Swan Hunter provided a full cable repair spread onboard the ASV Pioneer barge, for the CWind ‘Complete Cable Care’ service offering. Swan Hunter provided the new modular offshore carousel in the 15m, 2000Te variant, combined with loading tower, 10Te spooling tensioner, integrated cable highway, and a 15Te horizonal deck tensioner.
HVDC/HVAC INTERCONNECTOR CABLES
EXPORT
ARRAY CABLES
PROJECT OVERVIEW
PRODUCT DETAILS
2000Te 15m OD Modular Basket Carousel
Loading Tower c/w 10Te Spooling Tensioner
15Te Deck Tensioner
Integrated Loading Arm & Cable Highway
EQUIPMENT PROVIDED
www.swanhunter.com
© SWAN HUNTER. Project Information Page 2 of 2.
SWAN HUNTER’S SCOPE OF WORK
Provision of 2000Te New Build Carousel, Loading Tower, 10Te Spooling Tensioner, and 15Te Deck Tensioner
Intermediate mobilisation of all equipment at Port of Rotterdam, NL
Final mobilisation and commissioning at Port of Blyth, UK
Equipment Operators and Maintenance Technicians
Mobilisation, Operational, and Engineering Support
DETAILED ANALYSIS
Several specific design features were utilised to allow for an efficient equipment mobilisation and commissioning period, and to suit the client’s deck layout:
Modular carousel offered initially in 15m, 2000Te configuration, however deck layout and seafastening design allows for extension to 18m 2500Te configuration.
Variable carousel inner hub diameter to suit range of cable MBRs.
Modular loading tower design allowed for simple integration with client’s elevated cable highway.