c:usershillier750documents highland office existing survey ... drawings 36… · 9 all materials...

8
LOCUS PLAN & TITLE SHEET DATE: AJA PROJECT NO. ARNOLD JACOBSON ASSOCIATES, INC. 153 ANDOVER STREET, SUITE 101 DANVERS, MA 01923 phone: (781) 935-2500 fax: (781) 935-2519 16 MASON AVENUE, SUITE 5 NORTH ATTLEBORO, MA 02760 OFFICE RENOVATIONS A-0 1/20/16 363 HIGHLAND AVE. SOMERVILLE, MA 15-AJA43 GENERAL NOTES 3 ALL WORK SHALL COMPLY WITH THE COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE, THE REQUIREMENTS OF THE CITY OF SOMERVILLE, THE OCCUPATIONAL SAFETY AND HEALTH STANDARDS AND ALL OTHER APPLICABLE REGULATIONS, LAWS, ORDINANCES, ETC. GOVERNING THIS WORK. 4 IT IS STRONGLY RECOMMENDED THAT ALL BIDDERS/CONTRACTORS INSPECT THE PROJECT TO VERIFY ALL EXISTING CONDITIONS. THE BIDDER/CONTRACTOR WILL BE HELD FULLY RESPONSIBLE FOR THE FULL EXTENT OF ALL WORK REQUIRED. 5 THE BIDDER/CONTRACTOR SHALL CONFIRM AND VERIFY IN THE FIELD ALL CONDITIONS, DIMENSIONS AND LOCATIONS PRIOR TO SUBMITTING THEIR BID. DRAWN INFORMATION IS TAKEN FROM EXISTING DRAWINGS AND RANDOM FIELD MEASUREMENTS AND IS PROVIDED ONLY TO ASSIST THE BIDDER/CONTRACTOR IN ESTABLISHING THE SCOPE OF WORK. 6 THE BIDDER/CONTRACTOR SHALL REPORT IN WRITING ALL DEVIATIONS IN THE EXISTING CONDITIONS, DIMENSIONS AND LOCATIONS ETC. TO THE ARCHITECT. ACTUAL CONDITIONS MAY VARY FROM WHAT IS SHOWN ON THESE DRAWINGS. 7 DO NOT SCALE DRAWINGS FOR QUANTITIES, LENGTHS, SIZES OR AREAS. ALL EXISTING DIMENSIONS SHOWN ARE APPROXIMATE AND SHALL BE VERIFIED BY CONTRACTOR IN THE FIELD. 8 IT IS NOT INTENDED THAT THESE DRAWINGS SHOW EVERY CUT AND /OR CONDITION ETC. OF THE BUILDING SYSTEMS, HOWEVER THE CONTRACTOR SHALL FURNISH A COMPLETE PRODUCT IN ACCORDANCE WITH THE BEST PRACTICE OF THE TRADE, TO THE SATISFACTION OF THE ARCHITECT AND IN STRICT CONFORMANCE WITH ALL APPLICABLE STATE AND LOCAL BUILDING CODE REQUIREMENTS. 9 ALL MATERIALS AND NOTES REFER TO NEW MATERIALS UNLESS OTHERWISE NOTED OR INDICATED AS EXISTING. 10 THE CONTRACTOR SHALL TEMORARILY DISCONNECT AND REMOVE ALL EXISTING SERVICES THAT INTERFERE WITH THE PROPER INSTALLATION OF THE NEW CONSTRUCTION. CONTRACTOR IS RESPONSIBLE TO NOTIFY THE ARCHITECT/OWNER OF THESE SERVICES BEFORE DISCONNECTION. REINSTALL AND RECONNECT ALL TEMPORARILY DISCONNECT AND REMOVED ITEMS TO THE SATISFACTION OF THE ARCHITECT. 11 ALL EXISTING AREAS DISTURBED OR DAMAGED AS A RESULT OF THE NEW CONSTRUCTION ARE TO BE PATCHED OR REPLACED TO MATCH EXISTING AND /OR NEW ADJACENT SURFACES. 12 REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL SPECIFIC PROJECT REQUIREMENTS 13 DISPOSE OF ALL DEBRIS IN A LEGAL MANNER. LIST OF DRAWINGS SHEET NUMBER SHEET NAME A-0 TITLE SHEET A-1 ABBREVIATIONS/WALL TYPES/ DOOR SCHEDULE A-2 EXISTING FLOOR PLAN A-3 PROPOSED FLOOR PLAN A-4 PROPOSED CEILING PLAN A-5 ENLARGED FLOOR PLANS A-6 ENLARGED BATHROOM PLANS/ELEVATIONS A-7 LIFE SAFTEY PLAN PREMIT DRAWINGS

Upload: others

Post on 03-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: C:UsersHillier750Documents Highland Office Existing Survey ... Drawings 36… · 9 all materials and notes refer to new materials unless otherwise noted or indicated as existing

LOCUS PLAN & TITLE SHEETDATE:

AJA PROJECT NO.

ARNOLD JACOBSON ASSOCIATES, INC.153 ANDOVER STREET, SUITE 101 DANVERS, MA 01923

phone: (781) 935-2500 fax: (781) 935-2519

16 MASON AVENUE, SUITE 5 NORTH ATTLEBORO, MA 02760OFFICE RENOVATIONS

A-01/20/16

363 HIGHLAND AVE. SOMERVILLE, MA

15-AJA43

GENERAL NOTES3 ALL WORK SHALL COMPLY WITH THE COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE, THE REQUIREMENTS OF THE CITY OF SOMERVILLE, THE OCCUPATIONAL

SAFETY AND HEALTH STANDARDS AND ALL OTHER APPLICABLE REGULATIONS, LAWS, ORDINANCES, ETC. GOVERNING THIS WORK.4 IT IS STRONGLY RECOMMENDED THAT ALL BIDDERS/CONTRACTORS INSPECT THE PROJECT TO VERIFY ALL EXISTING CONDITIONS. THE BIDDER/CONTRACTOR WILL BE

HELD FULLY RESPONSIBLE FOR THE FULL EXTENT OF ALL WORK REQUIRED.5 THE BIDDER/CONTRACTOR SHALL CONFIRM AND VERIFY IN THE FIELD ALL CONDITIONS, DIMENSIONS AND LOCATIONS PRIOR TO SUBMITTING THEIR BID. DRAWN

INFORMATION IS TAKEN FROM EXISTING DRAWINGS AND RANDOM FIELD MEASUREMENTS AND IS PROVIDED ONLY TO ASSIST THE BIDDER/CONTRACTOR IN ESTABLISHINGTHE SCOPE OF WORK.

6 THE BIDDER/CONTRACTOR SHALL REPORT IN WRITING ALL DEVIATIONS IN THE EXISTING CONDITIONS, DIMENSIONS AND LOCATIONS ETC. TO THE ARCHITECT. ACTUALCONDITIONS MAY VARY FROM WHAT IS SHOWN ON THESE DRAWINGS.

7 DO NOT SCALE DRAWINGS FOR QUANTITIES, LENGTHS, SIZES OR AREAS. ALL EXISTING DIMENSIONS SHOWN ARE APPROXIMATE AND SHALL BE VERIFIED BY CONTRACTOR INTHE FIELD.

8 IT IS NOT INTENDED THAT THESE DRAWINGS SHOW EVERY CUT AND /OR CONDITION ETC. OF THE BUILDING SYSTEMS, HOWEVER THE CONTRACTOR SHALL FURNISH ACOMPLETE PRODUCT IN ACCORDANCE WITH THE BEST PRACTICE OF THE TRADE, TO THE SATISFACTION OF THE ARCHITECT AND IN STRICT CONFORMANCE WITH ALLAPPLICABLE STATE AND LOCAL BUILDING CODE REQUIREMENTS.

9 ALL MATERIALS AND NOTES REFER TO NEW MATERIALS UNLESS OTHERWISE NOTED OR INDICATED AS EXISTING.10 THE CONTRACTOR SHALL TEMORARILY DISCONNECT AND REMOVE ALL EXISTING SERVICES THAT INTERFERE WITH THE PROPER INSTALLATION OF THE NEW CONSTRUCTION.

CONTRACTOR IS RESPONSIBLE TO NOTIFY THE ARCHITECT/OWNER OF THESE SERVICES BEFORE DISCONNECTION. REINSTALL AND RECONNECT ALL TEMPORARILYDISCONNECT AND REMOVED ITEMS TO THE SATISFACTION OF THE ARCHITECT.

11 ALL EXISTING AREAS DISTURBED OR DAMAGED AS A RESULT OF THE NEW CONSTRUCTION ARE TO BE PATCHED OR REPLACED TO MATCH EXISTING AND /OR NEWADJACENT SURFACES.

12 REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL SPECIFIC PROJECT REQUIREMENTS13 DISPOSE OF ALL DEBRIS IN A LEGAL MANNER.

LIST OF DRAWINGSSHEET NUMBER SHEET NAME

A-0 TITLE SHEETA-1 ABBREVIATIONS/WALL TYPES/ DOOR SCHEDULEA-2 EXISTING FLOOR PLANA-3 PROPOSED FLOOR PLANA-4 PROPOSED CEILING PLANA-5 ENLARGED FLOOR PLANSA-6 ENLARGED BATHROOM PLANS/ELEVATIONSA-7 LIFE SAFTEY PLAN

PREMIT DRAWINGS

Page 2: C:UsersHillier750Documents Highland Office Existing Survey ... Drawings 36… · 9 all materials and notes refer to new materials unless otherwise noted or indicated as existing

ABBREVIATIONS

A/C AIR CONDITIONINGACT ACOUSTICAL TILEA.F.F. ABOVE FINISH FLOORALT ALTERNATEALUM ALUMINUMANC BLT ANCHOR BOLTAPPROX APPROXIMATEARCH ARCHITECTARGB ABUSE RESISTANT GBASPH ASPHALT

BC BRICK COURSEBD BOARDBITUM BITUMINOUSBLDG BUILDINGBLK BLOCKBLKG BLOCKINGBM BENCH MARKBOF BOTTOM OF FOOTINGBOD BOTTOM OF DUCTBOTT BOTTOMBRG BEARINGBRK BRICKBS BRICK SHELFBSMT BASEMENT

CAB CABINETCB CEMENT BOARDCDM CAVITY DRAINAGE

MATERIALCH CEILING HEIGHTCIP CAST IN PLACECJ CONTROL JOINTCL CENTRAL LINE/

COLUMN LINECLG CEILINGCLOS CLOSETCLR CLEARCMU CONCRETE MASONRY

UNITCNTR COUNTERCO CASED OPENINGCOL COLUMNCOMP COMPOSITIONCONC CONCRETECONST CONSTRUCTIONCONT CONTINUOUSCONV CONVECTORCORR CORRIDORCOORD COORDINATECPT CARPETCT CERAMIC TILECUH CABINET UNIT HEATER

D DRYERDBL DOUBLEDEMO DEMOLITIONDI DRAIN INLETDIAG DIAGONALDIAM DIAMETERDIM DIMENSIONDL DRAIN LEADERDN DOWND-PART DEMOUNTABLE PARTITIONDR DOORDS DOWNSPOUTDTL DETAILDWG DRAWINGDW DISHWASHER

EA EACHEF EACH FACEEIFS EXTERIOR INSULATED

FINISH SYSTEMEJ EXPANSION JOINTELEC ELECTRICELEV ELEVATOR/ELEVATIONEMER EMERGENCYENCL ENCLOSUREEP ELECTRICAL PANELEPXY EPOXY SEALING SYSTEMEQ EQUALEQUIP EQUIPMENTER EXISTING TO REMAINEXH EXHAUSTEXIST EXISTINGEXP EXPANSIONEXPT EPOXY PAINTEXT EXTERIOREW EACH WAYEWC ELECTRIC WATER COOLER

FACP FIRE ALARMCONTROL PANEL

FB FIRE BLANKETFD FLOOR DRAINFE FIRE EXTINGUISHERFF FINISH FLOORFFE FINISH FLOOR ELEVATIONFIN FINISHFG FIBERGLASSFLASH FLASHINGFLR FLOORFLUOR FLUORESCENTFNDN FOUNDATIONFOC FACE OF CONCRETEFOF FACE OF FINISHFOM FACE OF MASONRYFOS FACE OF STUDFP FIRE PROOFINGFR FIRE RETARDANTFTG FOOTINGFUR FURRINGFAM FLUID APPLIED MEMBRANE

GA GAUGEGB GYPSUM BOARDGC GENERAL CONTRACTORGALV GALVANIZEDGL GLASSGLAZ GLAZED BLOCKGLB GLASS BLOCKGN GOOSENECKGWB GYPSUM WALL BOARD

HC HANDICAPHD HEAVY DUTYHDWR HARDWAREHDPE HIGH DENSITY POLYETHYLENEHM HOLLOW METALHORIZ HORIZONTALHP HIGH POINTHT HEIGHTHTR HEATERHVAC HEATING, VENTILATING,

AIR CONDITIONING

ID INSIDE DIAMETERINSUL INSULATIONINT INTERIORINV INVERT

JST JOISTJT JOINT

L LENGTHLAM LAMINATELAV LAVATORYLBL LABELLC LEAD COATEDLCT LINOLEUM COMPOSITE TILELCC LEAD COATED COPPERLG LIGHT GUAGELP LOW POINTLSC LIFE SAFETY CODE

MAS MASONRYMAX MAXIMUMMB MARKER BOARDMBL MARBLE TILEMC MEDICINE CABINETMDF MEDIUM DENSITY FIBERBOARDMDO MEDIUM DENSITY OVERLAYMECH MECHANICALMFR MANUFACTURERMH MANHOLEMIN MINIMUMMIR MIRRORMISC MISCELLANEOUSML MATCH LINEMO MASONRY OPENINGMRGB MOISTURE RESISTANT GBMS METAL STUDMTD MOUNTEDMTL METALMTP METAL TIOLET PARTITIONMWF MOLDED WOOD FIBERBOARDMWP MULTI-COLOR

WALL PAINT

NA NOT APPLICABLENC NOT IN CONTRACTNOM NOMINALNTS NOT TO SCALENO NUMBERNW NEW

OA OVERALLOC ON CENTEROD OUTSIDE DIAMETEROH OPPOSITE HAND/OVERHEADOPNG OPENINGOPPHAND OPPOSITE HANDOPP OPPOSITEOSB ORIENTED STRAND BOARDOW OPERABLE WALL

PART BD PARTICLE BOARDPCP PRECAST CONCRETE PLANKPERM PERIMETERPF PREFINISHEDPL PLASTER OR PROPERTY LINEPLAM PLASTIC LAMINATEPLAS PLASTICPLWD PLYWOODPMJF PREMOLDED JOINT FILLERPNT PAINTPNTD PAINTEDPP POWER POLEPR PAIRPSF POUNDS PER

SQUARE FEETPT PRESSURE TREATEDPTD PAPER TOWEL DISPENSERPTN PARTITIONPVC POLYVINYL CHLORIDEPVMT PAVEMENT

QT QUARRY TILE

R & D REMOVE AND DISPOSER & R REMOVE AND REPLACER & S REMOVE AND SALVAGER RADIUS/RISERRB RUBBER MATRD ROOF DRAIN

REF REFRIGERATORREFURB REFURBISHREINF REINFORCEMENTRES RESILIENTREQD REQUIREDRH RIGHT HANDRL RAIN LEADERRM ROOMRO ROUGH OPENINGRST RUBBER STAIR TREADRT RUBBER TILERTU ROOF TOP UNIT

S SEALANTSG SECURITY GLASSSHM SECURITY HOLLOW METALSCH SCHEDULESCR SHOWER CURTAIN RODSCW SOLID CORE WOODSD SOAP DISPENSERSECT SECTIONSF SQUARE FEETSIM SIMILARSIP STRUCTURALLY INSULATED PANELSND SANITARY NAPKIN DISPENSERSNV SANITARY NAPKIN VENDORSPEC SPECIFICATIONSQ SQUARESS STAINLESS STEELSTD STANDARDSTL STAINLESS STEELSTD STANDARDSTL STEELSTOR STORAGESTRUCT STRUCTURE OR STRUCTURALSUSP SUSPENDED OR SUSPENSIONSV SHEET VINYL

T TREADT & B TOP AND BOTTOMTB TOWEL BARTBA TO BE ABANDONEDTTB TILE BACKER BOARDTBD TO BE DETERMINEDTEL TELEPHONETHK THICK OR THICKNESSTHOLD THRESHOLDTOC TOP OF CURBTOL TOP OF LANDINGTOP TOP OF PLATETOS TOP OF STEELTOW TOP OF WALLTS TUBULAR STEELTTD TOILET TISSUE DISPENSERTW TO WEATHERTYP TYPICAL

UC UNDERCUTUNO UNLESS NOTED OTHERWISEUV UNIT VENTILATOR

VB VINYL WALL BASEVCT VINYL COMPOSITION TILEVERT VERTICALLYVEST VESTIBULEVIF VERIFY IN FIELDVFB VENEER PLASTER BASEVS VENT-STACKVT VINYL TREADVTS VINYL TRANSITION STRIPVWB VINYL WALL BASEVWC VAINLY WALL COVERING

W WASHERW/ WITHW/O WITHOUTWB WRITING (WHITE) BOARDWC WATER CLOSETWD WOODWF WIRE FABRICWG WIRE GLASSWP WALL PAPERWPG WATER PROOF(ING)WS WOOD STUDWT WEIGHTWWF WELDED WIRE FABRIC

NEW 3 5/8" LG METALSTUDS @ 16" O.C.

NEW 1/2" GWB. W/SKIM-COATPLASTER. PREPARE ANDPAINT

WALL TYPE AINTERIOR PARTITION

WALL TYPE FINTERIOR PARTITION

WALL TYPE EINTERIOR PARTITION

WALL TYPE DINTERIOR 2HR FIRE-RATEDPARTITION INSULATED

NEW 1/2" GWB. W/SKIM-COATPLASTER.PREPARE & PAINT(BOTH SIDES)

WALL TYPE CINTERIOR PARTITION

4 1/8"

NEW 3 5/8" LG METALSTUDS @ 16" O.C.

NEW (2) 5/8" TYPE X GWB.W/SKIM-COAT PLASTER.PREPARE & PAINT (BOTH SIDES)

NEW 3 5/8" LG METALSTUDS @ 16" O.C.

NEW 1/2" GWB. W/SKIM-COATPLASTER. PREPARE & PAINT

NEW 6" LG METAL STUDS@ 16" O.C.

4 5/8"

NEW 1/2" GWB. W/SKIM-COATPLASTER. PREPARE & PAINT(BOTH SIDES)

NEW 6" LG METAL STUDS@ 16" O.C.

6 1/2"

7"

NEW SOUND DAMPENING BATTINSULATION

WALL TYPES

NEW 3 5/8" LG METALSTUDS @ 16" O.C.

NEW 1/2" GWB. W/SKIM-COATPLASTER. PREPARE ANDPAINT

WALL TYPE BINTERIOR PARTITION

4 1/8"

NEW SOUND DAMPENING BATTINSULATION

NOT IN SCOPE OF WORK

LEGEND

Scale:

Project number:

Date:

Drawn by:

Revisions:

ARN

OLD

JAC

OBS

ON

ASS

OC

IATE

S, IN

C. A

RC

HIT

ECTS

153

AND

OVE

R S

TREE

T, S

UIT

E 10

1 D

ANVE

RS,

MA

0192

3

(7

81) 9

35-2

500

As indicated

1/20

/201

6 12

:37:

16 P

M

A-1ABBREVIATIONS/WALL TYPES/ DOOR SCHEDULE

15-AJA43

OFF

ICE

RE

NO

VA

TIO

NS

36

3 H

IGH

LAN

D A

VE

. SO

ME

RV

ILLE

, MA

1/20/16

MM II

1" = 20'-0"3 BUILDING KEY PLAN

DOOR SCHEDULE

NO. WIDTH HEIGHT FRAME MATERIAL DOOR MATERIAL

101 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW102 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW103 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW104 2' - 6" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE105 2' - 6" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE106 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW107 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW108 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW109 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE110 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE111 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW112 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW113 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW114 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW115 6' - 0" 6' - 8" ALUMINUM GLASS SLIDER- FULL VIEW116 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW117 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW118 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW119 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW120 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE121 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW122 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE123 4' - 6" 8' - 0" STEEL (KNOCKDOWN) GLASS - FULL VIEW W/ SIDE LITE124 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE125 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE126 2' - 6" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE127 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE129 3' - 0" 6' - 8" ALUMINUM GLASS- FULL VIEW130 3' - 0" 6' - 8" STEEL (KNOCKDOWN) WOOD- SOLID CORE

Page 3: C:UsersHillier750Documents Highland Office Existing Survey ... Drawings 36… · 9 all materials and notes refer to new materials unless otherwise noted or indicated as existing

CONSIGNMENTSHOP

COMPASSCONTRACTING

Q DIVISION

Scale:

Project number:

Date:

Drawn by:

Revisions:

ARN

OLD

JAC

OBS

ON

ASS

OC

IATE

S, IN

C. A

RC

HIT

ECTS

153

AND

OVE

R S

TREE

T, S

UIT

E 10

1 D

ANVE

RS,

MA

0192

3

(7

81) 9

35-2

500

1/8" = 1'-0"

1/20

/201

6 12

:37:

32 P

M

A-2EXISTING FLOOR PLAN

15-AJA43

OFF

ICE

RE

NO

VA

TIO

NS

36

3 H

IGH

LAN

D A

VE

. SO

ME

RV

ILLE

, MA

1/20/16

MM II

1/8" = 1'-0"1 EXISTING FIRST FLOOR PLAN

Page 4: C:UsersHillier750Documents Highland Office Existing Survey ... Drawings 36… · 9 all materials and notes refer to new materials unless otherwise noted or indicated as existing

TEL. ROOM

101

TEL. ROOM

102

TEL. ROOM

104

TEL. ROOM

105

CONFERENCE ROOM

103

CONFERENCE ROOM

106

TOILET ROOM

107

TOILET ROOM

108

TEL. ROOM

112

TEL. ROOM

113

TEL. ROOM

110

TEL.ROOM

111

CONF. ROOM

109

CONFERENCE ROOM

120

CONF. ROOM

119

MENS ROOM

122

WOMENS ROOM

121

VESTIBULE

118

RECEPTION

117

KITCHEN

123

CONF. ROOM

114

CONF. ROOM

115

CONFERENCE ROOM

116

A-52

A-51

A-53

A-61

A-54

A-55

CLOSET

124

LOUNGE

125

9' -

10

3/4

"10

' - 0

"

DN

DN

A-56

Scale:

Project number:

Date:

Drawn by:

Revisions:

ARN

OLD

JAC

OBS

ON

ASS

OC

IATE

S, IN

C. A

RC

HIT

ECTS

153

AND

OVE

R S

TREE

T, S

UIT

E 10

1 D

ANVE

RS,

MA

0192

3

(7

81) 9

35-2

500

1/8" = 1'-0"

1/20

/201

6 12

:37:

38 P

M

A-3PROPOSED FLOOR PLAN

15-AJA43

OFF

ICE

RE

NO

VA

TIO

NS

36

3 H

IGH

LAN

D A

VE

. SO

ME

RV

ILLE

, MA

1/20/16

MM II

1/8" = 1'-0"1 PROPOSED FLOOR PLAN

Page 5: C:UsersHillier750Documents Highland Office Existing Survey ... Drawings 36… · 9 all materials and notes refer to new materials unless otherwise noted or indicated as existing

LAY-IN 2' x 2' FLUORESCENT TROFFERLIGHT FIXTURE

CEILING TILES 2'x2'

RECESSED LIGHT FIXTURE

GWB CEILING W/ LG METAL STUDS

LEGEND

NOTE:AREAS NOT DESIGNATED TORECIEVE NEW ACT AREEXPOSED TO ROOF DECK ORTHE EXISTING CEILING IS TOREMAIN.

Scale:

Project number:

Date:

Drawn by:

Revisions:

ARN

OLD

JAC

OBS

ON

ASS

OC

IATE

S, IN

C. A

RC

HIT

ECTS

153

AND

OVE

R S

TREE

T, S

UIT

E 10

1 D

ANVE

RS,

MA

0192

3

(7

81) 9

35-2

500

1/8" = 1'-0"

1/20

/201

6 12

:37:

39 P

M

A-4PROPOSED CEILING PLAN

15-AJA43

OFF

ICE

RE

NO

VA

TIO

NS

36

3 H

IGH

LAN

D A

VE

. SO

ME

RV

ILLE

, MA

1/20/16

MM II

1/8" = 1'-0"1 PROPOSED CEILING PLAN

Page 6: C:UsersHillier750Documents Highland Office Existing Survey ... Drawings 36… · 9 all materials and notes refer to new materials unless otherwise noted or indicated as existing

UP

TEL. ROOM

101

TEL. ROOM

102

CONFERENCE ROOM

103

CONFERENCE ROOM

106TEL. ROOM

105

TEL. ROOM

104

8' - 11 3/8" 8' - 2 1/8" 2' - 3 3/4" 16' - 11 3/8"

103

104

105

106108 107

102101

D D

EXISTINGCOLUMN

EXISTINGCOLUMN

4' - 6 3/4"

10' -

2 7

/8"

D

BD

D D

B

B

C

A

A

D

A

D

D

D

NEW ALUMINUM FRAMEGLAZING SYSTEM

NEW ALUMINUM FRAMEGLAZING SYSTEM

C

B

CONF. ROOM

109

TEL. ROOM

110

TEL.ROOM

111

PATCH WALL TO MATCHEXISTING STRUCTURE.PREPARE & PAINT.

PATCH EXTERIOR WALL TOMATCH EXISTING STRUCTURE.

PREPARE & PAINT.

D

D

D

D

6' -

7 1

/8"

111

112

113

NEW ALUMINUM FRAMEGLAZING SYSTEM

10' - 5 3/8" 10' - 11 1/4"

9' - 10 1/2"

10' - 0 1/2"

14' -

5 5

/8"

EXISTING EXTERIORDOOR TO REMAIN

LOUNGE

125

NEW METAL GAURD RAIL W/MIN. 42" HEIGHT

NEW STAIR : 5 RISERSRISER= 7" MAX.TREAD= 11" MIN.

NEW METALGAUDRAIL/HANDRAIL

TO MEET CODE 12"

118 119

116 117

D

D DBB B

D

D

D

DD

D DB

B

B

B BB D

CONFERENCE ROOM

116

CONF. ROOM

114

CONF. ROOM

115

TEL. ROOM

112TEL. ROOM

113

114 115

NEW ALUMINUM FRAMEGLAZING SYSTEM

NEW ALUMINUM FRAMEGLAZING SYSTEM

NEW ALUMINUM FRAME GLAZING SYSTEM

B

B

B

19' - 7 1/8"

7' -

6"

4' - 0"4' -

0"

CLEAR

4' - 11 1/2"

CLEAR

24' - 1 5/8"

11' -

10

"9' -

0 5

/8"

NEW ALUMINUM FRAME GLAZING SYSTEM

8' - 9 1/2"12' - 4 7/8"

12' - 4 5/8" 9' - 1"

EQEQ

6' -

9 1

/2"

18' -

5 1

/8"

7' -

1 1

/8"

17' -

5 3

/4"

10' - 10 3/8"

8' - 9 1/2"

CONFERENCE ROOM

120

CONF. ROOM

119

CLOSET

124

129

123124

7 3/4"27

1/2"

19' - 2 1/2"

16' -

4"

4' -

8"

ALIGN

29' -

9 5

/8"

11' - 1 1/2"

14' -

1 5

/8"

PATCH WALL TO MATCHEXISTING STRUCTURE

DA

A

D

D

C

B

NEW ALUMINUM FRAMEGLAZING SYSTEM

7' - 8 1/2" 7' - 4 3/4"

RECEPTION

117

5' -

7 1

/4"

4' -

0 3

/8"

9' -

0"

STORAGECLOSET

NEW 60" X 48" ALUMINUMRECPTION WINDOW

FRAMED @ COUTER HEIGHT

9' -

0 5

/8"

OPENIN

G

30

X80

C

C

C

C

CC

VESTIBULE

118

120

121

122

C

DN

12" MIN.

2' - 9" 5' - 6"

4' -

0"

12"

130

NEW STAIR : 4 RISERSRISER= 7" MAX.TREAD= 11" MIN.

Scale:

Project number:

Date:

Drawn by:

Revisions:

ARN

OLD

JAC

OBS

ON

ASS

OC

IATE

S, IN

C. A

RC

HIT

ECTS

153

AND

OVE

R S

TREE

T, S

UIT

E 10

1 D

ANVE

RS,

MA

0192

3

(7

81) 9

35-2

500

1/4" = 1'-0"

1/20

/201

6 12

:37:

43 P

M

A-5ENLARGED FLOOR PLANS

15-AJA43

OFF

ICE

RE

NO

VA

TIO

NS

36

3 H

IGH

LAN

D A

VE

. SO

ME

RV

ILLE

, MA

1/20/16

MM II

1/4" = 1'-0"2 ENLARGED FLOOR PLAN 2 1/4" = 1'-0"1 ENLARGED FLOOR PLAN 1

1/4" = 1'-0"3 ENLARGED FLOOR PLAN 3

1/4" = 1'-0"4 ENLARGED FLOOR PLAN 4

1/4" = 1'-0"5 ENLARGED FLOOR PLAN 5 1/4" = 1'-0"6 ENLARGED FLOOR PLAN 6

Page 7: C:UsersHillier750Documents Highland Office Existing Survey ... Drawings 36… · 9 all materials and notes refer to new materials unless otherwise noted or indicated as existing

TOILET ROOM

107

TOILET ROOM

108

A-6

11

12

13

14

109

110

A-67

8

9

10

EQ EQ

3' -

11"

9' -

5 1

/2"

3' -

10

1/4

"5' -

1 1

/4"

10' - 6 1/4"

4' - 1 3/8"5' - 7 1/4"

F

C

C

C

TOILET ROOM

107

NEW WALL-HUNGSINK

NEW MIRROR

NEW 4" VB TYP

NEW WALL HUNGTOILET

1' -

3"

1' -

3"

2' -

0"

TOILET ROOM

107

TOILET ROOM

107

109

NEW 4" VB TYP

TOILET ROOM

107

110

NEW 4" VBTYP.

TOILET ROOM

108

E

110

NEW 4" VBTYP.

TOILET ROOM

108

NEW WALLHUNG TOILET

NEW 4" VBTYP.

1' -

3"

TOILET ROOM

108

NEW SINK

NEW MIRROR

1' -

3"

TOILET ROOM

108

E

2' -

0"

WOMENS ROOM

121

MENS ROOM

122

A-65 6

A-64 3

11' -

5 3

/4"

5' - 2 7/8"2' - 1"

127

126

125

4' -

6 3

/8"

3' -

7 1

/2"

4' -

6 1

/4"

2' - 1"5' - 2 7/8"

4' - 9 5/8"

11' -

5 7

/8"

5' -

9 7

/8"

4' -

10

"3' -

3 7

/8"

5' -

1 5

/8"

5' -

10

1/8

"0

' - 1

1 1/

4"

3' -

1 1

/4"

1' -

0"

42"

1' - 3 7/8"6' - 0"

JANITOR CLOSET

126

42"12"

NEW HCP WATERFOUNTAIN

C

C

A

A

A

A

A

C

C

C

C

A

A

CC

F

C

A

AC

A

A

C

1' -

0 1

/4"

3' -

1 1

/4"

0' -

11"

2' -

4"

4' - 8"

MIN.

2' - 8"

MIN.

1' - 0"

MIN.

2' - 8"

MIN

1' - 0"4' - 8"

CLEAR

5' - 0" EQ EQ

6" 42"

2' -

0"

2' -

10

"

30" MIN. 30" MIN.

EQ EQ EQ EQ

WOMENS ROOM

121

MAX.

2' -

10

"

MAX.

3' -

4"

NEW HCPACESSIBLE SINK

NEW MIRROR

NEW 4" VB TYP.

1' -

7" 2' -

10

"

WOMENS ROOM

121

CLEAR

3' - 0"

NEW HCP 36" X 36"SHOWER STALL W/FOLDING SEAT &

GRAB BARS

NEW HCP 36" X 36"SHOWER STALL W/FOLDING SEAT &

GRAB BARS

CLEAR

3' - 0"

MENS ROOM

122

MAX

2' -

10

"

MAX

3' -

4"

NEW HCPACESSIBLE SINK

NEW MIRROR

NEW 4" VB TYP.

126

MIN. CLEAR

5' - 0"EQ EQ

30" MIN.

2' -

10

"

42" 6"

MAX.

1' -

7"

1' -

5"

2' -

0"

MENS ROOM

122

30" MIN.

EQ EQ EQ EQ

Scale:

Project number:

Date:

Drawn by:

Revisions:

ARN

OLD

JAC

OBS

ON

ASS

OC

IATE

S, IN

C. A

RC

HIT

ECTS

153

AND

OVE

R S

TREE

T, S

UIT

E 10

1 D

ANVE

RS,

MA

0192

3

(7

81) 9

35-2

500

1/2" = 1'-0"

1/20

/201

6 12

:37:

49 P

M

A-6ENLARGED BATHROOM PLANS/ELEVATIONS

15-AJA43

OFF

ICE

RE

NO

VA

TIO

NS

36

3 H

IGH

LAN

D A

VE

. SO

ME

RV

ILLE

, MA

1/20/16

MM II

1/2" = 1'-0"2 FLOOR PLAN- TOILET ROOM 107 & 108

1/2" = 1'-0"11 TOILET ROOM 107 A 1/2" = 1'-0"12 TOILET ROOM 107 B

1/2" = 1'-0"13 TOILET ROOM 107 C 1/2" = 1'-0"14 TOILET ROOM 107 D

1/2" = 1'-0"7 TOILET ROOM 108 A 1/2" = 1'-0"8 TOILET ROOM 108 B

1/2" = 1'-0"9 TOILET ROOM 108 C 1/2" = 1'-0"10 TOILET ROOM 108 D

1/2" = 1'-0"1 FLOOR PLAN - MENS & WOMENS ROOM

1/2" = 1'-0"5 WOMENS ROOM 121 A 1/2" = 1'-0"6 WOMENS ROOM 121 B

1/2" = 1'-0"3 MENS ROOM 122 A 1/2" = 1'-0"4 MENS ROOM 122 B

Page 8: C:UsersHillier750Documents Highland Office Existing Survey ... Drawings 36… · 9 all materials and notes refer to new materials unless otherwise noted or indicated as existing

CONFERENCE ROOM

103

CONFERENCE ROOM

106

TEL. ROOM

105

TEL. ROOM

104

TEL. ROOM

101

TEL. ROOM

102

LOUNGE

125

CONFERENCE ROOM

116

CONF. ROOM

114

CONF. ROOM

115

TEL. ROOM

113

TEL. ROOM

112

RECEPTION

117

VESTIBULE

118

CONF. ROOM

119

CLOSET

124

CONFERENCE ROOM

120

MENS ROOM

122

WOMENS ROOM

121

KITCHEN

123

TOILET ROOM

107

TOILET ROOM

108

CONF. ROOM

109

TEL. ROOM

110

TEL.ROOM

111

F

F

FF

FF FF

F

FEXIT

EXIT

F

F

F

F

F

FF

F

F EXIT

F

EXIT

H

H

F

F

F

F

EXIT

EXIT

EXIT SIGN

FIRE ALARM STROBE

EMERGENCY BATTERY PACKS

FIRE ALARM PULL STATIONF

HEAT DETECTORH

F

EMERGENCY BATTERY PACKSEXIT

SMOKE DETECTORSD

LEGEND

NOTE:CONTRACTOR TO INSTALL DUCTSMOKE DETECTORS IN SUUPLY ANDRETURN VENTS WITH REMOTE TESTSWITCHES

Scale:

Project number:

Date:

Drawn by:

Revisions:

ARN

OLD

JAC

OBS

ON

ASS

OC

IATE

S, IN

C. A

RC

HIT

ECTS

153

AND

OVE

R S

TREE

T, S

UIT

E 10

1 D

ANVE

RS,

MA

0192

3

(7

81) 9

35-2

500

1/8" = 1'-0"

1/20

/201

6 12

:37:

52 P

M

A-7LIFE SAFTEY PLAN

15-AJA43

OFF

ICE

RE

NO

VA

TIO

NS

36

3 H

IGH

LAN

D A

VE

. SO

ME

RV

ILLE

, MA

1/20/16

MM II

1/8" = 1'-0"1 PROPOSED LIFE SAFTEY PLAN