cv-ulises cortes gomez-english

2
Ulises Cortes Gómez Colonia Los Héroes, El Márques, Querétaro Cell Phone: (045) 55-23-73-03-12 E-mail: [email protected] SUMMARY Successful 4 and half years of experience career as an Engineer with excellent communication, organization and coordination skills. Possessing a proven track record of preparing and executing project plans and programs, ensuring that work is carried out in accordance with the companies procedures and clients satisfaction. Able to ensure timely, safe and cost effective design and implementation during the life cycle of projects from conception till customer satisfaction. PROFESSIONAL EXPERIENCE Kern-Liebers Mexico Product Engineer June 8, 2015 October 8, 2015 Responsible for quotation, development and execution of new products, implementation of new fixtures in production line, reduce time and scrap in process, tools and new product design in metal-mechanical division, PPAP creation for new products and recertification in new plant, APQP methodology for new products Factory and product transfer from Reynosa to Queretaro, 100% transfer of compression and torsion spring lines in time with new tools implementation that reduce 15 % of production time. 10% cost reduction in new product quotation and reduce 30% the time response to the customers. Bombardier Aerospace Mexico Methods Project Engineer January 6, 2014 - January 8, 2015 Leading a group of 5 engineers in the creation and implementation of new projects, such as, demolding process of the composites parts of pre-preg epoxy resins (carbon fiber and fiber glass), trimming process support, analysis of painting Area, Analysis of adhesive and bounding components in fabrication area. Design of fixtures to increase from 70 to 90% of repeatability in the process, generating less scrap. 100% upgrade of documentation and process validation of painting procedures, resulted in certification of painting site. Methods Configuration Team Leader April 1, 2013 January 5, 2014 Lead the implementation, review and incorporation of changes in work instructions in First Article Inspection stage for the new Learjet 85 monolithic configuration of composite hand lay-up materials of pre-preg epoxy resins (carbon fiber and fiber glass); lead the planning, management and control of priorities tasks to complete by 10 engineers in the team, as well as professional development of each team member, which ushered in new programs packages. Implementation of laser programming and material cutting programs of all new composites components in timely manner with zero rejections. Decrease 20% response time to release work instructions, developing a new organization system in the company. Methods Support Team Leader July 2, 2012 - March 31, 2013 Lead the production line support for Learjet 85 major components in composite hand lay-up materials of pre- preg epoxy resins (carbon fiber and fiber glass), lead the planning and human resource management of 7 engineers in the team, production areas support, as well as process definition, manufacturing process support, engineer’s professional development, obtaining growth and flexibility in each engineer.

Upload: ulises-cortes

Post on 12-Feb-2017

47 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: CV-Ulises Cortes Gomez-English

Ulises Cortes Gómez

Colonia Los Héroes, El Márques, Querétaro

Cell Phone: (045) 55-23-73-03-12

E-mail: [email protected]

SUMMARY

Successful 4 and half years of experience career as an Engineer with excellent communication, organization and coordination skills. Possessing a proven track record of preparing and executing project plans and programs, ensuring that work is carried out in accordance with the companies procedures and clients satisfaction. Able to ensure timely, safe and cost effective design and implementation during the life cycle of projects from conception till customer satisfaction.

PROFESSIONAL EXPERIENCE

Kern-Liebers Mexico

Product Engineer June 8, 2015 – October 8, 2015

Responsible for quotation, development and execution of new products, implementation of new fixtures in production line, reduce time and scrap in process, tools and new product design in metal-mechanical division, PPAP creation for new products and recertification in new plant, APQP methodology for new products

Factory and product transfer from Reynosa to Queretaro, 100% transfer of compression and torsion spring lines in time with new tools implementation that reduce 15 % of production time.

10% cost reduction in new product quotation and reduce 30% the time response to the customers.

Bombardier Aerospace Mexico

Methods Project Engineer January 6, 2014 - January 8, 2015

Leading a group of 5 engineers in the creation and implementation of new projects, such as, demolding process of the composites parts of pre-preg epoxy resins (carbon fiber and fiber glass), trimming process support, analysis of painting Area, Analysis of adhesive and bounding components in fabrication area.

Design of fixtures to increase from 70 to 90% of repeatability in the process, generating less scrap.

100% upgrade of documentation and process validation of painting procedures, resulted in certification of painting site.

Methods Configuration Team Leader April 1, 2013 – January 5, 2014

Lead the implementation, review and incorporation of changes in work instructions in First Article Inspection stage for the new Learjet 85 monolithic configuration of composite hand lay-up materials of pre-preg epoxy resins (carbon fiber and fiber glass); lead the planning, management and control of priorities tasks to complete by 10 engineers in the team, as well as professional development of each team member, which ushered in new programs packages.

Implementation of laser programming and material cutting programs of all new composites components in timely manner with zero rejections.

Decrease 20% response time to release work instructions, developing a new organization system in the company.

Methods Support Team Leader July 2, 2012 - March 31, 2013

Lead the production line support for Learjet 85 major components in composite hand lay-up materials of pre-preg epoxy resins (carbon fiber and fiber glass), lead the planning and human resource management of 7 engineers in the team, production areas support, as well as process definition, manufacturing process support, engineer’s professional development, obtaining growth and flexibility in each engineer.

Page 2: CV-Ulises Cortes Gomez-English

Creation and development of 20 procedures to optimize manufacturing, which reduced 15% of lay-up time.

Changes in process improvements and 80% laser programs missing were done for the First Test Vehicle in timely manner; with that achievement the program complete the Federal Aviation Administration (FAA) requirements to manufacture all the composites parts.

Methods Support Agent in Primary Components January 3, 2011 - Jul 1, 2012

Early in the company I was in several basic Trainings for better understanding of composite materials and work instructions creation, responsible for production support in small and medium parts of Learjet 85, problems development and improvements in composite hand lay-up materials of pre-preg epoxy resins (carbon fiber and fiber glass), analysis of CATIA Models, creation of assemblies and surface in Catia V5 and Unigraphics NX5, responsible for production support in major components of Learjet 85, problems development and creation of assemblies and surface in Catia V5.

Montreal assignation of 3 months for manufacturing models analysis, hand Lay-up sequences creation, tool orders creation, as well as developing work instructions.

Development of rework orders knowledge transfer of composites cured and uncured parts between Canada and Mexico during the assignment in Montreal; as well as the creation of templates for those reworks, what brought autonomy to Mexico site.

Incorporation of 5 improvements in composite hand lay-up materials of pre-preg epoxy resins (carbon fiber and fiber glass), such as, hand tools, materials, procedures and analysis of CATIA Models, which increase from 70 to 80% the quality of the parts.

EDUCATION

2006-2010 Escuela Superior de Ingeniería Mecánica y Eléctrica, IPN

Degree Aeronautical Engineering

Specialty Air Transport Operation

2003-2006 Centro de Estudios Científicos y Tecnológicos # 3, Estanislao Ramírez Ruiz, IPN

Specialty Technician in Computer-Aided Manufacturing

LANGUAGES

English advance level spoken, written and understanding.

KNOWLEDGE

GD&T 1 and 2

Problem Solving Methodology, six sigma, FMEA, PDCA, A3 Format, APQP and PPAP

NADCAP-Standards and Design Review Based on Failure Mode

Knowledge and handling of manuals, national and international legislation

ATA 100, Aircraft Systems and Structures

SKILLS

Design Software, AutoCAD, CATIA, UG NX, Fiber Sim, Hexagon, ASD and CNC Programming

Planning and Evaluations Process, Quality Management Processes

Leadership and Project Planning

Laser programming in Virtek and Assembly Guidance System

SAP

Date: October 9, 2015