cve 4070 construction engineering project organization test #1 review prof. ralph v. locurcio, pe
DESCRIPTION
Constructon Organizations…TRANSCRIPT
CVE 4070Construction Engineering
Project OrganizationTest #1 review
Prof. Ralph V. Locurcio, PE
Design Process
Construction Process
Project Delivery Process…Need for a project
Is recognizedOwner appointsProject Manager
Project Manager develops project
program: scope & cost parameters
Project is entered into an annual
capital program
Designer prepares concept design & preliminary cost
estimate
Designer completes plans &
specifications
Owner orders bid documents
Project Manager advertises for
construction bids
Contractors assemble team,
prepare & submit bid
Bids reviewed by owner
(with designer)
Builder’s credentials &
bonding approved
Owner approves program
Project Manager advertises for
designer
Owner hires designer
Owner authorizes final
design
Owner selectsbuilder
Notice to Proceed
Constructionbegins
Resident Engineeroversees
construction
Project phase(s)completed
All work completed final inspection
made
ProgresspaymentFinal paymentOwner accepts
facility
Constructon Organizations…Owner
Quality Control
Superintendent Project Engineer
Project Engineer
Project Manager
Subcontractor
Subcontractor
Subcontractor
Subcontractor
Subcontractor
Design Manager
ProjectArchitect
StructuralEngineer
CivilEngineer
MechEngineer
ElectricalEngineer
A
B
C
Quality Assure
OfficeEngineer
TechnicalInspectors
A/E Const Staff
Resident Engineer
UsingAgency
Contractor or
Construction Manager
Project Organization-designOwner
ProjectArchitect
StructuralEngineer
CivilEngineer
MechanicalEngineer
Design Manager
Corporate Management
Project Manager
ConstructionContract
UsingAgency
ElectricalEngineer
Design Staff Design Staff Design Staff Design Staff Design Staff
Consultant A Consultant B Consultant C
Project Organization-const mgt…Owner
Quality Assurance
OfficeEngineer
TechnicalInspectors
A/E Const Staff
ResidentEngineer
Corporate Management
Corporate staff
Field site
FoundationElectrical
Mechanical
Shop DrawingsRFI controlMaterialsSamples
SchedulesPayments
RFI responsesClarification of drawings
Monitor compliance
Monitor QC processPrepare QA reports
Monitor corrective actionsDocument QA/QC
Project Manager
ConstructionContract
Responsibility
Project Organization-const opnsOwner
Quality Control
Superintendent Project Engineer
Project Engineer
Corporate Management
Corporate staff
Field site
Interpret Drawings & SpecsShop Drawings
RFI controlMaterialsSamples
Construction operationsCoordination of trades
SchedulesPayments
Safety-OSHAChanges
RFI responsesClarification of drawings
Monitor compliance
Monitor QC processPrepare QC reportsMake inspections
Take corrective actionDocument QC checks
Project Manager
ConstructionContract
Subcontractor A Subcontractor B Subcontractor C Subcontractor D Subcontractor E
Sub-contracts
Contractor orConstruction
Manager
Project Organization…Owner
Quality Control
Superintendent Project Engineer
Project Engineer
Project Manager
Subcontractor
Subcontractor
Subcontractor
Subcontractor
Subcontractor
Design Manager
ProjectArchitect
StructuralEngineer
CivilEngineer
MechEngineer
ElectricalEngineer
A
B
C
Quality Assure
OfficeEngineer
TechnicalInspectors
A/E Const Staff
Resident Engineer
UsingAgency
Contractor or
Construction Manager
Concepts to Remember… Government vs. private contracting
Different selection process Documentation is key
All contracts differ; read your contract Design-build is faster but more difficult & risky Only Resident Engineer issues directives Only Project Manager can make changes Professional CM firm must be independent One-to-One concept; single point of contact
Preconstruction Activities… The 5-Step Process revisited…
Owner selects builder
PM advertises for builder
Bids opened, reviewed
(w/designer)
Builder’s credentials
checked
Awardmade
Notice To
ProceedConstruction
Begins
Const contract signed
Builders assemble
teams & prep bids
4
1 2
3
5
WBS & Flow Chart Three parts to this assignment
1. Arrange all tasks in order2. Prepare flow chart with all tasks3. Prepare WBS with all tasks & durations
Part 2 – Flow Chart
5% 15% 50% 95%
Part 2 – Flow Chart
5% 15% 50% 95%
Part 1 – Order Task List
Part 1 – Order Task List
Part 1 – Order Task List
Part 3 – WBS
Part 3 – WBS
Submittal Review Process…Inspecton
Work & Materials
Visual Or
Lab Test
Lab TestVisual Test
Compare w Plans & Specifications
Samples to lab
Lab Results
Conform? Test OK?Yes
No
Issue Non-Comp
Defective Mat Report
No Payment till corrected
Follow-upRecord in log
Reinspect When Corrected
No
Issue Non-Comp
Defective Mat Report
No Payment till corrected
Follow-upRecord in log
Resample When Corrected
Make FinalInspection
Work AcceptedPayment Authorized
Shop Drawing?
AE Review
One-to-One authority…
Organization Organization Organization Organization Organization Organization
One to One
PM CM
One-to-One authority…
Org
an
izatio
nO
rga
niza
tion
Org
an
izatio
n Org
aniz
atio
nO
rga
niz
atio
nO
rga
niz
atio
n
One to One
Don’t forget… Sept 22… Test #1 – The Basics CON 2001 – OLIN Engr – Rm 118 - 1100-1215 CVE 4070 – OLIN Life Sci – Rm 130 – 500-615 Study guide
Habitat info coming… Sept 26 best date Also Wed & Fri
Grading resumes now
Now it’s over
Grading Assignment #1