c:usershillier750documents highland office existing survey ... drawings 36… · 9 all materials...
TRANSCRIPT
LOCUS PLAN & TITLE SHEETDATE:
AJA PROJECT NO.
ARNOLD JACOBSON ASSOCIATES, INC.153 ANDOVER STREET, SUITE 101 DANVERS, MA 01923
phone: (781) 935-2500 fax: (781) 935-2519
16 MASON AVENUE, SUITE 5 NORTH ATTLEBORO, MA 02760OFFICE RENOVATIONS
A-01/20/16
363 HIGHLAND AVE. SOMERVILLE, MA
15-AJA43
GENERAL NOTES3 ALL WORK SHALL COMPLY WITH THE COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE, THE REQUIREMENTS OF THE CITY OF SOMERVILLE, THE OCCUPATIONAL
SAFETY AND HEALTH STANDARDS AND ALL OTHER APPLICABLE REGULATIONS, LAWS, ORDINANCES, ETC. GOVERNING THIS WORK.4 IT IS STRONGLY RECOMMENDED THAT ALL BIDDERS/CONTRACTORS INSPECT THE PROJECT TO VERIFY ALL EXISTING CONDITIONS. THE BIDDER/CONTRACTOR WILL BE
HELD FULLY RESPONSIBLE FOR THE FULL EXTENT OF ALL WORK REQUIRED.5 THE BIDDER/CONTRACTOR SHALL CONFIRM AND VERIFY IN THE FIELD ALL CONDITIONS, DIMENSIONS AND LOCATIONS PRIOR TO SUBMITTING THEIR BID. DRAWN
INFORMATION IS TAKEN FROM EXISTING DRAWINGS AND RANDOM FIELD MEASUREMENTS AND IS PROVIDED ONLY TO ASSIST THE BIDDER/CONTRACTOR IN ESTABLISHINGTHE SCOPE OF WORK.
6 THE BIDDER/CONTRACTOR SHALL REPORT IN WRITING ALL DEVIATIONS IN THE EXISTING CONDITIONS, DIMENSIONS AND LOCATIONS ETC. TO THE ARCHITECT. ACTUALCONDITIONS MAY VARY FROM WHAT IS SHOWN ON THESE DRAWINGS.
7 DO NOT SCALE DRAWINGS FOR QUANTITIES, LENGTHS, SIZES OR AREAS. ALL EXISTING DIMENSIONS SHOWN ARE APPROXIMATE AND SHALL BE VERIFIED BY CONTRACTOR INTHE FIELD.
8 IT IS NOT INTENDED THAT THESE DRAWINGS SHOW EVERY CUT AND /OR CONDITION ETC. OF THE BUILDING SYSTEMS, HOWEVER THE CONTRACTOR SHALL FURNISH ACOMPLETE PRODUCT IN ACCORDANCE WITH THE BEST PRACTICE OF THE TRADE, TO THE SATISFACTION OF THE ARCHITECT AND IN STRICT CONFORMANCE WITH ALLAPPLICABLE STATE AND LOCAL BUILDING CODE REQUIREMENTS.
9 ALL MATERIALS AND NOTES REFER TO NEW MATERIALS UNLESS OTHERWISE NOTED OR INDICATED AS EXISTING.10 THE CONTRACTOR SHALL TEMORARILY DISCONNECT AND REMOVE ALL EXISTING SERVICES THAT INTERFERE WITH THE PROPER INSTALLATION OF THE NEW CONSTRUCTION.
CONTRACTOR IS RESPONSIBLE TO NOTIFY THE ARCHITECT/OWNER OF THESE SERVICES BEFORE DISCONNECTION. REINSTALL AND RECONNECT ALL TEMPORARILYDISCONNECT AND REMOVED ITEMS TO THE SATISFACTION OF THE ARCHITECT.
11 ALL EXISTING AREAS DISTURBED OR DAMAGED AS A RESULT OF THE NEW CONSTRUCTION ARE TO BE PATCHED OR REPLACED TO MATCH EXISTING AND /OR NEWADJACENT SURFACES.
12 REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL SPECIFIC PROJECT REQUIREMENTS13 DISPOSE OF ALL DEBRIS IN A LEGAL MANNER.
LIST OF DRAWINGSSHEET NUMBER SHEET NAME
A-0 TITLE SHEETA-1 ABBREVIATIONS/WALL TYPES/ DOOR SCHEDULEA-2 EXISTING FLOOR PLANA-3 PROPOSED FLOOR PLANA-4 PROPOSED CEILING PLANA-5 ENLARGED FLOOR PLANSA-6 ENLARGED BATHROOM PLANS/ELEVATIONSA-7 LIFE SAFTEY PLAN
PREMIT DRAWINGS
ABBREVIATIONS
A/C AIR CONDITIONINGACT ACOUSTICAL TILEA.F.F. ABOVE FINISH FLOORALT ALTERNATEALUM ALUMINUMANC BLT ANCHOR BOLTAPPROX APPROXIMATEARCH ARCHITECTARGB ABUSE RESISTANT GBASPH ASPHALT
BC BRICK COURSEBD BOARDBITUM BITUMINOUSBLDG BUILDINGBLK BLOCKBLKG BLOCKINGBM BENCH MARKBOF BOTTOM OF FOOTINGBOD BOTTOM OF DUCTBOTT BOTTOMBRG BEARINGBRK BRICKBS BRICK SHELFBSMT BASEMENT
CAB CABINETCB CEMENT BOARDCDM CAVITY DRAINAGE
MATERIALCH CEILING HEIGHTCIP CAST IN PLACECJ CONTROL JOINTCL CENTRAL LINE/
COLUMN LINECLG CEILINGCLOS CLOSETCLR CLEARCMU CONCRETE MASONRY
UNITCNTR COUNTERCO CASED OPENINGCOL COLUMNCOMP COMPOSITIONCONC CONCRETECONST CONSTRUCTIONCONT CONTINUOUSCONV CONVECTORCORR CORRIDORCOORD COORDINATECPT CARPETCT CERAMIC TILECUH CABINET UNIT HEATER
D DRYERDBL DOUBLEDEMO DEMOLITIONDI DRAIN INLETDIAG DIAGONALDIAM DIAMETERDIM DIMENSIONDL DRAIN LEADERDN DOWND-PART DEMOUNTABLE PARTITIONDR DOORDS DOWNSPOUTDTL DETAILDWG DRAWINGDW DISHWASHER
EA EACHEF EACH FACEEIFS EXTERIOR INSULATED
FINISH SYSTEMEJ EXPANSION JOINTELEC ELECTRICELEV ELEVATOR/ELEVATIONEMER EMERGENCYENCL ENCLOSUREEP ELECTRICAL PANELEPXY EPOXY SEALING SYSTEMEQ EQUALEQUIP EQUIPMENTER EXISTING TO REMAINEXH EXHAUSTEXIST EXISTINGEXP EXPANSIONEXPT EPOXY PAINTEXT EXTERIOREW EACH WAYEWC ELECTRIC WATER COOLER
FACP FIRE ALARMCONTROL PANEL
FB FIRE BLANKETFD FLOOR DRAINFE FIRE EXTINGUISHERFF FINISH FLOORFFE FINISH FLOOR ELEVATIONFIN FINISHFG FIBERGLASSFLASH FLASHINGFLR FLOORFLUOR FLUORESCENTFNDN FOUNDATIONFOC FACE OF CONCRETEFOF FACE OF FINISHFOM FACE OF MASONRYFOS FACE OF STUDFP FIRE PROOFINGFR FIRE RETARDANTFTG FOOTINGFUR FURRINGFAM FLUID APPLIED MEMBRANE
GA GAUGEGB GYPSUM BOARDGC GENERAL CONTRACTORGALV GALVANIZEDGL GLASSGLAZ GLAZED BLOCKGLB GLASS BLOCKGN GOOSENECKGWB GYPSUM WALL BOARD
HC HANDICAPHD HEAVY DUTYHDWR HARDWAREHDPE HIGH DENSITY POLYETHYLENEHM HOLLOW METALHORIZ HORIZONTALHP HIGH POINTHT HEIGHTHTR HEATERHVAC HEATING, VENTILATING,
AIR CONDITIONING
ID INSIDE DIAMETERINSUL INSULATIONINT INTERIORINV INVERT
JST JOISTJT JOINT
L LENGTHLAM LAMINATELAV LAVATORYLBL LABELLC LEAD COATEDLCT LINOLEUM COMPOSITE TILELCC LEAD COATED COPPERLG LIGHT GUAGELP LOW POINTLSC LIFE SAFETY CODE
MAS MASONRYMAX MAXIMUMMB MARKER BOARDMBL MARBLE TILEMC MEDICINE CABINETMDF MEDIUM DENSITY FIBERBOARDMDO MEDIUM DENSITY OVERLAYMECH MECHANICALMFR MANUFACTURERMH MANHOLEMIN MINIMUMMIR MIRRORMISC MISCELLANEOUSML MATCH LINEMO MASONRY OPENINGMRGB MOISTURE RESISTANT GBMS METAL STUDMTD MOUNTEDMTL METALMTP METAL TIOLET PARTITIONMWF MOLDED WOOD FIBERBOARDMWP MULTI-COLOR
WALL PAINT
NA NOT APPLICABLENC NOT IN CONTRACTNOM NOMINALNTS NOT TO SCALENO NUMBERNW NEW
OA OVERALLOC ON CENTEROD OUTSIDE DIAMETEROH OPPOSITE HAND/OVERHEADOPNG OPENINGOPPHAND OPPOSITE HANDOPP OPPOSITEOSB ORIENTED STRAND BOARDOW OPERABLE WALL
PART BD PARTICLE BOARDPCP PRECAST CONCRETE PLANKPERM PERIMETERPF PREFINISHEDPL PLASTER OR PROPERTY LINEPLAM PLASTIC LAMINATEPLAS PLASTICPLWD PLYWOODPMJF PREMOLDED JOINT FILLERPNT PAINTPNTD PAINTEDPP POWER POLEPR PAIRPSF POUNDS PER
SQUARE FEETPT PRESSURE TREATEDPTD PAPER TOWEL DISPENSERPTN PARTITIONPVC POLYVINYL CHLORIDEPVMT PAVEMENT
QT QUARRY TILE
R & D REMOVE AND DISPOSER & R REMOVE AND REPLACER & S REMOVE AND SALVAGER RADIUS/RISERRB RUBBER MATRD ROOF DRAIN
REF REFRIGERATORREFURB REFURBISHREINF REINFORCEMENTRES RESILIENTREQD REQUIREDRH RIGHT HANDRL RAIN LEADERRM ROOMRO ROUGH OPENINGRST RUBBER STAIR TREADRT RUBBER TILERTU ROOF TOP UNIT
S SEALANTSG SECURITY GLASSSHM SECURITY HOLLOW METALSCH SCHEDULESCR SHOWER CURTAIN RODSCW SOLID CORE WOODSD SOAP DISPENSERSECT SECTIONSF SQUARE FEETSIM SIMILARSIP STRUCTURALLY INSULATED PANELSND SANITARY NAPKIN DISPENSERSNV SANITARY NAPKIN VENDORSPEC SPECIFICATIONSQ SQUARESS STAINLESS STEELSTD STANDARDSTL STAINLESS STEELSTD STANDARDSTL STEELSTOR STORAGESTRUCT STRUCTURE OR STRUCTURALSUSP SUSPENDED OR SUSPENSIONSV SHEET VINYL
T TREADT & B TOP AND BOTTOMTB TOWEL BARTBA TO BE ABANDONEDTTB TILE BACKER BOARDTBD TO BE DETERMINEDTEL TELEPHONETHK THICK OR THICKNESSTHOLD THRESHOLDTOC TOP OF CURBTOL TOP OF LANDINGTOP TOP OF PLATETOS TOP OF STEELTOW TOP OF WALLTS TUBULAR STEELTTD TOILET TISSUE DISPENSERTW TO WEATHERTYP TYPICAL
UC UNDERCUTUNO UNLESS NOTED OTHERWISEUV UNIT VENTILATOR
VB VINYL WALL BASEVCT VINYL COMPOSITION TILEVERT VERTICALLYVEST VESTIBULEVIF VERIFY IN FIELDVFB VENEER PLASTER BASEVS VENT-STACKVT VINYL TREADVTS VINYL TRANSITION STRIPVWB VINYL WALL BASEVWC VAINLY WALL COVERING
W WASHERW/ WITHW/O WITHOUTWB WRITING (WHITE) BOARDWC WATER CLOSETWD WOODWF WIRE FABRICWG WIRE GLASSWP WALL PAPERWPG WATER PROOF(ING)WS WOOD STUDWT WEIGHTWWF WELDED WIRE FABRIC
NEW 3 5/8" LG METALSTUDS @ 16" O.C.
NEW 1/2" GWB. W/SKIM-COATPLASTER. PREPARE ANDPAINT
WALL TYPE AINTERIOR PARTITION
WALL TYPE FINTERIOR PARTITION
WALL TYPE EINTERIOR PARTITION
WALL TYPE DINTERIOR 2HR FIRE-RATEDPARTITION INSULATED
NEW 1/2" GWB. W/SKIM-COATPLASTER.PREPARE & PAINT(BOTH SIDES)
WALL TYPE CINTERIOR PARTITION
4 1/8"
NEW 3 5/8" LG METALSTUDS @ 16" O.C.
NEW (2) 5/8" TYPE X GWB.W/SKIM-COAT PLASTER.PREPARE & PAINT (BOTH SIDES)
NEW 3 5/8" LG METALSTUDS @ 16" O.C.
NEW 1/2" GWB. W/SKIM-COATPLASTER. PREPARE & PAINT
NEW 6" LG METAL STUDS@ 16" O.C.
4 5/8"
NEW 1/2" GWB. W/SKIM-COATPLASTER. PREPARE & PAINT(BOTH SIDES)
NEW 6" LG METAL STUDS@ 16" O.C.
6 1/2"
7"
NEW SOUND DAMPENING BATTINSULATION
WALL TYPES
NEW 3 5/8" LG METALSTUDS @ 16" O.C.
NEW 1/2" GWB. W/SKIM-COATPLASTER. PREPARE ANDPAINT
WALL TYPE BINTERIOR PARTITION
4 1/8"
NEW SOUND DAMPENING BATTINSULATION
NOT IN SCOPE OF WORK
LEGEND
Scale:
Project number:
Date:
Drawn by:
Revisions:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1 D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
As indicated
1/20
/201
6 12
:37:
16 P
M
A-1ABBREVIATIONS/WALL TYPES/ DOOR SCHEDULE
15-AJA43
OFF
ICE
RE
NO
VA
TIO
NS
36
3 H
IGH
LAN
D A
VE
. SO
ME
RV
ILLE
, MA
1/20/16
MM II
1" = 20'-0"3 BUILDING KEY PLAN
DOOR SCHEDULE
NO. WIDTH HEIGHT FRAME MATERIAL DOOR MATERIAL
101 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW102 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW103 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW104 2' - 6" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE105 2' - 6" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE106 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW107 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW108 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW109 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE110 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE111 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW112 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW113 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW114 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW115 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW116 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW117 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW118 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW119 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW120 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE121 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW122 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE123 4' - 6" 8' - 0" STEEL (KNOCKDOWN) GLASS - FULL VIEW W/ SIDE LITE124 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE125 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE126 2' - 6" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE127 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE129 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW130 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE
CONSIGNMENTSHOP
COMPASSCONTRACTING
Q DIVISION
Scale:
Project number:
Date:
Drawn by:
Revisions:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1 D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
1/8" = 1'-0"
1/20
/201
6 12
:37:
32 P
M
A-2EXISTING FLOOR PLAN
15-AJA43
OFF
ICE
RE
NO
VA
TIO
NS
36
3 H
IGH
LAN
D A
VE
. SO
ME
RV
ILLE
, MA
1/20/16
MM II
1/8" = 1'-0"1 EXISTING FIRST FLOOR PLAN
TEL. ROOM
101
TEL. ROOM
102
TEL. ROOM
104
TEL. ROOM
105
CONFERENCE ROOM
103
CONFERENCE ROOM
106
TOILET ROOM
107
TOILET ROOM
108
TEL. ROOM
112
TEL. ROOM
113
TEL. ROOM
110
TEL.ROOM
111
CONF. ROOM
109
CONFERENCE ROOM
120
CONF. ROOM
119
MENS ROOM
122
WOMENS ROOM
121
VESTIBULE
118
RECEPTION
117
KITCHEN
123
CONF. ROOM
114
CONF. ROOM
115
CONFERENCE ROOM
116
A-52
A-51
A-53
A-61
A-54
A-55
CLOSET
124
LOUNGE
125
9' -
10
3/4
"10
' - 0
"
DN
DN
A-56
Scale:
Project number:
Date:
Drawn by:
Revisions:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1 D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
1/8" = 1'-0"
1/20
/201
6 12
:37:
38 P
M
A-3PROPOSED FLOOR PLAN
15-AJA43
OFF
ICE
RE
NO
VA
TIO
NS
36
3 H
IGH
LAN
D A
VE
. SO
ME
RV
ILLE
, MA
1/20/16
MM II
1/8" = 1'-0"1 PROPOSED FLOOR PLAN
LAY-IN 2' x 2' FLUORESCENT TROFFERLIGHT FIXTURE
CEILING TILES 2'x2'
RECESSED LIGHT FIXTURE
GWB CEILING W/ LG METAL STUDS
LEGEND
NOTE:AREAS NOT DESIGNATED TORECIEVE NEW ACT AREEXPOSED TO ROOF DECK ORTHE EXISTING CEILING IS TOREMAIN.
Scale:
Project number:
Date:
Drawn by:
Revisions:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1 D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
1/8" = 1'-0"
1/20
/201
6 12
:37:
39 P
M
A-4PROPOSED CEILING PLAN
15-AJA43
OFF
ICE
RE
NO
VA
TIO
NS
36
3 H
IGH
LAN
D A
VE
. SO
ME
RV
ILLE
, MA
1/20/16
MM II
1/8" = 1'-0"1 PROPOSED CEILING PLAN
UP
TEL. ROOM
101
TEL. ROOM
102
CONFERENCE ROOM
103
CONFERENCE ROOM
106TEL. ROOM
105
TEL. ROOM
104
8' - 11 3/8" 8' - 2 1/8" 2' - 3 3/4" 16' - 11 3/8"
103
104
105
106108 107
102101
D D
EXISTINGCOLUMN
EXISTINGCOLUMN
4' - 6 3/4"
10' -
2 7
/8"
D
BD
D D
B
B
C
A
A
D
A
D
D
D
NEW ALUMINUM FRAMEGLAZING SYSTEM
NEW ALUMINUM FRAMEGLAZING SYSTEM
C
B
CONF. ROOM
109
TEL. ROOM
110
TEL.ROOM
111
PATCH WALL TO MATCHEXISTING STRUCTURE.PREPARE & PAINT.
PATCH EXTERIOR WALL TOMATCH EXISTING STRUCTURE.
PREPARE & PAINT.
D
D
D
D
6' -
7 1
/8"
111
112
113
NEW ALUMINUM FRAMEGLAZING SYSTEM
10' - 5 3/8" 10' - 11 1/4"
9' - 10 1/2"
10' - 0 1/2"
14' -
5 5
/8"
EXISTING EXTERIORDOOR TO REMAIN
LOUNGE
125
NEW METAL GAURD RAIL W/MIN. 42" HEIGHT
NEW STAIR : 5 RISERSRISER= 7" MAX.TREAD= 11" MIN.
NEW METALGAUDRAIL/HANDRAIL
TO MEET CODE 12"
118 119
116 117
D
D DBB B
D
D
D
DD
D DB
B
B
B BB D
CONFERENCE ROOM
116
CONF. ROOM
114
CONF. ROOM
115
TEL. ROOM
112TEL. ROOM
113
114 115
NEW ALUMINUM FRAMEGLAZING SYSTEM
NEW ALUMINUM FRAMEGLAZING SYSTEM
NEW ALUMINUM FRAME GLAZING SYSTEM
B
B
B
19' - 7 1/8"
7' -
6"
4' - 0"4' -
0"
CLEAR
4' - 11 1/2"
CLEAR
24' - 1 5/8"
11' -
10
"9' -
0 5
/8"
NEW ALUMINUM FRAME GLAZING SYSTEM
8' - 9 1/2"12' - 4 7/8"
12' - 4 5/8" 9' - 1"
EQEQ
6' -
9 1
/2"
18' -
5 1
/8"
7' -
1 1
/8"
17' -
5 3
/4"
10' - 10 3/8"
8' - 9 1/2"
CONFERENCE ROOM
120
CONF. ROOM
119
CLOSET
124
129
123124
7 3/4"27
1/2"
19' - 2 1/2"
16' -
4"
4' -
8"
ALIGN
29' -
9 5
/8"
11' - 1 1/2"
14' -
1 5
/8"
PATCH WALL TO MATCHEXISTING STRUCTURE
DA
A
D
D
C
B
NEW ALUMINUM FRAMEGLAZING SYSTEM
7' - 8 1/2" 7' - 4 3/4"
RECEPTION
117
5' -
7 1
/4"
4' -
0 3
/8"
9' -
0"
STORAGECLOSET
NEW 60" X 48" ALUMINUMRECPTION WINDOW
FRAMED @ COUTER HEIGHT
9' -
0 5
/8"
OPENIN
G
30
X80
C
C
C
C
CC
VESTIBULE
118
120
121
122
C
DN
12" MIN.
2' - 9" 5' - 6"
4' -
0"
12"
130
NEW STAIR : 4 RISERSRISER= 7" MAX.TREAD= 11" MIN.
Scale:
Project number:
Date:
Drawn by:
Revisions:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1 D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
1/4" = 1'-0"
1/20
/201
6 12
:37:
43 P
M
A-5ENLARGED FLOOR PLANS
15-AJA43
OFF
ICE
RE
NO
VA
TIO
NS
36
3 H
IGH
LAN
D A
VE
. SO
ME
RV
ILLE
, MA
1/20/16
MM II
1/4" = 1'-0"2 ENLARGED FLOOR PLAN 2 1/4" = 1'-0"1 ENLARGED FLOOR PLAN 1
1/4" = 1'-0"3 ENLARGED FLOOR PLAN 3
1/4" = 1'-0"4 ENLARGED FLOOR PLAN 4
1/4" = 1'-0"5 ENLARGED FLOOR PLAN 5 1/4" = 1'-0"6 ENLARGED FLOOR PLAN 6
TOILET ROOM
107
TOILET ROOM
108
A-6
11
12
13
14
109
110
A-67
8
9
10
EQ EQ
3' -
11"
9' -
5 1
/2"
3' -
10
1/4
"5' -
1 1
/4"
10' - 6 1/4"
4' - 1 3/8"5' - 7 1/4"
F
C
C
C
TOILET ROOM
107
NEW WALL-HUNGSINK
NEW MIRROR
NEW 4" VB TYP
NEW WALL HUNGTOILET
1' -
3"
1' -
3"
2' -
0"
TOILET ROOM
107
TOILET ROOM
107
109
NEW 4" VB TYP
TOILET ROOM
107
110
NEW 4" VBTYP.
TOILET ROOM
108
E
110
NEW 4" VBTYP.
TOILET ROOM
108
NEW WALLHUNG TOILET
NEW 4" VBTYP.
1' -
3"
TOILET ROOM
108
NEW SINK
NEW MIRROR
1' -
3"
TOILET ROOM
108
E
2' -
0"
WOMENS ROOM
121
MENS ROOM
122
A-65 6
A-64 3
11' -
5 3
/4"
5' - 2 7/8"2' - 1"
127
126
125
4' -
6 3
/8"
3' -
7 1
/2"
4' -
6 1
/4"
2' - 1"5' - 2 7/8"
4' - 9 5/8"
11' -
5 7
/8"
5' -
9 7
/8"
4' -
10
"3' -
3 7
/8"
5' -
1 5
/8"
5' -
10
1/8
"0
' - 1
1 1/
4"
3' -
1 1
/4"
1' -
0"
42"
1' - 3 7/8"6' - 0"
JANITOR CLOSET
126
42"12"
NEW HCP WATERFOUNTAIN
C
C
A
A
A
A
A
C
C
C
C
A
A
CC
F
C
A
AC
A
A
C
1' -
0 1
/4"
3' -
1 1
/4"
0' -
11"
2' -
4"
4' - 8"
MIN.
2' - 8"
MIN.
1' - 0"
MIN.
2' - 8"
MIN
1' - 0"4' - 8"
CLEAR
5' - 0" EQ EQ
6" 42"
2' -
0"
2' -
10
"
30" MIN. 30" MIN.
EQ EQ EQ EQ
WOMENS ROOM
121
MAX.
2' -
10
"
MAX.
3' -
4"
NEW HCPACESSIBLE SINK
NEW MIRROR
NEW 4" VB TYP.
1' -
7" 2' -
10
"
WOMENS ROOM
121
CLEAR
3' - 0"
NEW HCP 36" X 36"SHOWER STALL W/FOLDING SEAT &
GRAB BARS
NEW HCP 36" X 36"SHOWER STALL W/FOLDING SEAT &
GRAB BARS
CLEAR
3' - 0"
MENS ROOM
122
MAX
2' -
10
"
MAX
3' -
4"
NEW HCPACESSIBLE SINK
NEW MIRROR
NEW 4" VB TYP.
126
MIN. CLEAR
5' - 0"EQ EQ
30" MIN.
2' -
10
"
42" 6"
MAX.
1' -
7"
1' -
5"
2' -
0"
MENS ROOM
122
30" MIN.
EQ EQ EQ EQ
Scale:
Project number:
Date:
Drawn by:
Revisions:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1 D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
1/2" = 1'-0"
1/20
/201
6 12
:37:
49 P
M
A-6ENLARGED BATHROOM PLANS/ELEVATIONS
15-AJA43
OFF
ICE
RE
NO
VA
TIO
NS
36
3 H
IGH
LAN
D A
VE
. SO
ME
RV
ILLE
, MA
1/20/16
MM II
1/2" = 1'-0"2 FLOOR PLAN- TOILET ROOM 107 & 108
1/2" = 1'-0"11 TOILET ROOM 107 A 1/2" = 1'-0"12 TOILET ROOM 107 B
1/2" = 1'-0"13 TOILET ROOM 107 C 1/2" = 1'-0"14 TOILET ROOM 107 D
1/2" = 1'-0"7 TOILET ROOM 108 A 1/2" = 1'-0"8 TOILET ROOM 108 B
1/2" = 1'-0"9 TOILET ROOM 108 C 1/2" = 1'-0"10 TOILET ROOM 108 D
1/2" = 1'-0"1 FLOOR PLAN - MENS & WOMENS ROOM
1/2" = 1'-0"5 WOMENS ROOM 121 A 1/2" = 1'-0"6 WOMENS ROOM 121 B
1/2" = 1'-0"3 MENS ROOM 122 A 1/2" = 1'-0"4 MENS ROOM 122 B
CONFERENCE ROOM
103
CONFERENCE ROOM
106
TEL. ROOM
105
TEL. ROOM
104
TEL. ROOM
101
TEL. ROOM
102
LOUNGE
125
CONFERENCE ROOM
116
CONF. ROOM
114
CONF. ROOM
115
TEL. ROOM
113
TEL. ROOM
112
RECEPTION
117
VESTIBULE
118
CONF. ROOM
119
CLOSET
124
CONFERENCE ROOM
120
MENS ROOM
122
WOMENS ROOM
121
KITCHEN
123
TOILET ROOM
107
TOILET ROOM
108
CONF. ROOM
109
TEL. ROOM
110
TEL.ROOM
111
F
F
FF
FF FF
F
FEXIT
EXIT
F
F
F
F
F
FF
F
F EXIT
F
EXIT
H
H
F
F
F
F
EXIT
EXIT
EXIT SIGN
FIRE ALARM STROBE
EMERGENCY BATTERY PACKS
FIRE ALARM PULL STATIONF
HEAT DETECTORH
F
EMERGENCY BATTERY PACKSEXIT
SMOKE DETECTORSD
LEGEND
NOTE:CONTRACTOR TO INSTALL DUCTSMOKE DETECTORS IN SUUPLY ANDRETURN VENTS WITH REMOTE TESTSWITCHES
Scale:
Project number:
Date:
Drawn by:
Revisions:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1 D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
1/8" = 1'-0"
1/20
/201
6 12
:37:
52 P
M
A-7LIFE SAFTEY PLAN
15-AJA43
OFF
ICE
RE
NO
VA
TIO
NS
36
3 H
IGH
LAN
D A
VE
. SO
ME
RV
ILLE
, MA
1/20/16
MM II
1/8" = 1'-0"1 PROPOSED LIFE SAFTEY PLAN