cv swp
TRANSCRIPT
CALIN CAMPIANU 28 Rose Street,Swindon,Wiltshire, 28 Rose St, Swindon SN2 2HH
0750 715 4378
Position applied for:
LAND SURVEYOR/SETTING OUT ENGINEER
Summary
I'm an experienced Land Surveyor/Setting Out Engineer (BTEC Level 4/SQA Higher National Certificate
standard issued by NARIC) and carried out civil engineering surveys, measured building surveys and
setting out motorways, highways, sewage systems, airport expansion and tramway lines. I have many
years of experience dealing with Land Surveying and I am looking to utilize these skills in a public or
private sector operation. As a Land Surveyor I was an operational team-leader on the field and
construction sites (4-7 people).
Skills
Construction Skills Certificate Scheme (CSCS) -white card (Health, Safety and Environment for Managers
and Professionals)
Knowledge of working with theodolites, optical andand electronic level machines;
Very good knowledge of working in AutoCAD Civil, TopoLT
Advance knowledge of working with total stations (Leica TS 06/TCRP 1205,TS16 ,Trimble, Nikon, Sokkia);
Work History
Setting Out Engineer
Swindon,Highworth 31Oct2016-present
Setting out Wastewater Treatement Plant
Thames Water is building the first-full scale Nereda plant in the UK at its Highworth Wastewater
Treatment Works in Highworth, Swindon. The new plant serves a population of approximately 9,000
customers and will replace the existing life-expired plant.
Setting Out Engineer
Bath,UK 31 May2016-21 Oct 2016
Britannia Construction Ltd.(Freelancer)
http://www.mulberryparkbath.co.uk/
Bentchmarks,Earthworks,Drainage,Services,Roads&Kerbs,Materials supply calculation,As Builds
Autocad,Leica Robotic 12,level machines
Setting Out Engineer
John Reddington Ltd
Newbury, UK Nov 2015 - Apr 2016
(Newbury Racecourse 78m Project, construction of 10 concrete framed apartment blocks overlooking
the racecourse)
Setting out RC Frames for foundation, pile caps, pre-casts, walls, slabs, drainage, concrete level control,
excavation, as-builds using blue prints, AutoCAD, Leica TS06 and 16 total station, level machines
Setting Out Engineer Mar 2013 - Feb 2015
Mr. Bede Zoltan Francisc
Cluj-Napoca, Romania
Collaboration Agreement with Mr. Bede Zoltan Francisc, authorised expert surveyor for cadastral
measurements.
Performing legal boundary surveys
Producing and maintaining the land tenure records: the survey field notes and plats
Topographical Land Surveyor Nov 2011 - Mar 2013
Swietelsky & Indyss Cluj-Napoca, Romania
Project for tramway lines rehabilitation in the Cluj-city.
Main duties:
AutoCAD
benchmark network;
checking project drawings checking;
digging level control;
gravel and sand level control before and after compacting;
stake out protection walls;
poured concrete level;
stake-out tramway lines axis;
setting tramway lines in place and levelling level;
asphalt level control;
stake-out electric network;
stake-out tramway stations;
volume calculation;
drainage stake-out and pipes ‘control on level.
Topographical Land Surveyor Aug 2010 - Nov 2011
Astaldi Spa Hunedoara, Romania
Main duties:
property limits, retaining walls, earthworks, road axis, asphalt elevation, storm manhole s and sewage
pipes, quantities,calculation, junior staff training
Topographical Land Surveyor May 2010 - Jul 2010
SC TIM SA Cluj-Napoca, Romania
Modernization of water/wastewater infrastructure agglomerations of Cluj county.
Main duties:
benchmark network, earthworks, topographical surveying, manholes and pipes setting and levelling
Topographical Land Surveyor Nov 2007 - Mar 2010
Astaldi Spa Cluj-Napoca, Romania
Cluj city Airport expansion: Terminal ‘'Arrivals’’, Terminal ‘'Departures’’, Linking Building, parking,
handling road, sewage system, platforms between terminals and ‘'taxi'' road.
Duties:
AutoCAD
local benchmark network
buildings' axis
excavation level checking
ground concrete level
metal structure setting out and levels(metal pilots basement and boullons in the R-bar structure, metal
pilots vertical
control, metal slabs)
flours and ceiling level control
setting out all inside compartments, rooms, desks, check-in points, luggage transportation bands,
windows, stairs ,lifts
building external walls control ("Alucobond" sheets)
sewage system setting-out and levelling (manholes, pipes)
outer platforms and handling road-setting out and levelling parking setting –out and asphalt level
control)
Topographical Land Surveyor Apr 2005 - Aug 2007
Bechtel International Inc. Cluj-Napoca, Romania
"Autostrada Transilvania''(‘'Romanian Motorway''), The four-lane Autostrada Transylvania will be the
largest motorway in
Europe. It will extend 258 miles from Brasov in central Romania to Oradea on the country's border with
Hungary. The whole
project will cost about $2.2bn (estimation in 2004).
-Involved in an operational team of 7 people, as land surveying team-leader in expropriations,
earthworks, structures, drainage
and paving for section 2B, a four-lane motorway, €330.4m, inaugurated in December 2009.
PROJECT LIMITS AND GEOMETRY
setting-out boundaries and expropriation limits using GPS and total stations Leica and Trimble;
setting out road axis and offsets;
setting out local benchmark network using total stations, optical and electronic level machines;
relocation of the local roads.
EARTHWORK
AutoCAD
control the mass excavations and filling areas;
topographical-surveying the waste areas an borrowing areas;
setting-out and levelling big slopes.
STRUCTURES
setting-out and level control the execution of small structures (culverts);
setting out the big structures, especially bridges axis ;
level control of the structural excavation;
setting-out the pilots and control the drilling levels;
R-bars control on level for the cast-in–place pilots;
setting-out and level control of all elevation elements of the bridges (pile head breaking, foundation
works, abutment walls,
pier elevation, pier head and deck slab).
DRAINAGE & SEWEGE
setting out alignments and manholes;
excavation level control;
level control of concrete for drainage;
control level of pipes for sewage;
setting out detention ponds.
PAVING
level control of the base-ground, gravel and sand layers;
setting-out the level for bitumen and asphalt layers;
checking the final asphalt level;
OTHER ACTIVITIES
junior staff training;
setting out elements of the asphalt plant.
Topographical Land Surveyor Feb 1984 - May 1990
I.C.S.H - Civil and Industrial ConstructionHunedoara, Romania
Mayorship projects (blocks of flats, streets, sewage systems) and Industrial Constructions for the C.S.H
(Hunedoara Steel
Plant).
Main duties:
earthworks, road axis ,civil and industrial topographical surveying using classical i nstruments
(theodolites, level
machines), projects drawings.
working with classical Theodolites
perform manual mathematical and topographical calculation upon orientation in gradients(centesimal
grades),distances,
using analytical coordinates, geometrical elements calculation for curves and setting stations by
intersection, using algorithms(Pothenot)
Education
Higher National Certificate: Topographer - Constructions 2008
“Anghel Saligny” Technical College - Cluj-Napoca, Romania
References(contact data available upon request)
1)"Calin Cimpianu has been employed under my supervision for the past 6 months. During that time he
has shown to be extremely
courteous and pleasant to work with. His time keeping was very good, rarely missing any time unless he
had notified us well in
advance. He formed part of a 2 engineer team which had total control over the groundworks on my site.
He was involved in all
aspects of substructure work and had dealings with superstructure elements as well. His main roles
included setting out of
foundation and drainage positions, setting of invert levels and setting of dig levels throughout the site.
All of these roles he
performed well in." - Ross McQuade, Senior Engineer, JRL Group
2)Dear Sir/Madam,
‘’I can reference for Calin Cimpianu that he has been working as a Civil Engineer for Britannia
Construction on our Mulberry Park new development site in Bath.
Although we have employed him through Carmichael for the past 6 months, he has been solely working
on the same site for us.
The second phase of works, Approx £2m is programmed to begin in October, which will lead well into
next summer. We our pleased with Calin's work, so will be continuing his employment and there is every
possibility that once phase 2 is complete, Calin can also move onto the next project with us.’’
Peter Hodgson-Senior Engineer at
Britannia Construction Ltd
Britannia House
Staverton Technology Park
Cheltenham
Gloucestershire
GL51 6TQ
Company Number : 1164013 Registered in England & Wales
3) Dear Sir,
I worked with Calin Campianu in Cluj-Napoca Romania in the highway project(‘’Transilvania Motorway’’).
I was survey superindentent in the structure group, Calin was responsible
survey engineer of big structures and piling works in that project. We worked together two years.
Piling and structure works were continuous two shifts. Calin worked in the both of shifts. Calin
was always an engineer we trust. Because he knew his responsibilities. In that
project had been successful as a group. You can certainly trust to Calin in the
similar jobs. I would recommend it. You can always communicate with me.
Best Regards,
Metin Cagatay
Senior Survey Chief - Structure
Bechtel Corporation
June 2006 – June 2008 (2 years 1 month)Cluj / Romania