TEMPLATE / INSTALLATION INSTRUCTION SEE PCI #IN1601268 20.10.16 ARUN B VW A 1 SEE PCI #IN1601693 04.01.17 ARUN B MW B 1 1285242-IN01 ARUN B 04.01.17 A.i. 04.01.17 04.01.17 04.01.17 JAYESH MW REFER NOTES REFER NOTES REFER NOTES 1:1 1 OF 1 NOTES 3) 4) 5) PRINT AREA = 675x492 mm (26.58”x19.35”) TITLE BLOCK & NOTES OUTSIDE PRINT AREA(2) SHOULD NOT TO BE PART OF PRINTING. SHEET SIZE = A1 (ALTERNATE SHEET SIZE 23”x36”) PAPER MATERIAL : MAPLITHO PAPER , 100 ± 5 GSM SAMPLE COPY TO BE APPROVED BY KOHLER INDIA ENGINEERING TEAM PRIOR TO PRODUCTION. PRINTING COLOR : BLACK 1) D300_001 : KITCHEN SINK & LAVATORY CUTOUT TEMPLATE DESIGN. 1 2 6) THE ARTWORK MUST NOT BE SCALED. MUST BE PRINTED ON 100% (1:1) SCALE. 6) 492 mm 675 mm 1 2 2 CUT-OUT TEMPLATE / INSTALLATION INSTRUCTION 76600IN-0 Kankara Vessel With 1TH TOOLS AND MATERIAL (Not supplied) Safety glasses Pencil Scissors Measuring tape Putty knife Plumbers putty Hacksaw Keyhole saw or saber saw Drill bit as required Adjustable wrench Pipe wrench Tube cutter · · · · · · · · · · · · Roughing-In Notes Fixture dimensions are nominal and conform to tolerances in ASME standard A112.19.2M. ROUGH-IN Unit: Inch (cm) 17-1/4”(43.8) 5-1/8” (13.0) 34”(86.4) 1-3/4”(4.5) 22-3/8”(56.8) · · · · Place this template on the counter top and align with the finish wall markings. Ensure clearance as specified between outer rim of lavatory and finish wall. Trace the template and mark the centers two hole for faucet hose and drain. Remove the template. INSTALLATION SERVICE PARTS Lift rod Custom linkage Adjust here. 84474 REQUIRED PARTS: Bottle Trap: 75823IN-CP IMPORTANT: For pop-up drains, use the custom linkage 84474 instead of the linkage supplied with the drain. Item Code:- 84474 Item description:- ASSEMBLY ADJUSTABLE LINKAGE NOTE: BEFORE CUTTING COUNTER-TOP, ALLOW FOR FAUCET HANDLE CLEARANCE FINISHED WALL / BACK SPLASH Floor CAUTION: Risk of personal injury or product damage. · Large lavatories are very heavy.Get help lifting the lavatory during installation. Temporarily position the lavatory in the cut-out and adjust to fit. Trace a pencil line around the outside edge of the lavatory. Remove the lavatory. Make sure drain is installed before proceeding further. Make sure faucet is installed before proceeding further. NOTE: · · · COMPATIBLE FAUCETS WITH ABOVE VESSEL (CHECK KOHLER CATALOGUE FOR FAUCET DETAILS) K-8657IN-CP Fairfax Single Control Lavatory With Lever Handle And Drain 12183IN-ND-CP Fairfax Lav Faucet, W/O Lift Rod K-37301IN-4ND-CP Cuff Single Control Lavatory Faucet W/O Drain K-5695IN-4ND-CP Viteo Single Control Lavatory Faucet With Lever Handle Without Drain K-8620IN-ND-CP Eolia Single Control Lavatory Faucet With Lever Handle Without Drain K-14402IN-4A-CP Purist Single Control Lavatory Faucet With Drain K-11545IN-4-CP Singulier Pillar Lavatory Faucet Without Drain 10319IN-4-CP Loure Single Control Lavatory Faucet 37327IN-4ND-CP Strayt Sc Lav Faucet Without Drain 73050IN-7-CP Composed Sc Side Mount Lav Faucet. W/D 7329IN-9ND-CP Toobi Single Control Lav Faucet 13523IN-4ND-CP Qualis Sc Lav Without Drain 14760IN-4ND-CP Stance Sc Lavatory Faucet INSTALLATION CHECK LIST Leakage between vessel and drain outlet. Vessel orientation. Visual inspection of applied sealant. Rim of lavatory 1285242-IN01-B Bottom of lavatory (Apply sealant on bottom edge) Ø Ø · · · Apply sealant at the joint of lavatory and counter as shown. · · Carefully position the lavatory in the cutout, and ensure the bottom face of lavatory is resting properly. · Verify the orientation of vessel with marking given on template. CARE AND CLEANING To keep your lavatory looking new, make sure you clean it out thoroughly after each use. DO NOT USE ABRASIVES on this product, as they will scratch and ruin the surface. Stubborn stains, paint, or tar can be removed with turpentine or paint thinner. · · Immediately wipe off any excess sealant, and fill any voids if needed. Allow the sealant to set for at least 30 minutes before any further activities. Orientation marking C/L C/L (Drain) BEFORE YOU BEGIN Observe all local plumbing & building codes. Inspect the waste and supply piping for leakages or damage, replace if necessary. Before installation, unpack the new lavatory and carefully inspect it for any transit damage. Return the lavatory to its protective carton until you are ready to install it. Use this template to mark correct cut-out size of lavatory. Assemble the drain to the lavatory before installing it. Assemble the faucet to the lavatory with help of tool (supplied) before installing it. · · · · · · · 1282804 Ø3-3/16” (8.1) Drain Hole 2”(5.1) Faucet Hole 6-1/4”(15.9) Hole for faucet hose 6-1/16”(15.4) Align the lavatory drain outlet hole with the hole on counter top. · · Make a hole of 8.1cm as drain center. Drill 4 cm hole for faucet hose as marked. Toll Free 1800 103 2244 kohler.co.in © 2016-17 Kohler Co. 2”(5.1) 2”(5.1) Finished wall Finished wall Minimum Minimum Minimum Ø1-9/16” (4)

Upload: others

Post on 24-Oct-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

TEMPLATE / INSTALLATION INSTRUCTIONSEE PCI #IN1601268 20.10.16ARUN BVWA1SEE PCI #IN1601693 04.01.17ARUN BMWB 1

1285242-IN01

ARUN B

04.01.17A.i.

04.01.17 04.01.17

04.01.17JAYESHMW

REFER NOTESREFER NOTES

REFER NOTES

1:1

1 OF 1

NOTES

3) 4) 5)

PRINT AREA = 675x492 mm (26.58”x19.35”)

TITLE BLOCK & NOTES OUTSIDE PRINT AREA(2) SHOULD NOT TO BE PART OF PRINTING.

SHEET SIZE = A1 (ALTERNATE SHEET SIZE 23”x36”)

PAPER MATERIAL : MAPLITHO PAPER , 100 ± 5 GSM

SAMPLE COPY TO BE APPROVED BY KOHLER INDIA ENGINEERING TEAM PRIOR TO PRODUCTION.PRINTING COLOR : BLACK

1) D300_001 : KITCHEN SINK & LAVATORY CUTOUT TEMPLATE DESIGN.

12

6) THE ARTWORK MUST NOT BE SCALED. MUST BE PRINTED ON 100% (1:1) SCALE.6)

492 mm

675 mm

1

2

2

CUT-OUT TEMPLATE / INSTALLATION INSTRUCTION

76600IN-0Kankara Vessel With 1TH

TOOLS AND MATERIAL (Not supplied) Safety glassesPencil Scissors Measuring tapeP utty knifeP lumbers puttyHacksawKeyhole saw or saber sawDrill bit as requiredAdjust able wrenchPipe wrenchTube cutter

· · · · · · · · · · · ·

Roughing-In NotesFixture dimensions are nominal and conformto tolerances in ASME standard A112.19.2M.

ROUGH-INUnit: Inch (cm)

17-1

/4”(

43.8

)

5-1/

8”(1

3.0)

34”(

86.4

)

1-3/4”(4.5)

22-3/8”(56.8)

·

·

·

·

Place this template on the counter top and align with the finish wall markings.Ensure clearance as specified between outer rim of lavatory and finish wall.Trace the template and mark the centerstwo hole for faucet hose and drain.Remove the template.

INSTALLATION

SERVICE PARTS

Lift rod

Custom linkageAdjust here.

84474

REQUIRED PARTS:Bottle Trap: 75823IN-CP

IMPORTANT:

For pop-up drains, use the custom linkage 84474 instead of thelinkage supplied with the drain.

Item Code:- 84474Item description:- ASSEMBLY ADJUSTABLE LINKAGE

NOTE: BEFORE CUTTING COUNTER-TOP, ALLOW FOR FAUCET HANDLE CLEARANCEFINISHED WALL / BACK SPLASH

Floor

CAUTION: Risk of personal injury orproduct damage.· Large lavatories are very heavy.Get

help lifting the lavatory during installation.Temporarily position the lavatory in thecut-out and adjust to fit.Trace a pencil line around the outside edge of the lavatory.Remove the lavatory.

Make sure drain is installed beforeproceeding further.Make sure faucet is installed beforeproceeding further.

NOTE:

·

·

·

COMPATIBLE FAUCETS WITH ABOVE VESSEL (CHECK KOHLER CATALOGUE FOR FAUCET DETAILS)K-8657IN-CP Fairfax Single Control Lavatory With Lever Handle And Drain 12183IN-ND-CP Fairfax Lav Faucet, W/O Lift Rod K-37301IN-4ND-CP Cuff Single Control Lavatory Faucet W/O DrainK-5695IN-4ND-CP Viteo Single Control Lavatory Faucet With Lever Handle Without DrainK-8620IN-ND-CP Eolia Single Control Lavatory Faucet With Lever Handle Without DrainK-14402IN-4A-CP Purist Single Control Lavatory Faucet With DrainK-11545IN-4-CP Singulier Pillar Lavatory Faucet Without Drain10319IN-4-CP Loure Single Control Lavatory Faucet37327IN-4ND-CP Strayt Sc Lav Faucet Without Drain73050IN-7-CP Composed Sc Side Mount Lav Faucet. W/D7329IN-9ND-CP Toobi Single Control Lav Faucet13523IN-4ND-CP Qualis Sc Lav Without Drain14760IN-4ND-CP Stance Sc Lavatory Faucet

INSTALLATION CHECK LIST

Leakage between vessel and drain outlet.

Vessel orientation.

Visual inspection of applied sealant.

Rim of lavatory

1285242-IN01-B

Bottom of lavatory(Apply sealant on bottom edge)

ØØ

·

·

· Apply sealant at the joint of lavatoryand counter as shown.

·

·

Carefully position the lavatory inthe cutout, and ensure the bottomface of lavatory is resting properly.

· Verify the orientation of vessel with marking given on template.

CARE AND CLEANINGTo keep your lavatory looking new, make sure you clean it outthoroughly after each use. DO NOT USE ABRASIVES on thisproduct, as they will scratch and ruin the surface. Stubborn stains, paint, or tar can be removed with turpentine or paint thinner.

·

·

Immediately wipe off any excess sealant, and fill any voids if needed.Allow the sealant to set for at least 30 minutes before any further activities.

Orientation marking

C/L

C/L (Drain)

BEFORE YOU BEGIN Observe all local plumbing & building codes. Inspect the waste and supply piping for leakages or damage, replace if necessary. Before installation, unpack the new lavatory and carefully inspect it for any transit damage. Return the lavatory to its protective carton until you are ready to install it. Use this template to mark correct cut-out size of lavatory. Assemble the drain to the lavatory before installing it.

Assemble the faucet to the lavatory with help of tool (supplied) before installing it.

· ·

·

·

· ·

·

1282804

Ø3-3/16” (8.1)

Drain Hole

2”(5

.1)

Faucet Hole

6-1/4”(15.9)

Hole for faucet hose

6-1/16”(15.4)

Align the lavatory drain outlet hole with the hole on counter top.

· ·

Make a hole of 8.1cm as drain center.Drill 4 cm hole for faucet hose as marked.

Toll Free 1800 103 2244kohler.co.in

© 2016-17 Kohler Co.

2”(5.1)

2”(5.1)

Fini

shed

wal

l

Fini

shed

wal

l

Minimum

Minimum

Min

imum

Ø1-9/16” (4)