cv for qa-qc

4

Click here to load reader

Upload: rizwan-aziz

Post on 15-Apr-2017

110 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CV For QA-QC

QA/QC Engineer

Rizwan Aziz

Father Name Abdul Aziz

Religion Islam

Nationality Pakistani

Iqama No. 2354896496

SAP No. 70017460. (Aramco Approved).

Marital Status Married.

Date of birth July 15, 1982

Cell: +966-545176871

+966-504320926.

Email: [email protected].

I consider myself a conscientious, adaptable and hardworking individual, confident

and committed to succeed in my profession. I am a fast learner in diverse

environment that enables me to accomplish assigned tasks within deadlines using my

acquired skills, drive, initiative and team work.

To enhance my abilities, skills and capabilities through working with professional,

dynamic, progressive and reputable organizations like yours.

1999 to 2003

University of Engineering and Technology, Lahore

B.Sc. Civil Engineering

1997 to 1999

Government College Jhelum

HSSC (Pre-Engineering)

1997

Falcon’s House Secondary School Jhelum,

SSC (Science)

My research work includes my final year project on the topic “Review of Cross

Drainage Works of Ghazi Barotha Hydro-power Project”.

Technical and Business Report Writing, Managerial Skills, Inter Personal

Communication Skills, Skilled at MS Office and Web Browsing,

Working Knowledge of AutoCAD, Good Knowledge of Contracts.

Personals

General Profile

Objective

Academics

Skills

Research Work

Page 2: CV For QA-QC

1. Position:Sr. QA/QC Engineer (Civil and Finishing) with Drake and Scull International KSA.

Duration: March 2013 to date:

Projects:

Antara Residential Project (SRCC), A Residential Project with 120+ luxury villas and

Apartments along development of infrastructure. King Abdullah Petroleum Studies and

Research Center, A Project by Saudi Aramco, located at Riyadh KSA.

QA/QC Civil Engineer at King Abdullah Petroleum Studies and Research Center, A Project

by Saudi Aramco, located at Riyadh KSA..

Key Responsibilities:

a. Implementation and over all monitoring of Quality Assurance and Quality Control Plans at assigned

Areas of the project.

b. Leading a group of QC Civil and QC Finishing Inspectors and assigning them their roles at the

project site and overall monitoring of the team work.

c. Helping my construction team to maintain quality by implementation of Specifications and American

standards at job site in order to avoid violations and re work.

d. Conducting field inspections of Civil and finishing works at the projects.

e. Conducting Material Inspections such as (MRI and MTA) with the client in order to ensure the

parameters of QA and QC.

f. Co-ordinate with testing agencies for different types of tests for the soil investigations such as Cavity

Probing, Electrical Resistivity Tomography, Bore holes for sub strata soil investigation, soil analysis

for back filling and filling materials, Concrete Compressive Strength , Steel Reinforcement tests and

other construction materials.

g. Arrange meetings with Client in order to discuss issues related to the quality of project..

h. Issuance of NCRs and follow up for close out.

i. Review the corrective and preventive actions

j. Help my QA/QC department for internal quality audits.

k. Review of all the documentation related to the project such as drawings, material acquisitions etc. for

better record keeping.

2. Position: QA/QC Engineer with Construct Lahore, Pakistan.

Duration: March 2012 to March 2013.

Projects: Army GC’s Mess and Maintenance works of GC’s Residential block at PMA Academy Kakul

Abbottabad, GHQ Army Head Quarter Islamabad.

Key Responsibilities:

a. Over all monitoring Quality plans for all projects.

b. Develop and implement project quality plans.

c. Assign Key Responsibilities of QC inspector and monitor their performance.

d. Co-ordinate with testing agency for different types of tests for the construction materials.

e. Attend meetings with client and discuss issues related to the quality of project.

f. Prepare monthly quality report for management.

g. Review NCR and follow up for close out.

h. Review the corrective and preventive actions

i. Conduct internal quality audits.

j. Review the material and drawing submission.

Work Experience

Page 3: CV For QA-QC

3. Position: QA/QC Engineer with Fourth Dimension Engineering Bahrain.

Duration: November 2010 to February 2012:

Projects: 22 Floor Al Manaratain Building at Manama,,10 Floor Techno Pvt. building at Um-Ul

Hassam, 5 Floor Residential buildings at West Riffa, attached 16 villas and 3 storey flat

buildings at Awadi Complex Manama and various luxury villas and garden projects for

Municipality etc.

Key Responsibilities:

a. Over all Internal Quality Control and Quality Control Management.

b. Implementation of American Standards and Project Specifications for all the projects.

c. Issuance of Non Conformance Reports to make corrective actions.

d. Implementation of Health and Safety Plans.

e. Testing of various materials to ensure quality of work.

f. Carry out the inspections as per Schedule.

g. Co-ordination with Client and Contractors.

h. Inspect the material on receiving to ensure the quality requirements.

i. Conduct Internal Quality Audit.

j. Checking and pointing out deficiencies in received drawings

4. Position: QA/QC Engineer with Exponent Engineers Islamabad

Duration: November 2005 to October 2010

Projects: 6 Storey Al Noor Plaza at Gujrat, MOL Sports Complex in Kohat, 14 Storey Ruby Heights in

Gujjar Khan, 5 Storey Al Khawrzam Plaza in Peshawar, MSC site for Telenor, BSC site for

Mobilink,, Project with JICA at Islamabad and various Telecom Projects.

Key Responsibilities:

a. To ensure quality of work according to standards and contract documents.

b. Over all supervision of various projects at different stages as per drawings and contract

documents.

c. Making sure that contractor is following the construction methods and performing tests on

various stages of project.

d. Testing of various materials to ensure the quality of work.

e. Checking of bar bending schedules to ensure the quality of work.

f. To negotiate with Client for better performance of quality work.

g. Coordination with contractor for better work and to make sure work is being done in good pace

for completion of project in time.

h. Review of all the documentation related to the project such as drawings, material acquisitions

etc. for better record keeping.

i. Implementation of Health and Safety Plans.

Page 4: CV For QA-QC

5. Position: Site Engineer with Bahria Town (Pvt.) Ltd. at Rawalpindi Pakistan.

Duration: April 2004 to October 2005.

Projects: 100 Residential Duplex Villas Project for Bahria Town Pakistan.

Key Responsibilities:

a. Coordination with Clients/Consultants at Higher Level.

b. Construction of 50 luxury houses.

c. Supervision of water supply and sewerage schemes at Phase-1

d. Construction of road and infra-structures.

e. Monitor activities of sub-contractors.

f. Quality and quantity control work.

g. Preparation of bar bending schedules.

h. Slump test and on Site Concrete Cube Tests.

i. Detailed Studies of Tender Documents of Lump-Sum Rate Tenders.

Available on Request References