cv 2016

2
Curriculum Vitae John Morrell Wadsworth Aircraft Avionics/Electrical Fitter UK Contact Address: 10 Vale Grove Gosport Hampshire P012 4PS Mobile: 07722320476 E-mail: [email protected] Nationality : British Education : Morrison Boys Grammar School, Rose Lane, Liverpool References : Fabian Shingleton, Boeing, RAF Odiham 07803800803 Mick Alderson, Vector Aerospace, Gosport 07828653530 Employment to date: Boeing, RAF Odiham, Hampshire March 2015 to present Chinook Mk 4 & 6 Enhancement Project Rewiring to bring the fleet up to latest mod status Vector Aerospace, Gosport. August 2013 to March 2015 Chinook Mk 4. Complete rewire of aircraft after severe crash causing the cockpit and tail to be replaced. All harnesses manufactured on site with the use of formboards and then installed and terminated in the aircraft. Reinstallation of all equipment and final test. British Airways Maintenance Cardiff, March 2012 to present. Boeing 777. Installation of Thales entertainment system and upgrade of !st class ambient lighting system. Disturbed system testing and fault rectification. Raytheon Systems Limited. Broughton, Chester. March 2011 to February 2012 Hawker Beechcraft Kingair. R&R Shadow Project for MoD. Installation of all systems related to the aircraft. Production of all wiring harnesses and build of associated racks and installation. Final Test and fault rectification. Hybrid Air Vehicle. Production of wiring harnesses and control panels. British Airways Maintenance Cardiff, August 2010 to March 2011 Boeing 747 and 777. Installation of Thales entertainment system and upgrade of 1st class ambient lighting system. Disturbed system testing and fault rectification. RAF Benson. August 2009 to June 2010 Merlin Mk. 3. TES team. Installation of LAIRCOM chaff and flare anti missile system and DNVG night vision system. Airbus UK. Broughton, Chester. March 2009 to August 2009 A340. Installation of wing wiring harnesses. Raytheon Systems Limited. Broughton, Chester. July 2004 to March 2009 Bombardier Global Express. Astor Project for the MoD. Production of wiring harnesses and system racks and installation in the aircraft. Final test and fault rectification. Hawker Beechcraft Kingair. R&R Shadow Project for the MoD. Nighshift supervisor. Responsible for supervision of both avionics and mechanical fitters. Security of the hangar, bonded stores and tool control. Reporting to the senior management any problems encountered. Page 1 of 2

Upload: john-wadsworth

Post on 12-Apr-2017

34 views

Category:

Documents


1 download

TRANSCRIPT

Curriculum Vitae John Morrell Wadsworth

Aircraft Avionics/Electrical Fitter

UK Contact Address: 10 Vale Grove Gosport Hampshire P012 4PS

Mobile: 07722320476

E-mail: [email protected]

Nationality : British

Education : Morrison Boys Grammar School, Rose Lane, Liverpool References : Fabian Shingleton, Boeing, RAF Odiham 07803800803 Mick Alderson, Vector Aerospace, Gosport 07828653530

Employment to date: Boeing, RAF Odiham, Hampshire March 2015 to present Chinook Mk 4 & 6 Enhancement Project

Rewiring to bring the fleet up to latest mod status

Vector Aerospace, Gosport. August 2013 to March 2015 Chinook Mk 4. Complete rewire of aircraft after severe crash causing the cockpit and tail to be replaced. All harnesses manufactured on site with the use of formboards and then installed and terminated in the aircraft. Reinstallation of all equipment and final test. British Airways Maintenance Cardiff, March 2012 to present. Boeing 777. Installation of Thales entertainment system and upgrade of !st class ambient lighting system. Disturbed system testing and fault rectification.

Raytheon Systems Limited. Broughton, Chester. March 2011 to February 2012 Hawker Beechcraft Kingair. R&R Shadow Project for MoD. Installation of all systems related to the aircraft. Production of all wiring harnesses and build of associated racks and installation. Final Test and fault rectification.

Hybrid Air Vehicle. Production of wiring harnesses and control panels.

British Airways Maintenance Cardiff, August 2010 to March 2011 Boeing 747 and 777. Installation of Thales entertainment system and upgrade of 1st class ambient lighting system. Disturbed system testing and fault rectification. RAF Benson. August 2009 to June 2010 Merlin Mk. 3. TES team. Installation of LAIRCOM chaff and flare anti missile system and DNVG night vision system.

Airbus UK. Broughton, Chester. March 2009 to August 2009 A340. Installation of wing wiring harnesses.

Raytheon Systems Limited. Broughton, Chester. July 2004 to March 2009 Bombardier Global Express. Astor Project for the MoD. Production of wiring harnesses and system racks and installation in the aircraft. Final test and fault rectification. Hawker Beechcraft Kingair. R&R Shadow Project for the MoD. Nighshift supervisor. Responsible for supervision of both avionics and mechanical fitters. Security of the hangar, bonded stores and tool control. Reporting to the senior management any problems encountered.

Page 1 of 2

Curriculum Vitae John Morrell Wadsworth

Airbus UK. Filton. February 2004 to July 2004 A380. Production of all wiring and system build of the test rig for the MLG. A complete mock up of the aircraft system to allow swinging of the landing gear before prototype cold test fly.

RAF Odiham .Hampshire. August 2003 to February 2004 Chinook DNVG Installation and fleet standardisation Mods. For the Mod.

PAL Aerospace, Redruth, Cornwall. May 2003 to August 2003 Chinook Production of air separators for the Chinook engines due to desert environment.

RAF Odiham. Hampshire. December 2002 to April 2003 Chinook Production of wiring harnesses for installation on modification programme.

Aeronavali. Venice. March 2002 to November 2002 DC 10 Conversion of DC 10 to MD10. Complete removal of all aircraft wiring and installation of all wiring in a production environment to complete the aircraft.

Marshalls of Cambridge. June 2001 to March 2002 Bombardier Global Express Installation of Baker cabin avionics system. Production and installation of all wiring harnesses, installation of all cabin equipment to an executive level. Testing and rectification for final release.

Monarch, Manchester. November 1999 to May 2001 Boeing 757, 767. Airbus A320.

'C checks. EGPWS and TCAS modification programme. Installation of Sony Entertainment System

British Airways, Heathrow/Gatwick. September 1998 to November 1999 Boeing 747/777 Field support engineer for Rockwell Collins Total Entertainment System. Providing technical support and liaison to BA Engineering and Marketing. Air UK/KLM, Norwich. May 1998 to August 1998 BAE 146 TCAS modification programme

TEAM Aer Lingus. Dublin January 1998 to May 1998 Boeing 737/757 'C and 'D' checks. Thrust reverser sync lock modification programme

Shannon Aerospace. Ireland July 1997 to December 1997 Boeing 737 and 757 Sync lock modification programme

American Trans Air Manchester, Heathrow and Gatwick Airports. 1994 1997 Lockheed L1011 Line Maintenance

American Trans Air Jakarta, Indonesia, Indianapolis, USA and Heathrow 1991 to 1993 Lockheed L1011 line maintenance.

FFV Aerotech, Manchester 1989 to 1990 Boeing 737 and 747 C checks

Saudi Arabian Airlines Jeddah, Saudi Arabia. 1981 to 1989 Boeing 707/737/747/747SP, Lockheed L1011, Airbus A300 Hangar and line maintenance

Royal Air Force. 1975 to 1981 Radio/Radar. Junior Technician,

Page 2 of 2