cv & portfolio

13
With 20+ years of experience in the Architectural field I experienced design from concepts to completion in several areas of the world. A constant commitment, driven by a passionate approach to design, brought me to discover amazing architectural challenges. Standing buildings, I have been pleased to design, are the witnesses of my professional career. Leading a design process from concept to completion needs the strong motivation that I always tried to transfer to the working teams. Inspiration, open discussion, common goals are always key factor to manage a project. No really matter where I have been, I experienced Architecture as a wonderful combination of cultural journeys and “problem solving” attitude. Keep them tight accordingly to client requirements would always give the right path to follow. Design is still a learning process impelling a focused reading of the human behaviours and “lifestyle”. Riccardo Rabbiolo Architect BA Arch, DIP Arch, MA Arch, RIBA email [email protected] www.linkedin.com/pub/dir/Riccardo/Rabbiolo

Upload: riccardo-rabbiolo

Post on 15-Apr-2017

236 views

Category:

Design


0 download

TRANSCRIPT

Page 1: Cv & Portfolio

With 20+ years of experience in the Architecturalfield I experienced design from concepts tocompletion in several areas of the world.

A constant commitment, driven by a passionateapproach to design, brought me to discoveramazing architectural challenges.Standing buildings, I have been pleased to design,are the witnesses of my professional career.

Leading a design process from concept tocompletion needs the strong motivation that Ialways tried to transfer to the working teams.Inspiration, open discussion, common goals arealways key factor to manage a project.

No really matter where I have been, I experiencedArchitecture as a wonderful combination of culturaljourneys and “problem solving” attitude. Keep themtight accordingly to client requirements wouldalways give the right path to follow.

Design is still a learning process impelling a focusedreading of the human behaviours and “lifestyle”.

Riccardo RabbioloArchitectBA Arch, DIP Arch, MA Arch, RIBA

email [email protected]

www.linkedin.com/pub/dir/Riccardo/Rabbiolo

Page 2: Cv & Portfolio

1995, graduated in Rome at the University “La Sapienza”followed by a diploma in Architecture.

Start practicing in Milan and Rome, I moved to London UK in1999 where I obtained a Master in Architecture at theGreenwich University.

2000, employed by HOK International Ltd, London office, I havebeen selected to join, as Design Architect, Richard Rogers &Partners Office for the new Terminal 5 design of LondonHeathrow Airport.

Promoted Associate in 2004 I have been designated to a roleof HOK Design Leader of the Aviation group. I initiatedconcept designs for Dublin, Frankfurt, Delhi and BahrainAirports.

During the same period I followed the HOK European partnerin Italy as Head of Design of Progetto CMR to lead thearchitectural team for a tower design, now built in Milan.

2007, with Woods Bagot plc in Abu Dhabi as Studio DesignDirector. Islamic Bank HQ and Yahsat HQ Design as major builtprojects.

2011, with Vector Foiltec in London UK I was appointed asManaging Director for South Europe.

2013, I moved to Asia where I joined Rocco Design LimitedAsia in Hong Kong as Executive Design Director, mainly forprojects located in China as Shunde, Zhuhai and Shanghai.

2015, I have appointed Design Director of Grandland DesignInstitute in Shenzhen, China.

In September 2015 publication on The Chinese architecturalmagazine “Grandland Voice”, No. 039

Page 3: Cv & Portfolio

ITC Shunbo Plaza Shunde, Foshan, China

Date - 2013Role – Project Director, Concept Designer

The project is part of the International & Technological Centre (ITC) Development in the city of Shunde. It will accommodate 2 high rise Towers of 16 and 18 floors over the Commercial/Retail podium.

The total height of the tallest Tower (A) is 80 meters, becoming the first iconic building of the city. The Tower A will be allocate an Hotel, Tower (B) will be accommodate Offices.

The total project GFA is 61.900 m²subdivided in:

Tower A - 34,615 m²Tower B - 13,088 m²Podium - 14,200 m²

Page 4: Cv & Portfolio

MIT Mercato ItticoTronchettoVenice, Italy

Date - 2011Role – Project Director, Concept Designer

The Wholesale Fish Market project will replace the existing building, constructed during the 50’. Venice Council has approved this project as currently recognized inadequate to the current hygiene and safety regulation standards.The EFTE roof will cover the whole area protecting the sale operations, mostly occurring during night time.

The new building will be erected in the same area, with a scheduled phasing process allowing the operations to continue during the construction period of about 3 years.

Client – Consorzio Mercato Ittico Venezia

Estimated cost of the Project 32.000.000 €

Page 5: Cv & Portfolio

Palazzo della RegioneLombardiaPiazza Milano Roof

Milan, Italy

Date - 2011Role – Project Director

The new ETFE Roof on the Piazza Milano is inserted at the top of an oval Plaza space that will be attending the major government events of the city.

The courtyard has been covered with an intricate steelwork structure and Texlon® ETFE cushions to create an active space all year round.

Designed in collaboration with the New York office of PEI COBB Freed & Partners, the roof membranes allow with its transparency the natural light being diffused at the pedestrian level.

Client - Regione Lombardia

Total area - 3,961 m²Project Value - 6.000.000 €

Page 6: Cv & Portfolio

Villa

Shunde, Foshan, China

Date - 2013Role – Concept Designer, Project Director

The Villa located in a hill side of Shunde, a district in the city of Foshan in the Pearl River Delta. On 3 different level stepping down terracing on the hill accommodates a 4 bedroom around a water feature surrounding the building. The construction started in mid August 2013.

Client - Private

Size – 1,350 m²

Page 7: Cv & Portfolio

ADIB Abu Dhabi Islamic Bank HQ

Abu Dhabi, UAE

Date - 2009Role – Concept Designer, Project Director

The new Abu Dhabi Islamic Bank Headquarters will be located in the heart of the City, on Airport Road. The iconic design is intended to celebrate the Islamic Bank main Office creating a comfortable office environment on 2 towers and a covered vaulted atrium entrance.

The work comprises the construction of two towers covering approximately 97,000 square meters, consisting of a ground floor, mezzanine level and 12 upper floors, as well as four levels of basement parking.

Client - Abu Dhabi Islamic Bank (ADIB)

Construction Commencement - 2011

Contract Value US$ : 105 MillionSize - 97,000 m²

Page 8: Cv & Portfolio

Al Ain Sports Club area Redevelopment

Al Ain, Abu Dhabi, UAE

Date - 2007Role – Concept Designer, Project Director

Concept Masterplan of the existing Al AinSport Club area will accommodate a central spine with commercial use to serve the local community.

On the sloping mountain side 16 Villas of approximately of 750 m² each will have open view to the whole development. 8 “clusters” of apartments, town houses and villas on the west side of the area will be also accommodated into the project.

Client - SOROUH REAL ESTATE P.J.S.C

Size - 230,000 m²

Page 9: Cv & Portfolio

Indira GhandiInternational Airport T3

Delhi, India

Date - 2007Role – Concept Designer

The new Terminal 3 is a two-tier building spread over an area of 20 acres (8.1 ha), with the lower floor being the arrivals area, and the upper floor being a departures area. This terminal has 168 check-in counters, 78 aerobridges at 48 contact stands, 54 parking bays, 95 immigration counters.

With its construction it became India's and South Asia's largest aviation hub, with a current capacity of handling more than 40 million passengers

It was timed to be completed for the 2010 Commonwealth Games and officially inaugurated on 3 July 2010

Client – GMR GroupSize - 2.7 million sq. ft. / 250,000 m²

AWARDSAirports Council International – Airport Service Quality Award (2011, 2012, 2013 and 2014)British Construction Industry – Best International Project

Page 10: Cv & Portfolio

Heathrow Airport Terminal 5 Interchange Station

London, UK

Date - 2007Role – Concept Designer

Terminal 5 was designed to handle 35 million passengers a year.

The building is 396 m. long, 176 m. wide and 40 m. tall. It is the largest free-standing building in the United Kingdom.Its four stories are covered by a single-span

undulating steel frame roof, with glass façades angled at 6.5 degrees to the vertical. Departing passengers enter the departures level on the third floor by lift or escalator from the “interchange” plaza. Upon entering the departures concourse, passengers see views across Heathrow and the surrounding area, and are in a space that is unobstructed to the rising roof above. The area covered by the roof is the size of five football pitches, and each section weighs 2,200 ton..

Client – BAA, British Airways Authority

Size – 260 hectare (640 acre)

Project Value - 4,5 billion UK Pounds

Page 11: Cv & Portfolio

Heathrow Airport Terminal 5 Interchange Station

London, UK

Date - 2007Role – Concept Designer

Page 12: Cv & Portfolio

Barclays World Bank HQCanary Wharf

London, UK

Date - 2001Role – Design Architect

One Churchill Place is a 156 m tall skyscraper with 32 floors, serving as the headquarters of Barclays Bank.

Floors are typically of around 3,200 m²with some extending to 3,500 m²where they do not embrace atria. Below street level, the base of the building provides connections to the retail center and to Canary Wharf Underground Station.

The building was planned to be 50 stories in height, but was scaled down to 31 after the 9/11 terrorist attacks.

Building completed - 2004

Client – Canary Wharf plc.

Size - 1 million sq. ft. / 92,900 m²

Page 13: Cv & Portfolio

2003 The University of Reading London, UKMaster in Construction and Project Management

CPD Module - Course of Construction and Project Management Prof. Stuart Green -School of Construction Management & Engineering Duration – 5 months

2001 RIBA, Royal Institute of British Architects London, UKRegistration as Chartered Member

2001 ARB, Architects Registration BoardLondon, UKRegistration as Member

2000 University of GreenwichLondon, UKMA Arch. – Master in Architecture

Master Thesis Project: J.W.M. Turner Museum at Margate (UK)Dissertation: Structural glass Architecture: transparency to the limit - Tutor: Doc. P. StringerArchitectural appraisal: The London IMAX Cinema - Tutor: Doc. N. Pillans

1996 University of Rome “La Sapienza”ItalyDiploma in Architecture, Registration as Chartered Architect

1995 University of Rome “La Sapienza”ItalyBachelor Degree in Architecture

2015 - Grandland Design Institute Shenzhen, China Chief Design Director

2015 2013 Rocco Design Limited AsiaHong KongExecutive Design Director

2012 2011 Vector FoiltecLondon, UKManaging Director for South Europe

2007 2006 Progetto CMRMilan ItalyHead of Design

2011 2007 WOODS BAGOT plcAbu Dhabi, UAEStudio Design Director

2006 1999 HOK International ltdLondon, UKAviation Design leader, Associate

2005 2001 Rogers Stirk Harbour + PartnersLondon, UKSenior Design Architect

1996 1999 Baccalini ArchitettiMilan, ItalyJunior Architect

Work Experience Academic Qualifications