c.v khaled2 - نسخة

5
CV Name : KHALED AHMED ATITO Nationality : Egyptian Date of Birth : 13/12/1975 Place of Birth : Cairo Marital Status : Married Qualification : Industrial technical Institute Diploma {Three years} Graduation : 1994 Occupation : General Supervisor, Constructions & Infrastructure (Sewerage Networks – Water Networks – Roads – Constructions) Experience : 20 Years Email : [email protected] Mob. No. : 01285622031/0545168452 CURRENT JOB : From 01/01/2012 till now, working as a consultant supervisor in Yard Consulting Engineers, Saudi Arabia, in the following projects: a-The project of Sewerage Networks and household connections in some Governorates of Qassim Region; implementation of Sewerage Networks and pumping plants in some Governorates of Qassim Region (Al-Muznib, Al-Badayea, Al- Khabra, Al-Bukairiyah), ceramic pipes and fiberglass pipes. PREVIOUS EXPERIENCES : From 05/1994 to 05/1996, Hassan Dorra Co., Lang CRC, in the following sites: a)First Tower ( now Four Seasons), Nile Corniche, in the following works:

Upload: khaled-ahmed

Post on 05-Aug-2015

52 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: c.v khaled2 - نسخة

CVName : KHALED AHMED ATITONationality : Egyptian Date of Birth : 13/12/1975 Place of Birth : Cairo Marital Status : Married Qualification : Industrial technical Institute Diploma {Three years}Graduation : 1994 Occupation : General Supervisor, Constructions & Infrastructure (Sewerage

Networks – Water Networks – Roads – Constructions) Experience : 20 Years Email : [email protected] Mob. No. : 01285622031/0545168452

CURRENT JOB : From 01/01/2012 till now, working as a consultant supervisor in Yard Consulting Engineers, Saudi Arabia, in the following projects: a- The project of Sewerage Networks and household connections in

some Governorates of Qassim Region; implementation of Sewerage Networks and pumping plants in some Governorates of Qassim Region (Al-Muznib, Al-Badayea, Al-Khabra, Al-Bukairiyah), ceramic pipes and fiberglass pipes.

PREVIOUS EXPERIENCES : From 05/1994 to 05/1996, Hassan Dorra Co., Lang

CRC, in the following sites: a) First Tower ( now Four Seasons), Nile Corniche, in the following

works: - Supervision and implementation of sewerage exits, ascendants,

descendants, manholes, ground purlins, water feeding works and reviewing implementation boards for doing so.

b) Shrouk City, Sheikh Zayed, in the following works: - Implementation of U.P.V.C sewerage networks for the city with

diameters of 4 inches to 8 inches. In addition, water networks, ground tank, header tank and mechanic works of tanks.

- Supervision and implementation of water line rooms of air and washing rooms and valves rooms. Special parts of ductile cast iron pipes.

Page 2: c.v khaled2 - نسخة

From 05/1996 to 03/2004, Ginza Construction and Real Estate Development Co., in the following sites: a) Gardenia Park, 6th October, in the following works:

- Supervision and implementation of sewerage and water networks of the village with U.P.V.C pipes.

- Supervision and implementation of landfilling and establishment of road networks of the village.

- Supervision and implementation of header tank with height of 30m and ground tank and electromechanical and establishment works.

b) Ashgar Dist., 6th October, in the following works: - Implementation of internal sewerage works for buildings sector

(cast iron pipes). - Implementation of road network for B sector in the village. - Implementation of water and sewerage networks for B sector in

the village (U.P.V.C). c) Dar Al Muna for Child Care, Cairo-Alexandria Desert Rd., in the

following works: - Implementation of sewerage network of the hospital with the

hanging sewerage for the basement and water network and internal sewerage (ceramic and plastic pipes).

- Implementation of pumping line serves the sewerage network (ductile cast iron).

- Citro Masr Factory, 10th of Ramadan City. - Establishment of road works of the site.

From 04/2004 to 10/2004, Al-Suhaib Works for Road Works, in the following sites: a) North Sinai Governorate, Arish, Paloza Village, in the following works:

- Implementation of road works on both sides of Al-Salam Canal. From 10/2004 to 07/2006, Ginza Construction and

Real Estate Development Co., in the following sites: a) Vegetables and Aromatic Plants Drying Factory, in supervision of:

- Implementation of firefighting system network of the site (cast iron).

- Implementation of central air conditioning network (galvanized sheet iron).

- Water treatment plant and its sedimentation network. - Sanitary ware works, plastic pipes. - Leveling of the general site for road establishment.

b) The project of Al Khamael in Sheik Zayed, in the following works: - Internal sewerage works and ascendants for the buildings (cast iron

pipes).

Page 3: c.v khaled2 - نسخة

- Supervision and implementation of construction works of some sections in the buildings (constructions, civil works, finishing, sewerage works).

From 15/07/2006 to 05/03/2008, Said Raddad Al-Zahrani Co. (SRACO), Saudi Arabia, in the following sites: a) Sewerage Project of Scheme 1/55 in Dammam, in the following

works: - Implementation of Pumping Plant for the scheme 1/55. - Sewerage network of the sector (GRP pipes) to 8 inches. - Pumping network and supervision of horizontal hole for the line,

the parts of ductile cast iron with fiberglass pipes. b) Project of establishment of Precast and Hollow-Core Factory in

Dammam, in supervision of: a) The project of establishing of Water Networks in Samtah

Governorate (Jazan Region). - Leveling of the general site. - Implementation and casting of grounds and bases of the factory. - Fixtures of production line. - Supervision of hanger fixtures works in the factory. - Constructions of rooms and offices of the factory administration

and laborers. - Infrastructure works of the factory (water network, sewerage

network, main electricity works), ceramic pipes for sewerage and plastic pipes for water network.

From 26/05/2008 to 01/07/2009, Project Build Co. (PBC), Arabia Arabia, in the following sites: a) Project of sewerage networks completion for some schemes in Qatif

in completion and implementation of sewerage networks in the governorate and connecting manholes for houses (GRP).

From 2009 to 31/12/2011, International Project Management & Construction Co., in the following projects: a) Swimming pool project (Zahrit Al-Buhayrat Village) in Suez, Ramadan

Fighters Association, in the following works: - Implementation of constructional works for the swimming pool

and fixtures for machines room. - Landscaping and finishing.

b) Project of buildings and villas in El-Tagamu El Khames, in supervision of:

- Implementation of four-floor residential units.

Page 4: c.v khaled2 - نسخة

ACQUIRED SKILLS :

─ Dealing with some surveying devices (Tall Scale, Theodolite). ─ Good at reading of engineering drawings; sewerage and

constructions. ─ Inventory of all works of sewerage and construction drawings. ─ Foundation works of networks with inventorying the works of

cutting, drilling and landfilling. ─ Sanitary works and its required inventory and electromechanical

works. ─ Dealing with all types of sanitary works with all diameters. ─ Supervision of constructional works and architectural finishing.