documentcv
TRANSCRIPT
![Page 1: Documentcv](https://reader037.vdocument.in/reader037/viewer/2022092617/587c5f371a28ab633c8b5887/html5/thumbnails/1.jpg)
10/06/2015 11:47CV
Reported by : Ahmed_Barakatcv Page 1 of 4
NATIONALITY
AHMED BARAKAT HASSAN IBRAHIM MOHAMED
EG
LANGUAGESAB and EN Fluent
EDUCATION AND PROFESSIONAL QUALIFICATIONBSC , ELECTRICAL , SHEROUK , 2012
ELECTRICALMember of the Egyptian Syndicate of Since 2012
1970
1992
1976
1993
1934
Projects05/03/2015
28/08/2014
10/07/2014
26/06/2014
08/05/2014
From To21/05/2015
15/01/2015
21/08/2014
26/06/2014
15/05/2014
M Month 2.4
3.2
1.2
0.1
0.2
Tot M Month 241.2
127.9
469.2
19.3
30.6
1.00%
2.53%
0.26%
0.47%
0.72%
% RoleProj NoCAIRO INTERNATIONAL MEDICAL CITY
ABC EGYPT NEW HEADQUARTERS
EMAL ADMINISTRATIVE COMPLEX
ENGINEERING SCHEMATIC DESIGN FOR ABC BANKHEADQUARTERS
GOLF COMMUNITY 1B (GC1B) - KING ABDULLAHECONOMIC CITY
On a land area of 138,258m2, the medical city includes the hospital's main building (footprint area of 14,720m2), an academic research center, a psychiatric unit, a wellness park, ahotel, a wellness resort, a health club, a medical mall, and staff accommodation units. ECG's scope encompasses the design of the hospital's main building. With a built-up area of73,600m2, the 360-bed hospital comprises a two-level basement, a ground floor, and four upper floors.
ABC Bank has acquired a skeleton building designed to function as an administration building. They aim to modify the design to serve as a new headquarter for the Bank in Egypt.
The building is located within the New Cairo area, East of Cairo, Egypt on a land area of 7,250 sqm. The building comprises of 2 underground basements and 6 floors with a total builtup area of about 28,00 sqm.
EMAL Administrative Complex is built on a plot area of 68,000m2 and comprises 12 buildings that include an administrative building (G+1), reception building (G+1), mosque, andancillary buildings.
The project aims to serve as ABC Bank New Headquarters. The building comprises of two underground basements and six floors with a total BUA of 28,000 m2. ATSP shall carryoutthe concept design and ECG, as their Sub Consultant, shall carryout the Schematic design.
GC-1B (207,000 m2) is a premium low-density residential development and is centrally located between all currently active development components. The infrastructure works designto GC1B is complete. However due to changing from developing villas to selling plots, AlMurooj GC1B has been re-master-planned and ECG shall provide VE, redesign and detaileddesign services for the GC1B infrastructure.
Over 3 Years of Experience with ECG in..........
Task M Month %
-
DATE OF BIRTH17/10/1989
EXPERIENCE
![Page 2: Documentcv](https://reader037.vdocument.in/reader037/viewer/2022092617/587c5f371a28ab633c8b5887/html5/thumbnails/2.jpg)
10/06/2015 11:47CV
Reported by : Ahmed_Barakatcv Page 2 of 4
2017
1933
1971
1600
1607
1711
1839
1543
1277
1884
Projects08/05/2014
10/04/2014
06/02/2014
28/11/2013
14/11/2013
14/11/2013
07/11/2013
19/09/2013
06/06/2013
06/06/2013
From To15/05/2014
10/04/2014
05/03/2015
29/01/2015
05/03/2015
12/12/2013
07/11/2013
19/09/2013
11/07/2013
05/06/2014
M Month 0.1
0.2
2.6
2.1
4.0
0.5
0.2
0.1
0.4
1.6
Tot M Month 5.5
54.2
81.5
274.9
266.9
215.5
28.4
219.4
2936.9
194.9
1.82%
0.39%
3.15%
0.77%
1.50%
0.24%
0.63%
0.05%
0.01%
0.84%
% RoleProj NoMODIFICATION OF THE LIFT STATION DETAILED DESIGN,AL TALAH GARDENS
BEACH COMMUNITY 2 (BC2) - KING ABDULLAHECONOMIC CITY
AL-MUROOJ PRIMARY INFRASTRUCTURE DESIGN &CONSTRUCTION SUPERVISION
SECOND INTEGRATED SEWERAGE AND SANITATIONINFRASTRUCTURE PROJECT ISSIP 2 -
BEYTI PLANT EXTENSION
GENERAL INVESTIGATION BUILDING IN KUWAIT
PORTO TARTOUS (SOUTHERN AND MIDDLE AREAS)
Al-Marasem International Hospital
Hyde Park
HOTEL AND MALL FOR DAR AL ESHARA
Al Talah Gardens was designed prior to updating KAEC overall master plan. Thus, it was designed with a mindset of total autonomy. The sanitary holding tank was designed toaccommodate the flows of the full community development for 2 full days; however, the design did not take into consideration the construction phasing of Talah Gardens.
Al Murooj is a premium low-density residential development and is centrally located between all currently active development components in KAEC. BC2 is part of Al Murooj having aland area of 678,254 m2.
Al-Murooj is located within King Abdullah Economic City (KAEC) on a land area of approximately 4,600,000m2, including TH1, TH4, BC1, BC2, GC1C, GC1B, GC, and TC communities.ECG shall review the existing primary infrastructure designs comprising roads, water, wastewater, storm drainage, electrical, and telecomm works with a VE exercise and redesign,including technical specifications and BOQs up to tender documents.
The project comprised the three main components: 1) provision of sanitation systems (networks and centralized/ decentralized wastewater treatment plants) within selected drainagesub-basins; 2) institutional development and capacity building; 3) increase awareness on improved hygiene and sanitation.
The project comprises the design, construction management, and supervision of four production buildings and a filling area, each with a ground floor, mezzanine, and a roof with afootprint of 10,750m2, as well as 3 warehouse buildings for raw materials with a footprint of 5,650m2, including all electromechanical and infrastructural works.
The overall goal of the project is to construct the General Investigation Department in West Abu-Fatira industrial area for the Ministry of Interior in Kuwait, the parcel occupies an areaof 20,000m2.
With a total built-up area of 21,120m2, the project scope comprised design of Building R3 with 16 floors (core and shell), master plan and urban design as well as site wideinfrastructure for the south and middle zones.
With a built-up area of 30,000m2, the 200-bed general hospital comprises a surgical department with an Intensive Care Unit, Labor/Delivery department, Intensive Care Unit, CoronaryAngioplasty Department, Endoscopy, Emergency, Physical Therapy Department, and outpatient clinics, in addition to a high-tech X-ray department and laboratories. Supportingdepartments at the hospital include a central kitchen, laundry, morgue, sterilization unit , and administrative offices.
The project is a unique residential and commercial development over 6.3 million m2. The development comprises luxury villas townhouses 2, 4 and 6 plex units), apartments, retailcenters, 72 m high commercial/office towers, a golf course, a golf club, a sports and health center, and community facilities.
The project comprised design development, detailed design and review of shop drawings. The 5-stars Hotel contains 2B+G+ 7 typical floors, the mall is G+2T.
Task M Month %
![Page 3: Documentcv](https://reader037.vdocument.in/reader037/viewer/2022092617/587c5f371a28ab633c8b5887/html5/thumbnails/3.jpg)
10/06/2015 11:47CV
Reported by : Ahmed_Barakatcv Page 3 of 4
1950 Projects
17/04/2014From To
17/04/2014M Month
0.1Tot M Month
49.4 0.10%% RoleProj No
MADINAH DEVELOPMENT AUTHORITY'S HEADQUARTERS
The project scope comprises developing conceptual design and preliminary design for Madinah Development Authority's Headquarter Building with two basements, ground floor andsix above ground floors.
Others
1821
1850
1789
1761
1859
1740
1716
1770
1802
Projects23/05/2013
18/04/2013
21/03/2013
07/03/2013
07/03/2013
17/01/2013
06/12/2012
25/10/2012
11/10/2012
From To31/10/2013
09/05/2013
28/03/2013
07/03/2013
21/03/2013
18/04/2013
06/12/2012
27/12/2012
18/10/2012
M Month 2.5
0.8
0.4
0.2
0.4
1.9
0.0
1.2
0.1
Tot M Month 98.9
5224.1
312.5
219.5
22.3
209.6
323.1
1274.0
61.6
2.57%
0.02%
0.11%
0.10%
1.84%
0.89%
0.01%
0.09%
0.23%
% RoleProj NoMOUNTAIN VIEW HYDE PARK
QATAR EMIRI NAVAL FORCES BASE BUILDINGSPACKAGE
AUDITORIUM IN RAS LAFFAN INDUSTRIAL CITY
ESTABLISHING OF SUEZ POWER PLANT (CAPACITY 650MEGAWATTS)
MAGRABI MEDICAL CENTER IN MUSCAT
UNIVERSAL GROUP OFFICE BUILDING
SOLVAY SODIUM CARBONATE PLANT - SHAHRAZADPHASE 2 PROJECT
GENERAL DIRECTORATE OF MILITARY WORKS (GDMW)RIYADH MEDICAL COMPLEX
HACIENDA WHITE-INFRASTRUCTURE WORKS
The project comprises 200 feddans of land in Hyde Park to be developed as a mixed use development. ECG scope encompasses the design of infrastructure (irrigation network,water network, wastewater network, sewage network, fire protection network, outdoor Electrical Distribution system, street lighting system, and telephone network); Roads networkin addition to Car Parking and facility buildings.
With a land area of 34,230m2 and built-up area of 3,500m2, the project comprises an auditorium/multipurpose hall, exhibition hall, VIP reception area, warming kitchen, and staffoffices.
Civil works for a 650MW power plant (Contract 102). The project comprises power generation facilities (boiler structure, STG, control building, and stack); auxiliary facilities (water
treatment, circulating water, fire protection, water tanks, and wastewater facility); ancillary facilities (warehouse and workshop, office building, security offices, fire protectionstation, mosque, guard dormitory, and guard towers).
With a total floor area of 761m2, the project aims to design and construct an extension to the ground floor of the Magrabi Hospital building. The new extension comprises operationtheatres for LASIK operations, pre- and post-operation wards, Central Sterile Supply Department (CSSD), male wards, female wards, nursing support facilities, doctors lounge,receptions, toilets, and administration offices.
An office building located on a total land area of 5,256m2 in 6th of October City comprising one basement with a total area of 3,800m2, ground floor and two typical floors with a totalarea of 6,600m2. The foot print of the building is about 40% of the land area.
The project comprises the installation of a new distillation line and a new concentration column, together with the revamping of the absorption sector (including an ammonia-receivingstation) and rationalization of the water-cooling sector to increase the production capacity from 130,000 tons/year to 200,000 tons/year.
ECG scope of work included detailed design of the Core Medical Hospital and Emergency Medical Center, Oncology Hospital and Outpatient Clinic, Polyclinic and Day Surgery, CentralLaboratory, Pharmacy, Medical Administration Building and Conference Center, parking structure, infrastructure design for medical and service zone, infrastructure design for mainroads of residential and university zones and utilities buildings.
The project comprises villas, town houses, hotels and malls spread over an area of 700,000m2.
Task M Month
Task M Month
%
%
![Page 4: Documentcv](https://reader037.vdocument.in/reader037/viewer/2022092617/587c5f371a28ab633c8b5887/html5/thumbnails/4.jpg)
10/06/2015 11:47CV
Reported by : Ahmed_Barakatcv Page 4 of 4
0040 Projects
20/09/2012From To
21/05/2015M Month
8.3Tot M Month
101681.6 0.01%% RoleProj No
..
Proposal From To M Month Total M Month % RoleProp No
Task M Month %
TRAINING COURSES YearCourse Location
Revit MEP 2012
Lightning Protection
Conveyance System Principles
Focus on What's Important Using SIMARIS Software
Protection of MV Transformers
ETAP
Soft Starters
LED Concepts & Applications
LED Concepts & Relux Software
Power Factor & Harmonics
LEED GA (V4) Preparation Course
Earthling & Lighting Systems
Lighting Control
Optimization of Main Distribution Board- MDB
Indoor & Outdoor Lighting Fixtures
2013
2014
2014
2014
2014
2014
2014
2014
2014
2014
2015
2015
2015
2015
2015
EG
EG
EG
EG
EG
EG
EG
EG
EG
EG
EG
EG
EG
EG
EG
4.48%
1.54%
3.6
22.8
0.2
0.4
19/06/2014
08/11/2012
19/06/2014
25/10/2012
8688
7456
ENGINEERING SERVICES FOR EPC CONTRACT FOR SCHLUMBERGERINTEGRATION BASE IN 6TH O CARGO AND MRO FACILITIES AT MUSCAT INTERNATIONAL ANDSALALAH AIRPORTS