c:usersdsongerdocumentsg19-16347 it package...
TRANSCRIPT
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
27:4
7 P
M
C002
General Notes
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
A.B.ABR.ABS.ABV.AC.A/CACC.A.C.C.AC. INSUL.ACC. PNL.ACT.A.C.U.ADD.ADDN.ADH.ADJ.A.F.F.A.H.U.AL.ALT.ALUM./AL.AMP.AMPL.ANCH.ANG.APPR.APPROX.ARCH.A.R.F.ASPH.A.S.R.ASSY.A.T.M.AUTO.AUX.AVG.AVS.AW.
ANCHOR BOLTABRASIVEABSORBINGABOVEACOUSTIC/ACOUSTICALAIR CONDITIONINGACCESSAIR CONDITIONING COMPRESSORACOUSTIC INSULATIONACCESS PANELACOUSTIC TILEAIR CONDITIONING UNITADDENDUMADDITIONADHESIVEADJUSTABLEABOVE FINISH FLOORAIR HANDLING UNITACOUSTICALLY LINEDALTERNATEALUMINUMAMPEREAMPLIFIERANCHORANGLEAPPROVEDAPPROXIMATEARCHITECT/ARCHITECTURALABOVE REFERENCE FLOORASPHALTAUTOMATIC SPRINKLER RISERASSEMBLYAUTOMATIC TELLER MACHINEAUTOMATICAUXILIARYAVERAGEACID VENT STACKACID WASTE
B.A.BB.B/BB.B.R.B/CBD.B.D.D.BDRY.BETW.BEV.B.F.BFE.B.F.P.B.I.BIT.B.L.BLDG.BLK.BLKG.BLR.BLR. F.BLR. H.BLVD.BM.B.M.B.N.BOT.BOT. EL.B.PL.BR.B.R.BRG.BRK.BRKR.BRZ.B.S.BSMT.BTU.BULL.B.U.R.B.W.
BURGLAR ALARMBALLED AND BURLAPPEDBACK-TO-BACKBASE BOARD RADIATIONBACK OF CURBBOARDBACK DRAFT DAMPERBOUNDARYBETWEENBEVELBARRIER FREEBOTTOM OF FOOTING ELEVATIONBACK FLOW PREVENTERBLACK-IRONBITUMINOUSBUILDING LINEBUILDINGBLOCKBLOCKINGBOILERBOILER FEEDBOILER HOUSEBOULEVARDBEAMBENCH MARKBULLNOSEBOTTOMBOTTOM ELEVATIONBASE PLATEBRASSBEDROOMBEARINGBRICKBREAKERBRONZEBOTH SIDESBASEMENTBRITISH THERMAL UNITBULLETINBUILT-UP ROOFINGBOTH WAYS
C-CA.CAB.CAP.CAT. NO.CB.C.BD.C.BR.C/CC.CL.CD.C.C.CEM.CEM. PLAS.CER.CERT.CF.CFH.CFM.C.G.CHAM.CHAN. OR [CHD.CHG.CHKD. PL.CHWR.CHWS.C.I.C.I.F.C.I.P.CIR.CIRC.CIRCUM.C.J.CL (CL)CL.CLG.CLO.CLR.CLRM.CLR. GL.CLR. W.GL.C.M.U.CNTR.CNVYR.CO.C.O.COEF.COL.COMB.COMPO.COMPR.COMPT.CONC.COND.CONF.CONN.CONST.CONT.CONTR.CONV.COR.CORR.COV.COV. PL.C.P.CPT.CRS.C.R.S.CSG.CSMT.CSTG.CSWRK.C.T.C.T.B.CTR.C.U.H.CU. FT.CULV.CW.CWR.CWS.CY.CYC.CYL.
CIVIL DRAWING-NO.COMPRESSED AIRCABINETCAPACITYCATALOG NUMBERCATCH BASINCHALKBOARDCIRCUIT BREAKERCENTER-TO-CENTERCOAT CLOSETCONDENSATE DRAINCEILING DIFFUSERCEMENTCEMENT PLASTERCERAMICCERTIFIEDCEILING FANCUBIC FOOT PER HOURCUBIC FEET PER MINUTECORNER GUARDCHAMFERCHANNELCHORDCHANGECHECKERED PLATECHILLED WATER RETURNCHILLED WATER SUPPLYCAST IRONCAST IRON FRAMECAST IRON PIPE/CAST-IN-PLACECIRCLE/CIRCULARCIRCUITCIRCUMFERENCECONTROL JOINTCENTERLINECLOSETCEILINGCLOSURECLEARCLASSROOMCLEAR GLASSCLEAR WIRE GLASSCONCRETE MASONRY UNITCOUNTERCONVEY0RCOMPANYCLEAN OUTCOEFFICIENTCOLUMNCOMBINATIONCOMPOSITIONCOMPRESSORCOMPARTMENTCONCRETECONDUITCONFERENCECONNECTIONCONSTRUCTIONCONTINUE/CONTINUOUSCONTRACTORCONVECTORCORNERCORRIDORCOVERCOVER PLATECONTROL PANELCARPETCOURSECARPET REDUCER STRIPCASINGCASEMENTCASTINGCASEWORKCERAMIC TILECERAMIC TILE BASECENTERCABINET UNIT HEATERCUBIC FEET/CUBIC FOOTCULVERTCOLD WATERCONDENSING WATER RETURNCONDENSING WATER SUPPLYCUBIC YARDCYCLESCYLINDER
D.D.A.DB.D.B.DBL.DEG.DEPR.DEPT.DES.DET.D.F.DGM.DIA.DIAG.DIFF.DIM.DIR.DISC.DISCONT.DISP.DIST.DIV.D.L.DMPFG.DMPR.DN.D.O.DR.DRN.DR. OP.D.S.D.S.P.D.T.D.T.C.DUP.DW.DWG.DWL.DWR.
DEEPDOUBLE ACTIONDECIBELDRY BULBDOUBLEDEGREE(S)DEPRESSEDDEPARTMENTDESIGNDETAILDRINKING FOUNTAINDIAGRAMDIAMETERDIAGONALDIFFUSERDIMENSIONDIRECTORYDISCONNECTEDDISCONTINUOUSDISPENSERDISTANCEDIVIDER/DIVISIONDEAD LOADDAMP PROOFINGDAMPERDOWNDOOR OPENINGDOORDRAINDOOR OPERATORDOWN SPOUTDRY STAND PIPEDRAIN TILEDRAIN TILE CONNECTORDUPLICATEDISHWASHERDRAWINGDOWELDRAWER
E.E-EA.E.A.E.C.E.D.E/EE.F.E.G.E.I.F.S.E.J.EL.ELAST.ELAST. FLASH.ELAST. W.P.ELEC.ELEC. CL.ELEC. CAB.ELEC. OPER.ELEV.EMERG.ENCL.ENGR.ENTR.EP.E.P.EPDM.EQ.EQUIP.EQUIV.E.R.ESP.E.S.R.EWCEXCAV.EXH.EXIST.EXP.EXP.B.EXP'D.EXT.EXTR.
EASTELECTRICAL DRAWING-NO.EXHAUST AIREACHELECTRICAL CONTRACTOREXHAUST DUCTEND-TO-ENDEXHAUST FANEXHAUST GRILLEEXTERIOR INSULATION FINISH SYSTEMEXPANSION JOINTELEVATIONELASTOMERICELASTOMERIC FLASHINGELASTOMERIC WATERPROOFINGELECTRIC/ELECTRICALELECTRICAL CLOSETELECTRICAL CABINETELECTRICALLY OPERATEDELEVATOREMERGENCYENCLOSUREENGINEERENTRANCE/ENTRYEPOXYELECTRICAL PANELETHYLENE PROPYLENE DIENE MONOMEREQUALEQUIPMENTEQUIVALENTEXHAUST REGISTEREXTERNAL STATIC PRESSUREELASTORMERIC SHEET ROOFINGELECTRIC WATER COOLEREXCAVATEDEXHAUSTEXISTINGEXPANSIONEXPANSION BOLTEXPOSEDEXTERIOREXTRUDED
F.F.A.FAB.F.A.C.P.FAS.F.BD.FBGLS.F. BRK.F.C.F.C.O.F.C.U.F.D.FDN.FDR.F.D.V.F.E.F.E.C.F/FF.FIN.F.H.F.H.C.FHMS.FHWS.FIG.FIN.FIN. FLR/F.F.FIXT.F.L.FLASH.FLDG.FLEX.FLR.FLR. FIN.FLUOR.FM. BD.FNFP.FPC.FPM.FPRFG.FR.F.R.FR/COV.FRMG.F.R.P.F.R.T.WD.FRZR.FS.FT OR 'F&TFTG.FURN.FURR.FUT.F.V.C.
FAHRENHEITFIRE ALARMFABRICATED/FABRICFIRE ALARM CONTROL PANELFASTENERFORM BOARDFIBERGLASSFIRE BRICKFLEXIBLE CONNECTIONFLOOR CLEAN OUTFAN COIL UNITFLOOR DRAINFOUNDATIONFEEDERFIRE DEPARTMENT VALVEFIRE EXTINGUISHERFIRE EXTINGUISHER CABINETFACE-TO-FACEFACTORY FINISHFIRE HYDRANTFIRE HOSE CABINETFLATHEAD MACHINE SCREWFLATHEAD WOOD SCREWFIGUREFINISH/FINISHEDFINISH FLOORFIXTUREFIRE LANEFLASHINGFOLDINGFLEXIBLEFLOORFLOOR FINISHFLUORESCENTFORMBOARDFENCEFIRE PROTECTIONFIRE PROTECTION CONTRACTORFEET PER MINUTEFIREPROOFINGFRAMEFIRE RETARDANT/FIRE RATEDFRAME AND COVERFRAMINGFIBERGLASS REINFORCED PANELINGFIRE RETARDANT TREATED WOODFREEZERFLOOR SINKFOOTFLOAT AND THERMOSTATIC TRAPFOOTINGFURNISH/FURNISHEDFURRING/FURREDFUTUREFIRE VALVE CABINET
G.GA.GAL.GALV.GALV. I.G.B.GC.GEN.GEN'L.GFCI.G.F.I.G.H.T.GI.GL.G.L.GLZ.GND.GPH.GPM.GR.GR. B.GRT.G.S.GSKT.GT.G.T.G.V.&B.GYP.BD.
GASGAUGEGALLONGALVANIZEDGALVANIZED IRONGRAB BARGENERAL CONTRACTORGENERATORGENERALGROUND FAULT CIRCUIT INTERRUPTERGROUND FAULT INTERRUPTERGLAZED HOLLOW TILEGREASE INTERCEPTORGLASSGRID LINEGLAZINGGROUNDGALLONS PER HOURGALLON'S PER MINUTEGRILLEGRADE BEAMGRAITEGREASE SEPARATORGASKETGROUTGREASE TRAPGATE VALVE AND BOXGYPSUM BOARD
HH.H.A. GL.H.B.G.BD.GC.H.C.HD.HDR.HDWD.HDWE.HEX.HGT.HHWR.HHWS.H.I.D.H.M.H.O.HORIZ.HOSP.HP.H.P.H.PR.HR.H.R.H.R.V.H.S.H.S.B.H.S.P.HSTWY.HTG.HTR.H.V.H/VH.V.A.C.H.V.C.H.W.HWR.HWS.HWY.HX.
HYDROGENHIGHHEAT ABSORBING GLASSHOSE BIBBHARDBOARDHEATING COILHOLLOW COREHEADHEADERHARDWOODHARDWAREHEXAGONHEIGHTHEATING HOT WATER RETURNHEATING HOT WATER SUPPLYHIGH INTENSITY DISCHARGEHOLLOW METALHUB OUTLETHORIZONTALHOSPITALHORSEPOWERHIGH POINTHIGH PRESSUREHOURHANDRAILHEAT RECOVERY VENTULATORHIGH STRENGTHHIGH STRENGTH BOLTHOSE STAND PIPEHOIST WAYHEATINGHEATERHIGH VOLTAGEHEATING AND VENTILATIONHEATING, VENTILATION, & AIR CONDITIONINGHOSE VALVE CABINETHOT WATERHOT WATER RETURNHOT WATER SUPPLYHIGHWAYHEAT EXCHANGER
I.D.I.E.I.F.IN. OR"INCAND.INCIN.INCL.INFO.INST'L.INSUL.INT.INTER.INV.I.W.
INSIDE DIAMETERINVERT ELEVATIONINSIDE FACEINCH/INCHESINCANDESCENTINCINERATORINCLUDE/INCLUDINGINFORMATIONINSTALL/INSTALLATIONINSULATE/INSULATIONINTERIORINTERMEDIATEINVERTINDIRECT WASTE
J.B.J.C.JST.JT.
JUNCTION BOXJANITOR CLOSETJOISTJOINT
K.D.K.O.P.K.P.KV.KVA.KW.
KNOCK DOWNKNOCK-OUT PANELKICK PLATEKILOVOLTKILOVOLT AMPEREKILOWATT
L-LAB.LAM.LAV.L.B.LBL.LBR.LBS. OR#LDG.LDRY.LEV.L.F.LGTH.L.H.L.H.R.B.LIN.LIN. DIFF.LIQ.L.L.L.L.H.L.L.V.LMST.L.O.L.P.L.P.G.L.PR.LPRF.L.R.P.LT.LTG.LTL.LTWT.LTWT. CONC.LVR.
LANDSCAPE DRAWING-NOLABORATORYLAMINATE/LAMINATEDLAVATORYLAG BOLTLABELLUMBERPOUNDSLANDINGLAUNDRYLEVELLINEAR FEET/FOOTLENGTHLEFT HANDLEFT HAND REVERSE BEVELLINEARLINEAR DIFFUSERLIQUIDLIVE LOADLONG LEG HORIZONTALLONG LEG VERTICALLIMESTONELOUVER OPENINGLOCATIONLIQUID PETROLEUM GASLOW PRESSURELIGHTPROOFLIGHTING/RECEPTACAL PANELLIGHTLIGHTINGLINTELLIGHTWEIGHTLIGHTWEIGHT CONCRETELOUVER
M.M-MACH.MACH. RM.MAINT.MAR.MAS.MATL.M.A.U.MAX.M.B.M.B.H.M.C.M.D.P.M.D.S.MECH.MED.MEMB.M.E.S.MET.MET. W.P.MEZZ.MFGR.MH.M.I.MIN.MISC.MIR.M.L.M.L. & PLAS.MLDGM.O.MOD.M.O.D.MON.MOV.M.S.B.M.T.MTD.MTG.MULL.MWK.
THOUSAND (1000)MECHANICAL DRAWING-NO.MACHINEMACHINE ROOMMAINTENANCEMARBLEMASONRYMATERIALMAKE-UP AIR UNITMAXIMUMMACHINE BOLT1000 BRITISH THERMAL UNITS/HOURMECHANICAL CONTRACTORMAIN DISTRIBUTION PANELMETAL DIVIDER STRIPMECHANICALMEDIUMMEMBRANEMETAL EDGE STRIPMETALMETALLIC WATERPROOFINGMEZZANINEMANUFACTURERMANHOLEMISCELLANEOUS IRONMINIMUMMISCELLANEOUSMIRRORMETAL LATHMETAL LATH & PLASTERMOLDINGMASONRY OPENINGMODELMOTOR OPERATED DAMPERMONUMENTMOVEABLEMAIN SWITCH BOARDMETAL THRESHOLDMOUNDED/INGMEETINGMULLIONMILLWORK
N.NAT.NEUT.N.I.C.NO. OR #NOS.N.S.N.T.S.
NORTHNATURALNEUTRALNOT-IN-CONTRACTNUMBERNOSINGNEAR SIDENOT-TO-SCALE
O.A.O.C.O.D.OFF.OH.OH.DR.O/OOPER.OPG.OPP.OPQ.ORIG.ORN.OZ.OSB.OXY.
OVERALLON CENTEROUTSIDE DIAMETEROFFICEOVERHEADOVERHEAD DOOROUT-TO-OUTOPERATOROPENINGOPPOSITEOPAQUEORIGINALORNAMENTALOUNCEORIENTED STRAND BOARDOXYGEN
P. OR 0/P.A.PART.PASS.P.B.P.BD.PC.P/CPCF.PCS.PED.PERIM.PERM.PERP.PFN.PG.P.G.P.H.PHOTO.P.I.V.PKG.PL.P.L.PLAS.PLAT.PLBG.PLF.PL. GL.PL. LAM.PLWD.PNL.PORT.POS.P.P.PREFAB.PRES.PRIM.PRL.PROJ.PROP.PRTN.P.R.V.PSF.PSI.PT.P.T.D.P.T.WD.P.T.W.R.PVC.PVMT.
PHASEPUBLIC ADDRESSPARTICLEPASSAGEPUSH BUTTONPARTICLE BOARDPIECEPRECASTPOUNDS PER CUBIC FOOTPIECESPEDESTALPERIMETERPERMANENTPERPENDICULARPREFINISHEDPAGEPRESSURE GAUGEPHYSICALLY HANDICAPPEDPHOTOGRAPHPOST INDICATOR VALVEPARKINGPLATEPROPERTY LINEPLASTERPLATFORMPLUMBINGPOUNDS PER LINEAR FOOTPLATE GLASSPLASTIC LAMINATEPLYWOODPANELPORTABLEPOSITIONPOWER PANELPREFABRICATEDPRESSUREPRIMARYPARALLELPROJECT/PROJECTIONPROPERTY/PROPOSEDPARTITIONPRESSURE REDUCING VALVEPOUNDS PER SQUARE FOOTPOUNDS PER SQUARE INCHPOINTPAPER TOWEL DISPENSERPRESERVATIVE TREATED WOODPAPER TOWEL WASTE RECEPTACLEPOLYVINYL CHLORIDEPAVEMENT
Q.T.Q.T.B.QTR.QTR. RD.QTY.
QUARRY TILEQUARRY TILE BASEQUARTERQUARTER ROUNDQUANTITY
R.A.R.A.D.RAD. OR R.R.A.F.R.A.G.R.A.R.R.C.RD.R.D.RECT.REC.RED.REF.REFL.REFR.REG.REINF.REM.REP.REPT.REQ'D.RET.RF.RFG.RF.H.R.H.R.H.M.S.R.H.R.B.R.H.W.S.RIO.RND. OR O/R.O.R.O.W.R.P.RPM.R.R.R.S.R.T.R.T.U.R.V.RVT.R.W.D.
RETURN AIRRETURN AIR DIFFUSERRADIUSRETURN AIR FANRETURN AIR GRILLERETURN AIR REGISTERROOF CONDUCTORROADROOF DRAINRECTANGLE/RECTANGULARRECEIVE/RECEIVEINGREDUCERREFER/REFERENCEREFLECTED/REFLECTIVEREFRIGERATORREGISTERREINFORCE/REINFORCING/REINFORCEMENTREMOVE/REMOVEABLEREPAIRRECEPTACLEREQUIREDRETURNROOFROOFINGROOF HATCHRIGHT HANDROUND HEAD MACHINE SCREWRIGHT HAND REVERSE BEVELROUND HEAD WOOD SCREWROUGH-IN-ONLYROUNDROUGH OPENINGRIGHT OF WAYRECEPTACLE PANELREVOLUTIONS PER MINUTERAILROADROOF SUMPRUBBER TILEROOF TOP UNITRELIEF VENTRIVETREDWOOD
S-S.SA.SAD.SAF.S.A.G.SAN.S.A.R.S.A.T.S.C.SCHED.S.C.R.S.D.S.DR.SECT.SERV.S.F.SGL.SHT.SHTHG.SHT. MET.SHWR.SIM.SK.S.N.D.S.N.R.SNS.SP.S.P.SPEC.SPKLR.SPKR.SPR.SPRYD.SQ.S.S.S.STL.ST.STD.STG.STL.STL. PL.STM.STOR.STR.STRUCT.STS.ST.STL.SUB.SUBST.SUPP.SURF.SUSP.SW.S.W.SWBD.SWGR.SYM.SYS.
STRUCTURAL DRAWING-NO.SOUTHSUPPLY AIRSUPPLY AIR DIFFUSERSUPPLY AIR FANSUPPLY AIR GRILLESANITARYSUPPLY AIR REGISTERSUSPENDED ACOUSTIC TILESOLID CORESCHEDULESHOWER CURTAIN RODSMOKE DETECTORSHOWER DOORSECTIONSERVICESQUARE FEET/SQUARE FOOTSINGLESHEETSHEATHINGSHEET METALSHOWERSIMILARSINKSANITARY NAPKIN DISPENSERSANITARY NAPKIN RECEPTACLESANITARY SEWERSPACESTATIC PRESSURESPECIFICATIONSSPRINKLERSPEAKERSPARESPRAYEDSQUARESERVICE SINKSTRUCTURAL STEELSTREETSTANDARDSEATINGSTEELSTEEL PLATESTEAMSTORAGESTRAIGHTSTRUCTURALSTORM SEWERSTAINLESS STEELSUBSTATIONSUBSTITUTESUPPORTSURFACE/SURFACINGSUSPEND/SUSPENSIONSWITCHSIDEWALKSWITCHBOARDSWITCH GEARSYMBOLSYSTEM
U.C.U.G.U.H.UNFIN.U.N.O.UR.USGS.U.SUB.UTIL.U.V.
UNDERCUTUNDER GROUNDUNIT HEATERUNFINISHEDUNLESS NOTED OTHERWISEURINALUNITED STATES GEOLOGICAL SURVEYUNIT SUBSTATIONUTILITYUNIT VENTILATOR
VENTVACUUMVARIABLEVARNISHVARIABLE AIR VOLUMEVINYL BASEVAPOR BARRIERVOLUME CONTROL DAMPERVINYL COMPOSITION TILEVOLUME DAMPERVENTILATE/VENTILATIONVERTICAL/VERTICALLYVESTIBULEVIBRATION ISOLATORVERIFY IN FIELDVINYL FABRICVOLTSVENEERVINYLVOLUMEVENEER PLASTERVENT STACKVENT THRU ROOF
V.VAC.VAR.VARN.VAV.V.B.V. BARR.VCD.VCT.V.D.VENT.VERT.VEST.V.I.V.I.F.VIN. FAB.VLT.VNR.VNY.VOL.V. PLAS.VS.VTR.
YARDYIELD POINTYIELD STRENGTHYEAR
YD.Y.P.YR.Y.S.
ZINCZC.
T.TAG.TAN.T.B.T&BTC.T/CTCC.T.D.TD.&WR.TECH.T/EL.TEL.TEMP.TEMP. GL.TF.T/FT.G.T/GT>HD.THERM.THK.THRESH.THRU.T/MT/PT/RTRFR.TS.T.S.T/S OR T.O.S.T./TOIL.T.U.TV.T.V.TV.M.T/W OR T.O.W.TYP.
THREADTRANSFER AIR GRILLETANGENTTEST BORINGTOP AND BOTTOMTOP OF CONCRETETOP OF CURBTEMPERATURE CONTROL CONTRACTORTRENCH DRAINTOWEL DISPENSER & WASTE RECEPTACLETECHNICALTOP ELEVATIONTELEPHONETEMPERATURETEMPERED GLASSTRANSFER FANTOP OF FOOTINGTRANSFER GRILLETOP OF GUTTERTONGUE AND GROOVETHREADTHERMOSTAT/THERMOMETERTHICK/THICKNESSTHRESHOLDTHROUGHTOP OF MASONRYTOP OF PAVEMENTTOP OF RIMTRANSFORMERTUBE SECTIONTHICKENED SLABTOP OF STEELTOILETTERMINAL UNITTELEVISIONTURNING VANETELEVISION MONITORTOP OF WALLTYPICAL
W.W/WAINS.W.C.W.CAB.W.C.O.WD.WDW.W.F.W.G.W.GL.W.H.W.L.W.M.W.O.W/OWP.W.P.W.PT.W.R.W.STPG.WT.W.V.W/WW.W.F.WWM.W_x_
WASTE/WATTSWITHWAINSCOTWATER CLOSETWALL CABINETWALL CLEAN OUTWOODWINDOWWASH FOUNTAINWATER GAUGEWIRE GLASSWATER HEATERWORKING LINEWIRE MESHWINDOW OPENINGWITHOUTWATERPROOFINGWEATHERPROOFINGWORKING POINTWASTE RECEPTACLEWEATHER STRIPPINGWEIGHTWALL VENTWALL-TO-WALLWELDED WIRE FABRICWELDED WIRE MESHWIDE FLANGE SECTION
ABBREVIATIONS
AND&
ANGLE
CENTERLINE
DIAMETER OR ROUND
AT@
BY (AS IN 6' X 8')X
PER/
PROPERTY LINE
SYMBOLS
TOWELDISPENSER ORMULTIPURPOSEUNIT
TOWELDISPENSERAND WASTERECEPTACLE
WASTERECEPTACLE
FULL-LENGTHMIRROR ANDBARRIER FREEMIRRORS
MIRROR OVERLAV ORCOUNTER
3'-4
"(M
AX.)
0' - 0"1'-8"
0' -
2"6'
-0"
0' -
0"1'-6
"
(MAX
.)
0' -
0"6" M
IN.
0' -
1"3'
-8"
(TYP
. HEI
GH
T)
0' -
1"5'
-4"
.3'-6
"TO
CO
NTR
OL
HANDDRYER
HOOKS SHELF(ABOVE)
0' -
2"5'-4
"
TYP.
HEI
GH
T
* OPERABLE CONTROLS SHALLFALL WITHIN FORWARDAPPROACH REACH RANGESREQUIRED BY CODEREGULATIONS
48" A.F.F.
.1'-3
"
15" A.F.F.
.2'-9
"
WALLMOUNTED OREMERGENCYTELEPHONE(B.F. FRONTAPPROACH)
E.W.C. ORDRINKINGFOUNTAINS
HIGH-LOWE.W.C. ORDRINKINGFOUNTAIN
FIREEXTINGUISHERCABINET
ELECTRICPANEL
FIREEXTINGUISHERAND WALLBRACKET
0' -
1"6'-8
"
0' -
1"5'-4
"
.4'
-0"
HEI
GH
TH
AND
LE B
.F.
.2'-3
"
(MIN
.)0' -
1"3'-3
"(M
IN.)
LOW
OFF
ICE
HT.
HIG
H-L
OW
FOU
NTA
IN O
RSI
NG
LE B
.F.
FOU
NTA
IN
.2'
-3"
(MIN
.)
.
3'-0
"
(MAX
.)LO
W O
FFIC
E H
T.
48"A.F.F.
0' -
1"4'-0
"
LIGHTSWITCH
CONTROLS
ELEVATOR PUSHBUTTONS
ELECTRONICDUPLEXTELEPHONE,OR T.V. OUTLETWITH LIGHTSWITCH
0' -
1"3'-6
"(M
AX.)
CLOCK
0' -
2"7'
-4"
(OR
AS
NO
TED
)
WALL SPEAKER CHALK BOARD ORTACKBOARD
0' - 1"VARIES
0' -
1"VA
RIE
S
0' -
1"0'
- 0"
0' -
1"2'
-0"
(STD
.)4 "
2'-1
0 1/
2"(B
.F. M
AX.)
WALL AND BASECABINETS
0' -
1"
0' -
0"1'
-6"
0' -
1"3'-4
"
4'-6
" (ST
D.)
4'-0
" (B.
F.)
SHELVING
BACKSPLASH
B.F. SHOWERSEAT
BARRIER FREEMEDICINECABINET
MEDICINECABINET
MOP STRIPAND SHELF
BARRIERFREE URINAL
STANDARDURINAL
SHOWER HEADAND VALVES
BARRIER FREE HANDHELD SHOWER HEADAND CONTROLS
WALLC.O.
0' -
0" 5" (T
YP.)
LINE OF WALLBASE
C.O. COVER
0' -
1"3'
-2" (
MIN
.)
0' -
1"33
" MIN
.
0' -
1"
.
4'-0
" MAX
.6'-0
" MIN
.
G.B.
.
1'-3" (MAX.)SHOWER 60" MIN. LENGTH HOSE WITH
HAND HELD OR ADJUSTABLESPRAY UNIT ON BARWALL LINE
NOTE: B.F. CONTROLSARE MOUNTED WITH-INTHIS AREA
0' -
2"6'
-4" (
STD
.)
0' -
1"3'
-4" (
STD
.)
FLUSHCONTROL
0' -
1"2'
-0"
0' -
0"
0' -
1"
1'-5
" B.F
.
15" (
MIN
.)
0' -
2"6'-0
"
0' -
2"6'-8
"
0' -
1"
3'-8
" (M
AX.)
IN C
ABIN
ETTO
SH
ELF
0' -
0"1'
-5" (
B.F.
MIN
.)
1'-7
" (B.
F. M
AX.)
FOLDEDPOSITION
DOORHARDWARE
HARDWARE-LEVER (B.F.)
0' -
1"3'-0
"
LOCKSET/LATCHSET LOCATION
LAVATORY
LINE OFWALL
.1'-3" (MIN.)
G.F.I. ELECT.OUTLET (SEENOTE BELOW)
.2'
-3"
.2'
-10"
.2'-6"
(B.F. MIN.)
33" M
IN.
.17
"-19
"
G.B.
. .
12" 24"
.16"-18"
WATERCLOSET
NOTE: ELECT. OUTLETNEAR SINKS TO BEMOUNTED 33" TO 36" A.F.F.
. .
.
12" 3'-6" (MIN.)
33" T
O 3
6"
4'-0
" (M
AX.)
URINAL
.
1'-3
" TO
4'-0
"
(B.F
. MAX
.).1-1/2"
LINE OFWALL
.
30" MIN.
. .
1'-3" 1'-3"
VANITY
.
1'-6"MAX.
3" MAX.
9" CLEAR(MIN.)
2'-3
" MIN
.
2'-1
0" M
AX.
LAVATORY
.
2'-5
" MIN
.2'
-10"
MAX
.
. 1'-6" MIN
SIGN
SIGNAGECHARACTERHEIGHT
CHARACTERS:5/8" MIN. 2"
MAX.
0' -
1"48
" MIN
. 60"
MAX
.
NOTE: MEASURED FROMBASELINE OF CHARACTER,BASED ON UPPERCASELETTER "I". ALL SIGNAGEMUST BE UPPERCASE &PLAIN SANS SERIF FONT CLEAR FLOOR AREA
FOR DOOR LATCHPULL SIDE
0' -
1"5'
-0"0' - 0" 0' - 0"
0' - 0"
1'-6"
9" 9"
TITLESCALE: 1/2" = 1'-0"1
DRAWINGNUMBER
ELEVATIONNUMBER 1
A101SHEET WHEREELEVATION IS
FOUND
ELEVATIONNUMBER
A101SHEET WHEREELEVATION IS
FOUND
1
2
3
4
SECTION ORDETAIL
NUMBER 1
A101SHEETWHERE
SECTION ORDETAIL IS
FOUND
1
A101
SECTIONOR DETAIL
NUMBER
SHEET WHERESECTION OR
DETAIL ISFOUND
MOUNTING HEIGHTS
ROOM, DOOR, & WINDOWIDENTIFICATION NUMBERS
101 DOOR IDENTIFICATION NUMBER
1 WINDOW IDENTIFICATION NUMBER
ROOM IDENTIFICATION BY FLOOR AS FOLLOWS:
BASEMENT FLOORS001
FIRST FLOORS101
SECOND FLOORS201
* CONTINUE FOR AS MANY FLOORS AS REQUIREDDOOR IDENTIFICATION NUMBERS SHALL REPEAT ROOM NUMBER.MULTIPLE DOORS IN A ROOM WILL USE A POSTSCRIPT LETTERFOR EACH ADDITIONAL DOOR REQUIRED
(MAX
.)
(MIN
.)
36" M
AX.
36" M
AX.
48" (
MAX
.)
(MAX
.)
A.F.
F.
15" A.F.F.
48" A.F.F.
.
.
GRABBARS
39"-41"
39" T
O 4
1"
.
.3'-0"(MAX.)
.
.
.
.
1'-3
" (M
IN.)
4'-0
" (M
AX.)1'
-0"
7"-9"
TOILET PAPER HOLDERDIMENSIONS
GRAB BAR DIMENSIONS
.
1-1/2"(CLEARBELOW)
.
CL
Ø
PL
NOT IN SCOPE OF WORK
G101A1
G102A1
G101A4
Room 1 Room 3 Room 5
Room 6Room 4Room 2
Room 11 Room 13 Room 15
Room 18Room 16Room 14
Room 10 Room 9
Room 7Room 8
NOT IN SCOPE OF WORK
NOT IN SCOPE OF WORK
SCOPE OF WORK1. WHITE BOARDS IN CLASSROOMS
2. INTERACTIVE TVS IN CLASSROOMS
3. I.T. BACKBONEENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
27:4
8 P
M
G100
Gilbert Elementary -Overall Plan
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
1/16" = 1'-0"A1 GILBERT ELEMENTARY - SCOPE OF WORKPROJECTNORTH
TRUENORTH
KEYNOTE LEGEND
1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD/SMART BOARD. FEILDVERIFY LOCATION. SALVAGE OR DISPOSE PER OWNERS REQUEST.
2 EXISTING BULLETIN BOARD TO REMAIN.
1
1
Room 1 Room 3 Room 5
Room 6Room 4Room 21
1
1
1
1
1
2
2
1
2
2
1 1
2
2 2
2 2
2
2
2
2
2
2
2
1 1
Room 8
Room 10 Room 9
Room 7
11
1
1 2 1 2
1
2 2
2 2 2 2
2
2
2
2
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
27:5
0 P
M
G101
Gilbert Elementary -Demolition Plans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
PROJECTNORTH
TRUENORTH
DEMOLITION NOTES:
1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.
2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.
SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.
5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.
6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.
7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.
8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.
9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.
10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.
11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.
12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.
13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.
14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.
15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.
1/8" = 1'-0"A1 GILBERT DEMOLITION GROUP 1 1/8" = 1'-0"A4 GILBERT DEMOLITION GROUP 2
PROJECTNORTH
TRUENORTH
1
1
Room 11 Room 13 Room 15
Room 18Room 16Room 14
111
2
2
2
2
1
2
2
111 1
1 1
2
2
2
2
NOT IN SCOPE OF WORK
NOT IN SCOPE OF WORK
GYM
2
2
2
2
2
2
2
2
2
2
2
2
2
2
KEYNOTE LEGEND
1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD/SMART BOARD. FEILDVERIFY LOCATION. SALVAGE OR DISPOSE PER OWNERS REQUEST.
2 EXISTING BULLETIN BOARD TO REMAIN. ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
27:5
0 P
M
G102
Gilbert Elementary -Demolition Plans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
PROJECTNORTH
TRUENORTH
1/8" = 1'-0"A1 GILBERT DEMOLITION GROUP 3
DEMOLITION NOTES:
1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.
2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.
SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.
5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.
6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.
7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.
8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.
9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.
10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.
11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.
12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.
13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.
14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.
15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.
KEYNOTE LEGEND
1 PROPOSED WHITE BOARD 4'x6'
2 PROPOSED WHITE BOARD 4'x8'
3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.
4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.
5 EXISTING BULLETIN BOARD
ALTERNATE PRICING NOTE:
1. PROVIDE MAGNETIC WHITE BOARD
3 3
3
3
3
3
2
1
4
4
1
4
1
2
1
4
1
11
4
4
2
Room 1 Room 3 Room 5
Room 6Room 4Room 2
84"AFF
84"AFF
84"AFF
84"AFF 84"AFF
84"AFF
5
5
2
5
5
1
15
5
2
15
5
5 5
5 5
5
5
TV TO BE MOUNTED @ 2'-4" AFF
TV TO BE MOUNTED @ 2'-4" AFF
3
1
11
2
4
3
2
4
3 4
2
3 1 4
Room 8 Room 7
Room 9Room 10
84"AFF84"AFF
84"AFF84"AFF
1
5 5
2 1
55
1
1
55 55
5
5
5
5
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
27:5
2 P
M
G103
Gilbert Elementary - FloorPlans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
GENERAL CONSTRUCTION NOTES:
1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS AND CONDITIONS.2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND
SUPERVISION.4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE NEAT
AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE STATE ANDLOCAL CODES.
6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, ORFACE OF METAL STUDS, UNLESS OTHERWISE NOTED.
7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.
8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAINING TOALL OWNER FURNISHED EQUIPMENT.
9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.
10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2 MICHIGANBUILDING CODE.
11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.
12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALLFIRE RATED ASSEMBLY CONSTRUCTION.
13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS
NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDING OPERATIONAS LITTLE AS POSSIBLE DURING CONSTRUCTION.
15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.
16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS AND INTERACTIVETELEVISIONS.
17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 32" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESS OTHERWISENOTED.
PROJECTNORTH
TRUENORTH
PROJECTNORTH
TRUENORTH
1/8" = 1'-0"A1 GILBERT FLOOR PLAN GROUP 1 1/8" = 1'-0"A4 GILBERT FLOOR PLAN GROUP 2
33
3 3
1
4
12
4
1
1
4
1
3
4
2
5
22
11
4
4
Room 11 Room 13 Room 15
Room 18Room 16Room 14
1
84"AFF
84"AFF84"AFF
84"AFF
84"AFF
84"AFF
1
5
1
5
5
1
5
5
5
5
NOT IN SCOPE OF WORK
NOT IN SCOPE OF WORK
GYM
DOCKING STATION. PROVIDED BY OWNER.
1
5
55
5
5
55
5
3
2
2
5
5
5
5
5
5
5
5
KEYNOTE LEGEND
1 PROPOSED WHITE BOARD 4'x6'
2 PROPOSED WHITE BOARD 4'x8'
3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.
4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.
5 EXISTING BULLETIN BOARD
ALTERNATE PRICING NOTE:
1. PROVIDE MAGNETIC WHITE BOARD
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
27:5
3 P
M
G104
Gilbert Elementary - FloorPlans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
GENERAL CONSTRUCTION NOTES:
1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS AND CONDITIONS.2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND
SUPERVISION.4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE NEAT
AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE STATE ANDLOCAL CODES.
6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, OR FACEOF METAL STUDS, UNLESS OTHERWISE NOTED.
7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS. COORDINATEWITH ALL TRADES AND OWNER.
8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENT SUPPLIERSAND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAINING TO ALL OWNERFURNISHED EQUIPMENT.
9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.
10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2 MICHIGANBUILDING CODE.
11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.
12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALLFIRE RATED ASSEMBLY CONSTRUCTION.
13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS
NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDING OPERATIONAS LITTLE AS POSSIBLE DURING CONSTRUCTION.
15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.
16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS AND INTERACTIVETELEVISIONS.
17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 32" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESS OTHERWISENOTED.
PROJECTNORTH
TRUENORTH
1/8" = 1'-0"A1 GILBERT FLOOR PLAN GROUP 3
NOT IN SCOPE OF WORK
NOT IN SCOPE OF WORK
NOT IN SCOPE OF WORK
H101A1
H102A1
H103A1
H1041
H101A4
SCOPE OF WORK1. WHITE BOARDS IN CLASSROOMS
2. INTERACTIVE TVS IN CLASSROOMS
3. I.T. BACKBONEENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
27:5
5 P
M
H100
Middle/High School -Overall Plan
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
3/64" = 1'-0"A2 MIDDLE/HIGH SCHOOL - SCOPE OF WORKPROJECTNORTH
TRUENORTH
2
1
2
1
Room 201 Room 202 Room 203 Room 204
Room 205
Room 206Room 207Room 208
1
2
1
1
1
1 1 1 1
1
1
1
1
CONFERENCE
1
1
KEYNOTE LEGEND
1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD. FEILD VERIFY LOCATION.SALVAGE OR DISPOSE PER OWNERS REQUEST.
2 EXISTING CHALK BOARD/BULLETIN BOARD TO REMAIN.
3 REMOVE EXISTING TVs IN ROOM. FIELD VERIFY LOCATIONS. SALVAGE OR DISPOSE PEROWNERS REQUEST.
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
27:5
7 P
M
H101
Middle/High SchoolDemolition Plan
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
PROJECTNORTH
TRUENORTH
DEMOLITION NOTES:
1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.
2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.
SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.
5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.
6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.
7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.
8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.
9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.
10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.
11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.
12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.
13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.
14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.
15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.
1/8" = 1'-0"A1 MIDDLE/HIGH SCHOOL DEMOLITION GROUP 1
GENERAL CONSTRUCTION NOTES:
1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS ANDCONDITIONS.
2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THEATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.
3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION ANDSUPERVISION.
4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE
NEAT AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLESTATE AND LOCAL CODES.
6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK,OR FACE OF METAL STUDS, UNLESS OTHERWISE NOTED.
7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.
8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTSPERTAINING TO ALL OWNER FURNISHED EQUIPMENT.
9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.
10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2MICHIGAN BUILDING CODE.
11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.
12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAINALL FIRE RATED ASSEMBLY CONSTRUCTION.
13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS
NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDINGOPERATION AS LITTLE AS POSSIBLE DURING CONSTRUCTION.
15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.
GENERAL CONSTRUCTION NOTES:
1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS ANDCONDITIONS.
2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THEATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.
3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION ANDSUPERVISION.
4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE
NEAT AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLESTATE AND LOCAL CODES.
6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK,OR FACE OF METAL STUDS, UNLESS OTHERWISE NOTED.
7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.
8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTSPERTAINING TO ALL OWNER FURNISHED EQUIPMENT.
9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.
10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2MICHIGAN BUILDING CODE.
11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.
12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAINALL FIRE RATED ASSEMBLY CONSTRUCTION.
13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS
NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDINGOPERATION AS LITTLE AS POSSIBLE DURING CONSTRUCTION.
15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.
GENERAL CONSTRUCTION NOTES:
1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS ANDCONDITIONS.
2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THEATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.
3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION ANDSUPERVISION.
4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE
NEAT AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLESTATE AND LOCAL CODES.
6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK,OR FACE OF METAL STUDS, UNLESS OTHERWISE NOTED.
7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.
8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTSPERTAINING TO ALL OWNER FURNISHED EQUIPMENT.
9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.
10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2MICHIGAN BUILDING CODE.
11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.
12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAINALL FIRE RATED ASSEMBLY CONSTRUCTION.
13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS
NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDINGOPERATION AS LITTLE AS POSSIBLE DURING CONSTRUCTION.
15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.
1/8" = 1'-0"A4 MIDDLE/HIGH SCHOOL DEMOLITON GROUP 2PROJECTNORTH
TRUENORTH
2
1
1
1
1
NOT IN SCOPE OF WORK
NOT IN SCOPE OF WORK
** EXISTING TV TO REMAIN
RELOCATE CLOSET &BLACK BOOK SHELF.REFER TO H106 FORNEW LOCATION.
Room 144
Room 156
Room 152 Room 154Room 140Room 138Room 134
**
1
11
1
2
1
1
2
NOT IN SCOPE OF WORK
NOT IN SCOPE OF WORK
Hallway
Hallway
2
1
1
1
1
1
KEYNOTE LEGEND
1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD. FEILD VERIFY LOCATION.SALVAGE OR DISPOSE PER OWNERS REQUEST.
2 EXISTING CHALK BOARD/BULLETIN BOARD TO REMAIN.
3 REMOVE EXISTING TVs IN ROOM. FIELD VERIFY LOCATIONS. SALVAGE OR DISPOSE PEROWNERS REQUEST.
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
27:5
8 P
M
H102
Middle/High School -Demolition Plans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
DEMOLITION NOTES:
1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.
2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.
SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.
5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.
6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.
7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.
8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.
9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.
10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.
11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.
12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.
13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.
14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.
15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.
1/8" = 1'-0"A1 MIDDLE/HIGH SCHOOL DEMOLITION GROUP 3PROJECTNORTH
TRUENORTH
1
3
1
NOT IN SCOPE OF WORK
Room 163
Room 164
Room 165
3
1
3
3
KEYNOTE LEGEND
1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD. FEILD VERIFY LOCATION.SALVAGE OR DISPOSE PER OWNERS REQUEST.
2 EXISTING CHALK BOARD/BULLETIN BOARD TO REMAIN.
3 REMOVE EXISTING TVs IN ROOM. FIELD VERIFY LOCATIONS. SALVAGE OR DISPOSE PEROWNERS REQUEST.
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
27:5
9 P
M
H103
Middle/High School -Demolition Plans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
DEMOLITION NOTES:
1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.
2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.
SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.
5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.
6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.
7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.
8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.
9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.
10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.
11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.
12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.
13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.
14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.
15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.
1/8" = 1'-0"A1 MIDDLE/HIGH SCHOOL DEMOLITION GROUP 4PROJECTNORTH
TRUENORTH
1
1
1
1
1
1
NOT IN SCOPE OF WORK
NOT IN SCOPE OF WORK
NOT IN SCOPE OF WORK
RELOCATE WALLSHELVING BRACKETS.REFER TO H108 FOR NEWLOCATION
Room 106
Room 100 Room 101 Room 118
Room 117
Room 115
Room 113
Room 111
Room 116Room 103
Room 105
1
1
1
1
1
1
1
1
2
1
1
1
1
11
1
Hallway
NOT IN SCOPE OF WORK
KEYNOTE LEGEND
1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD. FEILD VERIFY LOCATION.SALVAGE OR DISPOSE PER OWNERS REQUEST.
2 EXISTING CHALK BOARD/BULLETIN BOARD TO REMAIN.
3 REMOVE EXISTING TVs IN ROOM. FIELD VERIFY LOCATIONS. SALVAGE OR DISPOSE PEROWNERS REQUEST.
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
28:0
0 P
M
H104
Middle/High School -Demoltion Plans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
DEMOLITION NOTES:
1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.
2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.
SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.
5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.
6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.
7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.
8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.
9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.
10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.
11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.
12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.
13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.
14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.
15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.
1/8" = 1'-0"1 MIDDLE/HIGH SCHOOL DEMOLITION GROUP 5PROJECTNORTH
TRUENORTH
PROJECTNORTH
TRUENORTH
PROJECTNORTH
TRUENORTH
PROJECTNORTH
TRUENORTH
3
3
3
3
3
3
32
2
2
1
2
2
4
4
4
2
4
4
2 2
2
4
2
2
2
2
3
4
2
4
Room 201 Room 202 Room 203 Room 204
Room 205
Room 206Room 207Room 208
84"AFF
84"AFF
84"AFF84"AFF
84"AFF
84"AFF84"AFF
84"AFF
2 1
2
1
5
5
1
** MOUNT OVEREXISTING BULLETINBOARD
2
2
3
1
CONFERENCE
84"AFF
KEYNOTE LEGEND1 PROPOSED WHITE BOARD 4'X6'
2 PROPOSED WHITE BOARD 4'x8'
3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.
4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.
5 EXISTING CHALK BOARD/BULLETIN BOARD
6 PROPOSED LED TV 50" WITH HDMI
7 PROPOSED LED TV 60" WITH HDMI
ALTERNATE PRICING NOTE:1. PROVIDE MAGNETIC WHTIE BOARD
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
28:0
1 P
M
H105
Middle/High School - FloorPlans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
GENERAL CONSTRUCTION NOTES:
1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS ANDCONDITIONS.
2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THEATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.
3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION ANDSUPERVISION.
4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE NEAT
AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE STATE ANDLOCAL CODES.
6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, ORFACE OF METAL STUDS, UNLESS OTHERWISE NOTED.
7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.
8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAININGTO ALL OWNER FURNISHED EQUIPMENT.
9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.
10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2 MICHIGANBUILDING CODE.
11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.
12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALLFIRE RATED ASSEMBLY CONSTRUCTION.
13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS
NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDINGOPERATION AS LITTLE AS POSSIBLE DURING CONSTRUCTION.
15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.
16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS AND INTERACTIVETELEVISIONS.
17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 3'-0" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESS OTHERWISENOTED.
1/8" = 1'-0"A1 MIDDLE/HIGH SCHOOL FLOOR PLAN GROUP 1PROJECTNORTH
TRUENORTH
1/8" = 1'-0"A4 MIDDLE/HIGH SCHOOL FLOOR PLAN GROUP 2PROJECTNORTH
TRUENORTH
NOT IN SCOPE OF WORK
NOT IN SCOPE OF WORK
3
3
3
3
3
3
3
5
4
1
14
1
4
2
2
1
2
4
5
1
2
4
4
2
3
1
Room 144
Room 140Room 138Room 134 Room 152 Room 154
Room 156
84"AFF
84"AFF
84"AFF
84"AFF
84"AFF84"AFF
84"AFF
** EXISTING TV TO REMAIN
2
**
RELOCATED CLOSET & BLACKBOOKSHELF
2
1
2
2
1
84"AFF
6
Hallway
5
NOT IN SCOPE OF WORK
NOT IN SCOPE OF WORK
Hallway6
84"AFF
5
84"AFF
84"AFF
KEYNOTE LEGEND1 PROPOSED WHITE BOARD 4'X6'
2 PROPOSED WHITE BOARD 4'x8'
3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.
4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.
5 EXISTING CHALK BOARD/BULLETIN BOARD
6 PROPOSED LED TV 50" WITH HDMI
7 PROPOSED LED TV 60" WITH HDMI
ALTERNATE PRICING NOTE:1. PROVIDE MAGNETIC WHTIE BOARD
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
28:0
2 P
M
H106
Middle/High School - FloorPlans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
GENERAL CONSTRUCTION NOTES:
1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS AND CONDITIONS.2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND
SUPERVISION.4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE NEAT
AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE STATE ANDLOCAL CODES.
6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, OR FACEOF METAL STUDS, UNLESS OTHERWISE NOTED.
7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS. COORDINATEWITH ALL TRADES AND OWNER.
8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENT SUPPLIERSAND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAINING TO ALL OWNERFURNISHED EQUIPMENT.
9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.
10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2 MICHIGANBUILDING CODE.
11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.
12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALLFIRE RATED ASSEMBLY CONSTRUCTION.
13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS
NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDING OPERATIONAS LITTLE AS POSSIBLE DURING CONSTRUCTION.
15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.
16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS AND INTERACTIVETELEVISIONS.
17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 3'-0" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESS OTHERWISENOTED.
PROJECTNORTH
TRUENORTH
1/8" = 1'-0"A1 MIDDLE/HIGH SCHOOL FLOOR PLAN GROUP 3
3
7
7
6
6
1
1
4
7
1
6
1
Room 163
Room 164
Room 165
84"AFF
84"AFF
84"AFF 84"AFF
84"AFF
84"AFF
84"AFF
PROPOSED CAT6
2
KEYNOTE LEGEND1 PROPOSED WHITE BOARD 4'X6'
2 PROPOSED WHITE BOARD 4'x8'
3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.
4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.
5 EXISTING CHALK BOARD/BULLETIN BOARD
6 PROPOSED LED TV 50" WITH HDMI
7 PROPOSED LED TV 60" WITH HDMI
ALTERNATE PRICING NOTE:1. PROVIDE MAGNETIC WHTIE BOARD
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
28:0
3 P
M
H107
Middle/High School - FloorPlans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
GENERAL CONSTRUCTION NOTES:
1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS ANDCONDITIONS.
2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THEATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.
3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION ANDSUPERVISION.
4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE NEAT
AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE STATE ANDLOCAL CODES.
6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, ORFACE OF METAL STUDS, UNLESS OTHERWISE NOTED.
7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.
8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAININGTO ALL OWNER FURNISHED EQUIPMENT.
9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.
10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2 MICHIGANBUILDING CODE.
11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.
12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALLFIRE RATED ASSEMBLY CONSTRUCTION.
13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS
NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDINGOPERATION AS LITTLE AS POSSIBLE DURING CONSTRUCTION.
15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.
16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS AND INTERACTIVETELEVISIONS.
17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 3'-0" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESS OTHERWISENOTED.
PROJECTNORTH
TRUENORTH
1/8" = 1'-0"A1 MIDDLE/HIGH SCHOOL FLOOR PLAN GROUP 4
NOT IN SCOPE OF WORK
NOT IN SCOPE OF WORK
NOT IN SCOPE OF WORK
3
3
1
3
3
3
3
3
3
3
3
1
1
2
4
1
1
4
3
12
4
4
4
22
1
4
2
2
4
1
4
2 2
1
4
2
2
2
1
4
4
Room 106
Room 100
Room 101 Room 118
Room 117
Room 115
Room 113
Room 111
Room 105
Room 103 Room 116
2
84"AFF
84"AFF
84"AFF
84"AFF
84"AFF
84"AFF
84"AFF
84"AFF
84"AFF
84"AFF
84"AFF
1 1
** NOT TO COVER UP WALL PAINTINGS
22
RELOCATED WALLSHELVING BRACKETS
1
2 2
2
2
5
2 2
2 2
2
1
1
NOT IN SCOPE OF WORK
84"AFF
6
84"AFF
KEYNOTE LEGEND1 PROPOSED WHITE BOARD 4'X6'
2 PROPOSED WHITE BOARD 4'x8'
3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.
4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.
5 EXISTING CHALK BOARD/BULLETIN BOARD
6 PROPOSED LED TV 50" WITH HDMI
7 PROPOSED LED TV 60" WITH HDMI
ALTERNATE PRICING NOTE:1. PROVIDE MAGNETIC WHTIE BOARD
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
28:0
4 P
M
H108
Middle/High School - FloorPlans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
GENERAL CONSTRUCTION NOTES:
1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS ANDCONDITIONS.
2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THEATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.
3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION ANDSUPERVISION.
4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE NEAT
AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE STATE ANDLOCAL CODES.
6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, ORFACE OF METAL STUDS, UNLESS OTHERWISE NOTED.
7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.
8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAININGTO ALL OWNER FURNISHED EQUIPMENT.
9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.
10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2 MICHIGANBUILDING CODE.
11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.
12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALLFIRE RATED ASSEMBLY CONSTRUCTION.
13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS
NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDINGOPERATION AS LITTLE AS POSSIBLE DURING CONSTRUCTION.
15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.
16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS AND INTERACTIVETELEVISIONS.
17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 3'-0" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESS OTHERWISENOTED.
PROJECTNORTH
TRUENORTH
1/8" = 1'-0"A1 MIDDLE/HIGH SCHOOL FLOOR PLAN GROUP 5
NOT IN SCOPE OF WORK
NOT IN SCOPE OF WORK
K101A1
K101C1
K1011
K102A1
SCOPE OF WORK1. WHITE BOARDS IN CLASSROOMS
2. INTERACTIVE TVS IN CLASSROOMS
3. I.T. BACKBONEENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
28:0
6 P
M
K100
KI Sawyer Elementary -Overall Plan
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
1/16" = 1'-0"A1 KI SAWYER ELEMENTARY SCOPE OF WORKPROJECTNORTH
TRUENORTH
PROJECTNORTH
TRUENORTH
PROJECTNORTH
TRUENORTH
1
1
Room 3 Room 5
Room 4
2
2
1
1
2
2
2
2
2
KEYNOTE LEGEND
1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD/SMART BOARD. FEILDVERIFY LOCATION. SALVAGE OR DISPOSE PER OWNERS REQUEST.
2 EXISTING CHALK BOARD/BULLETIN BOARD TO REMAIN
3 EXISTING TACK STRIPS TO REMAIN.
1
2
Room 112
Room 111 Room 110
Room 109
Room 108
Room 107
1
1
1
1
21
3
1
1
1
3
22
2 2
12 2
22 2 2
2 2
2 2
2 2
2 2
3
3
1
1
1
Room 9
Room 11 Room 10
1
1
1
22
2
2
2 2 22
2
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
28:0
7 P
M
K101
KI Sawyer Elementary -Demolition Plans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
DEMOLITION NOTES:
1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.
2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.
SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.
5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.
6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.
7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.
8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.
9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.
10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.
11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.
12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.
13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.
14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.
15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.
1/8" = 1'-0"A1 KI SAWYER DEMOLITION GROUP 2PROJECTNORTH
TRUENORTH
PROJECTNORTH
TRUENORTH
PROJECTNORTH
TRUENORTH
1/8" = 1'-0"1 KI SAWYER DEMOLITION GROUP 3
1/8" = 1'-0"C1 KI SAWYER DEMOLITION GROUP 1
11 1
1
NOT IN SCOPE OF WORK
**REMOVE EXISTING TV. KEEPVCR/DVD IN CLASSROOM & CONNECT.
Room 17 Room 21 Room 23 Room 25 Room 27
Room 24Room 22Room 20Room 18
1
2
2
2
2
1
1
1
2
2
2
2
11
11 1 1
**
2
2
2
2
2
2
2
2
1
2
2
1
2
2
2
2
2
2
1 1
2
2
2
2
2
2
2
2
2
2
2
2
KEYNOTE LEGEND
1 REMOVE EXISTING CHALK BOARD/WHITE BOARD/BULLETIN BOARD/SMART BOARD. FEILDVERIFY LOCATION. SALVAGE OR DISPOSE PER OWNERS REQUEST.
2 EXISTING CHALK BOARD/BULLETIN BOARD TO REMAIN
3 EXISTING TACK STRIPS TO REMAIN.ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
28:0
7 P
M
K102
KI Sawyer Elementary -Demolition Plans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
DEMOLITION NOTES:
1. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THEARCHITECT/ENGINEER IMMEDIATELY.
2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND SUPERVISION.3. PRIOR TO DEMOLITION IDENTIFY WITH THE OWNER ALL ITEMS TO REMAIN IN OWNER'S POSSESSION.4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE EXTENT OF DEMOLITION WORK.
SEE RELATED ARCHITECTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR REQUIREDDEMOLITION.
5. CONTRACTOR ACCESS TO THE AREA OF WORK SHALL BE LIMITED AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL PROVIDE ALL REQUIRED MEASURES TO ENSURE THE PROTECTION AND SAFELY OFOCCUPANTS, BUILDING MATERIALS, AND EQUIPMENT.
6. EACH CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE PROJECT SITE DEBRIS RESULTING FROM THEIRWORK.
7. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND OBTAIN WITH THE APPROVAL OF THEOWNER. DISRUPTION TO THE NORMAL BUILDING OPERATION SHALL BE AS LITTLE AS POSSIBLE. ALL DEMOLITIONSHALL BE KEPT TO A MINIMUM. ALL DUST AND NOSE CREATED BY THE WORK SITE SHALL BE KEPT TO AMINIMUM. ALL DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND ALL WORK AREAS SHALL BEEFFECTIVELY BLOCKED AND BARRICADED TO GIVE COMPLETE PROTECTION TO THE BUILDING OCCUPANTS.
8. PROVIDE CONSTRUCTION DUST BARRIERS AS REQUIRED AND APPROVED BY OWNER. COORDINATELOCATIONS AND SEQUENCES WITH OWNER.
9. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, AND MAINTAINED INACCORDANCE WITH NFPA 10 REQUIREMENTS.
10. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALL FIRE RATEDASSEMBLY CONSTRUCTION.
11. GENERAL CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL, FLOOR, AND ROOF SURFACES TOACCOMMODATE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL WORK. COORDINATELOCATIONS AND OPENING REQUIREMENTS WITH EACH TRADE. MAINTAIN ALL FIRE RATED ASSEMBLYCONSTRUCTION.
12. EXISTING SURFACES WHICH ARE REWORKED OR DAMAGED DURING CONSTRUCTION SHALL BE PATCHED,REPAIRED, AND FINISHED WITH NEW MATERIALS AS REQUIRED TO MATCH ADJACENT SURFACES.
13. PROTECT EXISTING BUILDING. PREVENT MOVEMENT OR SETTLEMENT OF WALLS, CEILINGS, AND BUILDINGSTRUCTURE. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORTOF STRUCTURE. EXISTING STRUCTURE FOUNDATIONS TO REMAIN SHALL BE PROTECTED THROUGHOUT THECONSTRUCTION OPERATIONS WITH TEMPORARY SHORING, SHEETING, UNDERPINNING, AS REQUIRED TOPROTECT AND MAINTAIN STRUCTURAL INTEGRITY.
14. EXISTING BUILDING SHALL BE PROTECTED FROM WEATHER AT ALL TIMES. OPENINGS AND PENETRATIONSSHALL BE PROTECTED WITH DURABLE INSULATED TEMPORARY CONSTRUCTION. COORDINATE SECURITYREQUIREMENTS WITH OWNER.
15. PROTECT EXISTING UTILITY SERVICE LINES, STRUCTURES, AND DEVICES THAT ARE TO REMAIN ABOVE ANDBELOW GROUND.
PROJECTNORTH
TRUENORTH
1/8" = 1'-0"A1 KI SAWYER DEMOLITION GROUP 4
3
2
1
4
1
5
4
1
4
Room 3 Room 5
Room 484"AFF
84"AFF
84"AFF
5
3
2
5
5
5
5
2
5 5
TV TO BE MOUNTED @ 2'-4" AFF
TV TO BE MOUNTED @ 2'-4" AFF
KEYNOTE LEGEND1 PROPOSED WHITE BOARD 4'x6'
2 PROPOSED WHITE BOARD 4'x8'
3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.
4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.
5 EXISTING CHALK BOARD/BULLETIN BOARD
ALTERNATE PRICING NOTE:1. PROVIDE MAGNETIC WHITE BOARD
6 EXISTING TACK STRIPS. PLACE BOARDS OVER LOWER TACK STRIP.
3
2
3
3
34
1
24
3
2
24
1
3 4
1 2
2
4
2 5
4
Room 112
Room 111 Room 110
Room 109
Room 108
Room 107
84"AFF
84"AFF 84"AFF
84"AFF
84"AFF
5
84"AFF
5
25
55
2
15 52
55
55
5 5
55
5 5
1 2
55 1
2 16
6 6
3
3
51
2
4
1
4
5
3
1 1
4
84"AFF
Room 9
Room 11 Room 10
84"AFF
84"AFF
5
2
5
5
5
5 5
1
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
28:0
9 P
M
K104
KI Sawyer Elementary -Floor Plans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
GENERAL CONSTRUCTION NOTES:
1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS AND CONDITIONS.2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION AND
SUPERVISION.4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE NEAT
AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE STATE ANDLOCAL CODES.
6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, ORFACE OF METAL STUDS, UNLESS OTHERWISE NOTED.
7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.
8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAINING TOALL OWNER FURNISHED EQUIPMENT.
9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.
10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2 MICHIGANBUILDING CODE.
11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.
12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAIN ALLFIRE RATED ASSEMBLY CONSTRUCTION.
13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS
NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDING OPERATIONAS LITTLE AS POSSIBLE DURING CONSTRUCTION.
15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.
16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS AND INTERACTIVETELEVISIONS.
17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 32" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESS OTHERWISENOTED.
1/8" = 1'-0"A1 KI SAWYER FLOOR PLAN GROUP 2PROJECTNORTH
TRUENORTH
1/8" = 1'-0"1 KI SAWYER FLOOR PLAN GROUP 3
1/8" = 1'-0"2 KI SAWYER FLOOR PLAN GROUP 1
PROJECTNORTH
TRUENORTH
PROJECTNORTH
TRUENORTH
2
3
3 3
3
3 1
3
3
NOT IN SCOPE OF WORK
5
5
1
4
21
3
5
1
5
5
2
2
1
4
4
2
2
44
5
1
23
4 4
2
12
2
4
21
4
Room 17 Room 21 Room 23 Room 25 Room 27
Room 24Room 22Room 20Room 18
84"AFF
84"AFF
84"AFF
84"AFF
84"AFF
84"AFF
84"AFF 84"AFF
84"AFF
5
5
5
** IF A WORKING SMARTBOARDIS SALVAGED, PLACE HERE
5
5
5
5
**REMOVE EXISTING TV. KEEP VCR/DVD INCLASSROOM & CONNECT.
2
5
55
5
12
**
5
1
5
**
1
1
1
5
5
5
2
5
5
5
5
5
5
5
5
5
5
5
5
5
5
KEYNOTE LEGEND1 PROPOSED WHITE BOARD 4'x6'
2 PROPOSED WHITE BOARD 4'x8'
3 PROPOSED INTERACTIVE TV 70" DIAGONAL. POWER CORD TO BE CONCEALED BY PVCSURFACE RACEWAY. NEW NETWORK AND RECEPTACLE.
4 INTERACTIVE TV NEEDS: (2) USB, HDMI, AUDIO CABLES FROM DESK TO TV.
5 EXISTING CHALK BOARD/BULLETIN BOARD
ALTERNATE PRICING NOTE:1. PROVIDE MAGNETIC WHITE BOARD
6 EXISTING TACK STRIPS. PLACE BOARDS OVER LOWER TACK STRIP.
ENGINEERINGARCHITECTURE
PLANNINGSURVEYING
ENVIRONMENTAL
PROJECT TITLE:
OWNER:
PROJECT LOCATION:
PROJECT NO:
DRAWN BY:CHECKED:APPROVED:
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
DESIGNED BY:
DATE:ISSUED FOR:
100 PORTAGE STREETHOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREETISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE BMARINETTE, WI 54143
(715) 732-4188
2906 N. STEPHENSON AVE. SUITE 2IRON MOUNTAIN, MI 49801
(906) 779-0937
P:\G
19-1
6347
Gw
inn
Are
a C
omm
unity
Sch
ools
-Bon
d P
ropo
sal P
roje
cts\
Dw
gs\B
id S
et 3
_IT
Pac
kage
\Arc
hite
ctur
e\G
19-1
6347
_IT
Pack
age_
R16
.rvt
5/17
/201
7 4:
28:1
0 P
M
K105
KI Sawyer Elementary -Floor Plans
Gwinn AreaSchools - I.T.
Package
Gwinn AreaCommunity
Schools
Gwinn, MI 49841
G19-16347
DKSKADKAD
KAD
05/01/2017Bid Set
GENERAL CONSTRUCTION NOTES:
1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS ANDCONDITIONS.
2. ANY QUESTIONS, CLARIFICATIONS, DISCREPANCIES, ETC. SHALL BE BROUGHT TO THEATTENTION OF THE ARCHITECT/ENGINEER IMMEDIATELY.
3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT COORDINATION ANDSUPERVISION.
4. COORDINATE ALL PROJECT REQUIREMENTS WITH ALL TRADES.5. ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. ALL WORKMANSHIP SHALL BE
NEAT AND SKILLED, AND SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLESTATE AND LOCAL CODES.
6. ALL DIMENSIONS SHOWN ARE TO FACE OF CONCRETE, FACE OF CMU, FACE OF BRICK, ORFACE OF METAL STUDS, UNLESS OTHERWISE NOTED.
7. PROVIDE PROPER BACKING FOR ALL EQUIPMENT, CASEWORK, AND COMPONENTS.COORDINATE WITH ALL TRADES AND OWNER.
8. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENTSUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTSPERTAINING TO ALL OWNER FURNISHED EQUIPMENT.
9. SEE EXTERIOR BUILDING ELEVATIONS FOR LOCATIONS OF CONTROL JOINTS IN EXTERIORMASONRY WALLS.
10. ALL CASEWORK DESIGN SHALL CONFORM TO REQUIREMENTS OF SECTIONS 1101.2MICHIGAN BUILDING CODE.
11. PROVIDE FIRE EXTINGUISHERS LOCATED, INSTALLED, AND INSPECTED, TESTED, ANDMAINTAINED IN ACCORDANCE WITH NFPA 10 REQUIREMENTS.
12. AT ALTERATION AREAS, PATCH FINISHES AND MATERIALS TO MATCH EXISTING. MAINTAINALL FIRE RATED ASSEMBLY CONSTRUCTION.
13. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PROJECT PERMITS.14. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY DIRT AND DUST BARRIERS AS
NECESSARY AND REQUIRED BY OWNER. INTENT IS TO DISRUPT EXISTING BUILDINGOPERATION AS LITTLE AS POSSIBLE DURING CONSTRUCTION.
15. CONTRACTORS SHALL SUBMIT, REVIEW, AND COORDINATE ALL EXISTING BUILDINGSHUTDOWNS WITH OWNER PRIOR TO SCHEDULING AND OPERATIONS.
16. CONTRACTORS SHALL INSTALL MOUNTING BRACKETS FOR TELEVISIONS ANDINTERACTIVE TELEVISIONS.
17. WHITE BOARDS AND INTERACTIVE TELEVISIONS SHALL BE MOUNTED AT 32" AFF UNLESSOTHERWISE NOTED. LED TELEVISIONS SHALL BE MOUNTED AT 5'-0" AFF UNLESSOTHERWISE NOTED.
PROJECTNORTH
TRUENORTH
1/8" = 1'-0"A1 KI SAWYER FLOOR PLAN GROUP 4