Government of India Ministry of Water Resources River Development & Ganga Rejuvenation Central Water & Power Research Station Khadakwasla, Pune – 411 024 Issue No.: 07 July 2015 ________________________________________________________________ CWPRS MONTHLY INFORMATION BULLETIN __________________________________________________________________________ 1. ESTIMATES 1.1 Submitted 03 1.2 Awarded 05 2. REPORTS SUBMITTED 05 3. RESEARCH PAPERS 3.1 Submitted 06 3.2 Published 06 4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES 06 5. LECTURES DELIVERED 06 6. PARTICIPATION IN MEETINGS 6.1 Technical Committees 06 6.2 Other Committees 06 7. TRAINING OF PERSONNELS 07 8. IMPORTANT VISITORS 07 9. NEW APPOINTMENTS / PROMOTIONS / RETIREMENTS 07 10. OTHER INFORMATION 08 Phones : 24103378 Fax : 2438 1004 Email : [email protected] web: Http://cwprs.gov.in

Upload: vukhanh

Post on 11-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CWPRS MONTHLY INFORMATION BULLETIN 2015.pdf · Power Station, NHDC Office Complex, ... Calibration/testing of open channel ... distribution and shoreline changes

Government of India Ministry of Water Resources

River Development & Ganga Rejuvenation Central Water & Power Research Station

Khadakwasla, Pune – 411 024

Issue No.: 07 July 2015 ________________________________________________________________

CWPRS MONTHLY INFORMATION BULLETIN __________________________________________________________________________

1. ESTIMATES

1.1 Submitted 03

1.2 Awarded 05

2. REPORTS SUBMITTED 05

3. RESEARCH PAPERS

3.1 Submitted 06

3.2 Published 06

4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES 06

5. LECTURES DELIVERED 06

6. PARTICIPATION IN MEETINGS

6.1 Technical Committees 06

6.2 Other Committees 06

7. TRAINING OF PERSONNELS 07

8. IMPORTANT VISITORS 07

9. NEW APPOINTMENTS / PROMOTIONS / RETIREMENTS 07

10. OTHER INFORMATION 08

Phones : 24103378 Fax : 2438 1004 Email : [email protected] web: Http://cwprs.gov.in

Page 2: CWPRS MONTHLY INFORMATION BULLETIN 2015.pdf · Power Station, NHDC Office Complex, ... Calibration/testing of open channel ... distribution and shoreline changes

2

Summary Information For 2007-2015

Years Jobs Awarded

_____________________

Nos. | Amount (`)

Reports Submitted

Papers Published

Participation in Seminars/ Symposia/ Conferences

Lectures Delivered

Technical Committee Meetings

Training of Personnels

Training Programmes Organized

2007-08 131 12,23,51,446 106 44 30 31 19 34 02

2008-09 130 15,74,38,098 89 41 24 36 20 38 01

2009-10 118 14,46,68,747 94 57 39 36 30 59 04

2010-11 159 17,06,34,397 95 94 38 52 23 61 11

2011-12 139 18,56,13,568 116 63 26 45 42 88 08

2012-13 150 22,53,10,859 120 67 44 57 24 55 08

2013-14 152 18,24,51,087 112 63 37 68 21 54 11

2014-15 153 25,69,14,032 113 62 58 47 12 62 09

FOR CURRENT YEAR 2015-2016

Till Jun-15 18 2,86,77,531 16 11 04 16 03 04 01

During July-15 05 82,69,614 08 01 Nil 04 00 05 01

Total 23 3,69,47,145

24 12 04 20 03 09 02

Page 3: CWPRS MONTHLY INFORMATION BULLETIN 2015.pdf · Power Station, NHDC Office Complex, ... Calibration/testing of open channel ... distribution and shoreline changes

CWPRS Information Bulletin July, 2015

3

1. ESTIMATES

1.1 Submitted

(29 Nos. totaling to 3,92,01,000/- + Nil for Calibration works)

Sl. No.

Name of Work Sponsoring Agency Division Amount (Rs.)

1. Analysis and interpretation of seismological data for Indira Sagar Power Station, Narmada Nagar, Dist. Khandwa, M.P. (Period Jan 2016 to Dec 2018)

The Manager (Dam), Indira Sagar Power Station, NHDC Office Complex, Narmada Nagar, Dist. Khandwa 450 119, M.P.

ES 31,75,700

2. Visit to Nathpa Jhakri Dam Spillway, Himachal Pradesh for inspection of Spillway, Discussion with Project Engineers and to finalise scope of model studies

Additional General Manager, SJVNL Ltd., Devsari, O&M Cell, Civil Design Department, Verma Nivas, New Simla 171 009, Himachal Pradesh

SED 4,72,600

3. Surge analysis and suggesting anti-surge device for rising main of Tedhawa Shivani Lift Irrigation Scheme, Dist. Gondia, Maharashtra

Executive Engineer, Lift Irrigation Mechanical Division-1, In front of S.T. Workshop, Nagpur Road, Bhandara 441 904, Maharashtra

HMC 5,82,340

4. Geotechnical stability and liquefaction studies for deep water breakwater at Kakinada Port, Andhra Pradesh

The Vice President Projects, Andhra Pradesh Gas Distribution Corporation, Hyderabad 500 004, A.P.

GE 11,42,890

5. Mathematical model studies for assessment of wave tranquility inside the Marine area at Mandwa, Maharashtra

The Superintending Engineer, Maharashtra Maritime Board, Indian Mercantile Chamber, 3rd Floor, Ramjibhai Kamani Marg, Ballard Estate, Mumbai 400 001

MMCE 14,00,470

6. Mathematical model studies for hydrodynamics and siltation due to construction of breakwater for Marine facility at Mandwa jetty, Maharashtra

The Superintending Engineer, Maharashtra Maritime Board, Indian Mercantile Chamber, 3rd Floor, Ramjibhai Kamani Marg, Ballard Estate, Mumbai 400 001

MMCE 18,10,830

7. Desk and wave flume studies for the design of breakwater for the development of Marine at Mandwa, Raigad, Maharashtra

The Superintending Engineer, Maharashtra Maritime Board, Indian Mercantile Chamber, 3rd Floor, Ramjibhai Kamani Marg, Ballard Estate, Mumbai 400 001

CHS 11,68,170

8. Calibration/testing of open channel ultrasonic non-insertion type flow meters at Delhi Jal Board, NCR of Delhi

Executive Engineer (E&M), HP-II, Delhi Jal Board, NCR of Delhi, Haiderpur Water Works, Delhi 110 085

HMC 3,20,320

9. Design of sustainable coastal protection works at Maravanthe, Kodikanyan Pavinkure, Yermalthenka and Udyavara Under Trenche-2, SCPMIP Karnataka

Project Director, Project Management Unit, Sustainable Coastal Protection & Management Investment Programme (SCPMIP), Mangalore 575 001, Karnataka

CHS 26,07,300

10. Studies for determination of concrete properties on core samples of Bhakra Dam, Punjab

The Director-Designs, Bhakra Beas Design Directorate, BBMB Nangal Township, Dist. Roopnagar, Punjab 140 124

CT 10,08,130

11. Laboratory studies for determination of strength and elastic properties on extracted cylindrical concrete core samples from distressed blocks of Hirakud Dam, Odisha

Chief Engineer & Basin Manager, Upper Mahanadi Basin, Burla, Dist. Sambalpur 768 017, Odisha

CT 8,58,030

Page 4: CWPRS MONTHLY INFORMATION BULLETIN 2015.pdf · Power Station, NHDC Office Complex, ... Calibration/testing of open channel ... distribution and shoreline changes

CWPRS Information Bulletin July, 2015

4

12. Laboratory studies for assessing suitability of cement grout mix design for grouting work of Varasgaon Dam, Pune, Maharashtra

The Executive Engineer, Khadakwasla Irrigation Division, Sinchan Bhavan, Mangalwar Peth, Pune 411011

CT 6,21,120

13. 3D stress analysis by FEM for one most distressed spillway block of Hirakud Dam, Sambalpur, Odisha

Chief Engineer & Basin Manager, Upper Mahanadi Basin, Burla, Dist. Sambalpur 768 017, Odisha

SMA 14,89,120

14. Mathematical model studies for tidal hydrodynamics and siltation aspects for the development of proposed fishing harbour at Juvvaladinne, SPSR Nellore Dist., Andhra Pradesh

Commissioner of Fisheries, Govt. of Andhra Pradesh, Matsye Bhavan, Shanti Nagar, 4th Lane, Near Masab Tank, Hyderabad 500 028

MMCE 16,06,690

15. Mathematical model studies for estimation of littoral drift distribution and shoreline changes due to proposal fishing harbour at Juvvaladinne, SPSR Nellore Dist. Andhra Pradesh

Commissioner of Fisheries, Govt. of Andhra Pradesh, Matsye Bhavan, Shanti Nagar, 4th Lane, Near Masab Tank, Hyderabad 500 028

MMCE 9,89,640

16. Mathematical model studies for wave tranquility for development of fishing harbour at Juvvaladinne, SPSR Nellore Dist., Andhra Pradesh

Commissioner of Fisheries, Govt. of Andhra Pradesh, Matsye Bhavan, Shanti Nagar 4th Lane, Near Masab Tank, Hyderabad 500 028

MMCE 9,97,200

17. Desk and wave flume studies for the design of breakwaters for the development of fishery harbour at Juvvaladinne in Nellore district, Andhra Pradesh

Commissioner of Fisheries, Govt. of Andhra Pradesh, Matsye Bhavan, Shanti Nagar 4th Lane, Near Masab Tank, Hyderabad 500 028

CHS 16,21,060

18. Studies for identification of suitable material for repairing the distressed blocks of Hirakud Dam, Odisha

Chief Engineer & Basin Manager, Upper Mahanadi Basin, Burla, Dist. Sambalpur 768 017 Odisha

CT 19,30,560

19. Technical consultancy for installation of flowmeter at canal discharging water into Tenughat reservoir, Bokaro, Jharkhand

Superintending Engineer (C&M-1), TVNL, Hinoo, Doranda, Ranchi 634 002, Jharkhand)

HAPT 9,00,000

20. Geotechnical studies for seepage analysis through foundation of Bhakra Nangal Dam, Himachal Pradesh

Director/Designs, Bhakra & Beas Design Directorate, BBMB, Nangal Township, Dist. Roopnagar, Punjab 140 124

GE 4,02,090

21. Studies for location and hydraulic design of intake well for NMDC in river Sabri near Sukma, Chhatisgarh

General Manager (Power & Planning), NMDC Ltd., Khanij Bhavan, 10-3-311/A Kaisal Hills, Masab Tank, Hyderabad 500 028

BE 12,59,860

22. Mathematical model study at pump sump intake well in River Sabri near Sukma, Chhatisgarh for NMDC Ltd., Hyderabad

General Manager (Power & Planning), NMDC Ltd., Khanij Bhavan, 10-3-311/A Kaisal Hills, Masab Tank, Hyderabad 500 028

HMC 5,52,990

23. Underwater sonic logging of boreholes at Kalyani (Kolkata) West Bengal for M/s Fugro Geotech Pvt Ltd., Navi Mumbai, Maharashtra

The Business Line Manager, Onshore Geotechnics, Fugro Geotech (I) Pvt. Ltd., Plot No. 51, Sector 6, Sanpada, Navi Mumbai, Maharashtra

IH 13,07,410

24 Geotechnical stability analysis of proposed bunds and island to be constructed by M/s ONGC Ltd in the Gulf of Cambay, Gujarat

The Deputy General Manager (E), ONGC, Ankleshwar, Gujarat 393 001

GE 12,03,020

25. Desk studies for the design of bank protection works to Varoli river near village Bhati-Karambeli, Dist. Valsad, Gujarat

Executive Engineer, Damanganga Canal Investigation Division, Damanganga Bhavan, 2nd Floor, Valsad 396 001

BE 4,50,430

Page 5: CWPRS MONTHLY INFORMATION BULLETIN 2015.pdf · Power Station, NHDC Office Complex, ... Calibration/testing of open channel ... distribution and shoreline changes

CWPRS Information Bulletin July, 2015

5

26. Installation of wave rider buoy at Agathi and Minicoy islands, Lakshadweep

Deputy Chief Engineer, Andaman Lakshadweep Harbour Works, Kavaratti 682 555

CFS 56,43,910

27. Running and maintenance of Vishakapatnam port model during 2015-16

The Chief Engineer (Civil), Vishakapatnam Port Trust, Vishakapatnam 500 035

PH 18,58,030

28. Mathematical model studies for hydrodynamic and siltation for the proposed oil jetty at Kandla Port, Gujarat

Chief Engineer, Kandla Port Trust, Administrative Building, P.O. Box No. 50, Gujarat 370210

PH 8,59,390

29. Hydraulic model studies of sea water intake for M/s Development Consultants Pvt. Ltd., Kolkata

Head of Department - Mechanical, M/s Development Consultants Pvt. Ltd., DG-4, Sector-II, Salt Lake, Kolkata 700091

HMC 9,61,700

1.2 Awarded

(05 Nos totaling to 72,25,240/-+ 10,44,374/- for calibration works)

Sl. No.

Name of Work Sponsoring Agency Division Amount (Rs.)

1. Area drainage study for proposed BARC facilities at Atchutapuram mandalam, Visakhapatnam, Andhra Pradesh

Regional Director, Department of Atomic Energy, BARC, Visakhapatnam

Hydrometeorology

26,16,000

2. Site inspection and supervision of the atomation of gates at Naraura Barrage, Naraura, U.P.

Adhishasi Abhiyanta, Barrage Yantrik Anurakshan Vibhag, Sinchai and Jal Sansadhan Vibhag, Narora, U.P.

HMC 11,89,340

3. Geotechnical stability studies for proposed Jigaon Earthen Dam, Tal. Nandura, Dist. Buldhana, Maharashtra

Superintending Engineer, Buldhana Irrigation Project Circle, Opp. Ganpati Temple, Tata Ground, Buldhana 443 001, Maharashtra

GE 7,50,900

4. Mathematical model studies for reservoir sedimentation of Kwar H.E. project, J&K

Mahabrabandak, Chenab Valley Power Project Pariyojana, Kir & Kwar H.E. project, Chenab Nagar -11, Dist. Kishtwar, J&K 182 206

RAS 21,14,000

5. Desk studies for the design of coastal protection work for light house of Dwarka, Gujarat

Executive Engineer, Salinity Control Division, Jilla Seva Sadan-4, 1st Floor, Besides Raj Park Society, Jamnagar-Rajkot Highway, Jamnagar 361 001, Gujarat

CHS 5,55,000

2. REPORTS SUBMITTED (08 Nos.)

Sl. No.

Title Report No

Month/Year

1. Physical model studies for the revised alignment of offshore breakwater at Paradip Port, Odisha

5299 07/2015

2. (SECRET) 5300 07/2015

3. Surge analysis and suggesting anti-surge device on rising main of Narayankhed and Nimgaon Wayal Lift Irrigation Scheme

5301 07/2015

4. Assessment of quality of masonry core of Darna dam, Maharashtra 5302 07/2015

Page 6: CWPRS MONTHLY INFORMATION BULLETIN 2015.pdf · Power Station, NHDC Office Complex, ... Calibration/testing of open channel ... distribution and shoreline changes

CWPRS Information Bulletin July, 2015

6

5. Sub-bottom seismic reflection profiling of Intake Channel of TAPS 3 & 4, Tarapur, Maharashtra

5303 07/2015

6. Hydraulic model studies for Dri Dam spillway, Etalin project, Arunachal Pradesh, 1:40 scale

5304 07/2015

7. Hydraulic model studies for Dri Dam spillway, Etalin project, Arunachal Pradesh, 1:50 scale 2D sectional model

5305 07/2015

8. Updating the analysis of meteorological data for the proposed atomic power project at Gorakhpur, Haryana for NPCIL

5306 07/2015

03 RESEARCH PAPERS

3.1 Submitted – (02 Nos) 1. Andrade Rolland (Dr.), S. Bhowmick, Archana Pund (Mrs) "Tracer an effective tool in detecting

canal seepage - case studies from Northern India", for possible publication in "Bulletin of Engineering Geology and the Environment" or "Environmental Earth Sciences", Springer Publication, USA.

2. Gupta R.P., B. Muralidhar "Dynamic analysis for Lakya iron ore tailings dam at Kudremukh, Karnataka", for possible publication in "Indian Geotechnical Conference (IGC-2015)",COEP, Pune,16-19 December 2015.

3.2 Published – (01 No.)

1. Ghodake V.K., G.R. Kulkarni "Effect of low frequency mechanical vibrations on human blood (in

vitro), International Journal of Chemical and Physical Sciences, Vol. 4, Special Issue No. 5, May 2015.

4.���� PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES - Nil 5. LECTURES DELIVERED – (04 Nos.)

Sl. No. Title Event, Place, Date Name of Officer

1. Data acquisition, wireless data and transmission system for dam structure

Training programme on "Dam Safety and Instrumentation" for engineers of WRD, Govt. of Bihar, at WALMI, Patna

02 July 2015

Selva Balan M, Sci-D

2. Flow characteristics and design consideration of hydraulic gates

Training program for Capacity Building of officials of Govt. of Bihar, at WALMI, Patna

23 July 2015

Patil R.G. (Dr.), Sci-D

3. Model studies for gates Training program for Capacity Building of officials of Govt. of Bihar, at WALMI, Patna

23 July 2015

Patil R.G. (Dr.), Sci-D

4. Rajbhasha Neeti tatha hindi me tippan evam masauda lekhan

Hindi workshop for officers and staff of Pune-I/Pune-II Central Excise Commissioner's Office, Pune

02 July 2015

Shukla V.K., Sci-B

6. PARTICIPATION IN TECHNICAL COMMITTEE

Page 7: CWPRS MONTHLY INFORMATION BULLETIN 2015.pdf · Power Station, NHDC Office Complex, ... Calibration/testing of open channel ... distribution and shoreline changes

CWPRS Information Bulletin July, 2015

7

6.1 Technical Committee Meetings : Nil

6.2 Other Meetings : Nil

7. TRAINING OF PERSONNEL - (05 Nos.)

Sl. No.

Title Event, Place, Date Name of Officer

1. Training on `World Bank's Procurement Procedure'

NWA, Pune

27-31 July 2015

Atkekar N.D., Sci-D Ranade S.D., Sci-D Sundar Lal B.S., Sci-B Solanki Pratap Singh, Sci-B Srimant Kumar, RO Phulpagar S, Sci-B

8. IMPORTANT VISITORS :

Sl. No.

Name & Designation Organization / Constituency

Date of Visit Purpose

1. Shri Sanjeev Chopra, Joint Secretary

Irrigation, GOI 01.07.2015 Visit to CWPRS

2. Shri S.K. Gangwar, Director (R&D)

MOWR, RD & GR

14 & 15.07.2015

To expedite R&D works assigned and inspection of works under R&D scheme implemented at CWPRS

3. Shri Sarvesh Kaushal, IAS, Principal Secretary

Irrigation Dept., Govt. of Punjab

01.07.2015 Visit to CWPRS

4. Shri Pradeep Kumar, Commissioner (SPR)

MOWR, RD & GR

06.07.2015 Visit to CWPRS

9. NEW APPOINTMENTS, PROMOTIONS & RETIREMENTS

Sl.No. Name of Person Designation Division Date

New Entrants

1. Shri Prasant S Dhoke JE EE(C) 21.07.2015

2. Shri Mahendra D Sonawane MTS PH 16.07.2015

3. Shri Aditya Raj MTS Admin 20.07.2015

Promotions

1. Shri Hradaya Prakash Sci-D PH 13.07.2015

2. Smt. A.B. Pardeshi Sci-D MMCE 13.07.2015

3. Shri P.D. Kamalasekaran Sci-D INST-II 13.07.2015

4. Shri B.S. Chavan Sci-D SED 13.07.2015

Page 8: CWPRS MONTHLY INFORMATION BULLETIN 2015.pdf · Power Station, NHDC Office Complex, ... Calibration/testing of open channel ... distribution and shoreline changes

CWPRS Information Bulletin July, 2015

8

5. Shri B.M. Simpiger Sci-D SED 13.07.2015

6. Shri G.V. Ramana Rao Sci-D CFI 13.07.2015

7. Shri B. Murlidhar Sci-D II-GE 13.07.2015

8. Dr. (Kum). L.R. Pattanur Sci-D ES 13.07.2015

9. Shri G.G. Kamble Supdt )C(EE 13.07.2015

10. Shri M.A. Kadgi Head D’man II-MMCE 27.07.2015

Retirement

1. Shri R.S. Ramteke AD 31.07.2015

2. Dr. V. Bhavanarayana Sci-C BRTS 31.07.2015

3. Shri T.V.S. Ramakrishna Sci-C MMCE-II 31.07.2015

4. Shri R.M. Badwe AE Mech W/s 31.07.2015

5. Shri D.K. Shinde C’man B Mech W/s 31.07.2015

6. Shri S.V. Dhotrikar Supdt EE(C) 31.07.2015

7. Shri S.M. Gavkare LA-II Transport 31.07.2015

10. Other Information:

(a) Training course on “Current Techniques of Flow Measurement” was conducted at CWPRS

during 08-10 July 2015