JUN REY M. MORALES Civil Engineer Address: Plot Number 288A, Makeni, Lusaka, Zambia Mobile Number: +260971236021 / +260968414481 Email: [email protected] CAREER SUMMARY: A Civil Engineer who specializes in the construction of sustainable infrastructures such as roads, highways, expressways and bridges. Knowledgeable in Construction Materials and Testing, Quality Control, Survey, and Project Evaluation and Monitoring. Experience includes the construction of 88-Km Tarlac-Pangasinan-La Union Toll Expressway Project, an 18-Km Tagaytay-Nasugbu Roads Project funded by World Bank, and various roads and highways projects in Philippines and in Zambia. EDUCATIONAL BACKGROUND: UNIVERSITY OF THE CITY OF MANILA (October 2013) Master of Engineering Management with specialization in Construction Management SAINT JOSEPH INSTITUTE OF TECHNOLOGY (March 2011) Bachelor of Science in Civil Engineering Academic Scholar, awarded by the Commission on Higher Education Awardee, Special Academic Distinction Award Awardee, College Leadership Award, College of Engineering and Architecture AGUSAN NATIONAL HIGH SCHOOL (March 2006) High School Diploma Salutatorian, Second Highest Honor PROFESSIONAL LICENSE AND ACCREDITATIONS: REGISTERED CIVIL ENGINEER Issued by the Professional Regulation Commission, Philippines License No. 121540 ACCREDITED MATERIALS ENGINEER I Issued by the Bureau of Research and Standards Department of Public Works and Highways, Philippines Accreditation No. 4726 PROFESSIONAL AFFILIATIONS: AMERICAN SOCIETY OF CIVIL ENGINEERS Membership No. 10028984 PHILIPPINE INSTITUTE OF CIVIL ENGINEERS, INC. Membership No. 131374280 ENGINEERING INSTITUTION OF ZAMBIA Membership No. 0282509280

Upload: junreymorales

Post on 30-Jan-2016

8 views

Category:

Documents


0 download

DESCRIPTION

Civil Engineer

TRANSCRIPT

Page 1: CV JUN REY M

JUN REY M. MORALES Civil Engineer

Address: Plot Number 288A, Makeni, Lusaka, Zambia Mobile Number: +260971236021 / +260968414481 Email: [email protected]

CAREER SUMMARY:

A Civil Engineer who specializes in the construction of sustainable infrastructures such as roads, highways, expressways and bridges. Knowledgeable in Construction Materials and Testing, Quality Control, Survey, and Project Evaluation and Monitoring. Experience includes the construction of 88-Km Tarlac-Pangasinan-La Union Toll Expressway Project, an 18-Km Tagaytay-Nasugbu Roads Project funded by World Bank, and various roads and highways projects in Philippines and in Zambia.

EDUCATIONAL BACKGROUND:

UNIVERSITY OF THE CITY OF MANILA (October 2013) Master of Engineering Management with specialization in Construction Management

SAINT JOSEPH INSTITUTE OF TECHNOLOGY (March 2011)

Bachelor of Science in Civil Engineering Academic Scholar, awarded by the Commission on Higher Education Awardee, Special Academic Distinction Award Awardee, College Leadership Award, College of Engineering and Architecture

AGUSAN NATIONAL HIGH SCHOOL (March 2006) High School Diploma

Salutatorian, Second Highest Honor PROFESSIONAL LICENSE AND ACCREDITATIONS:

REGISTERED CIVIL ENGINEER Issued by the Professional Regulation Commission, Philippines License No. 121540 ACCREDITED MATERIALS ENGINEER I Issued by the Bureau of Research and Standards Department of Public Works and Highways, Philippines Accreditation No. 4726

PROFESSIONAL AFFILIATIONS:

AMERICAN SOCIETY OF CIVIL ENGINEERS

Membership No. 10028984

PHILIPPINE INSTITUTE OF CIVIL ENGINEERS, INC. Membership No. 131374280

ENGINEERING INSTITUTION OF ZAMBIA Membership No. 0282509280

Page 2: CV JUN REY M

EMPLOYMENT BACKGROUND:

SCIROCCO ENTERPRISES LIMITED Industry: Construction/ General Building and General Engineering

Inclusive Dates: August 1, 2014 – Present Designation: Project/ Materials Engineer Responsibilities:

Developed project objectives by reviewing project proposals and plans; conferring with management. Implemented project work items and controlled project plan by reviewing design, specifications, schedule changes and recommended actions for various circumstances. Monitored the daily progress of the project by formulating program of works in weekly basis. Controlled project costs by approving expenditures; administering contractor contracts. Provided direction to survey team, quality control and construction personnel of the project.

Project 1: The Upgrading to Bituminous Standard of approximately 8km of the Mutumbi Cemetery to Zambezi Road in Lusaka, Zambia

Client: ROADS AND DEVELOPMENT AGENCY Consultant: ZULU DEVELOPMENT CONSULTANTS LIMITED Scope of Works: Road works such as construction of embankment, roadbed

preparation, subgrade preparation, chemically-stabilized sub-base, crushed stone base, asphalt surfacing, cross and access culverts, side lined-drains, bridge construction and pavement markings.

Project 2: The Construction of a fixed Electronic Weighbridge at

Mumbwa District of Central Province Client: ROADS AND DEVELOPMENT AGENCY Consultant: ZULU DEVELOPMENT CONSULTANTS LIMITED Scope of Works: Drainage, Earthworks, Concrete and Asphalt Pavements,

Weighbridge Structure, and Weighbridge Houses

Project 3: Engineering Design, Rehabilitation and Construction/ Upgrading of Parking Areas and Access Roads in and to the New Independence Stadium in Lusaka City

Client: ROADS AND DEVELOPMENT AGENCY Consultant: EASTCONSULT LIMITED Scope of Works: Road works such as construction of embankment, roadbed

preparation, subgrade preparation, chemically-stabilized sub-base, crushed stone base, asphalt surfacing, cross and access culverts, side lined-drains, bridge construction and pavement markings.

Page 3: CV JUN REY M

:

PERTCONSULT INTERNATIONAL Industry: Engineering Consultancy

Inclusive Dates: June 2013 – July 2014 Designation: Quality Assurance Engineer Responsibilities:

Worked as client’s supervising engineer for various roads projects. Organized, implemented, conducted and managed the QA/QC Programs as per the Client's Quality Policy. Coordinated all inspections, monitored the required tests and recorded inspections and tests made as per the Contract Plan and Contract Specifications. Provided technical support to the Project Manager and guidance to site staff in submission of materials for testing. Coordinated with the Project Manager regarding work performance and held authority to stop work in any area where discrepancies remain uncorrected and/or cancel the stopped work order upon satisfactory corrections for noted deficiencies.

Projects: DPWH Various Roads Projects

PACIFIC CONCRETE PRODUCTS, INC. Industry: Construction/ General Building and General Engineering Inclusive Dates: April 2011 – May 2013 Designation: Project Engineer Responsibilities:

Provided the over-all direction of the project Scheduled weekly works for different division of the project such

as survey team, paving team, plant crew, quality control division and quantity surveying team

Held internal meetings with supervisors & engineers from every division

Attended weekly sub-contractors' coordination meeting

Evaluated and prepared accomplishment report to be submitted to the head office

Approved the preparation of engineering project proposals, budget monitoring and trend tracking.

Project No. 1: TARLAC-PANGASINAN-LA UNION TOLL EXPRESSWAY Client: D.M. Consunji, Inc. Consultant: RENARDET Consulting Scope of Works: Furnishing, Delivery, Laying, Rolling and Correction of

Asphalt Treated Base, Asphalt Binder Course, Asphalt Wearing Course

Project No. 2 NORTH LUZON EXPRESSWAY: Segment 1 to 3 Rehabilitation of Pavement Structure

Client: Manila North Tollways Corporation (MNTC)

Page 4: CV JUN REY M

Consultant: CTI Engineering and Consulting

Scope of Works: Asphalt Overlay, Lane Markings, Concrete Patching and

Asphalt Patching

Project No. 3: NINOY AQUINO INTERNATIONAL AIRPORT: Repair/Resurfacing of Terminal 4 Apron (Bay 4,5,6,7 and 9)

Client: Manila International Airport Authority (MIAA) Scope of Works: Concreting and Asphalting of T4 Apron

Project No. 4: ASPHALT OVERLAY AND CONSTRUCTION OF LINED CANAL ALONG TAGAYTAY-NASUGBU ROAD, BATANGAS, REGION IV-A

Client: National Roads Improvement Management Program – Project Management Office DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (Funded by World Bank with L/A No. 7552-PH) Scope of Works: Asphalt Overlay, Grouted Riprap (Line Canal), Removal/Rotomilling of Existing Damaged Asphalt Pavement & Patching, and Shouldering Works

Project No. 5: ASSETS PRESERVATION OF NATIONAL ROADS GENERATED FROM PAVEMENT MANAGEMENT

SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT Client: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Regional Office No. 02 Scope of Works: Portland Cement Concrete Pavement (PCCP), 0.3 m thick, Asphalt Overlay, 0.1 m thick, Aggregate Surface Course Project No. 6: CLUSTER I AND II: ASPHALT OVERLAY ALONG DAANG

MAHARLIKA Client: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Ilagan First District Engineering Office (IFDEO) Scope of Works: Asphalt Overlay, 0.08 m thick

TECHNICAL SKILLS:

Drafting using AUTOCAD 2015 MS Office Applications: Word, Excel, and PowerPoint Microsoft Project Management Driving Skills