

1

1

KEYNOTE LEGEND

1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD. FEILD VERIFY LOCATION.SALVAGE OR DISPOSE PER OWNERS REQUEST.

2 EXISTING CHALK BOARD/BULLETIN BOARD TO REMAIN.

3 REMOVE EXISTING TVs IN ROOM. FIELD VERIFY LOCATIONS. SALVAGE OR DISPOSE PEROWNERS REQUEST.

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

27:5

8 P

M

H102

Middle/High School -Demolition Plans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

DEMOLITION NOTES:

1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.

SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.

5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.

6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.

7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.

8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.

9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.

10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.

11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.

12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.

13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.

14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.

15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.

1/8" = 1'-0"A1 MIDDLE/HIGH SCHOOL DEMOLITION GROUP 3PROJECTNORTH

TRUENORTH

1

3

1

NOT IN SCOPE OF WORK

Room 163

Room 164

Room 165

3

1

3

3

KEYNOTE LEGEND

1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD. FEILD VERIFY LOCATION.SALVAGE OR DISPOSE PER OWNERS REQUEST.

2 EXISTING CHALK BOARD/BULLETIN BOARD TO REMAIN.

3 REMOVE EXISTING TVs IN ROOM. FIELD VERIFY LOCATIONS. SALVAGE OR DISPOSE PEROWNERS REQUEST.

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

27:5

9 P

M

H103

Middle/High School -Demolition Plans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

DEMOLITION NOTES:

1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.

SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.

5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.

6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.

7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.

8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.

9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.

10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.

11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.

12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.

13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.

14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.

15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.

1/8" = 1'-0"A1 MIDDLE/HIGH SCHOOL DEMOLITION GROUP 4PROJECTNORTH

TRUENORTH

1

1

1

1

1

1

NOT IN SCOPE OF WORK

NOT IN SCOPE OF WORK

NOT IN SCOPE OF WORK

RELOCATE WALLSHELVING BRACKETS.REFER TO H108 FOR NEWLOCATION

Room 106

Room 100 Room 101 Room 118

Room 117

Room 115

Room 113

Room 111

Room 116Room 103

Room 105

1

1

1

1

1

1

1

1

2

1

1

1

1

11

1

Hallway

NOT IN SCOPE OF WORK

KEYNOTE LEGEND

1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD. FEILD VERIFY LOCATION.SALVAGE OR DISPOSE PER OWNERS REQUEST.

2 EXISTING CHALK BOARD/BULLETIN BOARD TO REMAIN.

3 REMOVE EXISTING TVs IN ROOM. FIELD VERIFY LOCATIONS. SALVAGE OR DISPOSE PEROWNERS REQUEST.

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

28:0

0 P

M

H104

Middle/High School -Demoltion Plans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

DEMOLITION NOTES:

1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.

SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.

5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.

6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.

7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.

8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.

9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.

10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.

11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.

12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.

13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.

14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.

15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.

1/8" = 1'-0"1 MIDDLE/HIGH SCHOOL DEMOLITION GROUP 5PROJECTNORTH

TRUENORTH

PROJECTNORTH

TRUENORTH

PROJECTNORTH

TRUENORTH

PROJECTNORTH

TRUENORTH

3

3

3

3

3

3

32

2

2

1

2

2

4

4

4

2

4

4

2 2

2

4

2

2

2

2

3

4

2

4

Room 201 Room 202 Room 203 Room 204

Room 205

Room 206Room 207Room 208

84"AFF

84"AFF

84"AFF84"AFF

84"AFF

84"AFF84"AFF

84"AFF

2 1

2

1

5

5

1

** MOUNT OVEREXISTING BULLETINBOARD

2

2

3

1

CONFERENCE

84"AFF

KEYNOTE LEGEND1 PROPOSED WHITE BOARD 4'X6'

2 PROPOSED WHITE BOARD 4'x8'

3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.

4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.

5 EXISTING CHALK BOARD/BULLETIN BOARD

6 PROPOSED LED TV 50" WITH HDMI

7 PROPOSED LED TV 60" WITH HDMI

ALTERNATE PRICING NOTE:1. PROVIDE MAGNETIC WHTIE BOARD

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

28:0

1 P

M

H105

Middle/High School - FloorPlans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

GENERAL CONSTRUCTION NOTES:

1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS ANDCONDITIONS.

2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THEATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.

3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION ANDSUPERVISION.

4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE NEAT

AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE STATE ANDLOCAL CODES.

6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, ORFACE OF METAL STUDS, UNLESS OTHERWISE NOTED.

7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.

8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAININGTO ALL OWNER FURNISHED EQUIPMENT.

9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.

10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2 MICHIGANBUILDING CODE.

11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.

12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALLFIRE RATED ASSEMBLY CONSTRUCTION.

13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS

NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDINGOPERATION AS LITTLE AS POSSIBLE DURING CONSTRUCTION.

15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.

16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS AND INTERACTIVETELEVISIONS.

17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 3'-0" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESS OTHERWISENOTED.

1/8" = 1'-0"A1 MIDDLE/HIGH SCHOOL FLOOR PLAN GROUP 1PROJECTNORTH

TRUENORTH

1/8" = 1'-0"A4 MIDDLE/HIGH SCHOOL FLOOR PLAN GROUP 2PROJECTNORTH

TRUENORTH

NOT IN SCOPE OF WORK

NOT IN SCOPE OF WORK

3

3

3

3

3

3

3

5

4

1

14

1

4

2

2

1

2

4

5

1

2

4

4

2

3

1

Room 144

Room 140Room 138Room 134 Room 152 Room 154

Room 156

84"AFF

84"AFF

84"AFF

84"AFF

84"AFF84"AFF

84"AFF

** EXISTING TV TO REMAIN

2

**

RELOCATED CLOSET & BLACKBOOKSHELF

2

1

2

2

1

84"AFF

6

Hallway

5

NOT IN SCOPE OF WORK

NOT IN SCOPE OF WORK

Hallway6

84"AFF

5

84"AFF

84"AFF

KEYNOTE LEGEND1 PROPOSED WHITE BOARD 4'X6'

2 PROPOSED WHITE BOARD 4'x8'

3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.

4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.

5 EXISTING CHALK BOARD/BULLETIN BOARD

6 PROPOSED LED TV 50" WITH HDMI

7 PROPOSED LED TV 60" WITH HDMI

ALTERNATE PRICING NOTE:1. PROVIDE MAGNETIC WHTIE BOARD

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

28:0

2 P

M

H106

Middle/High School - FloorPlans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

GENERAL CONSTRUCTION NOTES:

1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS AND CONDITIONS.2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE

ATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND

SUPERVISION.4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE NEAT

AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE STATE ANDLOCAL CODES.

6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, OR FACEOF METAL STUDS, UNLESS OTHERWISE NOTED.

7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS. COORDINATEWITH ALL TRADES AND OWNER.

8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENT SUPPLIERSAND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAINING TO ALL OWNERFURNISHED EQUIPMENT.

9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.

10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2 MICHIGANBUILDING CODE.

11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.

12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALLFIRE RATED ASSEMBLY CONSTRUCTION.

13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS

NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDING OPERATIONAS LITTLE AS POSSIBLE DURING CONSTRUCTION.

15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.

16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS AND INTERACTIVETELEVISIONS.

17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 3'-0" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESS OTHERWISENOTED.

PROJECTNORTH

TRUENORTH

1/8" = 1'-0"A1 MIDDLE/HIGH SCHOOL FLOOR PLAN GROUP 3

3

7

7

6

6

1

1

4

7

1

6

1

Room 163

Room 164

Room 165

84"AFF

84"AFF

84"AFF 84"AFF

84"AFF

84"AFF

84"AFF

PROPOSED CAT6

2

KEYNOTE LEGEND1 PROPOSED WHITE BOARD 4'X6'

2 PROPOSED WHITE BOARD 4'x8'

3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.

4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.

5 EXISTING CHALK BOARD/BULLETIN BOARD

6 PROPOSED LED TV 50" WITH HDMI

7 PROPOSED LED TV 60" WITH HDMI

ALTERNATE PRICING NOTE:1. PROVIDE MAGNETIC WHTIE BOARD

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

28:0

3 P

M

H107

Middle/High School - FloorPlans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

GENERAL CONSTRUCTION NOTES:

1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS ANDCONDITIONS.

2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THEATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.

3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION ANDSUPERVISION.

4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE NEAT

AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE STATE ANDLOCAL CODES.

6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, ORFACE OF METAL STUDS, UNLESS OTHERWISE NOTED.

7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.

8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAININGTO ALL OWNER FURNISHED EQUIPMENT.

9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.

10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2 MICHIGANBUILDING CODE.

11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.

12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALLFIRE RATED ASSEMBLY CONSTRUCTION.

13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS

NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDINGOPERATION AS LITTLE AS POSSIBLE DURING CONSTRUCTION.

15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.

16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS AND INTERACTIVETELEVISIONS.

17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 3'-0" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESS OTHERWISENOTED.

PROJECTNORTH

TRUENORTH

1/8" = 1'-0"A1 MIDDLE/HIGH SCHOOL FLOOR PLAN GROUP 4

NOT IN SCOPE OF WORK

NOT IN SCOPE OF WORK

NOT IN SCOPE OF WORK

3

3

1

3

3

3

3

3

3

3

3

1

1

2

4

1

1

4

3

12

4

4

4

22

1

4

2

2

4

1

4

2 2

1

4

2

2

2

1

4

4

Room 106

Room 100

Room 101 Room 118

Room 117

Room 115

Room 113

Room 111

Room 105

Room 103 Room 116

2

84"AFF

84"AFF

84"AFF

84"AFF

84"AFF

84"AFF

84"AFF

84"AFF

84"AFF

84"AFF

84"AFF

1 1

** NOT TO COVER UP WALL PAINTINGS

22

RELOCATED WALLSHELVING BRACKETS

1

2 2

2

2

5

2 2

2 2

2

1

1

NOT IN SCOPE OF WORK

84"AFF

6

84"AFF

KEYNOTE LEGEND1 PROPOSED WHITE BOARD 4'X6'

2 PROPOSED WHITE BOARD 4'x8'

3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.

4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.

5 EXISTING CHALK BOARD/BULLETIN BOARD

6 PROPOSED LED TV 50" WITH HDMI

7 PROPOSED LED TV 60" WITH HDMI

ALTERNATE PRICING NOTE:1. PROVIDE MAGNETIC WHTIE BOARD

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

28:0

4 P

M

H108

Middle/High School - FloorPlans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

GENERAL CONSTRUCTION NOTES:

1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS ANDCONDITIONS.

2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THEATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.

3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION ANDSUPERVISION.

4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE NEAT

AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE STATE ANDLOCAL CODES.

6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, ORFACE OF METAL STUDS, UNLESS OTHERWISE NOTED.

7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.

8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAININGTO ALL OWNER FURNISHED EQUIPMENT.

9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.

10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2 MICHIGANBUILDING CODE.

11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.

12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALLFIRE RATED ASSEMBLY CONSTRUCTION.

13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS

NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDINGOPERATION AS LITTLE AS POSSIBLE DURING CONSTRUCTION.

15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.

16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS AND INTERACTIVETELEVISIONS.

17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 3'-0" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESS OTHERWISENOTED.

PROJECTNORTH

TRUENORTH

1/8" = 1'-0"A1 MIDDLE/HIGH SCHOOL FLOOR PLAN GROUP 5

NOT IN SCOPE OF WORK

NOT IN SCOPE OF WORK

K101A1

K101C1

K1011

K102A1

SCOPE OF WORK1. WHITE BOARDS IN CLASSROOMS

2. INTERACTIVE TVS IN CLASSROOMS

3. I.T. BACKBONEENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

28:0

6 P

M

K100

KI Sawyer Elementary -Overall Plan

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

1/16" = 1'-0"A1 KI SAWYER ELEMENTARY SCOPE OF WORKPROJECTNORTH

TRUENORTH

PROJECTNORTH

TRUENORTH

PROJECTNORTH

TRUENORTH

1

1

Room 3 Room 5

Room 4

2

2

1

1

2

2

2

2

2

KEYNOTE LEGEND

1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD/SMART BOARD. FEILDVERIFY LOCATION. SALVAGE OR DISPOSE PER OWNERS REQUEST.

2 EXISTING CHALK BOARD/BULLETIN BOARD TO REMAIN

3 EXISTING TACK STRIPS TO REMAIN.

1

2

Room 112

Room 111 Room 110

Room 109

Room 108

Room 107

1

1

1

1

21

3

1

1

1

3

22

2 2

12 2

22 2 2

2 2

2 2

2 2

2 2

3

3

1

1

1

Room 9

Room 11 Room 10

1

1

1

22

2

2

2 2 22

2

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

28:0

7 P

M

K101

KI Sawyer Elementary -Demolition Plans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

DEMOLITION NOTES:

1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.

SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.

5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.

6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.

7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.

8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.

9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.

10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.

11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.

12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.

13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.

14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.

15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.

1/8" = 1'-0"A1 KI SAWYER DEMOLITION GROUP 2PROJECTNORTH

TRUENORTH

PROJECTNORTH

TRUENORTH

PROJECTNORTH

TRUENORTH

1/8" = 1'-0"1 KI SAWYER DEMOLITION GROUP 3

1/8" = 1'-0"C1 KI SAWYER DEMOLITION GROUP 1

11 1

1

NOT IN SCOPE OF WORK

**REMOVE EXISTING TV. KEEPVCR/DVD IN CLASSROOM & CONNECT.

Room 17 Room 21 Room 23 Room 25 Room 27

Room 24Room 22Room 20Room 18

1

2

2

2

2

1

1

1

2

2

2

2

11

11 1 1

**

2

2

2

2

2

2

2

2

1

2

2

1

2

2

2

2

2

2

1 1

2

2

2

2

2

2

2

2

2

2

2

2

KEYNOTE LEGEND

1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD/SMART BOARD. FEILDVERIFY LOCATION. SALVAGE OR DISPOSE PER OWNERS REQUEST.

2 EXISTING CHALK BOARD/BULLETIN BOARD TO REMAIN

3 EXISTING TACK STRIPS TO REMAIN.ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

28:0

7 P

M

K102

KI Sawyer Elementary -Demolition Plans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

DEMOLITION NOTES:

1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.

SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.

5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.

6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.

7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.

8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.

9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.

10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.

11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.

12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.

13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.

14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.

15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.

PROJECTNORTH

TRUENORTH

1/8" = 1'-0"A1 KI SAWYER DEMOLITION GROUP 4

3

2

1

4

1

5

4

1

4

Room 3 Room 5

Room 484"AFF

84"AFF

84"AFF

5

3

2

5

5

5

5

2

5 5

TV TO BE MOUNTED @ 2'-4" AFF

TV TO BE MOUNTED @ 2'-4" AFF

KEYNOTE LEGEND1 PROPOSED WHITE BOARD 4'x6'

2 PROPOSED WHITE BOARD 4'x8'

3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.

4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.

5 EXISTING CHALK BOARD/BULLETIN BOARD

ALTERNATE PRICING NOTE:1. PROVIDE MAGNETIC WHITE BOARD

6 EXISTING TACK STRIPS. PLACE BOARDS OVER LOWER TACK STRIP.

3

2

3

3

34

1

24

3

2

24

1

3 4

1 2

2

4

2 5

4

Room 112

Room 111 Room 110

Room 109

Room 108

Room 107

84"AFF

84"AFF 84"AFF

84"AFF

84"AFF

5

84"AFF

5

25

55

2

15 52

55

55

5 5

55

5 5

1 2

55 1

2 16

6 6

3

3

51

2

4

1

4

5

3

1 1

4

84"AFF

Room 9

Room 11 Room 10

84"AFF

84"AFF

5

2

5

5

5

5 5

1

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

28:0

9 P

M

K104

KI Sawyer Elementary -Floor Plans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

GENERAL CONSTRUCTION NOTES:

1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS AND CONDITIONS.2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE

ATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND

SUPERVISION.4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE NEAT

AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE STATE ANDLOCAL CODES.

6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, ORFACE OF METAL STUDS, UNLESS OTHERWISE NOTED.

7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.

8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAINING TOALL OWNER FURNISHED EQUIPMENT.

9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.

10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2 MICHIGANBUILDING CODE.

11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.

12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALLFIRE RATED ASSEMBLY CONSTRUCTION.

13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS

NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDING OPERATIONAS LITTLE AS POSSIBLE DURING CONSTRUCTION.

15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.

16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS AND INTERACTIVETELEVISIONS.

17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 32" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESS OTHERWISENOTED.

1/8" = 1'-0"A1 KI SAWYER FLOOR PLAN GROUP 2PROJECTNORTH

TRUENORTH

1/8" = 1'-0"1 KI SAWYER FLOOR PLAN GROUP 3

1/8" = 1'-0"2 KI SAWYER FLOOR PLAN GROUP 1

PROJECTNORTH

TRUENORTH

PROJECTNORTH

TRUENORTH

2

3

3 3

3

3 1

3

3

NOT IN SCOPE OF WORK

5

5

1

4

21

3

5

1

5

5

2

2

1

4

4

2

2

44

5

1

23

4 4

2

12

2

4

21

4

Room 17 Room 21 Room 23 Room 25 Room 27

Room 24Room 22Room 20Room 18

84"AFF

84"AFF

84"AFF

84"AFF

84"AFF

84"AFF

84"AFF 84"AFF

84"AFF

5

5

5

** IF A WORKING SMARTBOARDIS SALVAGED, PLACE HERE

5

5

5

5

**REMOVE EXISTING TV. KEEP VCR/DVD INCLASSROOM & CONNECT.

2

5

55

5

12

**

5

1

5

**

1

1

1

5

5

5

2

5

5

5

5

5

5

5

5

5

5

5

5

5

5

KEYNOTE LEGEND1 PROPOSED WHITE BOARD 4'x6'

2 PROPOSED WHITE BOARD 4'x8'

3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.

4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.

5 EXISTING CHALK BOARD/BULLETIN BOARD

ALTERNATE PRICING NOTE:1. PROVIDE MAGNETIC WHITE BOARD

6 EXISTING TACK STRIPS. PLACE BOARDS OVER LOWER TACK STRIP.

ENGINEERINGARCHITECTURE

PLANNINGSURVEYING

ENVIRONMENTAL

PROJECT TITLE:

OWNER:

PROJECT LOCATION:

PROJECT NO:

DRAWN BY:CHECKED:APPROVED:

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DESIGNED BY:

DATE:ISSUED FOR:

100 PORTAGE STREETHOUGHTON, MI 49931

(906) 482-4810

424 SOUTH PINE STREETISHPEMING, MI 49849

(906) 485-1011

707 ASHMUN ST.SAULT STE. MARIE, MI 49783

(906) 635-0511

1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143

(715) 732-4188

2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801

(906) 779-0937

P:\G

19-1

6347

Gw

inn

Are

a C

omm

unity

Sch

ools

-Bon

d P

ropo

sal P

roje

cts\

Dw

gs\B

id S

et 3

_IT

Pac

kage

\Arc

hite

ctur

e\G

19-1

6347

_IT

Pack

age_

R16

.rvt

5/17

/201

7 4:

28:1

0 P

M

K105

KI Sawyer Elementary -Floor Plans

Gwinn AreaSchools - I.T.

Package

Gwinn AreaCommunity

Schools

Gwinn, MI 49841

G19-16347

DKSKADKAD

KAD

05/01/2017Bid Set

GENERAL CONSTRUCTION NOTES:

1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS ANDCONDITIONS.

2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THEATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.

3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION ANDSUPERVISION.

4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE

NEAT AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLESTATE AND LOCAL CODES.

6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, ORFACE OF METAL STUDS, UNLESS OTHERWISE NOTED.

7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.

8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTSPERTAINING TO ALL OWNER FURNISHED EQUIPMENT.

9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.

10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2MICHIGAN BUILDING CODE.

11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.

12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAINALL FIRE RATED ASSEMBLY CONSTRUCTION.

13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS

NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDINGOPERATION AS LITTLE AS POSSIBLE DURING CONSTRUCTION.

15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.

16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS ANDINTERACTIVE TELEVISIONS.

17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 32" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESSOTHERWISE NOTED.

PROJECTNORTH

TRUENORTH

1/8" = 1'-0"A1 KI SAWYER FLOOR PLAN GROUP 4