cv-cm-317 - nz transport agency · cv-cm-317 0 otaihanga rd crossing site access bb 16-05-13 a...

3
No. Appd Revision Chk.V Date DO NOT SCALE * Refer to Revision 1 for Original Signature Scale (A1) Scale (A3) Reduced Dwg Check Dsg Verifier Drawn Original Design Date Approved For Project: IF IN DOUBT ASK. Title: Drawing No: Document No. Rev. Drawing Plotted: 17 May 2013 01:22 a.m. TRAFFIC STAGING DRAWINGS - UPDATE.DWG SH1 MACKAYS TO PEKA PEKA RP 1012/0.00 TO 1023/5.00 Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON Construction* By Chk EXPRESSWAY FOR TOC NOT FOR CONSTRUCTION CV-CM-317 0 OTAIHANGA RD CROSSING SITE ACCESS BB 16-05-13 A TRAFFIC STAGING FOR TOC PHASE BB 16-05-13 0 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12

Upload: others

Post on 17-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CV-CM-317 - NZ Transport Agency · CV-CM-317 0 OTAIHANGA RD CROSSING SITE ACCESS BB 16-05-13 A TRAFFIC STAGING FOR TOC PHASE BB 16-05-13 0 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 17 May 2013 01:22 a.m.

TRAF

FIC

STAG

ING

DRAW

INGS

- UP

DATE

.DW

G

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

Construction*

By Chk

EXPRESSWAY

FOR TOC

NOT FOR CONSTRUCTION

CV-CM-317 0OTAIHANGA RD CROSSING

SITE ACCESSBB 16-05-13

A TRAFFIC STAGING FOR TOC PHASE BB 16-05-130 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12

Page 2: CV-CM-317 - NZ Transport Agency · CV-CM-317 0 OTAIHANGA RD CROSSING SITE ACCESS BB 16-05-13 A TRAFFIC STAGING FOR TOC PHASE BB 16-05-13 0 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 17 May 2013 01:23 a.m.

TRAF

FIC

STAG

ING

DRAW

INGS

- UP

DATE

.DW

G

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

Construction*

By Chk

EXPRESSWAY

FOR TOC

NOT FOR CONSTRUCTION

CV-CM-318 0OTAIHANGA RD CROSSING

DETOURBB 16-05-13

A TRAFFIC STAGING FOR TOC PHASE BB 16-05-130 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12

Page 3: CV-CM-317 - NZ Transport Agency · CV-CM-317 0 OTAIHANGA RD CROSSING SITE ACCESS BB 16-05-13 A TRAFFIC STAGING FOR TOC PHASE BB 16-05-13 0 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 17 May 2013 01:23 a.m.

TRAF

FIC

STAG

ING

DRAW

INGS

- UP

DATE

.DW

G

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

Construction*

By Chk

EXPRESSWAY

FOR TOC

NOT FOR CONSTRUCTION

CV-CM-319 0WAIKANAE RIVER BRIDGE

SITE ACCESSBB 16-05-13

A TRAFFIC STAGING FOR TOC PHASE BB 16-05-130 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12